PHILIPPINES ATC EXPERIENCE ON PBN 6/15/ CIVIL AVIATION AUTHORITY OF THE PHILIPPINES

Similar documents
Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

AERONAUTICAL INFORMATION CIRCULAR 18/18

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

Lecture Minimum safe flight altitude

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE

A Pilot s perspective

USE OF RADAR IN THE APPROACH CONTROL SERVICE

SECTION 4 - APPROACH CONTROL PROCEDURES

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene

AREA NAVIGATION RNAV- MANAGEMENT

MODULE 4: SIDs and STARs. Slide <#> of

Status of PBN implementation in France

Implementation of PBN in Armenian airspace

EXPLANATION OF TPP TERMS AND SYMBOLS

Approach Specifications

Título ponencia: Introduction to the PBN concept

Air Navigation Bureau ICAO Headquarters, Montreal

Safety and Airspace Regulation Group

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

TWELFTH AIR NAVIGATION CONFERENCE

Amendment 7 to PANS-ATM, Doc 4444

PBN Airspace Concept. ATS requirements

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

Honeywell.com PBN Concepts Krakow, Poland

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

Open Questions & Collecting Lessons Learned

FLIGHT OPERATIONS PANEL (FLTOPSP)

(RN R A N V A V & & RN R P N

INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS. Agenda Item: B.5.12 IFATCA 09 WP No. 94

Flight Operations Inspector Manual

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

OPERATIONS MANUAL PART A

RNAV - RNP. July 2010

GENERAL INFO NOTICE 1. BACKGROUND

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

IFR SEPARATION WITHOUT RADAR

Performance Based Navigation (PBN) Implementation Plan. The Gambia

REPORT FORM IR(A) INITIAL SKILL TEST. (Use Type or Class Rating forms to revalidate IR(A) or renew expired IR(A)) Type rating: Type rating:

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

ICAO framework for LPV

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

MINIMUM FLIGHT ALTITUDES

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING

PBN and Procedure Design training

DSNA NAVIGATION STRATEGY

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

AIRAC AIP SUPPLEMENT 02/16 26 th MAY 2016

Learning Objectives. By the end of this presentation you should understand:

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

PROCEDURES SPECIAL OPERATIONS

Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports.

REPUBLIC OF CROATIA. Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, POBox 103 Croatia

P-RNAV GENERAL INFO NOTICE. 1. Background

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

AIP PORTUGAL ENR NOV-2007

Report for instrument rating - IR(A) skill test

Following supplement is issued for information, guidance and necessary action. [EFFECTIVE DATE: 1 JULY 2010] RGI AIRPORT, SHAMSHABAD

EASA RNP (AR) Workshop The Landscape Working Together

INSTRUMENT RATING STUDENT RECORD

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

RNP AR APCH Approvals: An Operator s Perspective

Validation & Implementation Considerations Module 14 Activities 11 to 17

Title: PBN Operations and Licensing Requirements - Declaration for AOC Holders

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

APAC PBN UPDATE Slide 1 of xx

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014

Performance Based Navigation Implementation of Procedures

AIR LAW AND ATC PROCEDURES

AIRAC AIP SUPPLEMENT A 16/17 08 June 2017

AD 2. AERODROMES FYWE AD 2.1 AERODROME LOCATION INDICATOR AND NAME. FYWE - Windhoek (Eros) Airport

FLIGHT OPERATIONS PANEL

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

GBAS ICAO Provisions. Presented by Sylvie GRAND-PERRET EUROCONTROL Navigation Unit

European Aviation Safety Agency

Flying an Approach with the Garmin GTN 750

NEW CALEDONIA PBN PLAN

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

Instrument Proficiency Check Flight Record

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

Implementation challenges for Flight Procedures

INSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS

SPECIAL PROCEDURES FOR IN-FLIGHT CONTINGENCIES IN OCEANIC AIRSPACE OF SEYCHELLES FIR

Transcription:

PHILIPPINES ATC EXPERIENCE ON PBN

a Brief History Dependency to Ground Navigational Aids In June 2010, the outage of the Manila DVOR/DME and ILS system brought air traffic to a halt. The very low visibility did not help the situation. Scores of flight have to be diverted to nearby airports displacing thousands of air travellers for days. Normal flights to Manila resumed when authorities assured that a safe landing can be made.

a Brief History Fleet readiness Consultative meetings with local airline operators have been conducted since 2007 to determine the airlines capability to perform RNAV procedures. Successive surveys were conducted in 2009 and 2010. In 2009, only two (2) out of the five (5) local airlines signified capability to meet the navigational accuracy requirements. By the end of 2010, 90% of domestic registered aircraft are ready and equipped with GNSS avionics necessary to perform RNAV procedures.

a Brief History ICAO Mandate The 36 th Session of the ICAO Assembly held in Montreal in September of 2007 adopted Resolution A36-23 urging all States to implement RNAV and RNP air traffic services (ATS) routes and approach procedures in accordance with ICAO PBN concept described in the Performance Based Navigation Manual (Doc 9613).

PBN Training for ATC On January 24 to 26, 2012. QUOVADIS conduct a PBN training for ATC; Concept of PBN Procedures Stripmarkings Phraseologies Chart Symbols

PBN Training for ATC Air Traffic Service ordered Manila Approach training staff to conduct lecture and dry-run to other ATC facilities where RNAV will be implemented. The ATC facilities are: 1. Legaspi Approach 2. Butuan Approach 3. Laguindingan Approach 4. Iloilo Approach 5. Puerto Prinsesa Approach 6. Tacloban Approach

PBN Training for ATC 7. Bacolod Approach 8. Davao Approach 9. Kalibo Approach 10. Tambler Approach 11. Clark Approach 12. Laoag Approach 13. Caticlan Approach

Experiences on PBN Implementation During the first year of implementation of RNAV, ATC verifying all aircraft if RNAV capable. (Based on the fields of the flight plan check item # 10 and item # 18. ) before giving a clearance for an RNAV procedure.

Experiences on PBN Implementation In the Philippines we re using RNAV1 and RNP1. Manila, Mactan and Clark are using RNAV 1 due to availability of Radar. Other airports utilizing RNP1 due to non radar environment.

Experiences on PBN Implementation Handling of RNAV capable and non RNAV. If an ATC faced a difficult situation in handling a mix traffic, ATC discourage the RNAV capable aircraft not to use RNAV STAR.

Experiences on PBN Implementation Some pilots opted to request fly to FIX (IF) sometimes its a shorter route than the RNAV STAR. In some cases pilot were discourage to fly direct to (IF) if the interception to FIX is more than 90 degrees.

Experiences on PBN Implementation LL06 H LL06 G LL06F IAF 5000 DAGAT LL06E RWY06 MApt IF LL06D GONDO IAF 5000 TRECE IAF 5000

Experiences on PBN Implementation Several aircraft significantly diverts from the RNAV SID/STAR path due to weather. ATC procedure and training to manage a request of deviation from an RNAV procedure: termination of the RNAV SID/STAR procedure, management of the situation by the pilot without the responsibility of the ATCO, delivery of new clearance by the ATCO once the weather problem is solved.

Experiences on PBN Implementation Several aircraft significantly diverts from the RNAV SID/STAR path due to failure of GNSS signal. ATCO procedure and training specifying the necessity for ATCOs to report any GNSS interferences to all aircrews.

Experiences on PBN Implementation During arrival phase RNAV clearance to STAR were not issued immediately. Training of ATCs regarding RNAV must not be limited to approach controllers only.

Experiences on PBN Implementation Interference between aircraft on RNAV SID without appropriate separation. ATCO trained to the specific features of the new procedure, particularly if there are no strategic separations between trajectories. ATCO procedure and training specific for the management of mixed traffic. Training for the new ATCO procedures should specify points at which an ATCO may discourage use of PBN procedures when managing mixed traffic environment.

Experiences on PBN Implementation GPS signal interuptions were experience as a result of RNAV implementation are suspended. RNAV implementation were temporary suspended until the problem are resolved.

6/15/2017 1

Experiences on PBN Implementation Training Syllabus FPL Processing and Stripmarking Safety Requirement Procedure for Air Navigation Services

Thank You for listening. 6/15/2017 1

RNAV-PBN TRAINING SYLLABUS (THEORETICAL PHASE) I. Introduction to RNAV-PBN A. Why PBN? B. PBN Navigation Specification -RNAV 10 -RNP 4 -RNAV 5 -RNAV 2 -RNAV 1 -Basic RNP C. PBN Obstacle Clearance D. PBN Approach Specifications -RNP APCH -RNP-AR II. GNSS Concept A. GNSS Reliability B. RAIM C. Waypoints D. Flight Management Systems E. Accuracy and Repeatability III. IV. Application of RNAV-PBN in AIR TRAFFIC CONTROL A. Standard Phraseologies a. IFR Arrivals - Reiteration to the pilot of the QNH prior to the FAF. b. IFR Departure B. Strip Markings and Flight Plan Processing C. Basic Approaches D. Routes of Vectoring / Direct Routing E. Continuous Descent Operations F. Continuous Climb Operations Instrument Flight Procedure (IFP) A. STAR B. IAP C. SID D. Mixed Sequencing

LIST OF SAFETY REQUIREMENTS IN THE IMPLEMENTATION OF BACOLOD RNAV Ref Safety Requirement Remarks Status SR-02 IAF and waypoints of the STAR shall be indicated as mandatory points of report on the chart SR-03 ATCO s procedure shall be precise; -the phraseology for request of position report from the pilot, including the full name of the point Recommended by Bacolod ATCO the list of waypoints of the STAR shall be indicated as mandatory points are: RWY 03- DIMBO, JULUS, RAVIA, MARIZ and MANAY RWY 21- RIANN, KLAIR, GABRE and LIDIA Already discussed in the Phraseology and stripmarking procedure -the procedure of verification of the aircraft and aircrew qualification by the ATCO (based on fields of the flight plan) Before giving clearance for an RNAV Procedure -that local QNH provided by the approach controller to the crew at the first altitude clearance -the phraseology associated to clearance For RNAV procedures -the procedure to manage the request of deviation on an RNAV procedure; termination of the STAR RNAV procedure, management of the situation by the pilot without responsibility of the ATCO, delivery of a new clearance by the ATCO once the weather problem is solved -procedure for management of mixed Traffic in Bacolod (including the possibility to discourage usage of PBN procedure when traffic mix is too important) Check item 10 on Fpl (R for PBN), on item 18 on FPL (O1 or O2 for SID and STAR and S1 or S2 for Approach) and indicate R1 on FPS for O1 or O2 + S1 or S2, R2 on FPS for O1 or O2 only and R3 on FPS for S1 or S2 capable Already discussed in the Phraseology and stripmarking procedure Already discussed in the Phraseology and stripmarking procedure Already discussed in the Phraseology and stripmarking procedure and simulated dry-run Already discussed with Bacolod ATCO s during lectures and simulated dry-run

SR-04 ATCO shall be trained to: -the necessity to request position report from the pilot at the mandatory points of report indicated on the chart or supplemental points in order to detect hazard such as aircraft deviation or aircraft on the wrong procedure Already discussed with Bacolod ATCO s during lectures and simulated dry-run -the phraseology for the position s report that should include the complete name of the point Already discussed in the Phraseology and Stripmarking procedure and simulated dry-run -the necessity to perform a verification of the aircraft qualification (based on fields of flight plan) before giving a clearance for RNAV procedure Already discussed in the Phraseology and Stripmarking procedure and simulated dry-run -the criticity of the QNH in the LNAV/ VNAV procedures Already discussed with Bacolod ATCO s during lectures and simulated dry-run -the phraseology associated to clearance For RNAV procedure Already discussed in the Phraseology and Stripmarking procedure and simulated dry-run -the necessity to report any GNSS Interferences to all aircrews Already discussed with Bacolod ATCO s during lectures and simulated dry-run -the necessity to assigns conventional procedure in case of GNSS interferences Already discussed with Bacolod ATCO s during lectures and simulated dry-run -ATC procedure to manage a request of deviation on an RNAV procedure; termination of the STAR RNAV procedure, management of the situation by the pilot without responsibility of the ATCO once the weather problem is solved Already discussed with Bacolod ATCO s during lectures and simulated dry-run -specific features of the new procedures (intersection with Iloilo trajectories, intersection with conventional trajectories ) -the procedure for management of mixed traffic in Bacolod Already discussed with Bacolod ATCO s during lecture on Area Study Already discussed with Bacolod ATCO s during lectures and simulated dry-run -the possibility to discourage usage of PBN procedure when traffic mixed is too important Already discussed with Bacolod ATCO s during lectures and simulated dry-run

SR-14 SR-16 SR-21 The new specific cross check of the QNH before the FAF shall be part of ATCO procedures and training. GEN part of Bacolod AIP shall define ATCO expectation regarding RNAV procedure(mandatory report. Phraseology, explanation how to read the charts ) A correspondence table matching TMA enrty point/star procedure/ Approach procedure shall be defined and published in Bacolod s AIP Already discussed with Bacolod ATCO s during lectures and simulated dry-run Already discussed with Bacolod ATCO s during lecture on Area Study, Phraseology and Stripmarking Already discussed with Bacolod ATCO s during lecture on Area Study

PROCEDURES FOR AIR NAVIGATION SERVICES AIR TRAFFIC MANAGEMENT PROCEDURES FOR DEPARTING AIRCRAFT NASAG 4P DEPARTURE LEVEL CLEARANCE ON A STANDARD INSTRUMENT DEPARTURE When level clearances are issued to aircraft departing or establishing on a SID, the controller shall explicitly indicate either that the aircraft shall follow the published level restriction(s) or that the level restriction(s) on the SID is cancelled. Published minimum levels based on terrain clearances shall be applied. Note: Example (RNAV Departure RWY 03) where the initial clearance is CLEARED RPLL via NASAG 4P T10 B473 LIP DCT RPLL CLIMB TOFL280. i.e., CEB488 cleared RPLL via NASAG 4P T10 B473 LIP DCT RPLL CLIMB TO FL280. PROCEDURES FOR ARRIVING AIRCRAFT BARBA 3PARRIVAL LEVEL ON STAR When level clearances are issued to aircraft arriving or established on a STAR, the controller shall explicitly indicate either that the aircraft shall follow the published level restriction(s) or that the level restriction(s) on the STAR is cancelled. Published minimum levels based on terrain clearance shall always be applied. Note: Example (RNAV ARRIVAL RWY 03) where the initial clearance is CLEARED BARBA 3P, QNH 1011, EXPECT RNAV APPROACH RWY03, report DIMBO i.e. CEB473 CLEARED BARBA 3P, QNH 1011, EXPECT RNAV APPROACH RWY03, report DIMBO

PART A: Standard Instrument Departure (SID) A.1) Departure clearance, for the situation where the initial cleared level will allow compliance with all published level restrictions. NASAG 4P DEPARTURE APP: SRQ7083: SRQ7083 cleared to MANILA via NASAG 4P CLIMB TO 11,000FT CLEARED to MANILA via NASAG 4P CLIMB TO 11,000FT REQUIREMENTS: SRQ7083 MUST COMPLY WITH THE LATERAL PROFILE OF THE SID AS WELL AS ALL PUBLISHED SPEED AND LEVEL RESTRICTIONS. SRQ7083 MUST NOT CLIMB ABOVE 11,000FT A.2)CEB488 is airborne, had been cleared for and was established on NASAG 4P DEPARTURE. Later on, pilot requested weather deviation away from NASAG 4P Subsequently, ATC reestablished CEB488 on the NASAG 4P DEPARTURE. CEB488 is established on NASAG 4P DEPARTURE (.. time elapses..) CEB488: APP, REQUEST DEVIATION TO THE RIGHT DUE WEATHER APP: CEB488 DEVIATION APPROAVED, CANCEL NASAG 4P ADVISE WHEN CLEARED OF WEATHER CEB488: DEVIATION APPROAVED, CANCEL NASAG 4P ADVISE WHEN CLEARED OF WEATHER ( time elapses.) CEB488: APP: CEB488: CLEARED OF WEATHER READY FOR LEFT TURN CEB488 TURN LEFT PROCEED DIRECT MELAI, RESUME NASAG 4P CLIMB TO FL160UFA TURN LEFT PROCEED DIRECT MELAI, RESUME NASAG 4P CLIMB TO FL160UFA

REQUIREMENTS: ONCE INSTRUCTED TO PROCEED DIRECT TO MELAI, CEB488 MUST ARRANGE FLIGHT SO AS TO COMPLY WITH PUBLISHED LEVEL AND SPEED RESTRICTIONS. CEB488 MUST NOT CLIMB ABOVE FL160UFA. PART B: STANDARD INSTRUMENT ARRIVAL (STAR) B.1)For the situation where the cleared level will allow compliance with all published level restriction. APP: CEB473: CEB473 CLEARED BARBA 3P, QNH 1011, EXPECT RNAV APPROACH RWY03, report DIMBO CLEARED BARBA 3P ARRIVAL, QNH 1011, EXPECT RNAV APPROACH RWY03, report DIMBO REQUIREMENTS: CEB473 must comply with the lateral profile of the STAR as well as all published speed and level restrictions. CEB473 must not descend below 3000ft.Unless ATC clearance for the approach is granted. B.2)For the situation where the cleared level will allow compliance with all published level restrictions. APP: CEB473 CLEARED BARBA 3P QNH 1011, DESCEND 9000ft, EXPECT RNAV APPROACH RWY03, report DIMBO CEB473: CLEARED BARBA 3P, QNH 1011, DESCEND 9000ft, EXPECT RNAV APPROACH RWY03, report DIMBO REQUIREMENTS: CEB473 MUST COMPLY WITH THE LATERAL PROFILE OF THE STAR, as well as speed restriction at or above 9,000ft. And do not descend below 9,000ft. If ATC clears CEB473: Descend on STAR to 3000ft. prior to reaching DIMBO, CEB473 will be expected to cross DIMBO at or below 6,500ft.

B.3) CEB473 has been cleared for and was established at BARBA 3P ARRIVAL. Pilot requested a weather deviation away from BARBA 3P.Subsequently, ATC reestablishes CEB473 on BARBA 3P {CEB473 is established on BARBA 3P} {.time elapse.} CEB473: APP: CEB473: APP REQUEST RIGHT HEADING 150 DUE WEATHER CEB473 HEADING 150 APPROAVED, CANCEL BARBA 3P DESCEND 9000FT. HEADING 150 APPROAVED, CANCEL BARBA 3P DESCEND 9000FT. { time elapse.} CEB473: APP: CEB473: APP we are now cleared of weather CEB473 PROCEED DIRECT TO DIMBO RESUME BARBA 3P, QNH 1011, EXPECT FOR RNAV RWY03APPROACH, REPORT DIMBO PROCEED DIRECT TO DIMBO RESUME BARBA 3P, QNH 1011, EXPECT FOR RNAV RWY03 APPROACH, REPORT DIMBO REQUIREMENTS: While on weather deviation, CEB473 need not comply with any published level or speed restriction of the STAR, CEB473 must not descend below 9000ft. Once instructed to proceed direct DIMBO, CEB473 must arrange flight so as to comply with published level and speed restrictions, beginning at DIMBO. CEB473 is not required to comply with level and speed restrictions published at significant point before DIMBO. Note: For terrain clearance refer to Minimum Sector Altitude (MSA).