AL-469 (FAA) CARTERSVILLE BRTEN DOBBINS ARB FULTON COUNTY AIRPORT- BROWN FIELD. BOKRT Turbojets: Expect K Turboprops: Expect 9000 or 7000

Similar documents
NCAA COLLEGE FOOTBALL NATIONAL CHAMPIONSHIP

2019 SUPER BOWL LIII

SE-3, 06 DEC 2018 to 03 JAN SE-3, 06 DEC 2018 to 03 JAN 2019

BAIRN FOUR ARRIVAL(RNAV) (BAIRN.BAIRN4) SE-3, 09 NOV 2017 to 07 DEC SE-3, 09 NOV 2017 to 07 DEC 2017 (BAIRN.BAIRN4)27APR17

SE-3, 01 FEB 2018 to 01 MAR SE-3, 01 FEB 2018 to 01 MAR 2018

GAA Membership List Airport Members 6/17

NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS INSTRUMENT APPROACH PROCEDURE CHARTS IFR ALTERNATE AIRPORT MINIMUMS

VERO BEACH VRB Chan 120 N W L-23-24, H-8 PHORD N W

SE-3, 11 OCT 2018 to 08 NOV SE-3, 11 OCT 2018 to 08 NOV 2018

2 Purpose and Need. 2.1 The Need for the Proposed Action Description of the Problem

GAA Membership List Airport Members 8/8/2016

O.C.G.A GEORGIA CODE Copyright 2014 by The State of Georgia All rights reserved. *** Current Through the 2014 Regular Session ***

I3202 WORKSHEET / DD-175 / JET LOG

Hartsfield Jackson Update prepared for:

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

MASTERS GOLF TOURNAMENT

Georgia Skywarn Spotter linked repeater System

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE

ISSUE SUMMARY: FUNCTIONAL CLASSIFICATION NETWORK UPDATE FOR PRINCIPAL ARTERIALS

American Job Center Finder

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments

APPENDIX B DRO INSTRUMENT APPROACH CHARTS & DEPARTURE PROCEDURES

Piedmont Triad International Airport

SW-3, 11 OCT 2018 to 08 NOV SW-3, 11 OCT 2018 to 08 NOV 2018

CONTACT INFORMATION - APPENDIX A

MASTERS GOLF TOURNAMENT AUGUSTA, GEORGIA APRIL 7 15, 2019

Navigation at the. Federal Aviation Administration Crossroads

Standard Instrument Approach Procedures, and Takeoff Minimums and. Obstacle Departure Procedures; Miscellaneous Amendments

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments

Overview of NextGen Institute Project

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments

Federal Aviation Administration. Optimization of Airspace and Procedures in the Metroplex (OAPM) Study Team Final Report Atlanta Metroplex

BOSTON ARTCC (vzbw) TRAINING SYLLABUS LEVEL: Center Controller (C1)

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

PROCEDURES SPECIAL OPERATIONS

JJEDI TWO ARRIVAL(RNAV)

Transitioning to ICAO Flight Plan why, when, what, how

11/21/2008 ZDC-ZTL LOA Version 1. Letter of Agreement

10-February 2019 ZTL JO B VIRTUAL AIR TRAFFIC SIMULATION NETWORK ATLANTA CENTER

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments

IFR SEPARATION WITHOUT RADAR

Providence ATCT Standard Operating Procedures

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

Flying an Approach with the Garmin GTN 750

Effective: GOLD COAST (YBCG) NEW PROCEDURES FOR INTRODUCTION OF ILS ON RWY 14

Pi Aero Instrument Rating Syllabus

I3203 WORKSHEET. b. FMS procedure turn approach Selecting appropriate transition (example VOR RWY 08 at KPNS)

Atlanta NextGen PBN Activities

[Docket No. FAA ; Airspace Docket No. 14-ASO-4] SUMMARY: This action proposes to amend Class E Airspace at Newnan, GA,

EASA Safety Information Bulletin

NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS INSTRUMENT APPROACH PROCEDURE CHARTS IFR ALTERNATE AIRPORT MINIMUMS

ATLANTA ARTC CENTER AND JACKSONVILLE ARTC CENTER LETTER OF AGREEMENT

Session Eight: FAA Southern Region Update 2018 GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau

Airservices Australia 2016

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports.

04 Installed on TWY T Installed on TWY T2 THRU T4 22 Installed on TWY T5

GEORGIA. Georgian Air Navigation Sakaeronavigatsia Ltd. AERONAUTICAL INFORMATION SERVICE. TBILISI/Tbilisi Airport, 0158 Tbilisi, Georgia

Albany ATCT Standard Operating Procedures

The First State Bank 4806 N. Henry Blvd. Stockbridge, GA (770)

I 3-Feb-16 ALLENTOWN PA LEHIGH VALLEY INTL I 10-Sep-06 CEDAR RAPIDS IA THE EASTERN IOWA I 14-Oct-07

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

A V I A T I O N BI 2008/72 C I V I L E

The Most Respected Name in Pilot Certification. IFR Flight Planning. Training Supplement. Revised

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments

Instrument Proficiency Check Flight Record

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

Chapter 6. Nonradar. Section 1. General DISTANCE

Standard Instrument Approach Procedures, and Takeoff Minimums. and Obstacle Departure Procedures; Miscellaneous Amendments

Greenville Spartanburg International

Approach (TMA) Air Traffic Control. An Introduction to Approach/Departure Control Airspace and Operating Positions... 2

Southern California Terminal Radar Approach Control and Ontario Airport Traffic Control Tower

Introduction to Navigation

Housing Market Update U.S. and Southeast Federal Reserve Bank of Atlanta February 24, 2011

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures

Flight Trials of CDA with Time-Based Metering at Atlanta International Airport

Jeppesen NavData and Charts

EXPLANATION OF TPP TERMS AND SYMBOLS

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

January 2018 Air Traffic Activity Summary

Southern Company's Designated Network Resources for 2016

MARKING AIDS TYPHOON EVACUATION APRON ABN H 107 WEST APRON H SOUTH H NORTH N E ARP PAR m E3 4 STOP

AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW)

Burlington ATCT Standard Operating Procedures

Standard Operational Procedures

BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB

Acknowledgements. Proprietary Information 1

Standard Operating Procedures

2007 Instrument Procedures Handbook; Chapter 5 Approach

Southern Company's Designated Network Resources for 2018

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures

PTA RADAR M INI MUM ALTI TUDE S PUERTO PLATA, DOM REP MDPP/POP PTA ,000 13,000 PUERTO PLATA

Transcription:

(BOKRT.BOKRT2) 17285 BOKRT TWO ARRIVAL(RNAV) AL-469 (FAA) FULTON AIRPORT- ATIS COBB INTL- ATIS GWINNETT -BRISCO FIELD ATIS APP CON 119.8 354.125 BRTEN 075 (22) BAPPY CHEROKEE 082 (2) KENZI COBB INTL- LEE GILMER MEMORIAL 082 GWINNETT - 040 (15) PONGG FULTON AIRPORT- PINGG 017 (23) NOTE: RNAV 1. NOTE: GPS required. 017 (10) BOKRT Turbojets: Expect 11000 250K Turboprops: Expect 9000 or Reciprocating: Expect or 5000 3500 042 (19) KEEPS KEEPS TRANSITION (KEEPS.BOKRT2): From BOKRT on track 017 to PINGG, then on track 017 to PONGG, then on track 040 to BRTEN, then on track 075 to BAPPY, then on track 082 to KENZI, then on track 082. LOST COMMUNICATIONS: Cross BOKRT at or below 11000, cross PONGG at or below, cross KENZI at 5000; after KENZI proceed direct to the IAF for desired approach to filed airport. BOKRT TWO ARRIVAL(RNAV) (BOKRT.BOKRT2) 12OCT17

(HLNDS.BUKHD1) 17005 BUKHD ONE ARRIVAL(RNAV) LTLFV WUDYA FULTON - ATIS COBB INTL- ATIS GWINNETT -BRISCO FIELD ATIS APP CON 121.0 268.7 RIZZZ 5300 193 (83) RIZZZ TRANSITION (RIZZZ.BUKHD1) WUDYA TRANSITION (WUDYA.BUKHD1) LANDING HMP/FFC/RYY/FTY/6A2/CCO/ 4600 147 (50) VPC/PUJ/MGE: From HLNDS on track 147 to BUKHD, then on track 152 to DRINC, then on track 152. MDTWN HAVVE 4600 147 (31) 327 179 4600 LANDING PDK/D73/LZU/CVC: From HLNDS on track 147 to BUKHD, then on track to CCOKE, then on track. HLNDS 147 (21) 3800 BUKHD Turbojets/Turboprops: Expect 8000 NOTE: RNAV 1. NOTE: GPS required. Reciprocating: Expect 5000 3800 152 (9) DRINC 3800 (11) 152 CCOKE FULTON AIRPORT- COBB INTL- COVINGTON MUNI HENRY AIRPORT GWINNETT - MONROE- WALTON BUKHD ONE ARRIVAL(RNAV) (HLNDS.BUKHD1) 15SEP16 NEWNAN COWETA RGNL FALCON FIELD GRIFFIN-SPALDING

(AWSON.DEHAN1) 16315 COBB INTL-McCOLLUM FIELD ATIS FULTON AIRPORT- ATIS GWINNETT - ATIS APP CON 126.975 257.9 APPLS HIGGI HELNN 7800 196 195 (28) 032 TRALZ SCNRY 9000 (68) 8500 235 (68) VIEWS NOTE: RADAR required NOTE: RNAV 1 NOTE: GPS required SPIKR 253 SHUNS 230 COBB INTL- (8) 253 230 (9) HOUPS AWSON 208 (8) 3500 (4) (33) 209 TFALS 162 (11) (7) 195 209 029 (34) DEHAN Expect 8000 WTWTH 162 234 (34) TARAA 255 (35) GWINNETT - MILBY FULTON AIRPORT- WEST GEORGIA RGNL- O V GRAY FIELD COVINGTON MUNI MONROE-WALTON RGNL FALCON FIELD HENRY AIRPORT NEWNAN COWETA GRIFFIN-SPALDING (NARRATIVE ON FOLLOWING PAGE) (AWSON.DEHAN1) 15SEP16

(AWSON.DEHAN1) 16259 APPLS TRANSITION (APPLS.DEHAN1) MILBY TRANSITION (MILBY.DEHAN1) SCNRY TRANSITION (SCNRY.DEHAN1) VIEWS TRANSITION (VIEWS.DEHAN1) LANDING HMP/D73/LZU/6A2/CVC: From AWSON on track 209 to DEHAN, then on track 208 to TFALS, then on track 162 to WTWTH, then on track 162. LANDING PDK/FFC/CCO: From AWSON on track 209 to DEHAN, then on track 208 to TFALS, then on track to HOUPS, then on track. LANDING RYY/VPC/PUJ/CTJ: From AWSON on track 209 to DEHAN, then on track 208 to TFALS, then on track 253 to SPIKR, then on track 253. LANDING FTY/MGE: From AWSON on track 209 to DEHAN, then on track 208 to TFALS, then on track 230 to SHUNS, then on track 230. (AWSON.DEHAN1) 15SEP16

(LGC.DIFFI3) 17229 DIFFI THREE ARRIVAL AL-469 (FAA) FULTON ATIS APP CON 119.8 354.125 ROME 115.4 RMG Chan 101 R-172 CHEROKEE DOBBINS 113.0 (T) DOB Chan 77 COBB INTL- LEE GILMER MEMORIAL GWINNETT - 21 DOBBINS ARB TIINI N33 41.90'-W85 03.08' VERTICAL NAVIGATION PLANNING INFORMATION Expect 5000 LAGRANGE 115.6 LGC Chan 103 N33 02.95'-W85 12.37' L-18, H-9-12 DIFFI N33 48.86' W85 04.10' TEMPO NANNC N33 23.32' W85 06.32' 21 (14) 352 N33 36.68' W85 02.32' 352 (7) (14) 013 013 013 (7) (5) 35 28 33 R-294 R-283 R-273 BUUZZ N33 16.66'-W85 08.30' VERTICAL NAVIGATION PLANNING INFORMATION FULTON AIRPORT- 116.9 ATL Chan 116 NOTE: DME required from LGC VORTAC to NANNC. TURBOJETS: Expect 11000 and 250K TURBOPROPS: Expect R-228 048 228 From LGC VORTAC on R-013 to TEMPO INT/LGC 35 DME, then on RMG VORTAC R-172 to DIFFI INT/RMG 21 DME. Expect RADAR vectors. DIFFI THREE ARRIVAL (LGC.DIFFI3) 04FEB16

SWTEE ONE ARRIVAL (RNAV) (SWTEE.SWTEE1) 15SEP16 YAMSS LPTON (35) NOTE: RNAV 1. NOTE: GPS required. OKRAA (34) 292 BIZKT 095 (5) SW TEE Turbojets/Turboprops: Expect 8000 Reciprocating: Expect 5000 N COBB INTL- LACCE 095 COBB INTL-McCOLLUM FIELD ATIS GW INNETT - DOBBINS ARB NORTHW EST FULTON AIRPORT-BROW N FIELD ATIS GW INNETT - ATIS APP CON 126.975 257.9 SWTEE ONE ARRIVAL (RNAV) (SWTEE.SWTEE1) 16315 MONROE- W ALTON ARRIVALROUTE DESCRIPTION BIZKT TRANSITION (BIZKT.SW TEE1) LPTON TRANSITION (LPTON.SW TEE1) From SW TEE on track 095 to LACCE, then on track 095. FULTON AIRPORT- BROW N FIELD COVINGTON MUNI

WRGNZ ONE ARRIVAL (RNAV) (WRGNZ.WRGNZ1) 12OCT17 275 ARRIVALROUTE DESCRIPTION filed airport. NORTHW EST KISTN TRANSITION (KISTN.W RGNZ1) LUKIE TRANSITION (LUKIE.W RGNZ1) SHRLT TRANSITION (SHRLT.W RGNZ1) vectors to final approach course. CHEROKEE DECLN 275 (2) COBB INTL- DBOLT TRANSITION (DBOLT.W RGNZ1) MMMOE TRANSITION (MMMOE.W RGNZ1) NOKIE TRANSITION (NOKIE.W RGNZ1) track 346 to CADUR, then on track 320 to track 296 to BAPPY, then on track 275 to DECLN, then on track 275. Expect RADAR or below 11000, cross CADUR at or below, cross DECLN at ; after DECLN proceed direct to desired approach IAF for FULTON GW INNETT - AIRPORT- BROW N FIELD W OGOM TRANSITION (W OGOM.W RGNZ1) From W RGNZ on track 346 to SKYME, then on LOGEN, then on track 309 to LOGEC, then on LOST COMMUNICATIONS: Cross W RGNZ at BAPPY 296 (14) LOGEC 309 (6) W RGNZ LOGEN 320 (14) (18) Turbojets: Expect 11000 250K Turboprops: Expect 8000 or 6000 CADUR 346 Reciprocating: Expect 6000 or (10) (41) NOKIE SKYME 346 003 340 271 (37) 325 W OGOM FULTON AIRPORT-BROW N FIELD ATIS GW INNETT - ATIS APP CON 128.575 343.675 MONROE-W ALTON COBB INTL-McCOLLUM FIELD ATIS LUKIE (67) MUARY NOTE: RADAR required NOTE: RNAV 1 NOTE: GPS required 325 (7) (57) SHRLT 256 285 (55) 287 (35) KISTN DBOLT MMMOE WIZZZ N KERLY WRGNZ ONE ARRIVAL (RNAV) AL-469 (FAA) (WRGNZ.WRGNZ1) 17285