AIR NAVIGATION SERVICES DEPARTMENT ДАРГА П.ГАНБОЛД

Similar documents
Russian Federation ATM modernization program

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

ROAD SECTOR. Ulaanbaatar MINISTRY OF ROADS AND TRANSPORTATION GOVERNMENT POLICY FOR DEVELOPING ROAD SECTOR OF MONGOLIA

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Learning Objectives. By the end of this presentation you should understand:

Performance Based Navigation Operational End-State 2023

NEW CALEDONIA PBN PLAN

Flight Inspection Services

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

APAC PBN UPDATE Slide 1 of xx

Título ponencia: Introduction to the PBN concept

WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS (NAIROBI, 6-10 DECEMBER 2010) ZAMBIA

ICAO Air Navigation Panels/Study Groups Work Programme

Presentation of the First Deputy Director, Scientific and Research Institute of Airnavigation

ICAO UPDATE. (Presented by the Secretariat)

AIR NAVIGATION PLAN REGIONAL PERSPECTIVE Performance Framework Workshop. ICAO NACC Office

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

Flight Procedure Design and Cartography

2012 Performance Framework AFI

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IFR SEPARATION WITHOUT RADAR

Packaging Tomorrow s Aviation System

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

(RN R A N V A V & & RN R P N

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

Learning Objectives 090 Communications

Bits to Blocks Aviation System Block Upgrades (ASBU)

Ministry of transport and communications of the Kyrgyz Republic. Modernization of aero navigation facilities of SE Kyrgyzaeronavigatsia

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

PBN Implementation Plan Tonga

Syllabus details and associated Learning Objectives ATPL CPL ATPL/ IR COMMUNICATIONS

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

Work Programme of ICAO Panels and Study Groups

JAA Administrative & Guidance Material Section Five: Licensing, Part Two: Procedures

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING

User Requirements for Air Traffic Services (URATS) Communications, Navigation, and Surveillance (CNS) Technologies

Appendix A REQUEST FOR AUTHORIZATION FORM

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

Air Traffic Services Standards and Procedures Contents

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

Global ATM System ~Interoperability and Harmonization ~

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

Project RLA/06/901 Lima, Peru, 22 September to 3 October Final Version

PBN Airspace Concept. ATS requirements

Air Traffic Services Standards and Procedures Contents

What is B-RNAV? 1. 1 Adaptado de [ ]

NEW FPL Transition Phase & Implementation Stages

Continuous Improvement of the Global Air Traffic Management System

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

NATA 2018 AGM & CONFERENCE

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

NextGen Priorities: Multiple Runway Operations & RECAT

CNS/ATM Systems Interoperability and Harmonization

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

French DSNA approach to CNS rationalization & evolution

Next Generation Airspace Developments: Key Operational Trends and Enablers

DRAFT. AND/OR one or more of the following to indicate the serviceable COM/NAV/approach aid equipment and capabilities:

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

ASSEMBLY 39TH SESSION

APV IMPLEMENTATION PLAN

Work Programme of ICAO Panels and Study Groups

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

AIRAC AIP SUPPLEMENT A 16/17 08 June 2017

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

Nepal PBN Implementation Plan. Civil Aviation Authority of Nepal Babarmahal, Kathmandu

DSNA NAVIGATION STRATEGY

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

TWELFTH AIR NAVIGATION CONFERENCE

European Aviation Safety Agency

AERODROME OPERATING MINIMA

PBN Implementation Plan - Fiji Version 1 19 January 2010

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Navigation at the. Federal Aviation Administration Crossroads

AIRLINE TRANSPORT PILOTS LICENSE ( COMMUNICATIONS)

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR)

Aeronautical Radio Licensing Policy Manual

AIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

Chapter 6. Brize Radar, Speedbird 213 Heavy, request radar advisory. Speedbird 123 change call sign to BA 123

ICAO provisions on data link implementation

Air Traffic Control & Management

Subject: Application of Data Link services within Kolkata FIR

Air Navigation Bureau ICAO Headquarters, Montreal

(Presented by the Secretariat) SUMMARY. This Working Paper presents for the Meeting s consideration, the Draft Agenda and suggested schedule

Transcription:

AIR NAVIGATION SERVICES DEPARTMENT ДАРГА П.ГАНБОЛД

AGENDA

COMMUNICATION NAVIGATON SURVEILLANCE SERVICE FLIGHT INSPECTION AND PROCEDURE DESIGN SERVICE AIR NAVIGATION SERVICE AVIATION WEATHER INFORMATION SERVICE AIR TRAFFIC SERVICE AERONAUTICAL INFORMATION SERVICE

MONGOLIAN STATUS OF ICAO GLOBAL PLAN INITIATIVES GPI-1 Flexible use of airspace GPI-2 Reduced vertical separation minima GPI-3 Harmonization of level systems GPI-4 Alignment of upper airspace classifications GPI-5 RNAV and RNP (Performance based navigation) GPI-6 Air traffic flow management GPI-7 Dynamic and flexible ATS route management GPI-8 Collaborative airspace design and management GPI-9 Situational awareness GPI-10 Terminal area design and management GPI-11 RNP and RNAV SIDs and STARs GPI-12 Functional integration of ground systems with airborne systems GPI-13 Aerodrome design and management GPI-14 Runway operations GPI-15 Match IMC and VMC operating capacity GPI-16 Decision support systems and alerting systems GPI-17 Data link applications GPI-18 Aeronautical information GPI-19 Meteorological systems GPI-20 WGS-84 The implementation of WGS-84 by all States. GPI-21 Navigation Systems GPI-22 Communication infrastructure GPI-23 Aeronautical radio spectrum

AIRSPACE MANAGEMENT 1 FLGHT INFORMATION REGION (UB FIR) 15 9 6 50 6 15 8 ENTRY AND EXIT POINT ENTRY & EXIT POINT WITH RUSSIA ENTRY & EXIT POINT WITH CHINA AIR ROUTES AREA CONTROL CENTER SECTORS AERODROME / APPROACH CONTROL SECTORS AERODROME FLIGHT INFORMATION SERVICE

AIR TRAFFIC SERVICES 80 24 4-5 300 50 AIR TRAFFIC CONTROLLER HOUR SHIFT OVER FLIGHT DEPARTURE AND ARRIVAL

AIR TRAFFIC FLOW 60000 51294 53793 56758 50000 40000 39718 43014 30000 Олон улсын өнгөрөлт 20000 Олон улсын хөөрөлт,буулт 10000 2791 4441 2780 3218 5723 4168 7744 6981 4359 4541 Орон нутгийн хөөрөлт,буулт 0 I/01 - IX/01 I/01 - IX/01 I/01 - IX/01 I/01 - IX/01 I/01 - IX/01 2009 он 2010 он 2011 он 2012 он 2013 он

AIRNAVIGATION AIDS IMPLEMENTATION PLAN 2013

FACILITY RCAG voice communication VHF Data-link communication (VDL mode-2) HF Voice communication VSAT voice/data communication Fiber Optic network AFTN and AWOS network

AERONAUTICAL SATELLITE COMMUNICATION. VSAT SINCE 1998 9 WILL BE REPLACED CURRENTLY 22 TerrsaSat 400 STATIONS NEW INSTALLED 16 STATIONS WILL BE REPLACED 9 STATIONS Хатгал Улаангом Их түнэл Мөрөн Баян-Өлгий Ховд Булган (Ховд) Ургамал Тосонцэнгэл Доной Булган Улаанбаатар Алтанбулаг Өндөрхаан Чойбалсан Алтай Баянхонгор Арвайхээр Хар хорин Бор Өндөр БаруунУрт Мандалговь Далан Сайншанд Даланзадгад New MASCOM VSAT network is being installed for swapping existing system.

Ground-to-Ground communication VSAT VOICE/DATA COMMUNICATION Irkutsk (Russia) Ulaanbaatar (Mongolia) Beijing (China) Bangkok (Thailand) Neighbors have been connected by VSAT and ground fiber optic links for exchanging information faster

FIBER OPTIC LINK NETWORK Terminals: AFTN, RCAG, AWOS Telephone SINCE 2003 18 LOCATIONS ARE CONNECTED 6 LOCATIONS WILL BE CONNECTED

AIR-GROUND COMMUNICATION RCAG Voice Communication Баян-Өлгий Улаангом Хэнгэрэгтэй Мөрөн Ховд Ургамал Тосонцэнгэл Доной Цэцэрлэг Булган Улаанбаатар Өндөрхаан Чойбалсан Булган (Ховд) Алтай Баянхонгор Арвайхээр Бор-Өндөр БаруунУрт Мандалговь Далан Сайншанд Даланзадгад Ханбумбат DUAL CHANNEL 23 RCAG VHF RADIO STATIONS 20 LOCATIONS

Air-to-Ground communication HF VOICE COMMUNICATION 22 AIRPORTS R&S XK-2900 HF radios

SURVEILLANCE SYSTEM / PHASES IMPLEMETATION SSR SYSTEM SINCE 2008 2012 3 SSR IMPLEMENTED 2013 2 SSR INSTALLED 2014 2 WILL BE INSTALLED Баян-Өлгий Улаангом Ургамал Ховд Булган (Ховд) Алтай Тосонцэнгэл Доной Мөрөн Цэцэрлэг Булган Баянхонгор Арвайхээр Далан Улаанбаатар Мандалговь Дадал Өндөрхаан Чойбалсан БаруунУрт Сайншанд Даланзадгад

STAGE OF ADS-B IMPLEMENTATION Баян-Өлгий Улаангом Мөрөн Ховд Булган (Ховд) Ургамал Тосонцэнгэл Доной Цэцэрлэг Булган Улаанбаатар Дадал Өндөрхаан Чойбалсан Алтай Баянхонгор Арвайхээр БаруунУрт Мандалговь Далан Сайншанд Даланзадгад

PBN IMPLEMENTATION DME INSTALLATION PLAN NOPUS Ulgii (ZMUL) TEBUS Ulaangom (ZMUG) Khovd (ZMKD) NIGOR Улаангом ZMUM Bulgan Sum (ZMBS) NOTE: COVERAGE OF DME & UPDATE AREA FL=9,000m (20 stations) DME COVERAGE (200 NM) 0 km SCALE Ховд 46 53.4N 92 27.5E Ургамал URGAM Baruunturuun (ZMBT) ZMTD SILUS Алтай Altai (ZMAT) 46 48.6N 97 12.6E TEKOR DARNO TOMES Доной Donoi (ZMDN) Тосонцэнгэл Tosontsenge (ZMTL) Tudevtai (ZMTD) ZMHG Muren (ZMMN) Мөрөн ZMHU ZMHH ZMTG Цэцэрлэг KENTA LETBI Bulgan (ZMBN) BayanKhongor Arvaikheer Арвайхээр Баянхонгор (ZMBH) (ZMAH) Далан DALAN Булган Дархан Даланзадгад Dalanzadgad (ZMDZ) SERNA Ulaanbaatar (ZMUB) Baruun-Urt Улаанбаатар Underkhaan (ZMBU) Morin- UNDUR ZMTM (ZMUH) Uui Өндөрхаан ARGAT MODUN MENOR Баруун-Урт Мандалговь ZMMG ZMOT BAGAT ANIKU ZMDL Дадал DEGIR Сайншанд Sainshand (ZMSH) DORUTL Choibalsan (ZMCD) Дорнод 01 ZMAH 11 ZMMG 02 ZMAT 12 ZMMN MORIT 03 ZMBN 13 ZMSH LEGEND DME/DME More than two 04 ZMBH 14 ZMTG UPDATE AREA DME/DME INTERNATIONAL 05 ZMBU 15 ZMTL UPDATE AREA EN-ROUTE 06 ZMCD 16 ZMUG AIRPORT OR RCAG SITE 07 ZMDL 17 HMUH 350 km 700 km REPORTING POINT 08 ZMDN 18 DALAN 08 ZMDZ 19 Morin-Uui 09 ZMKD 20 URGAM INTIK POLHO SULOK ZMSM LOCATION OF DME STATION PLAN TO INSTALL CURRENT Далан, Дорнод

NON DIRECTION BEACONS (NDB) LOCATIONS Ulaangom Ulgii NDB Baruunturuun NDB Murun Teshig Hovd NDB Tosontsengel NDB Bulgan ULAANBAATAR Dadal Choibalsan NDB Bulgan Altai Uliastai NDB Bayankhongor NDB Tstetserleg Arvaiheer NDB Mandalgobi NDB NDB Undurkhaan Baruun-Urt Sainshand NDB Dalanzadgad NDB NDB: ARM-150MA 12 stations, PAR-10C 5 stations MARKERS : MRM-97 15 stations, MRM-70

Ground-to-Ground communication AFTN AND AWOS NETWORK based on fiber optic network Ulaangom Ulgii Baruunturuun Murun Teshig Hovd Bulgan Altai Tosontsengel Uliastai Tstetserleg Bulgan Arvaiheer Bayankhongor ULAANBAATAR Mandalgobi Dadal Undurkhaan Baruun-Urt Sainshand Choibalsan Dalanzadgad - AFTN Aeronautical Message exchange network - 18 Domestic airport Weather data collecting system - Data automatically passed through AFTN X.25 Network every 30 minutes

RUNWAY LIGHTING SYSTEM Баян-Өлгий Улаангом Мөрөн Ховд Булган (Ховд) Ургамал Тосонцэнгэл Доной Цэцэрлэг Булган Улаанбаатар Дадал Өндөрхаан Чойбалсан Алтай Баянхонгор Арвайхээр БаруунУрт Мандалговь Далан Сайншанд Даланзадгад NEW EXISTING

SOLAR POWER STATION WITH 443KWATTS Solar Panels Junction Box Power Conditioner Power Distributor Solar light measurement Power Supply Company Display Weather sensor Load System Controller

Asphalt-Concrete RW4D category Asphalt-Concrete RW3C category Concrete RW3C category Concrete RW4C category Grass RW3C category

REDUCTION OF SEPARATION MINIMA 2012 оноос өмнө 150 км Агаарын хөлгүүдийн зайчлалын зураг

2012 онд 90 км 2012 оноос өмнө 150 км 2014 онд 40 км Агаарын хөлгүүдийн зайчлалыг ирээдүйд 10км болгон

АНХААРАЛ ТАВЬСАНД БАЯРЛАЛАА