MAP 1: MEDIUM TERM NIGHT CONTRA-FLOW FROM PJU 3/31 TO PJU 5/1 (KOTA

Similar documents
1. CONTINUATION OF LANE CLOSURE ALONG PERSIARAN INDUSTRI (KEPONG-BOUND)

MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG BANDAR SRI DAMANSARA & LEBUHRAYA SUNGAI BESI 23 NOVEMBER 2018

1. LANJUTAN PENUTUPAN LORONG DI JALAN CEMPAKA, BANDAR SRI DAMANSARA

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG LEBUHRAYA BESRAYA & SERI KEMBANGAN 20 OGOS 2018

Outlet Region Address Tel. No. Fax. No. WiFi Business Hours

1. CONTINUATION OF RIGHT LANE CLOSURE TOWARDS SLIP ROAD OF JALAN KUCHAI LAMA & NEW PANTAI EXPRESSWAY (NPE) (NORTH-BOUND)

NATIONAL ACHIEVERS CONGRESS 2017

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG GARDEN DAN JALAN ST. THOMAS 20 DISEMBER 2018

MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG 28 NOVEMBER 2018

FLOOR AREA AUCTION PRICE (RM) SQFT 139 SQ METER

Page 1 of 6. Land Area (sq. ft.) Built Up (sq. ft.) No PROPERTY TYPE PROPERTY ADDRESS FH /LH REMARKS AUCTIONEER AUCTION DATE RESERVE PRICE

No. Brand Outlet Locations Start Date End Date

Gamuda Berhad. Stellar Q1 Setting the Pace for FY12. Q INVESTORS BRIEFING 16 December 2011

THE BODY SHOP (W. Malaysia ) OUTLETS

Advertising Revenue By Publisher: Y2016

Outlet Region Address Tel. No. Fax. No. WiFi Business Hours

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG (ARAH SUNGAI BULOH DAN ARAH JINJANG)

Cast Iron Pipes & Fittings

PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH REMARKS AUCTIONEER AUCTION DATE RESERVE PRICE

Lakefront Living In T he Heart Of PJ

Desirable Locati. sunwayserene.com

Gamuda Berhad. Scaling New Heights. Q INVESTORS BRIEFING 27 September 2012

June Privileges for Maybankard Cardmembers

Welcome Home to 96 Residences

Treat yourself with Maybank 0% EzyPay

ioiproperties.com.my/pavilion

CONNECTIVITY TO LIFESTYLE LIVING

Investing in retail - shoplots or shophouses?

Infrastructure. New capacity additions and good volume growth have. seen our expressway and water treatment concession

GIORDANO PARTICIPATING OUTLETS - MAYBANK PROMOTION 2018

The hassle-free and fastest mode of transport to visit fascinating places of interest.

ILLA Heights2 T A M A N E Q U I N E

A PANORAMIC EXPERIENCE LIFEST YLE

Gamuda Berhad (29579-T) Annual Report 2011

WATSONS CLICK & COLLECT EXPRESS UPDATED STORE LIST (AS OF 05 NOV 2018) WILAYAH PERSEKUTUAN KUALA LUMPUR

REDISCOVER URBAN LIVING SENTUL, KL

: Membina Jejambatan Melintasi Landasan Keretapi Di JalanPelabuhan, Pelabuhan Kalng, North Port, Selangor Darul Ehsan - Tubell (Water Well)

@ IOI RESORT CITY A NEW BENCHMARK IN GRADE A OFFICES

B & I SECURITY FENCING

1. LANJUTAN PENUTUPAN LORONG SEPANJANG JALAN KUALA SELANGOR (ARAH SUNGAI BULOH DAN ARAH KEPONG)

42 Jalan Sultan Ahmad Shah Penang. : Manufacturing, assembling and sales of elevators & escalators.

List of Guardian Stores. NO. State Store Name Address. 1 Holiday Plaza LOWER GROUND 10 HOLIDAY PLAZA JALAN DATO SULAIMAN,82050,JB,JOHOR

A BRAND NEW DESTINATION FOR LIFE AND LEISURE FREEHOLD GLMB-YL _serena&urban centre-master-fa.indd 1

Sony Centre Dealer List NO. STATE SHOP NAME ADDRESS TEL. NO.

l l l REGISTER NOW Semi furnished residence with affordable price 2 designated carparks

LOW YAT PLAZA PUBLIKA NU SENTRAL

Focus Point Outlet list

CHARLES & KEITH LOT CC16/17 NU SENTRAL NO 201 JALAN TUN SAMBATHAN 50470

Address: 102, Bakar Arang Industrial Estate, Kawasan Perusahaan Ringan Bakar Arang, Sungai Petani, Kedah

PERSONAL CARE 101 HAIR CARE CENTRE NO 23 PLAZA MAHKOTA MELAKA JLN PM2 ADONIS FIRST ACADEMY OF COSMETOL

Sunway Berhad TP: RM4.30 (+22.0%) A Solid Start

1 ST HALF 2013 HOSPITALITY HIGHLIGHTS KLANG VALLEY / KUALA LUMPUR. Tourist Arrivals Boom!!!

28 OGOS PENUTUPAN PENUH LORONG SEPANJANG PERSIARAN DAGANG (ARAH SUNGAI BULOH DAN ARAH KEPONG)

Q2 FY2016 RESULTS & BRIEFING 28 JUNE 2016

Paradigm Mall GF 01, Ground Floor, Paradigm Mall, 1, Jalan SS7/26A, Kelana Jaya, Petaling Jaya, Selangor

Exclusively for The Platinum Card and the American Express Platinum Credit Cardmembers

PROJECT REFERENCES: ESTA SWITCHGEAR. Last updated: 17-Apr-18

Traffic Management Plan for Roebuck Street to Crumpton Street

Continuity from unity

Shop with your TreatsPoints!

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release.

Tada-Nellore Highway in India which is BOT Concession Project

PB Privileges January to June 2016 Shopping Privileges Terms and Conditions

TRAINING INFORMATION PACKAGE

GF 01, Ground Floor, Paradigm Mall, 1, Jalan SS7/26A, Kelana Jaya, Petaling Jaya, Selangor

Sunway Berhad KINDLY REFER TO THE LAST PAGE OF THIS PUBLICATION FOR IMPORTANT DISCLOSURES. Maintain BUY INVESTMENT HIGHLIGHTS

PROJECTS LIST 2006 Updated 16 May 06

Irresistible shopping deals just for you

Enjoy the full experience of a lakeside lifestyle, with the presence of a 500m jogging track that is situated around the 2-acre sparkling lake.

TRAFFIC MANAGEMENT. Planned Works and Night Closures Review EAST MIDLANDS GATEWAY RAIL FREIGHT INTERCHANGE

Special Delivery for your loved ones

06 APRIL Untuk maklumat lanjut sila rujuk peta di bawah.

country charm & city convenience Apartment Denai Sutera English Brochure Open Size: 56cm(w)x33cm(h) Close Size: 28cm(w)x33cm(h)

Parking Space Occupancy at Rail Stations in Klang Valley

AN GARDA SIOCHANA TRAFFIC PLAN INFORMATION FOR PAPAL VISIT TO KNOCK

Malaysia-International Dental Exhibition & Conference (MIDEC) th 31 st July 2016 Putra World Trade Centre

57000 Kuala Lumpur Johor Bharu Tel: Fax: Tel: Fax:

FINAL ANNOUNCEMENT. Malaysia - Russia Palm Oil Trade Fair & Seminar 2010

SMART REWARDS. e l i t e 2010

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

KLANG VALLEY HOSPITALITY MARKET 1Q 2012

A unique urban lakeside living experience. 3.1-acre facilities deck one of the largest in KL

The Company Financial Results 4 th Quarter 2014 Financial Results FYE 31 Dec 2014 Engineering & Construction Property Development Investment &

Monthly Traffic Update

Millionaire Mind Intensive By T. Harv Eker s Lead Trainer

2004 Successfully completed first overseas project - the construction of the Tada-Nellore Highway in India which is BOT Concession Project

Make your stop spectacular with American Express Selects SM

METROPOLIS NEWS ISSUE 54

A WORLD OF ANCIENT NATURAL WONDERS INVITES YOU TO ITS LATEST AND GREATEST CHAPTER

Kuala Lumpur. Top 5. KL Tower. Petronas Twin Tower and KLCC. Petaling Street (Chinatown) Batu Caves. Lake Gardens (taman Tasik...

Sunway Berhad Outperformance Driven by Strong Progress Billings

TROPICANA CORPORATION BERHAD (formerly known as Dijaya Corporation Berhad) ( Tropicana OR COMPANY )

GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.

Developing Homes, Building Lifestyles

@ Bandar Puchong Jaya

1 Choose the. 3 Reserve your. Why Choose Grid? THE FIRST BUILD & BUY HOME ONLINE IN MALAYSIA. The Perfect 1st Home or Investment

SUNWAY CONSTRUCTION GROUP BERHAD SEEKS LISTING ON BURSA MALAYSIA. ANALYST PACK 19 September 14

KLANG VALLEY HOSPITALITY MARKET 2Q 2011

Stage 10 Map. Tasik Kenyir - Kuala Terengganu 103.1km Saturday 8 March Kuala Terengganu. Loop. Tasik Kenyir. Padang Air 47.

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

Transcription:

TRAFFIC ANNOUNCEMENT UPDATES ON TRAFFIC MANAGEMENT PLAN FOR MRT CONSTRUCTION AT PERSIARAN SURIAN, PERSIARAN BANDAR UTAMA, CHANGKAT SEMANTAN AND JALAN SUNGAI CHUA, KAJANG 6 FEBRUARY 2015 1. MEDIUM TERM NIGHT CONTRA-FLOW FROM PJU 3/31 TO PJU 5/1 (KOTA DAMANSARA-BOUND) AND LANE CLOSURE AT JALAN PJU 3/22 (PERSIARAN SURIAN-BOUND) Date 9 February 2015 28 February 2015 Time 12:00 midnight to 6:00am Duration 20 nights Reason Mobilizing of heavy construction machinery to facilitate launching for special span There will be a medium term night contra-flow implemented from the traffic light junctions of PJU 3/31 to PJU 5/1 (Kota Damansara-bound) from 9 February 2015 28 February 2015 from 12midnight to 6:00am. During this closure, the following diversion will take place: Motorists on Persiaran Surian from LDP Highway wanting to turn right into Jalan PJU 5/1 or head towards Kota Damansara: will be diverted to the opposite lane (as indicated by PURPLE arrow in map). Motorists from Jalan PJU 3/22 wanting to exit to Persiaran Surian to head towards Kota Damansara or make a U-turn toward LDP Highway: will be diverted to use PJU 3/27, PJU 3/29 and exit at Jalan PJU 3/31 where they can turn left towards LDP Highway or turn right and be diverted to the contra-flow to head towards Kota Damansara (as indicated by GREEN arrow in map). MAP 1: MEDIUM TERM NIGHT CONTRA-FLOW FROM PJU 3/31 TO PJU 5/1 (KOTA DAMANSARA-BOUND) AND LANE CLOSURE AT JALAN PJU 3/22 (PERSIARAN SURIAN-BOUND) Page 1 of 6

2. CONTINUATION OF LANE CLOSURE NEAR IPC SHOPPING CENTRE TO INTERSECTION OF PJU 7/1 NEXT TO SURIAN UNDERPASS (KOTA DAMANSARA-BOUND) Date 9 February 2015 30 April 2015 Time 12 midnight to 6 am Duration 81 nights Reason To facilitate segmental launching, concreting There will be a continuation of lane closure for stretch of 450m from IPC Shopping Centre to the intersection of PJU 7/1 next to the Surian Underpass (Kota Damansara-bound) and closure of Jalan PJU 7/8 intersection with Persiaran Surian from 9 February 2015 30 April 2015 between 12 midnight to 6:00am. During these closure the following diversion will take place: Motorists from LDP Highway wanting to turn right into Jalan PJU 7/8 and motorists from Kota Damansara wanting to turn left into Jalan PJU 7/8: Motorists will be diverted to turn Jalan PJU 7/1 and make a right turn at the traffic light next to Tesco into Jalan PJU 7/4, then turn right into Jalan PJU 7/2 (as indicated by RED arrow in map) Motorists from Jalan PJU 7/1 wanting to exit Persiaran Surian: Motorists will exit Jalan PJU 7/1 on Persiaran Surian, turn right and drive ahead to make U-turn at Palm Spring Condo to access the underpass to exit to LDP Highway (as indicated by GREEN arrows in map) Motorists from Jalan PJU 7/8 wanting to exit Persiaran Surian: Motorists will be diverted to make a U- turn and take the roundabout behind Surian Tower, turn left into Jalan PJU 7/1 and exit to Persiaran Surian where they can make U-turn at Palm Spring Condo to access the Underpass to exit to LDP Highway (as indicated by BLUE arrows in map). MAP 2: CONTINUATION OF LANE CLOSURE NEAR IPC SHOPPING CENTRE TO INTERSECTION OF PJU 7/1 NEXT TO SURIAN UNDERPASS (KOTA DAMANSARA-BOUND) Page 2 of 6

3. FLYOVER CLOSURE AT CHANGKAT SEMANTAN (PJ-BOUND) Date 9 February 2015 4 March 2015 (including public holiday) Time Duration Reason 10:00 pm to 6:00 am 24 days To facilitate SBG installation and launching works There will be a full night closure of the flyover at Changkat Semantan (PJ-bound), from 9 February 2015 until 4 March 2015 from 10.00 pm 6.00 am, intermittently. During this period, motorists are advised to use the following alternative routes: From Lorong Dungun (Damansara Height) to PJ: Motorists will proceed to Jalan Gelenggang and left into Jalan Beringin before connecting back to SPRINT Highway (indicated by Blue arrows in map). From KL to Lorong Dungun (Damansara Height): Motorists will be diverted to turn right at the slip road heading to Jalan Beringin, then right into Jalan Gelenggang before connecting to Lorong Dungun (indicated by Green arrows in map). Motorists heading toward Semantan Villas and Idamansara: are advised to use Jalan Duta route. Motorists from KL heading towards Petaling Jaya and vice versa on SPRINT Highway will not be affected. MAP 3: FLYOVER CLOSURE AT CHANGKAT SEMANTAN (PJ-BOUND) Page 3 of 6

4. SHORT TERM NIGHT CONTRA-FLOW AT JALAN SUNGAI CHUA, KAJANG (BANGI-BOUND & SEMENYIH-BOUND) Date 10 February 2015-17 February 2015 Time 12:00am to 5:00am Duration 8 days Reason To facilitate the erection of segmental box girder (SBG) A short term night contra-flow will be implemented in stages at Jalan Sungai Chua, Kajang (near former MCA Building) for both Bangi-bound & Semenyih-bound During this period, one lane will be made available for motorists for both direction (Bangi-bound & Semenyih-bound). Stage 1: 10 February 2015 13 February 2015 Motorists from Bangi heading towards Semenyih will be diverted to the opposite lane and those bound for Bangi will be diverted to their left-most lane. MAP 4; STAGE 1: SHORT TERM NIGHT CONTRA-FLOW AT JALAN SUNGAI CHUA, KAJANG (BANGI-BOUND & SEMENYIH-BOUND) Stage 2: 14 February 2015 17 February 2015 During this period, motorists from Semenyih heading towards Bangi will be diverted to the opposite lane and those bound for Semenyih will be diverted to their left-most lane. Page 4 of 6

MAP 4; STAGE 2: SHORT TERM NIGHT CONTRA-FLOW AT JALAN SUNGAI CHUA, KAJANG (BANGI-BOUND & SEMENYIH-BOUND) 5. CONTINUATION OF LONG-TERM NIGHT TRAFFIC MANAGEMENT PLAN AT PERSIARAN BANDAR UTAMA (LDP HIGHWAY; KEPONG-BOUND) Date 11 February 2015-11 August 2015 Time 11:00pm to 6:00am Duration Six months Reason Mobilisation of heavy construction vehicles, beam launching and concreting works for the MRT Bandar Utama Station. There will be a continuation of long term night lane closures at the following areas; A. One lane closure at LDP Highway (Kepong-bound, in front of Sri Pentas) B. Road closure along Persiaran Bandar Utama turning into LDP Highway (Kepong-bound; next to Sri Pentas) During these night clousures, motorists are advised to use this following diversion: Motorists from First Avenue heading toward LDP Highway: will be directed to make a U-turn at Persiaran Bandar Utama, turn right at the traffic light to Dataran Bandar Utama and take another right at of Lebuh Bandar Utama to join LDP highway Motorists from Persiaran Bandar Utama heading towards LDP: will be directed to turn left into Dataran Bandar Utama and turn right at the traffic light of Lebuh Bandar Utama to join LDP Highway (*both diversions are indicated by BLUE in Map) Page 5 of 6

MAP 5: CONTINUATION OF LONG-TERM NIGHT TRAFFIC MANAGEMENT PLAN AT PERSIARAN BANDAR UTAMA (LDP HIGHWAY; KEPONG-BOUND) For media enquiries, please contact: Adeline De Cruz (Item 1, 2 & 5) Tel:+6012 217 2017 adeline@mudajaya.com Subba Rao (Item 3) Tel: +6019 1136806 srao@sunway.com.my Zamri Zakariah (Item 4) Tel: +6012 9162000 zamri.zakariah@uembuilders.uemnet.com Siti Fadzillah Ismail (Item 1-5) Tel: +603 7493 3965 sitifadzillah@mgjv-kvmrt.com.my MMC GAMUDA KVMRT (PDP) SDN BHD (927050-H) Block A, Level 7, Menara Mustapha Kamal, PJ Trade Centre, No 8, Jalan PJU 8/8A, Bandar Damansara Perdana, 47820 Petaling Jaya, Selangor, Malaysia T: 603 7494 2200 F: 603 7722 2643 www.kvmrt.com.my Page 6 of 6