PROJECT: GROUND/GROUND COM PROJECT.1 Coordinator: South Africa DOMAIN: IIM (Infrastructure & Information Management)

Similar documents
SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management)

INTERNATIONAL CIVIL AVIATION ORGANIZATION

METEOROLOGY PROJECT.1. Programme Title of the Project Start End

Agenda Item 1: Use of VSAT technology in the AFI Region

APPENDIX D IDENTIFICATION AND DEVELOPMENT OF AERONAUTICAL METEOROLOGY PROJECTS. Programme Title of the Project Start End

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Welcome to AVI AFRIQUE IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group

(Presented by the Secretariat)

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN (ESAF) REGIONAL OFFICE MEETINGS, SEMINARS AND WORKSHOPS PROGRAMME FOR 2017

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

INTERNATIONAL CIVIL AVIATION ORGANIZATION

NAVISAT Middle East & Africa

Coordinations mechanisms between ANSPs themselves and with States: case of ASECNA. ASECNA, May 2018

DESCRIPTION OF THE PEER REVIEW CONCEPT

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN (ESAF) REGIONAL OFFICE MEETINGS, SEMINARS AND WORKSHOPS PROGRAMME FOR 2017

ICAO GANP Requirements and Evolution

First Review Meeting of AFI VSAT Network Managers (AFI VSAT Review/1) (Dakar, Senegal, 3 to 5 October 2011) SUMMARY

Special Africa-Indian Ocean Regional Air Navigation Meeting (Durban, South Africa 24 to 29 November 2008) FOLLOW-UP ON ATM RECOMMENDATIONS

The UN Funded ICAO/WHO Ebola Aviation Action Plan project

Global Operational Data Link Doc 10037

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

The UN Funded ICAO/WHO Ebola Aviation Action Plan project. Chief Aviation Medecine Section/ANB, ICAO Project Manager ICAO - Montreal

INTERNATIONAL CIVIL AVIATION ORGANIZATION. SIXTH MEETING OF DIRECTORS GENERAL OF CIVIL AVIATION (DGCA/6) (Brazzaville, Congo, 2 4 November 2016)

MET/SG/12-WP/05 REV2-23/11/14

AFI Region AIXM-e AIP Implementation Workshop Dakar, Senegal, 3-5 October 2016

CAPSCA Africa Achievements

ATFM/CDM ICAO s Perspective

Agenda Review to the action plans for the implementation of AIDC interconnection in the NAM/CAR/SAM Regions

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

ICAO EUR Region Performance Framework

MID Region Air Navigation Strategy

ICAO provisions on data link implementation

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

SAMPLE TEMPLATE APPENDIX 3.5C-1

MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN

182ND SESSION OF THE COUNCIL

SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

CNS/ATM Systems Interoperability and Harmonization

NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN

International Civil Aviation Organization (ICAO) (May 2015-April 2016) ICAO s support to the New Partnership for Africa s Development (NEPAD)

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

International Civil Aviation Organization African Flight Procedure Programme

QMS for AIS/MAP Service Implementation Workshop

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

(Presented by United States) EXECUTIVE SUMMARY

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

TWELFTH AIR NAVIGATION CONFERENCE

4 th Africa Regional Meeting of the Collaborative Arrangement for the Prevention and Management of Public Health Events in Civil in Civil Aviation

Regional Air Navigation Plan - Planning Methodologies and Tools. H. Sudarshan

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

2012 Performance Framework AFI

GMA Riyadh Global Ministerial Aviation Summit

AIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION

Status of Implementation of the Integrated Aeronautical Information Package. (Presented by the Secretariat) Summary

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

AFI Air Navigation Services Key Performance Indicators

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

ANNEX 9: MANDATE, DESCRIPTION & LATEST DEVELOPMENTS: MANDATE

7.3d VSAT Network Best Practices and AFI ATN Architecture. (Presented by ATNS)

Global ATM System ~Interoperability and Harmonization ~

Airport Development & APEX. Adrian Cioranu, LL.M., MBA Project Manager APEX ACI World. ACI Africa Regional Assembly Livingstone, Zambia 29 August 2012

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

TWELFTH AIR NAVIGATION CONFERENCE

AIR GROUND DATA LINK IN SOUTH ATLANTIC REGION. NAM/ CAR/ SAM ATS DATALINK IMPLEMENTATION WORKSHOP (Philisburg, Sint Maarten, April 2016)

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

Block 0 to Block 1 Vaughn Maiolla

Terms of Reference for a rulemaking task. Requirements for Air Traffic Services (ATS)

RMT.0464 ATS Requirements The NPA

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

AFI AIR NAVIGATION SYSTEM IMPLEMENTATION ACTION PLAN FOR THE AFRICA-INDIAN OCEAN (AFI) REGION

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

CAPSCA Global Feedback

International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY

ICAO ASBU Implementation/ Surveillance and ATS Automation

International Civil Aviation Organization Eastern and Southern African Office

The ICAO Global Air Navigation Plan and the monitoring of ASBU implementation

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

ATFM Implementation Thailand and Southeast Asia. 55 th DGCA Conference October 2018 Nadi, Fiji

Accept, Sir/Madam, the assurances of my highest consideration.

Aviation safety in Africa, reality and perception

Work Programme of ICAO Panels and Study Groups

Russian Federation ATM modernization program

SEARCH AND RESCUE (SAR) ORGANIZATION IN CAMEROON

INTERNATIONAL CIVIL AVIATION ORGANIZATION

RMT.0464 ATS Requirements

SATELLITE DISTRIBUTION SYSTEM OPERATIONS GROUP (SADISOPSG)

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

Historical background

Transcription:

AFI REGION PROJECT: GROUND/GROUND COM PROJECT.1 Coordinator: South Africa DOMAIN: IIM (Infrastructure & Information Management) Sub-domain Title of the Start End Aeronautical Communication (COM) (ICAO Facilitator: WACAF/ESAF ROs/CNS Objectives Scope GROUND/GROUND COMMUNICATION : Implementation of Ground/ground communication aimed at ensuring traffic coordination between air traffic controllers -Team Coordinator: South Africa Experts (13): Côte d Ivoire, Cameroon, Ghana, Seychelles, Senegal, Kenya, Mauritania, ASECNA, IATA, Nigeria, Botswana, Togo, Uganda Month/ Year In the framework of the technologies Roadmap for Communication defined in the GANP and the AFI strategy, aassist States in the implementation of : Month/ Year a) Air Traffic Service /Direct Speech (ATS/DS) in accordance with the operational requirements of Annex 11, Air Traffic Service Chapter 6, Doc 4444 Procedures for air Navigation services Chapter 10 and the provision of Annex 10 Volume b) Air Traffic Service Interfacilities Data Communication (AIDC) in accordance with the requirements of Annexes 10 and 11 and the relevant supporting guidance documents (Doc 44, Doc 9694...) c) Voice over Internet Protocol (VoIP) The provision of coordination service between Air traffic controllers will cover all Air Traffic control Centers involved in the provision of air avigation service for international civil aviation. The implementation scheme will be in accordance with the requirements of the provision of Aeronautical fixed Service (AFS) as defined by the AFI Air Navigation Plan (AFI/RAN Abuja 1997).

Sub-domain Title of the Start End a) ATS/DS: Metrics Strategy Rationale/Justification Related s Number of ATS/DS circuits implemented: X - Average availability of ATS/DS circuits : X% b) AIDC: Number of AIDC systems installed: X - % of ATS units with AIDC: X% Number of AIDC interconnections implemented, - % of ACCs with AIDC systems interconnection implemented: X c) VoIP: Number of VoIP systems installed: X - % of ATS units with VoIP: X% Number of VoIP interconnections implemented, - % of ACCs with VoIP systems interconnection implemented: X % Ground/Ground coordination communication supporting enhanced aeronautical operational safety, capacity and efficiency All tasks will be carried out by COM experts nominated by AFI States participating in the project, led by the -Team Coordinator and under the supervision of the Facilitators (ROs/CNS, Dakar and Nairobi) through the IIM SG working methodology. Upon completion of the tasks, the results will be sent to the Facilitators as a final document for submission to, and if necessary approval by the APIRG s Coordination Committee (APCC). For the purpose of collaborative decision-making, meetings will be held with the areas involved. a) ATS/DS: The requirements for ATS/DS are contained in the AFI Air Navigation Plan (ANP), FASID Table CNS 1D (ATS/DS Plan) and ATS/DS circuits have been implemented in accordance with these AFI Rationalized Plan. Significant improvements are noted, notably with the implementation of aeronautical satellite telecommunications. However the non- availability of ATS/DS encountered from time to time results from the obsolescence of some VSAT technologies b) AIDC: The introduction of automated Air Traffic Management systems in the region associated with surveillance data processing systems has paved the way to the automation of the transfer and coordination of Air Traffic between air traffic centers. AIDC appears to complement ATS/DS service and will gradually play the first role in traffic coordination. c) VoIP: In the AFI region the ATS/DS Network is based on point to point circuits and the absence of an ATS voice switching and signaling system does not facilitate the automation of backup links for ATS/DS. The implementation of VoIP will bring more flexibility and increase the availability of vocal, coordination communication. All APIRG projects specifically related to: PIA2-Increased Interoperability, Efficiency and Capacity through Ground- Ground Integration (B0-FICE) PIA3-Increased effectiveness of ground based safety nets (B0-SNET)

Sub-domain Title of the Start End Deliverables Implementation/Activation of ATS/DS Circuits Restauration/Improvement of the availability of ATS/DS Failing circuits PIA3- Air Traffic Situational Awareness(ATSA ) (B0-ASEP) Relationship with the Regional Performance- Objectives (RPOs/PFFs) and ASBU Modules KPI Responsible Air Traffic Service Direct Speech (ATS/DS) Status of Implementation 1 Air Traffic Service Interfacilities Data communication (AIDC) Date of Delivery December 2017 December 2017 Comments Teleconferences, Workshops/Seminars, meetings (French and English) on AIDC systems operation and their implementation scheme Implementation/interconnection and operation of AIDC systems

Sub-domain Title of the Start End Assessment/Reporting on the operation of AIDC systems and operation Voice over Internet protocol (VoIP) Teleconferences, Workshops/Seminars, meetings (French and English) on VoIP systems operation and their implementation scheme Implementation/interconnection and operation of VoIP systems Assessment/Reporting on the operation of VoIP systems and operation Detailed guidance provided to States not complying with the AFI AFS Plan List of States with ATS/DS, AIDC and VoIP, implemented

Sub-domain Title of the Start End Resources needed Grey Green Yellow Red Adequate Human Resource to be appointed by States Funds to conduct meetings, Workshops, Seminars Missions and to translate reports, regional guides and manuals. Likewise, participants must be given facilities to participate in teleconferences and coordination meetings. Funds for meetings with project Team Members in order to assess the results and propose corrective actions. States could use their human resources to conduct the foreseen COM tests and monitoring, and, if necessary, cover the financial costs, since the experience gained will result in an improvement of their own systems. Task not started yet Activity being implemented as scheduled Activity started with some delay, but will be implemented on time Activity not implemented on time; mitigation measures are required