13/06/2013 1
GROUPE SCE A wide range of skills & competencies in land planning and environment management www.groupe-sce.fr 13/06/2013 2
GROUPE SCE At a glance Staff growth Turnover growth (in M ) Staff growth Turnover growth (in M ) 13/06/2013 3
GROUPE SCE Locations abroad ODISEA Consulting (Bucarest) Romania Groupe SCE Algérie (Alger) - Algeria Groupe SCE Maroc (Casablanca) - Morocco Groupe SCE Middle East (Abu Dhabi) U.A.E, and (Doha) - Qatar Representative office (Qingdao) China Representative office (Hanoi) Vietnam Groupe SCE UK (Leeds ) - UK 13/06/2013 4
GROUPE SCE - Fields of Activities Water Land and Urban Development Environment Information Systems Marine Environment Ports and Marina 13/06/2013 5
SCE
Our Missions Consulting & Engineering Technical Assistance Institutional Strengthening Capacity Building/Training Project Management Works supervision 13/06/2013 7
Our Fields of Activities Urban Planning and programming Urban infrastructure Transportation Infrastructure Water Water Environment Energy 13/06/2013 8
Yves GILLET President François BAILLY Managing Director Urban Planning Director Patrick LIGEARD Spatial Strategy Christoph VON FISCHER Urban planning Sylvain GRISOT Landscape and Public spaces Jean-Luc PATRY Infrastructure Director Thierry DELAUNAY Stéphane MALGORN Urban and Public Transport Cyrille BEAU Rail Transport Sébastien BODAINE Mobility Sébastien BODAINE Urban Infrastructure Rehabilitation François GERAIN Urban Infrastructure development Vincent CHOLLET Road Infrastructure Pascal QUINAOU Water Director Gilles WAROT Deputy Director Jean-François COMMAILLE Urban Hydraulic Studies Antoine FAZIO Urban Hydraulic Project management Thierry MARTINET Water Treatment Jean-François COMMAILLE Integrated Water Resources management Jacques MARREC Agro-environment Christelle BESSE Rivers and Wetlands Jérémie LEMAIRE Environment Director Raynald Le Menn Noise, Air and Risk Gilles SAUVAGE Contaminated sites and polluted soils Pascal VICAT Environmental Protection and Management Raynald LE MENN Energy Bruno VIOLLEAU International Director Vincent LELOUP Shared Services Director Marie GODARD Finance, Accounting and Legal Frédéric MARC Human Resources Virginie PLOQUIN Communication Anne-Sophie MACE ICT Sylvain DAGNAUD Quality Marie GODARD Civil Works Stéphane MALGORN CSR Cécile VILLAINE Port Infrastructure Tom RENAUD Bayonne Patrice LARIOS Caen David MARIE Caraïbes Gaëlle VERJUS- LAGRANDCO URT Branches & Business Development La Rochelle Sébastien BRISSON Director Matthieu NEDONCHELLE Montpellie Lyon r Pierre-Henri Maud DEPLANNE JOALLAN D Orléans Nicolas TOCQUAR D Paris Bernard BARADEL Toulon Olivier VIGNOULLE Toulouse Sophie DERRIEN SCE - 5 avenue Augustin-Louis Cauchy BP 10703-44307 Nantes cedex 3 FRANCE Tel: +33 (2) 40 68 51 55 Fax: +33 (2) 40 68 79 43 SCE Organisation Chart 13/06/2013 9
References in France Transportation BRT: Feasibility study for developing a Bus Rapid Transit (BRT) line La Rochelle Extension of the rapid transit network in le Mans Feasibility study of the rapid bus line Chronobus on the isle of Nantes Nantes BRT line 4 Project management - Design & Realization Design and realization of a rapid bus lines (Chronobus c5 & c6) Tram: Extension of Nantes' first Tram line, 1996-2000 Southward extension of Nantes' second Tram line, 2001 2005 Design for insertion of Line A of Angers Tram network, 2005 2006 Planning, Scheduling and Coordination of works for Angers' first Tram line, 2007 2011 Linking of Nantes Tram line 1 &2 design & project management, 2007 2012 Tram- train link Nantes & Châteubriant management, 2009 2012 Road : Road of Vannes rehabilitation project Road 763 - Vallet Clission Preliminary Study design & works project Ring of Nantes Interchange of Grand Lieu Door Development National Road 10 Bypass of Chauvauds Road 923 between Ancenis and Le Maine et Loire county 13/06/2013 10
Project Reference - France Feasibility study for developing a Bus Rapid Transit (BRT) line in La Rochelle Objective : Provide insertion expertise in the creation of BRT line between Minimes neighbourhood and the train station by combining bus and tram traffic, particularly at crossroads Missions: Insertion and design studies for infrastructure and urban development Putting together technical documentation for traffic light signalling, road marking and signposting in preparation for the project's realisation Putting together documentation required for the consideration of subsidies by the State Participation in trials and implementation of the designated tram and bus way Time frame: 2000-2001 13/06/2013 11
Project Reference - France Nantes Bus Rapid Transit (BRT) Line 4 - Project Management Design & realisation Objective : Assist Municipalities of Nantes in implementing construction of 6.6 km of designated road bed for the Busway (BRT) Missions: Project Management: - Overall project management - Financial management of operations - Planning, scheduling and coordination of all works (PSC) - Assistance for works contracts tender process - Provision of assistance for public information - Assistance during works' acceptance and commissioning Design: - Preliminary project studies - Preliminary & Detailed design, Approval of drawings Time frame: 2002-2006 13/06/2013 12
Project Reference - France Extension of The Rapid Transit Network in Le Mans Objective : Assist Le Mans Metropole in gerenal project management of complete project from design to works supervision for infrastructure and urban insertion Missions: BRT & LRT projects: - General project management - Preliminary & detailed design, Assistance for works contracts tender process, Approval of drawings, Project management of construction works, Works supervision for associated urban infrastructure - Administrative dossier BRT project only: - Preliminary & detailed design - Assistance for works contracts tender process - Approval of drawings - Project management of construction works, Works supervision for the BRT platform Time frame: 2010-2014 13/06/2013 13
Project Reference - France Planning, Scheduling and Coordination of works for Angers' first Tram line Objective : Assist Angers in Planning, scheduling and coordination (PSC) component of the first tram line project to implement the resources and methods required to ensure the project is delivered on-time and to limit the impact of the works on everyday urban life Projects characteristics: - Length of line: 12 km - 25 passenger stations - 74 junctions intersected by the tram - 4 park and ride car parks - 1 transport interchange bus/tram/train (SNCF rail station) - 1 major permanent structure for crossing the Maine river Missions : Planning of design and works phases Planning, scheduling and coordination (PSC) of construction works Monitoring of all works and events in the Angers agglomeration Time frame: 2007-2011 13/06/2013 14
Project Reference - France Southern Extension of Nantes Second Tram Line Objective : Assist SEMITAN in gerenal project management of extension line 2 of Tram network along 2.4 km to the South-West, the ring road and the link to major bus interchange (8 bus stop) Missions: Preliminary project studies Preliminary & detailed designs Assistance for works contracts tender process Project management of construction works Assistance during works' acceptance and commissioning Environmental impact study Analysis of different scenarios Analysis of project effects and insertion measures Preparation of local regulatory documentation Public interest survey documentation Time frame: 2001-2005 13/06/2013 15
Project References Vietnam Hanoi Urban Railway Line 3 Section Nhon- Hanoi Raiway Station Objective : Provide Technical Assistance (TA) to HRB in order to make sure that Metro line 3 is implemented to the required quality, on time and within the budget, and when opened operates effectively and efficiently Missions : FIDIC Contracts (MDB 2010 Edition and Yellow Book 1999 Edition) training courses to HRB staff Module 1: Practical use. Module 2 : Claim Management and Dispute Resolution Technical assistance services for : Reliability, Availability and Maintainability System (RAMS) Safety management Environmental monitoring Time frame : 2013-2014 13/06/2013 16
Project References - Morocco First BHLS (Bus with High Level of Services) line for the city of Agadir Objective : Assess the feasibility of a first BHLS Line in the city of Agadir (South Morocco, 700,000 inh, high touristic spot), and prepare the project for IFI financing (World Bank, AFD) Missions: Pre-feasility traffic study / diagnostic assessment, definition of a rapid transit system and of the priority BHNS line Feasibility study of a 10 to 12km line : Engineering study Environmental & social assessment Financial & economic analysis Institutional analysis Time frame: 2012-2013 13/06/2013 17
Sample References Information Systems, Urban Planning, Transportation Information Systems: GIS for Bangalore water supply & sewerage systems, India, French Govt financing, 2000-2003 Ningbo Central Water Supply System Central Control & Monitoring System, China, World Bank financing, 2006-2008 GIS for Greater Paris water supply network, 2003-2007 Urban Planning Greater Bangalore Metropolitan Spatial Planning and Data Infrastructure, India, French Govt financing, 2002-2007 Regeneration of Fes Medina UNESCO World Heritage Site, Morocco, MCC (USA) financing, 2009-2012 Rabat-Sale Development Master Plan, Environmental & Transportation Due Diligence, Morocco, 2008-2009 Cat Ba Island Development Plan Identification mission, Vietnam, local financing. 2012. Urban infrastructure: Breil Malville Urban renewal project, France, 2000-2007 Grand Pigeon Urban renewal project, France, 2003-2006 Evaluation of Ho Chi Minh City Public lighting project, Vietnam, French Govt financing, 2010 13/06/2013 18