Backgrund Califrnia law permits ILEV (Inherently Lw Emissin Vehicles) and previusly hybrid vehicles t access HOV lanes Yellw decals hybrid vehicles 85,000 decals Valid until 07/01/11 Green Decals - plug-in vehicles 40,000 decals - Valid until 01/01/15 White decals ILEVs 19,300 (as f DEC 2011) Valid until 01/01/15 Requires perfrmance mnitring and reprting n HOV facilities that allw single ccupancy vehicles (i.e. hybrids and tlled) t access since 2005 As required by Title 23 USC 166, Caltrans prepared the 2011 Califrnia High-Occupancy Vehicle Lane Degradatin Determinatin Reprt Analyzes the perfrmance f the HOV netwrk in Califrnia 2
MAP-21 Mving Ahead fr Prgress in the 21 st Century Enacted n July 6, 2012 Requires State DOTs t remedy degraded HOV/HOT facilities within 180 days Ptential sanctins: Lss f Federal funding and prject apprvals Definitin f Degraded Segment: Speed falls belw 45 mph during the mrning r evening weekday peak hur perids fr mre than 10% f a 180-day perid In ther wrd, an HOV facility is cnsidered degraded if its speed falls belw 45 mph fr 3 weekdays r mre each mnth 3
Analysis Methdlgy Traffic cllected frm in-grund lp detectrs, radars, r micrwave vehicle detectin systems Freeway Perfrmance Measurement System (PeMS) Separated int multiple segments Each segment = 5 miles maximum Peak Hur Data (typical statewide peak travel delay) Mrning 8:00 am t 9:00 am Evening 5:00 pm t 6:00 pm Degradatin status data include tw 180-day perids (weekday data, including weekday hlidays) The first 180-day perid is Jan. 1, 2011 t June 30, 2011 129 weekdays and 52 weekend days The secnd 180-day perid is July 1, 2011 t Dec. 31, 2011 131 weekdays and 53 weekend days 4
Analysis Methdlgy (Cnt.) Caltrans categrized degradatin int three classes Slightly degraded Very degraded Extremely degraded Degradatin Severity Definitins Federally "Degraded" Degradatin Severity Extremely Degraded Percent f 180 days failing t maintain 45mph fr either Mrning r Evening peak hurs 75% r higher Very Degraded 50%-74% Slightly Degraded 10%-49% 5
Analysis Methdlgy (Cnt.) 2011 Statewide HOV Netwrk Degradatin Summary First 180-day Perid January t June 2011 Secnd 180-day Perid July t December 2011 Ttal Degraded 43% 49% Nt Degraded 57% 51% Mrning Peak Hur Degradatin 20% 23% Mrning Peak Hur Severity 13% slightly Degraded 7% Very r Extremely Degraded 19% Slightly Degraded 4% Very r Extremely Degraded Evening Peak Hur Degradatin 24% 40% Evening Peak Hur Severity 19% Slightly Degraded 15% Very r Extremly Degraded 25% Slightly Degraded 15% Very r Extremely Degraded 6
Statewide Degradatin Summary by Peak Hur (July 1 - December 31, 2011) Mrning nly degraded 153.4 lane-miles 12% Mrning & evening degraded 141.2 lane-miles 11% Nt degraded 669.9 lane-miles 50% Evening nly degraded 362.0 lane-miles 27% 7
Statewide Degraded HOV Lane-Miles Summary by District (July 1 - December 31, 2011) 500 450 400 Degraded Nt degraded 350 Lane-Miles 300 250 200 179.8 260.3 109.1 150 100 50 0 59.3 200.7 187.2 32.4 107.2 127.6 31.7 15.6 15.6 District 3 District 4 District 7 District 8 District 11 District 12 Nte: 1326.5 lane-miles ttal; numbers may nt add up due t runding 8
District 7 HOV Degradatin Map 14
Ptential Causes f Degradatin Ptential Causes Cngestin in general purpse (GP) lanes Weaving cnflict at ingress/egress(i/e) lcatins cngests the HOV lane due t speed differential Lane drps create cngestin n the mainline which effects the HOV peratin Cnstructin activities Faulty vehicle detectr system Majr Bttlenecks n the mainline Merging Prblems HOV vlume exceeds capacity HOV vilatins 18
Remediatin Strategies District 7 Caltrans has been wrking very clsely with FHWA fr many years twards understanding the causes and identifying mst effective strategies t remedy degradatin levels. The prpsed Actin Plans Strategies were develped by the District with input frm Caltrans HQ and FHWA-Califrnia Divisin. Remediatin Strategies Shrt Term Imprve mainline peratin by remving lane drps thrugh Restriping Mre assertive ramp and cnnectr metering peratin In partnership with Metr, Enhance Freeway Service Patrl (FSP) peratin/deplyment. Wrk with CHP t imprve enfrcement and incident management Imprve HOV vehicle detectin infrastructure Lng Term HOV Direct Cnnectrs Increase ccupancy in cnjunctin with HOT cnversin in HOV facility where adding an additinal lane is feasible (I-105) 19
Cnclusin In 2011, Califrnia HOV lanes carried abut 13% f the traffic n the freeway during the mrning peak hur and 15% during the evening peak hur Overall increase in cngestin in the latter half f the year, particularly after schl begins in the late summer Recurrent cngestin r ther factrs culd be causing degradatin The 2011 HOV Degradatin Reprt and Actin Plan were develped in cmpliance with federal laws The 180-day timeframe t remediate degradatin begins when the reprt was submitted t the FHWA, n August 1 st, 2013 Our lng recrd f wrking clsely with FHWA will help us t cntinue t find efficient and effective slutins t HOV degradatin challenges. 21
What s Next? Awaiting fr fficial respnse frm FHWA. Anticipated t be received in September 2013 2012 Degradatin Reprt is currently in prgress Additinal studies may be needed. 22