Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011

Similar documents
Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

WORKSHEET 1 Wilderness Qualities or Attributes Evaluating the Effects of Project Activities on Wilderness Attributes

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Alternative 3 Prohibit Road Construction, Reconstruction, and Timber Harvest Except for Stewardship Purposes B Within Inventoried Roadless Areas

Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through

Attendees: 40 attendees representing 14 organizations/governmental entities.

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**:

Daisy Dean Trail 628/619 ATV Trail Construction

National Forests and Grasslands in Texas

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Final Recreation Report. Sunflower Allotment Grazing Analysis. July 2015

Rogue River Access and Management Plan Draft Alternatives

Continental Divide National Scenic Trail Legislative History and Planning Guidance

ROAD AND TRAIL PROJECT APPROVAL

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

RUSHMORE CONNECTOR TRAIL PROPOSAL

Flow Stand Up Paddle Board Parkway Plan Analysis

St. Joe Travel Management EA CULTURAL RESOURCES

Silver Creek Plunge Campground Reconstruction

General Implementation

S Central Coast Heritage Protection Act APRIL 21, 2016

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction

5.0 OUTDOOR RECREATION OPPORTUNITIES AND MANAGEMENT

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

Connie Rudd Superintendent, Black Canyon of the Gunnison National Park

Kelly Motorized Trails Project Proposed Action

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

ANAGEMENT. LAN November, 1996

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND

Cultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF RECREATION AND PARKS RECREATIONAL CARRYING CAPACITY GUIDELINES

Decision Memo Sun Valley Super Enduro & Cross-Country Mountain Bike Race. Recreation Event

112th CONGRESS. 1st Session H. R. 113 IN THE HOUSE OF REPRESENTATIVES

Recreation Opportunity Spectrum for River Management v

MAIN LAKE PROVINCIAL PARK

Discussion Topics. But what does counting tell us? Current Trends in Natural Resource Management

3.12 Roadless Areas and Unroaded Areas

Existing Resource Information

MANAGEMENT DIRECTION STATEMENT June, 1999

Welcome to the future of Terwillegar Park a Unique Natural Park

LOCAL PLAN FOR THE MANAGEMENT OF THE APPALACHIAN TRAIL IN MAINE. (GRAFTON NOTCH TO KATAHDIN) 1 January 2013 (Revised 5 February 2014)

BUTTE COUNTY FOREST ADVISORY COMMITTEE

ROUTE ANALYSIS PROCESS

MANAGEMENT DIRECTION STATEMENT June, 1999

Proposed Action Kaibab Campground Capital Improvement Project September 2008

Decision Notice & Finding of No Significant Impact Middle Citico Equestrian Trail Network

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

Watchorn Provincial Park. Management Plan

Business Item No

Response to Public Comments

Whychus Creek Wild and Scenic River Management Plan

DRAFT. Dorabelle Campground Rehabilitation

Thank you for this third opportunity to comment on the proposed revisions to the Coconino National Forest Management plan.

Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project

Blue River Trail Master Plan JSA to Town Hall June 2004

CHAPTER 5. Chapter 5 Recreation Element

Yard Creek Provincial Park. Management Plan

Natural and Cultural Resources Management, Part 610: Wilderness Stewardship

TETON COUNTY WYOMING PUBLIC LANDS INITIATIVE: TURIANO TEAM PROPOSAL

Ouimet Canyon Provincial Nature Reserve. Management Plan

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

Overview. Wilderness Act of Statement of Need. What is Wilderness Character. Monitoring Wilderness Character

Lake Myra County Park. Wake County, North Carolina Community Forum #2 June 12, 2008

Lakeview-Reeder Fuel Reduction Project

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012

Wallace Falls State Park Classification and Management Planning Stage 3 Preliminary Recommendations July 18, 2018 Sultan City Hall

Thank you for this second opportunity to comment on the proposed revisions to the Coconino National Forest Management plan.

DECISION NOTICE. Sled Springs OHV Trail System and Road Management Plan

Chetco River Kayaking Permit

MARBLE RIVER PROVINCIAL PARK

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

Evaluation of Outstanding Remarkable Values for Collawash River March 2011

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action

As outlined in the Tatshenshini-Alsek Park Management Agreement, park management will:

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Clearwater Lake Provincial Park. Draft Management Plan

Central Cascades Wilderness Strategies Project

APPENDIX I STANDARD CONSULTATION PROTOCOL FOR TRAVEL MANAGEMENT ROUTE DESIGNATION

Sibley LUPA. Board Executive Committee Meeting December 7, 2017

Appendix A BC Provincial Parks System Goals

Open Space and Mountain Parks (OSMP) Department

ANAGEMENT P LAN. February, for Elk Lakes and Height of the Rockies Provincial Parks. Ministry of Environment, Lands and Parks BC Parks Division

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS. Notice of intent to prepare an Environmental Impact Statement.

The Roots of Carrying Capacity

THUNDER HILL PROVINCIAL PARK

Mountain City, Ruby Mountains and Jarbidge Ranger Districts Combined Travel Management Project Final Environmental Impact Statement Summary Report

O REGON TRAILS SUMMIT. Oregon Trails Summit. Rogue River National Forest

WILDERNESS PLANNING. Wilderness. Interagency Regional Wilderness Stewardship Training. Alamosa, Colorado - March 26-29, 2007

Peter Axelson. Beneficial Designs, Inc. Minden, NV

SECTION 4. PUBLIC RECREATION

DIRECTOR S ORDER #41: Wilderness Preservation and Management

KANANASKIS COUNTRY PROVINCIAL RECREATION AREAS MANAGEMENT PLAN DRAFT TERMS OF REFERENCE - November 20, 2007

Special Recreation Management Areas Extensive Recreation Management Areas Public Lands Not Designated as Recreation Management Areas

Pembina Valley Provincial Park. Draft Management Plan

Transcription:

Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011 Primary Goals of the Proposed Action 1. Maintain or enhance ORVs primarily by managing recreation impacts. Manage these impacts by controlling access, by implementing limits on the number of users at one time, by placing seasonal limits on the type of recreational opportunities available in the corridor, and by developing and hardening specifically identified recreation sites 2. Improve visitors recreation experience while focusing on protection and enhancement of all ORVs. 3. Control the number of cars to address safety, resource damage, congestion, and lack of available parking areas. 4. Reduce impacts from dispersed camping (litter, fires, sanitation, violations, vegetation removal, etc.). 5. Protect water quality by allowing a limited number of day use-only visitors in Middle Fossil Creek from May to September, by providing toilets and other facilities at recreation sites that provide a vegetated buffer between the site and Fossil Creek, by rerouting portions of the waterfall trail, by paving, repairing, and potentially rerouting key road segments, by allowing a limited number of designated dispersed campsites outside of the riparian zone at Fossil Springs, by prohibiting campfires, and by implementing Best Management Practices (BMPs)s on roads, trails, and at developed recreation sites. 6. Concentrate camping in areas and seasons that can support this recreation activity while protecting or enhancing the ORVs. 7. Develop a shuttle system that would allow continued and controlled recreation access that promotes protection of the ORVs. 8. Continue to maintain FS 708 from Strawberry to support administrative access and emergency response during the summer season. 9. Develop a phased implementation approach that provides immediate ORV protection and allows for development of planned facilities in a timely manner. 10. Actively monitor and learn from the system as it responds to changes in recreation use and resource management. 11. Respond to information gathered in public workshops. Area Wide Management Institute year-round fees No glass containers would be allowed No campfires would be allowed Restrict vehicles to routes designated for motorized use and developed parking areas Developed creek access points with key information and visitor services Allow dispersed camping in all areas outside Wild and Scenic corridor unless specified otherwise in a closure order Phase implementation Fossil Creek WSR CRMP Forest Service proposed action details Page 1 of 6

Northern Wild Segment Access / Management Access via existing trail network. No new trail development. Designate as Primitive ROS classification No fires allowed Allow camping year-round Fossil Springs Recreational Segment Access Access via Fossil Springs Trail and Flume Trail (trailhead access: summer via shuttle, winter via private vehicle) Provide limited access controlled by a shuttle drop off system Allow for construction and maintenance of a helipad rescue site just outside corridor Designate as Semi-Primitive ROS classification Camping Designate dispersed campsites outside of riparian zone; limited in number (~ 5 campsites) Provide two composting toilets; one on each side of creek Limit group size to less than 25 people Consider requiring permits for camping No fires allowed Old Dam to Waterfall Wild Segment Maintain wildlife habitat in a relatively undisturbed condition No camping (day use only) and no designated trails Recreation use not encouraged but not closed Emphasize fish, wildlife, geology and water ORVs in this area Designate as Primitive ROS classification Middle Fossil Creek Recreational Segment SUMMER MANAGEMENT (May through September) Access Allow for day use only Provide access via shuttle system with shuttle hub staging areas at both ends- Fossil Creek Road (from Camp Verde) and Strawberry Road (between Fossil Springs TH and Strawberry close to Strawberry would be ideal to reduce dust on road and provide a link to the community) 1 Develop summer shuttle service to shuttle stops that offer toilets, shade, kiosks, tables, creek access and trash service Limit numbers of visitors through shuttle system. Limits may be placed at shuttle hubs and/or specific shuttle stops when capacities are reached. Guess of 500-1200 people per day with this option (further analysis will be conducted later). (In 2010, close to 1100 people visited Fossil Creek on some weekends) Allow personal vehicles access to the Childs area during shuttle season 1 **Feasibility of a shuttle system: There is a question whether a shuttle would be financially and operationally feasible. So, at the same time we are analyzing the environmental effects of alternatives, we will also be analyzing the feasibility of a transportation operation (concession, contract, or government-run). Fossil Creek WSR CRMP Forest Service proposed action details Page 2 of 6

Shuttle stop locations: Strawberry Road Staging shuttle staging location with large parking area, restrooms, shade structures, and information/interpretive kiosks. Also provides trailer parking for equestrian users. Fossil Creek Road Staging - shuttle staging location with large parking area, restrooms, shade structures, and information/interpretive kiosks. Fossil Springs TH trailhead access (may limit number dropped off to reduce numbers accessing Fossil Springs), restroom, information kiosk, picnicking facilities, horse trailer loading and unloading zone. Waterfall TH trailhead access to waterfall, restroom, information kiosk, designated creek Irving footbridge across stream (allows ATV access for maintenance), restroom, picnic facilities, group picnic facilities, shade structures, information kiosk, designated creek Tonto Bench restroom, picnic facilities, shade structures, information kiosk, designated creek Bridge Area restroom, picnic facilities, shade structures, information kiosk, designated creek Homestead restroom, picnic facilities, group picnic facilities, shade structures, information kiosk, designated creek Old Corral restroom, picnic facilities, shade structures, information kiosk, designated creek Sally May restroom, picnic facilities, shade structures, information kiosk, designated creek Purple Mountain restroom, picnic facilities, shade structures, information kiosk, designated creek Trails and Access Waterfall Trail realign for resource protection Irving- add a footbridge to access recreation site and trail Improve Purple Mountain entrance to include a drop off Pave and repair roads in key areas Consider potential road re-route near Sally May to reduce sedimentation into creek Camping and Group Sites Irving and Homestead large group picnic sites Camping available outside Wild and Scenic corridor during summer shuttle season Potential Interpretive Center Potentially provide larger kiosk or small building at Irving or Homestead WINTER MANAGEMENT (October through April) Access No winter shuttle service will be provided Allow private vehicles to access area Allow parking only in designated sites Charge user fees Camping Allow dispersed camping at developed recreation sites (no fires) Fossil Creek WSR CRMP Forest Service proposed action details Page 3 of 6

Southern Wild Segment Access / Management Adjust wild boundary to the south to remove segment that contains a road. Access via existing trail network No fires allowed Allow dispersed camping year-round Designate as Primitive ROS classification Phased Implementation Plan Full implementation of the CRMP could take up to 3 years and would be dependent upon funding. A phased approach is necessary to begin implementation immediately upon finalization of the management plan. Phase I - Immediate Implementation (first round implementation, design, funding sources) Implement Day Use Only policy immediately when plan is approved. Make campfire ban permanent. Institute fees after public involvement, presentation to Resource Advisory Committee, and approval (evaluate options as part of the CRMP process). Add entry gates and entry stations on the Fossil Creek Road (from Camp Verde) and Strawberry Road to control access and numbers of people (two people at all times at each gate). The purpose is to collect fees, limit user numbers when capacity is met, and provide information on the existing regulations and available parking locations (informational, not enforcement). Limit the number of people accessing Middle Fossil to the number of existing parking spaces (approximately 100). A large portion of the spaces are not where people traditionally recreate in the area. Add additional porta-potties, trash pick-up, and a few picnic tables (built to accessible standards) at key recreation sites. Improve signage for interpretation and protection of ORVs. Install composting toilets at Fossil Springs dispersed camping area. Delineate trails and improve access for ORV protection (cultural, wildlife, etc). Add footbridge at the Irving site and immediate amenities (toilet, picnic tables, etc.). This would be the first site for full development. Develop a shuttle pull off at the Bridge Area that could be used as parking during Phase I. Evaluate roads for immediate sedimentation and erosion controls needs and implement improvements and BMP s in order of priority. Pave/concrete the approaches to the bridges and add other BMP s to control sediment Explore different dust abatement and soil stabilizer options to reduce impacts to water quality (soil stabilizers, binders, asphalt, etc). Survey, design, and fundraise for desired improvements in construction (shuttle, shuttle stops, facilities, etc). Develop plans for low-improvement areas (places with minimal improvements or design). Pursue permits from ADEQ and other agencies, as required. Assess areas for first priority fuel treatments and implement as appropriate (protect immediate riparian corridor first, larger watershed second). Phase II- Construction Construction and development of shuttle staging areas, parking, shuttle stops, facilities, trails, creek access points. Construction would be phased to avoid summer season (winter and shoulder seasons) Increase interpretation facilities Fossil Creek WSR CRMP Forest Service proposed action details Page 4 of 6

Phase III- Shuttle Implementation, Facility Construction Implement shuttle system for all summer (May September) Increase interpretation facilities Resource Components Wildlife & Fisheries Continued maintenance of fish barriers allowed (encourage Bureau of Reclamation to continue when commitment lapses). Maintain ability to remove non-natives from the fishery through different measures (physical, chemical). Removal may be required from stock tanks and Fossil Creek. Maintain ability to treat noxious and invasive weeds (physical, chemical, and biological). Chemical treatment is within current NEPA allowances. Establish closure orders to prohibit entry into areas identified as crucial for Threatened and Endangered Species habitat or life cycle processes.. Preserve/protect mesquite stands. Develop an emergency response plan to balance resource protection with emergency situations. Heli-spots, if required, need to be sited to avoid black-hawk nesting sites. Emphasize interpretation on aquatic invasive species at key locations (Bridge area, etc.). [Forest Plan] Prohibit felt-soled waders, encourage lug sole waders. Water Support continued placement of water gage at bridge Support studies that investigate the indirect or cumulative impacts to the water quantity in Fossil Creek from groundwater pumping. Pumping could be from increased water demand in Strawberry and from facility use in corridor. Maintain Childs Road (FR 502) south of the Purple Mountain area to prevent sedimentation into the creek. Maintenance could involve paving a small section or rerouting the road, Support Gila County dust suppression measures (paving or other appropriate methods) for the Fossil Creek road between Strawberry and the forest boundary to reduce dust to residents. Maintain the ability to have a gauging station on the creek for monitoring. Consider adding a water quality monitoring feature to the gauging station. [Forest Plan] Proposals for development within the recharge area for Fossil Creek would require analysis for their impact upon water recharge to Fossil Creek Quantify federal reserved water rights needed to protect or enhance the ORVs. Install and maintain BMPs on roads and trails, recreation sites, and other areas of disturbance. History and Traditional Cultural Uses Continue cultural inventory. Focus interpretation on cultural importance of Fossil Creek. Accommodate tribal ceremonial events and ceremonial gatherings in cooperation with federally-recognized tribes to the maximum extent possible. Encourage a site steward program on site. Geology Support monitoring and research on travertine. Support research on the potential effects of recreation (swimming, kayaking) on travertine formation Fossil Creek WSR CRMP Forest Service proposed action details Page 5 of 6

Fire Priority treatments should occur where fire intensity and fire severity pose a threat to public safety. Treat within fuel types where potential fire severities may impact soil and water quality. Reintroduce low severity disturbance into pinyon-juniper woodland and ponderosa pine systems. Examine, design, and implement treatments to reduce or minimize the impact of wildfire to aquatic habitat in Fossil Creek. Lands & Special Uses Prioritize the acquisition of water rights and property that would enhance and protect ORVs Develop a strategy for future communication site development (cell towers, etc.). Manage vegetation surrounding transmission and power lines to minimize risk of wildfire starts and provide access for regular maintenance while minimizing impact to ORVs Commercial photography would be prohibited in wilderness and wild segments unless wilderness dependent and necessary for wilderness administration. Commercial photography may be allowed in non-wilderness recreational segments Livestock & Grazing Grazing allocations would be allowed following the guidelines established in recent grazing NEPA for Coconino NF. Water lanes and access to water would be negotiated with recreation use. Boundaries of the Tonto allotments would be adjusted to avoid unsuitable areas (steep slopes, feed, etc.) within the WSR Corridor. Botany Maintain Fossil Springs Botanical Area and support plant surveys of the area. Fossil Creek WSR CRMP Forest Service proposed action details Page 6 of 6