OBSOLETE DESIGN DATA DELUGE VALVE FOAM/WATER SYSTEM USING AFFF OR ARC. March 1, Foam 20a

Similar documents
FLAT PANEL INFUSION DEMONSTRATION

WARNING: Read all instructions in this manual and component manufacturer supplied information before using your RV.

WARNING: Read all instructions in this manual and component manufacturer supplied information before using your RV.

Chart SAN 1001 (INT 2611)

SIN GLE BOND HOSE CLAMPS

A TI,DIOS (You Are God) œ œ. œ œ œ œ. œ. œ. œ. Dios, Dios, God, we ac -

Transactions Increase While Values De crease in Pre-Owned Mar ket

A TI,DIOS (You Are God) INTRO South American Dance (q = ca. 80) Dm. œ œ. œ # œ œ œ œ. œ. œ. œ œ. j J œ. œ œ œ œ œ œ œ. ba - mos; you; All

Summi triumphum. & bc. w w w Ó w w & b 2. Qui. w w w Ó. w w. w w. Ó œ. Let us recount with praise the triumph of the highest King, 1.

Monte Carlo Modeling of Nuclear Measurements in Vertical and Horizontal Wells in the Presence of Mud-Filtrate Invasion and Salt Mixing 1

Hid den Fires Improving kitchens and stoves to gether with us ers Re port from a pro ject in El Limón, Ni ca ra gua. by Maria Andersson

Commissioned by Paul and Joyce Riedesel in honor of their 45th wedding anniversary. Lux. œ œ œ - œ - œ œ œ œ œ œ œ œ œ œ. œ œ œ œ œ œ œ œ œ.

Control Unit CU (XX)

WARNING: Read all instructions in this manual and component manufacturer supplied information before using your RV.

EN HANCED RA DI A TION SHIELD ING WITH GA LENA CON CRETE

THE URBAN TRANSPORTATION MONITOR

United States Patent (19) Townsend et al.

United States Patent (19) An

MEA SURE MENT OF COS MIC RA DI A TION EX PO SURE OF AIR CRAFT CREW AT COM MER CIAL AVI A TION AL TI TUDES

Thomas Tallis Mass for 4 voices

III. United States Patent 19 Focke 5,439,105. [11] Patent Number: Aug. 8, Date of Patent:

CO LON NE POSTS (C)2011

United States Patent (19) 11 Patent Number: 5,003,652

Two At tempts at Gro un ding So cial Critique in Ordinary Actors Perspectives: The Cri ti cal The o ri es of Nancy Fra ser and Axel Hon neth

DEUS CARITAS EST SATB Choir, Soloist, Organ. œ œ. œœœœœ. œ œœœ œ œ œ

WARNING: Read all instructions in this manual and component manufacturer supplied information before using your RV.

(12) Patent Application Publication (10) Pub. No.: US 2011/ A1

The Dramatic Publishing Company

Pliocene Quaternary stratigraphy and sedimentation at the Neretva River Mouth, on Cro atian Adri atic Coast

People & Places Upcoming Events

- 3. Nihil Sum - b b. œ œ œ œ. œ œ. œ œ œ. œ œœ. œ œ. œ p œ. Œ œ. P œ n. œ œ œ œ œ. P œ œœ. Cantata Amoris. Sop. Alt. Ten. Bas.

Samuel Perkins Company Inc

World Airmail Covers. Daniel F. Kelleher Auctions LLC Sale Dec. 14, Third Session.

United States Patent (19 Steffes

S. E. GOODE CABINET BED. Azge 4. perts, photo-uthorophor, Washingto.

The Cran berry Report

35 SSÉ6 954,856. %.44%ay ( - Fig J tly, Denbinski, Patented Apr. 12, 1910, J. DEMBINSKI, PAIDOCK, APPLICATION FILED FEB. l5, 1910.

ANCIENT GROOVE MUSIC ( ) Motets for Holy Week. Edited by BEN BYRAM WIGFIELD

(12) Patent Application Publication (10) Pub. No.: US 2015/ A1

(12) Patent Application Publication (10) Pub. No.: US 2009/ A1

C O R M E U M E S T T E M P L U M S A C R U M P A T R I C I A V A N N E S S

Now. 5, 1968 L. A. PEHRSSC)N 3,408,974

Verbum caro factum est

(12) Patent Application Publication (10) Pub. No.: US 2008/ A1

(12) Patent Application Publication (10) Pub. No.: US 2015/ A1

Northern Neck MARKETPLACE

United States Patent (19) Cutler

" Voting Place " " Prince William County, Virginia Gainesville Election District Voting Precincts and Voting Places EVERGREEN BATTLEFIELD ALVEY

United States Patent (19) Lundblade

(12) Patent Application Publication (10) Pub. No.: US 2014/ A1

SEA STARS (ECHINODERMATA: ASTEROIDEA) IN ROCKY REEFS OF GUADALUPE ISLAND, NORTHWEST MÉXICO

United States Patent (19) Johnston

27 25 y. (12) Patent Application Publication (10) Pub. No.: US 2009/ A1. (19) United States. (43) Pub. Date: Sep. 24, 2009.

Magnificat for a Prosperous World

United States Patent (19)

Operator s Manual Manual de Operario YTH22V Rev. 2. English/Spanish

United States Patent (19)

Salem, 1692 for. Women s Choir. Keith A. Hamel

Operator s Manual Manual de Operario LGT48DXL Rev. 2. English/Spanish

(n) \signe is being company Chicago I A. 239: Eli et al. 705/1

Pre ven tion of Her pes Genitalis by the Bul gar ian Vac cine F.HSV-2 V (PRK): Pre lim i nary Clin i cal Ev i dence

œ j J œ. j œ œ œ j œ œ œ œ œ œ œ j œ œ œ œ œ œ> j œ œ œ œ œ

Operator s Manual Manual de Operario YTH24V English/Spanish

Peo ple & Places. ect. RSVP Amy Cruce (785) or

OB SO LE TE IN VEN TO RY MA NA GE MENT. CA SE STU DY Zarządzanie zapasami produktów przestarzałych. Studium przypadku

Toyostove Error Code EE 2 (EE 6)

al-zma F.ES 2 trao. Vacksow 4. A LEO 42 -sa a77 Oeway Jan. 8, 1963 J. A. ALEO 3,072,285 SURVIVAL KIT CONTAINER Filed June 27, Sheets-Sheet

United States Patent (19) Pfeiffer

Hymn of the Week. March 6 Ash Wednesday. Sunday s Palms Are Wednesday s Ashes

(12) Patent Application Publication (10) Pub. No.: US 2013/ A1

(12) United States Patent (10) Patent No.: US 7555,147 B2

United States Patent (19)

THE HIGHEST HEAVEN. Dra matic Pub lishing Woodstock, Il li nois Eng land Aus tra lia New Zea land. A Full-length Play by JOSE CRUZ GON ZA LEZ

PN 3000 Series Fail Closed Pneumatic Actuators

Hill. United States Patent (19) 11 Patent Number: 5,081,822. Boyd et al. of a capsule. A vacuum line is connected to an orifice in

; SO 3AE Eevice lets Motorists send Mayday. At Touch of

Ecce dies venit desideratus

United States Patent (19)

Franklin Lakes, N.J. 21 Appl. No.: 23, Filed: Feb. 26, Int. Cl'... A61B 17/ U.S. C / Field of Search...

United States Patent (19) Lieberman

(12) Patent Application Publication (10) Pub. No.: US 2010/ A1

280 Propane Barbecue Assembly Manual

THE PAUL MAGID EXHIBITION COLLECTION, PART

HHHHHHHHHHIIII. United States Patent (19) Carter-Mann. 11 Patent Number: 5,314, Date of Patent: May 24, 1994

S. ll IN THE SENATE OF THE UNITED STATES A BILL

United States Patent Flider

(12) Patent Application Publication (10) Pub. No.: US 2008/ A1

GEO MOR PHO LOGI CAL DE VEL OP MENT OF THE MEM PHITE FLOOD PLAIN OVER THE PAST 6,000 YEARS

"aénez % 46 ATTORNEYS. 777 af2 afar/ ca 4%aza - Gaapais Z. M7, 4.7"ow Aaaay Goa al Zy. Nov. 29, 1966 M. LE ROY GOFF III, ETA. 3,288,403.

Alma Redemptoris Mater

Saebace? TORNEYS &NS. Nov. 11, 1969 c.c. TETZLAFF ET AL 3,477,106 HOSE CLAMP WITH HOSE ATTACHING MEANS. INVENTORs SYS2S 62 GAORGE CHAMBAAPLAIN

FOAM PROPORTIONING EQUIPMENT

Feb. 18, 1969 W. J. EveRETT, Jr 3,428,277 GLIDING PARACHUTE filed Feb. 3, Sheet A of 5 INVENTOR. w/44 fam V Aweeery Jr. "Arya.

3 Burner ASSEMBLY MANUAL

United States Patent (19) Paulson et al.

Operator s Manual Manual de Operario YT46LS English/Spanish

YT2142F. Operator's Manual Rev. 1 WARNING:

Emergency Management Portable Water System Set-up and Operations Manual

(12) Patent Application Publication (10) Pub. No.: US 2009/ A1. Schuler (43) Pub. Date: Mar. 12, 2009

BARGE: GBL 3530 HULL No. JEFFBOAT

Transcription:

March 1, 2001 Foam 20a 1. DESCRIPTION A De luge Blad der Tank Foam/Wa ter Sys tem is a stan dard de luge sys tem ca - pa ble of dis charg ing a foam/wa ter so lu - tion au to mat i cally through open sprin - klers, spray noz zles, mon i tor noz zles, and other dis charge de vices. A De luge Blad der Tank Foam/Wa ter Sys tem with a hy drau li cally ac tu ated Halar coated Vi king De luge Con cen trate Con trol Valve ( CCV ) con sists of a stan dard de - luge sys tem us ing a Vi king De luge Valve com plete with full stan dard trim and de tec tion and re leas ing de vices on the wa ter supply line, a con cen trate con trol ler-proportioning de vice with ap - pro pri ately sized or i fice, a hy drau li cally ac tu ated Halar coated Vi king De luge CCV on foam con cen trate line, a foam con cen trate blad der tank and trim and foam agent. 2. OPERATION Ac tu a tion of the re lease line (pneu- matic, hy drau lic or elec tric) re lieves the pres sure in the prim ing cham ber of both the Vi king de luge valve (C) and the Halar coated Vi king de luge CCV (D). This al lows the clap per to open on both valves (C) and (D). The sys tem pip ing is filled with wa ter, ac ti vat ing con nected alarms and pres sur iz ing the blad der tank (A) by the wa ter sup ply pip ing (12). Sys tem wa ter pres sure in the space be - tween the flex i ble blad der and the in side sur face of the steel tank, causes the blad der to col lapse, forc ing the foam con cen trate out through the foam con - cen trate dis charge pip ing (15), Halar coated CCV (D), and the me ter ing or i - fice of the con cen trate con trol ler (B), into the venturi, (low pres sure) area of the con cen trate con trol ler (B). The foam con cen trate is pro por tioned (usu- ally 1%, 3% or 6%), with the main wa ter sup ply, send ing foam so lu tion to the sprin klers and foam/wa ter dis charge de vices down stream. 3. DISCHARGE DEVICES Open stan dard spray sprinklers Foam/wa ter sprin klers Non-aspirating spray noz zles Man ual and os cil lat ing mon i tors Foam cham bers Sub-surface in jec tion (forcing foam maker) Hose reels and hand lines... and other dis pens ing de vices 4. GENERAL IN STRUC TIONS AND WARNINGS A. Re fer to the Gen eral Notes and Warn ings at the end of the De sign sec tion of the foam wa ter data book. B. Re fer to spe cific tech ni cal data sheets, ac cept able in stal la tion stan dards, codes and Au thor ity Hav ing Ju ris dic tion for ad di tional in stal la tion, op er a tion and main te - nance in struc tions. C. In spec tions - It is im per a tive that the sys tem be in spected and tested on a reg u lar ba sis. See In - spec tion and Main te nance. D. WARNING - Any sys tem main te - nance or test ing which in volves plac ing a con trol valve or de tec - tion sys tem out of ser vice may elim i nate the Fire Pro tec tion of that sys tem. Prior to pro ceed ing, no tify all Au thor ities Hav ing Ju ris - dic tion. Con sid er ation should be given to em ploy ment of a Fire Pa - trol in the af fected area. E. The valve, trim and as sem bly must be in stalled in an area not sub ject to freez ing tem per a tures or phys i - cal dam age. 5. DESIGN & INSTALLATION WARNING: Lo cate all por tions of the foam/wa ter sys tem sub ject to freez ing, in a heated area. A. Re fer to the Spe cial Notes on page 20c and the Gen eral Notes and Warn ings on page 50a-d in the De sign Sec tion of the foam wa ter data book. B. In stall the de luge valve (C) and trim in ac cor dance with the Vi king En - gi neering and De sign Data Book. C. In stall the pro por tion ing de vice (B), con cen trate con trol ler with in - te gral or i fice, in riser pip ing. D. In stall foam so lu tion test valve (17) and sys tem iso la tion valve (18). These valves are used to con duct foam/wa ter so lu tion tests. E. In stall hy drau li cally ac tu ated Halar coated Vi king De luge foam CCV (D) and as so ci ated trim as in - di cated on Fig ure 20, Page 20b, and trim charts or tech ni cal data pages. F. In stall blad der tank (A) in ac cor - dance with the man u fac turer s in - struc tions with con nec tions as shown on Fig ure 20, Page 20b and herein de scribed. 1. Lo cate the tank as close as prac ti cal to the sys tem riser. (See Spe cial Note B on Page 20c) 2. Al low enough room around the tank to ser vice the blad der. 3. Al low ac cess to the tank for fill - ing from bar rels of foam con - cen trate 4. In stall the pipe from the riser to the tank as in di cated on Fig - ure 20. In stall the pip ing from the tank (A) to the con cen - trate con trol ler (B) as straight as pos si ble. 5. All valves and de vices should be lo cated for easy ac cess for op er a tion and main te nance. G. Pres sur ize Sys tem 1. Ver ify that wa ter supply valve (10) is closed, then place blad der tank (A) in ser vice by fol low ing man u fac turer s in - struc tions 2. Close tank wa ter supply con - trol valve (11), then place the de luge valve (C) in ser vice as fol lows (See in stal la tion in - struc tions on Vi king Tech ni - cal Data Sheet) 3. Set release and detection sys - tem according to installation in - structions for type of release used (Pneumatic, Hydraulic or Elec tric) 4. Prime both Vi king De luge valves (C & D) by open ing the prim ing valve on the de luge valve (C) trim. Bleed off any air pres sure trapped in the prim ing line (13) to the Halar coated CCV (D) by open ing the 3 way pres sure gauge valve (14). Once air pres sure has been re lieved, close the 3 way valve and plug out let. Re-open 3 way valve to main - tain pres sure on gauge (14) 5. When pres sure in de luge valve (C) prim ing cham ber equals sys tem wa ter supply pres sure, turn on sys tem wa - ter sup ply by open ing main drain on de luge valve (C) and partially open ing wa ter sup ply valve (10). When wa - ter ap pears at main drain, slowly close main drain. Be - fore fully open ing wa ter sup - ply con trol valve (10), place alarm test shut-off valve in alarm po si tion, and open tank Form No. 011092 Re places Foam 201a-f dated Feb ru ary 9, 1998. Re placed ATC ref er ence with ARC and re vised page num ber.

Foam 20b March 1, 2001 FIGURE 20

March 1, 2001 Foam 20c wa ter sup ply con trol valve (11) A. Foam Con cen trate Blad der Tank com - plete with Items 1-8 1. Wa ter Drain/Fill Valve - 2. Fill Line Mas ter Shut-off Valve. 3. Con cen trate Drain/Fill Valve 4. Fill Cup Sight Gauge Shut-off Valve - 5. Sight Gauge As sem bly - The trim for this as sem bly var ies with the type of foam con cen trate to be used. Re fer to Tank Man u fac - turer s O & M Manual for spe cific de tails. 6. Tank Water Vent Valve - 7. Hy dro static Re lief Valve A B C D SYS TEM COM PO NENTS FOR FIGURE 20 - BLAD DER TANK FOAM SYSTEM WITH HYDRAULICALLY ACTUATED 8. Di a phragm Con cen trate Vent Valve- B. Pro por tioning De vice - Con cen trate Con trol ler with In te gral Or i fice C. Type of Sys tem - De luge Valve with Standard Trim and Gauges con - nected to an ap pro pri ate re lease and de tec tion sys tem 10. Wa ter Sup ply Con trol Valve - NORMALLY OPEN D. Foam Con cen trate Con trol Valve ( CCV ) - Hy drau lically ac tu ated Halar coated Vi king De luge Valve 14. Wa ter Pres sure Gauge and 3 way valve, and re main der of CCV spe - cial trim 19. 1/2" Foam Con cen trate Auxillary Drain Valve E. Ac ces sory Trim - (Or der each item sep - a rately ) SPECIAL NOTES 9. Con cen trate Con trol Shut-off Valve - NORMALLY OPEN *** 11. Tank Water Sup ply Con trol Valve - NORMALLY OPEN 12. Wa ter Sup ply Pip ing to Blad der Tank 13. Re lease Line/Priming Line Pip - ing to foam CCV (D) 15. Foam Con cen trate Dis charge Pip ing 16. Foam Con cen trate Swing Check Valve 17. Foam So lu tion Test Valve - 18. Sys tem Iso la tion Valve - NORMALLY OPEN *** Full Port Bronze Body with 316 Stain less Steel Trim and Ball (2" and un der) for AFFF & ARC. Cast Iron Body OS & Y with Pro vide a min i mum of 5 pipe di am e ters of straight pipe on the in let and out let of the conc en trate con trol ler (B) to min i mize tur bu lence in side the con cen trate con trol ler. Ex cep tion, the out let for the tank wa ter sup ply con trol valve (11) maybe con nected nearer to the in let of the con cen trate con trol ler and should not c ause ex ces sive tur bu lence. How ever, if the out let for the foam so lu tion test valve (17) is lo cated closer than 5 pipe di am e ters, there may be tur bu lence at high flow rates. The com bined to tal equiv a lent length of pipe, fit tings and valves in both the wa ter sup ply in let pip ing (12) and the foam con cen trate dis charge pip ing (15), must not ex ceed 50 equiv a lent feet (15.2 me ters). This will al low both pipes to be the same size as the foam liq uid in let to the con cen trate con trol ler. Should the to tal equiv a lent length ex ceed 50 feet (15.2 me ters), then re fer to the Pro por tioning Device De sign Data loc ated in the De sign sec tion of this Data book for the method of cal cu lat ing these pipe sizes. The Halar coated de luge CCV (D) and swing check valve (16) must be con nected ad ja cent to the con cen trate con trol ler us ing pipe nip ples as short as pos si ble. Fig ure 20 is a gen eral sche matic of the re quired pip ing ar range ment. Re fer to the ap pro p ri ate tech ni cal data page for spe cific in for ma tion re gard ing the valve, tank and re lated trim and de vices. E The tech ni cal in for ma tion, state ments and rec om men da tions con tained in this man ual are based on in for ma tion and tests which, to the best of our knowl edge, we be lieve to be de pend able. It rep re sents ge n eral guide lines only, and the ac cu racy or com plete ness thereof, are not guar an teed since con di tions of han dling and us age are out side our con trol. The pur chaser should de ter mine the suit abil ity of the product for its in tended use and as sumes all risks and li a bil ity what so ever in con nec tion therewith. F The Halar coated foam con cen trate con trol de luge CCV (D) does not re quire any trim ex cept for a ½ prim ing line (13) and wa ter pres sure gauge and 3 way valve (14) from the main de luge valve (C) to the prim ing cham ber of valve (D). Plug all the re main ing valve trim out lets. Con nect CCV (D) prim ing line (13) to de luge valve (C) as shown on Fig ure 20. Re fer to the Equip ment sec tion of this data book un der Valve s, to find the cor rect trim kit part num ber for the cor re spond ing size of Halar coated foam con cen trate con trol de luge valve (D) re quired. G A strainer is not re quired in the foam con cen trate dis charge pip ing (15) of blad der tank sys tems per NFPA Stan dards.

Foam 20d March 1, 2001 bronze Trim and Seats (over 2") for AFFF only. and sys tem iso la tion valve (18). With sys tem fully set, fully open and se cure wa ter sup - ply con trol valve (10). 6. Ver ify nor mal valve po si tions 7. Check for and re pair any leaks. 6. REMOVING THE SYSTEM FROM SERVICE AND RE - TURNING THE SYSTEM TO SERVICE WARNING: See Warn ing on Page 20e, Item 7, In spec tion and Main te nance A. For sys tem and riser pip ing main - te nance and ser vice. 1. Close wa ter sup ply con trol valve (10) 2. Close con cen trate shut-off valve (9***) and tank wa ter sup ply valve (11) 3. Open all drain valves on de luge sys tem 4. Leave sys tem iso la tion valve (18) open 5. Re fer to in struc tions for re mov - ing the de luge valve (C) from ser vice in the Vi king En gi - neering and De sign Data Book 6. Per form main te nance and ser - vice on sys tem and riser pip - ing 7. Open con cen trate shut-off valve (9***) 8. With tank wa ter sup ply valve (11) closed, place the de luge valve (C) in ser vice as fol lows (See in stal la tion in struc tions in Vi king En gi neering and De - sign Data Book 9. Set re lease and de tec tion sys - tem ac cord ing to in stal la tion in struc tions for type of re - lease used (Pneu matic, Hy - drau lic or Elec tric) 10. Prime both Vi king De luge valves (C & D) by open ing the prim ing valve on the de luge valve (C) trim. Bleed off any air pres sure trapped in the prim - ing line to the CCV by opening the 3 way pres sure gauge valve (14). Once air pres sure has been re lieved, close the 3 way valve and plug the out let. Re-open 3 way valve to main - tain pres sure on gauge (14) 11. When pres sure in de luge valve (C & D) prim ing cham bers equal sys tem wa ter sup ply pres sure, turn on sys tem wa - ter sup ply by open ing main drain on de luge valve (C) and par tially open ing wa ter sup ply valve (10). When wa ter ap - pears at main drain, slowly close main drain. Be fore fully open ing wa ter supply valve (10), place alarm test shut-off valve in alarm po si tion. Ver ify sys tem iso la tion valve (18) is open and open tank wa ter sup ply valve (11). With sys tem fully set, fully open and se cure wa ter sup ply con trol valve (10) 12. Ver ify nor mal valve po si tions 13. Check for and re pair any leaks. B. For tank main te nance and ser vice - While leav ing de luge sys tem in ser vice 1. Close con cen trate shut-off valve (9***) and tank wa ter sup ply (11) 2. Fol low tank man u fac turer s pro ce dures for re mov ing from ser vice, and per form main te nance 3. To re turn to ser vice, close wa - ter sup ply con trol valve (10) and ver ify Halar coated foam CCV (D) is closed. Fol - low tank man u fac turer s pro - ce dure 4. Ver ify that con cen trate shut-off valve (9***), tank wa ter sup - ply (11) and sys tem iso la tion valve (18) are open. Ver ify de luge valve (C) is primed, then open wa ter sup ply con - trol valve (10) 5. Ver ify nor mal valve po si tions 6. Check for an re pair any leaks C. For to tal sys tem main te nance and ser vice 1. Close wa ter sup ply con trol valve (10), con cen trate con - trol shut-off valve (9***) and tank wa ter sup ply valve (11) 2. Open all drain valves on de luge sys tem 3. Leave sys tem iso la tion valve (18) open 4. Re fer to in struc tions for re mov - ing the de luge valve (C) from ser vice. See ap pro pri ate Vi - king Tech ni cal Data Sheet 5. Per form main te nance and ser - vice as re quired 6. Refer to the Special Notes on page 20c and the Gen eral Notes and Warn ings at the end of the de sign sec tion. 7. All valves should be closed, in - clud ing con cen trate con trol shut-off valve (9***), wa ter sup ply con trol valve (10), tank wa ter sup ply valve (11), foam so lu tion test valve (17), sys tem iso la tion valve (18) and Halar coated foam CCV (D), and alarm test shut-off valve on de luge valve (C) trim. 8. Ver ify that wa ter supply valve (10) is closed, then place blad der tank (A) in ser vice by fol low ing man u fac turer s in - struc tions. 9. Place the de luge valve (C) in ser vice as fol lows (See in stal - la tion in struc tions on Vi king Tech ni cal Data Sheet) 10. Set re lease and de tec tion sys - tem ac cord ing to in stal la tion in struc tions for type of re lease used (Pneu matic, Hy drau lic or Elec tric) 11. Prime both Vi king De luge valves (C & D) by open ing the prim ing valve on the de luge valve (C) trim. Bleed off any air pres sure trapped in the prim ing line (13) to the Halar coated CCV by open ing the 3 way pres sure gauge valve (14). Once air pres sure has been re lieved, close the 3 way valve and plug out let. Re-open 3 way valve to main - tain pres sure on gauge (14) 12. When pres sure in de luge valve (C & D) prim ing cham bers equal sys tem wa ter supply pres sure, turn on sys tem wa - ter sup ply by open ing main drain on de luge valve (C) and par tially open ing wa ter supply valve (10). When wa ter ap - pears at main drain, slowly close main drain. Be fore fully open ing wa ter sup ply con trol valve (10), place alarm test shut-off valve in alarm po si - tion, and open tank wa ter sup -

March 1, 2001 Foam 20e ply con trol valve (11) and sys - tem iso la tion valve (18). With sys tem fully set, fully open and se cure wa ter sup ply con trol valve (10) 13. Ver ify nor mal valve po si tions 14. Check for and re pair any leaks 7. INSPECTION AND MAIN TE - NANCE NO TICE: The owner is re spon si ble for main tain ing the fire pro tec tion sys tem and de vices in proper op er at ing con di - tion. For min i mum main te nance and in - spec tion re quire ments, re fer to rec og - nized stan dards such as those pro - duced by NFPA, LPC and VdS which de scribe care and main te nance of sprin kler sys tems. In ad di tion, the Au- thor ity Hav ing Ju ris dic tion may have ad di tional main te nance, test ing and in - spec tion re quire ments which must be fol lowed. WARNING - Any sys tem main te nance or test ing which in volves plac ing a con - trol valve or de tec tion sys tem out of ser - vice may elim i nate the Fire Pro tec tion of that sys tem. Prior to pro ceed ing, no tify all Au thor ities Hav ing Ju ris dic tion. Con - sid er ation should be given to em ploy - ment of a Fire Pa trol in the af fected area. In spec tions - It is im per a tive that the sys tem be in spected and tested on a reg u lar ba sis. The fol low ing rec om - men da tions are min i mum re quire - ments. The fre quency of the in spec - tions may vary due to con tam i nated or cor ro sive wa ter sup plies and cor ro sive at mo spheres. In ad di tion, the alarm de - vices or other con nected equip ment may re quire more fre quent in spec tions. Re fer to the tech ni cal data, sys tem de - scrip tion, ap pli ca ble codes and Au thor - ity Hav ing Ju ris dic tion for min i mum re - quire ments. Prior to test ing the equip - ment, no tify ap pro pri ate per son nel. A. Alarm Test - At least quar terly, test all con nected alarm de vices by open ing the re mote in spec tors test valve. B. Riser Flow Test - At least quar terly, per form a riser flow test. Ob serve and re cord the sup ply pres sure gauge read ing. Open the main drain valve fully. Again, ob serve and re cord the sup ply pres sure gauge read ing. Close the main drain valve. If the read ings vary sig nif i cantly from those pre vi ously es tab lished or from nor mal, check the main supply line for ob struc - tions or closed valves and cor rect. C. Gen eral - Vi sually in spect the valve, trim, pip ing, alarm de vices and con nected equip ment for phys i cal dam age, freez ing, cor ro - sion or other con di tions that may in hibit the proper op er a tion of the sys tem. 8. TROUBLESHOOTING A. For op er at ing and main te nance in - struc tions per tain ing to Vi king man u fac tured equip ment, refer to the ap pro pri ate Vi king Tech ni cal Data Sheet. B. For op er at ing and main te nance in - struc tions per tain ing to foam equip ment man u fac tured for Vi - king, refer to the ap pro pri ate sec - tion of the Vi king Foam Data Book. C. For op er a tion and main te nance in - struc tions for all other equip ment, re fer to ap pro pri ate equip ment data 9. EMERGENCY INSTRUCTIONS A. Dur ing and af ter a fire: 1. Make sure the fire is OUT! Make a com plete in spec tion of all ar eas cov ered by this sys tem in clud ing ar eas not in - volved in the fire. Place a fire watch in the en tire area un til the sys tem is back in ser vice. 2. Close the sys tem wa ter supply con trol valve (10). Post a per - son at the valve ready to turn it back on, should the fire re kin - dle. Close the tank wa ter sup - ply valve (11). 3. Open the flow test an gle vlave, sys tem drain valve and all auxillary drain valves. Close drain valves once the sys tem has com pletely drained. 4. Re place any fused sprin klers in the pilot line (if so equipped), with the same type and tem - per a ture rat ing as were re - moved. Check all re leases and/or de tec tors in the fire area for dam age. 5. Iso late the blad der tank (A) by clos ing the con cen trate con - trol shut-off valve (9***) and ver ify that the tank wa ter sup - ply con trol valve (11) is closed. 6. Check the level of foam con - cen trate and re fill the foam con cen trate blad der tank (A) by fol low ing tank man u fac - turer s in struc tions. Al ways re place the foam con cen trate with the same brand and type as that be ing used cur rently. Note: Never in ter mix dif fer ent types or brands of foam con - cen trate, as this could cause them to gel or so lid ify, and ren der the con cen trate use - less. 7. Re turn the com plete sys tem to ser vice by fol low ing the pro - ce dure listed in Sec tion 6C, Steps 6 through 14. 8. Per form quar terly test. 9. Fire can dam age pip ing and sup ports, so call your Vi king Rep re sen ta tive for as sis tance in ob tain ing a com plete in - spec tion and ad di tional re - place ment sprin klers. For ad - di tional de tails, see tech ni cal data sheets for spe cific de - vice. NOTE: If re place ment foam con cen - trate is not im me di ately avail able, ac ti vate the de luge sys tem por tion of the foam/wa ter sys tem un til the re place ment con cen trate ar rives. B. For emer gency shut down of the com plete sys tem 1. Close main wa ter sup ply valve (10) 2. Close con cen trate con trol shut-off valve (9***) to elim i - nate the flow ing of the foam con cen trate to the hy drau li - cally ac tu ated Halar coated Vi king De luge CCV (D) and the con cen trate con trol ler (B) 3. Close tank wa ter supply con - trol valve (11) to re duce the pres sure on the blad der tank (A) 4. Open main drain 5. Com pletely drain sys tem 6. Re pair the dam aged por tion of the dis charge sys tem, or per - form emer gency main te - nance as re quired 7. Re turn the riser and foam sys - tem to ser vice by fol low ing the pro ce dure listed in Sec - tion 6C, Steps 4 and 6 through 14 C. If the foam con cen trate pipe sys - tem is dam aged: 1. Close the con cen trate con trol shut-off valve (9***) to elim i - nate the flow ing of the foam con cen trate to the hy drau li -

Foam 20f March 1, 2001 cally ac tu ated Vi king de luge foam CCV (D) and the con - cen trate con trol ler (B) 2. Close the tank wa ter sup ply con trol valve (11) to re duce the pres sure on the bladder tank (A). 3. Ver ify that the Halar coated foam de luge CCV (D) is closed by ob serv ing wa ter pres sure gauge (14). If the wa ter pres sure gauge reads the same or higher than the sys tem wa ter pres sure gauge lo cated on the Vi king de luge valve (C), the foam de luge CCV (D) is closed. 4. Re pair the dam aged por tion of the foam con cen trate piping sys tem. 5. Re turn the foam con cen trate sys tem to ser vice, by fol low - ing the pro ce dure as de - scribed above in Sec tion 6B, items 3 through 6. NOTE: If there are no dam aged sec - tions of the dis tri bu tion sys tem, the de luge por tion of the sprin kler sys tem may be kept in ser vice for pro tec tion, while re pairs to the foam con cen trate sys tem are per - formed. Re places Foam 201a-f dated Feb ru ary 9, 1998. Re placed ATC ref er ence with ARC and re vised page num ber. Form No. 011092