NOTHING CHANGES & YET EVERYTHING IS COMPLETELY DIFFERENT

Similar documents
NOTHING CHANGES & YET EVERYTHING IS COMPLETELY DIFFERENT

Oil and Gas Capabilities

UK Port Infrastructure Project Pipeline Analysis Report

Oil and Gas Capabilities

InchgreenDryDock. More than Ports. Sat Nav: PA15 2NA

Millport Charrette. Moving forward What do you think? Where are the opportunities? What are the priorities?

The Junction A NEW DIRECTION LEASING BROCHURE. a new direction

Dodds. COACH HOLIDAYS Autumn/Spring Tours. doddsoftroon.com. Ireland & Nothern Ireland England

PEEL WIRRAL COMMERCIAL PORTFOLIO. Over 300,000 sq ft of industrial & office space

West of Scotland Inverclyde Renewable Energy Hub

Draft Tourism Development Plan for Scotland March 2013

APPLICANT NAME PROJECT DESCRIPTION AWARD

Oil and Gas Capabilities

Scotland - Round 3 Awards - Rest of Scotland

PORT MARKETS IN NUMBERS STEPHEN TAYLOR

WORKING DRAFT (DECEMBER 2016) - FOR COMMUNITY REVIEW BY

Water Space. A development opportunity at the Canting Basin, Pacific Quay, Glasgow

Place Standard Where are we now? John Howie Organisational Lead Health Equity (Physical Activity & Place) NHS Health Scotland

New Ideas Form. LEADER Arwain Sir Benfro FORM 2. Discussed with PLANED staff member: Yes, Cris Tomos

TITANIC QUARTER VISION

shopping revitalised _

CAA Passenger Survey Report 2017

Scotland Oil & Gas Gas.

Ulsterbus Coach & Sail Service 2018

Mid and East Antrim Borough Council. Tourism Strategy. January 2016

DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. The single biggest investment ever undertaken in Dover

ALDERNEY GUERNSEY 3 BARRA BENBECULA 1 BELFAST CITY (GEORGE BEST) BELFAST INTERNATIONAL 17 BELFAST INTERNATIONAL LIVERPOOL (JOHN LENNON) 1

Cross. Channel Express Service. Tel /7003. LONDON RETURN from 59. Winter Timetable until further notice. FREE internet on board

Health and Safety Report 2016

Proud to be making a difference in Leeds. tcs-plc.co.uk

insouthglos Economy .co.uk Our economy

OUR UNDERSTANDING OUR GLOBAL REACH

COMPANIONS of the QUAICH MALT WHISKY TOUR Of SCOTLAND SEP, 2007 Hosted by Founder and President Ed Patrick

Quarterly Statistics for New Businesses

GIPPSLAND TOURISM MASTER PLAN

LIVERPOOL INVESTMENT OPPORTUNITIES

Cross. Channel Express Service. Tel /7003. LONDON RETURN from 61. Summer Timetable until further notice. FREE internet on board

Draft Marine and Harbour Facilities Strategy

Ravenscraig Regional Sports Facility. Directions & Maps

St. John s Port Authority. Newfoundland and Labrador, Canada

This vibrant and accessible gateway to the city will have wide and varied appeal and looks to build on its rich cultural stage to help define a

Facts and figures 2019

Atlantic Forum Workshop Cardiff 24 th January. Ethna Murphy Destination Development

Simply better procurement. User Guide. National Framework for Medium Works

.org.uk. Regional. Transport. Strategy. Revised June Serving Dumfries and Galloway. South West of Scotland Transport Partnership

THE QUAY, NO12 PRINCES DOCK, LIVERPOOL WATERS

Welcome to Aberdeen, UK for the International Institute of Fisheries Economics and Trade 18 th Biennial Conference 11 th 15 th July 2016

Scotland Edinburgh, Oban, Inverness

Highland & Argyll LPD Partnership

Go First Go Far Go Forth Queensferry One

HGS Map Catalogue 21st July 2014 Version. Page 1 of 5

TRANSFORMING EAST LONDON...

Scrabster Harbour Economic Impact Assessment Final Report. Scrabster Harbour Trust. grangeston

FOR SALE. Zeus Packaging, Central Park, Mallusk, Newtownabbey, BT36 4FS. Investment Opportunity - Modern, Fully Let Industrial Facility

TRANSFORMING EAST LONDON...

Clyde Cruising Club. Amendments to Sailing Directions

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for December 2017 Comparison with December 2016 December 2017.

Quarterly Statistics for New Businesses

Kilgore College Rangerettes Forevers - KC Friends & Family Scotland and Ireland March 8-18, 2015

DESIGN & BUILD. c.100,000 sq.ft. INDUSTRIAL / WAREHOUSE DISTRIBUTION FACILITY BANBRIDGE, CO. DOWN

PORT USERS GROUP (COMMERCIAL) MONDAY 03 NOVEMBER hrs GATE 2, ALBERT TERMINAL

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for July 2016 Comparison with July 2015

Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for February 2017 Comparison with February February 2016.

Bathgate. Lothian Gateway. The Site. Junction 4 M8. To Edinburgh

LISBURN CASTLEREAGH BELFAST

Town Centre Partnership Models and Governance, STP Learning Event A Local Government perspective on models of urban regeneration

Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for February 2018 Comparison with February February 2017.

Enterprise Island 36 [

Yorkshire s Offshore, Renewable Energy and Operations and Maintenance Centre. 7 th October 2014

Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for October 2018 Comparison with October 2017

CROSS-PARTY GROUP ANNUAL RETURN

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for June 2018 Comparison with June 2017

Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for November 2018 Comparison with November November 2017.

FOR SALE EXCITING NEW COMMERCIAL DEVELOPMENT

VisitScotland Scottish Accommodation Occupancy Survey April to June Quarterly Report

Conferences & Events

A GREAT PLACE TO INVEST. wearedoncaster.co.uk

Business Development Prospectus.

WHERE MORE HAPPENS. Image: Spectra Festival of Light ABERDEEN

Daytrips Ireland (Daytrips Series) By Patricia Tunison Preston READ ONLINE

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for October 2018 Comparison with October 2017

Engineering and Computing Summer School

Visit Belfast Recruitment Communications and PR Manager (Maternity Post Fixed Term Contract)

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for October 2016 Comparison with October 2015

TO LET OMNI GREENSIDE PLACE EDINBURGH EH1 3AA

Sample Itinerary. UK Family Adventure

insouthglos Economy .co.uk Our economy

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for November 2017 Comparison with November 2016 November 2017

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for January 2018 Comparison with January 2017

Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for March 2018 Comparison with March 2017

Strategy - The Big Picture

Table 12.3 Domestic Air Passenger Traffic To and From Each Reporting Airport for September 2018 Comparison with September 2017.

Table 12.2 Domestic Air Passenger Traffic To and From Reporting Airports for October 2017 Comparison with October 2016

Kommunenes Internasjonale Miljøorganisasjon. Local Authorities International Environmental Organisation

ROSYTH WATERFRONT COMMUNITY PLANNING WEEKEND

Patterns of housing wealth inequality in Wales, Scotland and Northern Ireland

Things to do in the area

a range of new ideas, practical classroom skills and materials for teaching English to young learners

Celtic Highlights Tour Scotland and Ireland September 10 th to 23 rd, nights and 14 days

For further advice and information, please contact the Leisure Sales Team. RBH Groups Desk E: T:

Transcription:

CIVIL ENGINEERING

<< NEIL SHAWCROSS The adjacent painting was created by artist Neil Shawcross to illustrate the evolution of the McLaughlin & Harvey brand from 1853 to the present. It symbolises that while our face has changed, our values remain the same. NOTHING CHANGES & YET EVERYTHING IS COMPLETELY DIFFERENT ALDOUS HUXLEY

OUR APPROACH For over 160 years McLaughlin & Harvey has combined traditional values and experience, with an advanced innovative approach. Ferry Infrastructure STENALINE LOCH RYAN PORT DEVELOPMENT Cairnryan 55m We operate throughout the United Kingdom and Ireland, and pride ourselves on delivering quality building construction, fit-out, civil engineering, and facilities management projects. We work in various sectors including health, education, industrial, retail, sporting venues, marine and rivers, transport infrastructure, offshore, energy, commercial, and leisure. We have a strong commitment to delivering quality cost effective solutions for our customers within a safe, considerate working environment. Through proactive stakeholder engagement we have implemented a strong Corporate Social Responsibility (CSR) strategy, facilitating a sustainable business which supports the health, safety, welfare, and well-being of our workforce, customers, supply chain and the local communities in which we work. Our core values and strengths are: Hands on accessible leadership Strong relationships, collaboration and communication Corporate resilience and capacity

Commercial Ports PD PORTS TEESPORT BERTH 1 RECONSTRUCTION Middlesbrough 32m MARINE PROVIDING PORT FACILITIES FOR OVER 3 MILLION PASSENGERS AND 70 MILLION TONNES OF FREIGHT

CIVIL ENGINEERING» 8 Ferry Infrastructure BELFAST HARBOUR COMMISSIONERS VICTORIA TERMINAL 4 Belfast 37m Ferry Infrastructure P&O CAIRNRYAN BERTH 1 LINKSPAN & RECLAMATION Cairnryan 13m

Ferry Infrastructure CMAL PORT ELLEN QUAY EXTENSION Isle of Islay 5m Ferry Infrastructure HIGHLAND COUNCIL SCONSER FERRY TERMINAL Isle of Skye 2m

Commercial Ports CROMARTY FIRTH PORT AUTHORITY INVERGORDON SERVICE BASE PHASE 3 Invergordon 18m Commercial Ports GLOBAL ENERGY GROUP NIGG SOUTH QUAY Cromarty Firth 19m

CIVIL ENGINEERING» 14 Commercial Ports ABERDEEN HARBOUR BOARD TORRY QUAY REDEVELOPMENT PHASE 2 Aberdeen 16m Commercial Ports ABERDEEN HARBOUR BOARD TORRY QUAY REDEVELOPMENT PHASE 3 Aberdeen 14m

CIVIL ENGINEERING» 16 Cruise Berths ORKNEY ISLANDS COUNCIL HATSTON PIER EXTENSION Kirkwall 9m Jetties RNLI JETTY Montrose 420k

CIVIL ENGINEERING» 18 Fishing Harbours FRASERBURGH HARBOUR COMMISSIONERS HARBOUR DEEPENING Fraserburgh 14m Fishing Harbours KILKEEL HARBOUR REPAIRS PHASES 1-3 Kilkeel 10m

Marine Structure Repair PORT OF LARNE Larne 25m Historic Restoration TITANIC DOCK SEA DEFENCE Belfast 1m

CIVIL ENGINEERING» 22 Coastal Defences SUMBURGH AIRPORT COASTAL DEFENCE Shetland Isles 14m Coastal Defences BARNBOUGLE CASTLE Edinburgh 600k

CIVIL ENGINEERING» 24 Leisure Marinas PORTGLENONE MARINA Portglenone 400k Pontoons FOYLE MOORING FACILITY Londonderry 2m

CIVIL ENGINEERING» 26 Pontoons RNLI PONTOON Stromness 400k Lock + Dock Gates LOCK GATES SUPPORT STRUCTURE Milford Haven 5m

CIVIL ENGINEERING» 28 Flood Defence COLERAINE LODGE BURN FLOOD ALLEVIATION SCHEME Coleraine 2m Flood Defence HIGHLAND COUNCIL RIVER NESS FLOOD ALLEVIATION SCHEME PHASE 2 Inverness 10m

CIVIL ENGINEERING» 30 Flood Defence DP WORLD SITE X ENVIRONMENTAL MITIGATION Kent 4m Flood Defence CITY OF EDINBURGH COUNCIL WATER OF LEITH PHASE 2 Edinburgh 14m

CIVIL ENGINEERING» 32 Land Remediation CULMORE LANDFILL REMEDIATION Londonderry 7m Port Warehouses PEEL PORTS ALEXANDRA DOCK WAREHOUSING Liverpool 15m

Offshore SUBSEA DRILLING TECHNOLOGY PHASE 2 Northern Ireland 500k Port Warehouses BELFAST HARBOUR COMMISSIONERS STORMONT WHARF Belfast 9m

Offshore SR2000 FOUNDATION INSTALLATION Orkney 1m Offshore OPENHYDRO TEST PLATFORM INSTALLATION Orkney 4m

Roads TRANSPORT SCOTLAND A82 PULPIT ROCK REALIGNMENT Loch Lomond 10m TRANSPORT PROVIDING ROAD, RAIL, SEA, AND AIR INFRASTRUCTURE THROUGHOUT THE UK AND IRELAND

CIVIL ENGINEERING» 40 Roads TRANSPORT SCOTLAND A75 HARGROVE REALIGNMENT Dumfries 11m Roads TRANSPORT NI A32 CHERRYMOUNT LINK Enniskillen 9m

CIVIL ENGINEERING» 42 Roads N2 PHASES 2 & 4 Co Monaghan 6m Roads THOMPSON S BRIDGE Fermanagh 2m

CIVIL ENGINEERING» 44 Footbridges OMAGH RIVERSIDE WALK Omagh 1m Footbridges GOBBINS COASTAL PATH Islandmagee 4m TO BE REPLACED

CIVIL ENGINEERING» 46 Footbridges MOIRA FOOTBRIDGE Moira 400k Footbridges BALLYMONEY FOOTBRIDGE Ballymoney 2m

CIVIL ENGINEERING» 48 Rail Infrastructure TRANSLINK COLERAINE TO LONDONDERRY PHASE 2 Coleraine 3m Rail Infrastructure TRANSLINK TRAINS 2 PLATFORM EXTENSIONS Northern Ireland 5m

Rail Infrastructure TRANSLINK TRACK SAFETY IMPROVEMENTS COLERAINE TO LONDONDERRY Coleraine 2m Rail Infrastructure TRANSLINK TRACK LIFE EXTENSION BALLYMONEY TO COLERAINE Ballymoney 9m

CIVIL ENGINEERING» 52 Rail Bridges TRANSLINK GLYNN BRIDGE RECONSTRUCTION Larne 400k Rail Bridges GAULTS CROSSING Ballymena 500k

CIVIL ENGINEERING» 54 Rail Depots EDINBURGH TRAM DEPOT Edinburgh 16m Rail Depots TRANSLINK FORTWILLIAM TRAIN MAINTENANCE FACILITY Belfast 9m

Airports RYANAIR MAINTENANCE FACILITY Prestwick 6m Airports LONDON LUTON AIRPORT PROJECT CURIUM London 51m

Public Realm COMMERCIAL WAY PUBLIC REALM Woking 5m Airports ABERDEEN AIRPORT DELTA APRON EXTENSION Aberdeen 800k

CIVIL ENGINEERING» 60 Car Parks ALTNAGELVIN HOSPITAL MULTI-STOREY Londonderry 5m Car Parks SHIELDS ROAD MULTI-STOREY Glasgow 4m

GOBBINS COASTAL PATH Islandmagee 4m CIVIL ENGINEERING

Belfast Glasgow Edinburgh London mclh@mclh.co.uk www.mclh.co.uk 15 Trench Road Newtownabbey County Antrim BT36 4TY +44 28 9034 2777 100 Inchinnan Road Paisley Renfrewshire PA3 2RE +44 141 848 8000 20-22 Torphichen Street Edinburgh EH3 8HX +44 131 285 1749 6th Floor 2 Kingdom Street London W2 6BD +44 203 542 8308