Volume: 4 Alberta AEUB Plant Code: 672 83 Fractionation Harmattan Mountain View Complex includes a,269.5 E3m3/d (4 MMcf/d) processing facility and associated gas gathering system, a deep cut NGL extraction facility and NGL Fractionation and Terminalling facilities. Located on the same property as the Harmattan Gas Plant (code 6), but this facility is now treated as it own. Page 83-9 Also known as "Co-stream Harmattan". 9 27 3 4 W5 Inlet Gas Iso - 23 24 25 26 3,697,935 4,926,259 3,954,563 4,687,773 2,72,38 3,29,24 2,497,27 2,66,35,532,864,523,579,388,55,29,82,492,3,44,926,224,724,7,595 or Please note: These volumes include third party mix. Mixed : Pentanes+ and some of the butane go into the Plains pipeline. products go in the company's line to the remote loading dock at Didsbury. way: CPR, Didsbury siding, with one switch available daily. Two loading tracks, each holding up to eight jumbo rail cars, taking either propane or butanes. : Remote loading dock located on Highway 2A, north of the Secondary Highway 582 junction. The single loading spot is attended twelve hours daily. Loading is for transports and bobtails, measurement by meter. Presently no loading/unloading at the plant location. Suite 7 Harmattan Gas Plant, Bag #4 T2P J Olds T4H V2 (43) 69-7575 (43) 335-332 (43) 69-7576 (43) 335-8623 October, 27
Volume: 4 Alberta AEUB Plant Code: 635 83 2 Adanac Oil & Gas Limited Tomahawk Parkland Refrigeration Onstream in 99 with a raw gas capacity of 44 E3m3/d (5.6 MMcf/d) and liquids design capacity of 5 m3/d (34.7 bbls/d). Processing associated and non-associated gas from Tomahawk field. Operator History: Keyera Facilities Income Fund KeySpan (25) Stampeder (997) 4 3 52 6 W5 Adanac Oil & Gas Limited 6 Inlet Gas Iso - 6,868 5,74 5,4 4,4 The mix has averaged about 3% ethane, 25% propane, 25% butanes and 47% pentanes plus. 23 24 25 26 Located five miles south of Highway 6 on the township line road, four miles west of Gainsford. Loading is for transports, trucked to pipeline or fractionation facilities. 9 3, Mixed or Adanac Oil & Gas Limited 57 Patina Place SW Adanac Oil & Gas Limited P.O. Box 795 T3H 2P5 Drayton Valley T7A S9 (43) 249-2989 (78) 797-2877 (78) 797-2878 October, 27
Volume: 4 Alberta AEUB Plant Code: 7835 83 3 Advantage Oil & Gas Ltd. Glacier Plant came onstream in 2 with,4 E3m3/d (5 MMcf/d) capacity. In Q2 2 expanded the plant to 2,82 E3m3/d ( MMcf/d) and installed acid gas compression. In Q2 22 the plant expanted to 3,945 E3m3/d (4 MMcf/d) capacity. In 25 the plant expanded again and throughput capacity increased to 7,5 E3m3/d (25 MMcf/d). Processes gas from the Montney formation. 5 2 76 2 W6 Advantage Oil & Gas Ltd. 249 Inlet Gas Iso - 37 45 27 23 24 25 26 497 69,24 25 57 7 38 Mixed or Gas is sold through Advantage's 22 KM sales pipeline into TransCanada pipeline system. Advantage Oil & Gas Ltd. 44 2nd Ave. SW Suite 3 Advantage Oil & Gas Ltd. (43) 78-8 (43) 78-8332 T2P 5E9 October, 27
Volume: 4 Alberta AEUB Plant Code: 47 83 4 Advantage Oil & Gas Ltd. Joffre Red Deer Refrigeration Onstream in September 98, with a raw gas capacity of 69.8 E3m3/d (6 MMcf/d) and liquids design capacity of 28 m3/d (76 bbls/d). Processing gas from Joffre field. Operator History: Due West Resources Inc..(22) Suncor (999) 2 3 2 38 27 W4 Advantage Oil & Gas Ltd. 55 Great Northern Exploration 33 s 2 6 Inlet Gas Iso - 23 24 25 26 9,228,437,875 9,625 623 or The mix has averaged about % ethane, 26% propane, % iso-butane, 2% normal butane and 4% pentanes plus. 598 Mixed Located just east of Red Deer city limits, and one mile south of Highway. Loading is for transports, trucked to fractionation or pipeline input facilities. Advantage Oil & Gas Ltd. Devon Tower Suite 7, 4-3 Avenue SW Advantage Oil & Gas Ltd. Bay 3 724 Johnstone Drive T2P 4H2 Red Deer T4P 3Y6 (43) 78-8 (43) 78-83 (43) 34-6725 (43) 34-6749 October, 27
Volume: 4 Alberta AEUB Plant Code: 96 83 5 Turbo expander Onstream in mid-978 with a raw gas capacity of 9,722 E3m3/d (345 MMcf/d) and a liquids design capacity of 3,65 m3/d (22,976 bbls/d) of ethane and,3 m3/d (8,84 bbls/d) of propane and heavier. Processed gas is from the Northwestern Utilities system, usually from Bonnie Glen, Pembina or Rimbey streams. Operator History: BP Canada Energy Company (24) Amoco Canada Petroleum Company (2) Amoco Ellerslie Edmonton 4 4 52 24 W4 LSD ATCO Midstream Sec Twp Rge Mer 48.6 5.4 343 Inlet Gas Iso - 35 293 25 2 23 24 25 26 The amounts shown in the "" column above reflect specification ethane output. The mix has averaged about % ethane, 68% propane, 8% iso-butane, 3% normal butane and % pentanes plus. No storage at this facility.,459,659,643,322 472,788 647,428 Mixed or 3,884,37 2,975,37 2,544,88,265,63 is delivered into the Alberta Gathering System 2-inch line to Fort Saskatchewan, NGL mix into the -inch CoEd pipeline to Fort Saskatchewan storage. Suite 7-29th Avenue T2P J Edmonton T6N A5 (43) 69-7575 (78) 462-565 (43) 69-7576 (78) 462-728 October, 27
Volume: 4 Alberta AEUB Plant Code: 89 83 6 Refrigeration Started up in September 995, with a raw gas capacity of 594.6 E3m3/day (2 MMcf/d). Processing associated gas from Pembina wells. Operator History: Northrock (999) Energy Processors Pembi Parkland 25 5 6 W5 LSD Sec Twp Rge Mer 2 Inlet Gas Iso - 23 24 25 26,3 8,4,962 or 478 29 The mix has averaged about 3% ethane, 27% propane, % iso-butane, 2% normal butane and 38% pentanes plus. Last production was April 25. Mixed Located miles north on Secondary Highway 759 from the Highway 39 junction east of Drayton Valley, then one-half mile east. The mix is trucked to pipeline or fractionation facilities. Suite 7 c/o Northrock P.O. Box 3 T2P J Tomahawk TE 2H (43) 69-7575 (78) 339-2245 (43) 69-7576 (78) 339-2264 October, 27
Volume: 4 Alberta AEUB Plant Code: 239 83 7 Cryogenic Gordondale This plant came onstream August 22 with a design capacity of 3,38.8 E3m3/d (2 MMcf/d). Processes sour gas from the Montney resource area. Plant also includes refrigeration, condensate stabalization, amine sweetening, ethane extraction and gas gathering. EnCana has a long term contract to extract NGL's with capablities of 3-4 of NGL's per day (8,885-25,8 bbls/d). Grande Prairie 6 3 78 W6 LSD Sec Twp Rge Mer 9 Inlet Gas Iso - 6 2 9 23 24 25 26,439,585 2,56,757 2,376,387 2,274,352 The amounts shown in the "" column above reflect specification pentane output. Mixed or 53,623 27,285 95,93 82,87 Located kilometers Northwest of Grande Prairie or 5 kilometers East of Dawson Creek. Latitude: 55.8853 Longitude: 9.6839 : Twelve sales pipelines Suite 7 Off of Range Road 5 T2P J Grand Prairie TH 3G (43) 69-7575 (43) 69-736 (43) 69-7576 October, 27
Volume: 4 Alberta AEUB Plant Code: 77 83 8 Refrigeration Onstream in July 2 with a raw gas capacity of 285 E3m3/d ( MMcf/d). Processing gas from Provost fields. Kirkpatrick Lake Special Area 2 5 3 32 W4 LSD Sec Twp Rge Mer Plant shut in in January 24. Inlet Gas Iso - 23 24 25 26 3,46 The mix has averaged about 3% propane, 35% butanes, and 35% pentanes plus. Mixed or Located on a dirt road approximately six miles south and two miles east of the junction of Secondary Highway 586 and Secondary Highway 872. Loading is for transports, trucked to pipeline or fractionation facilities. Suite 7 P.O. Box 656 T2P J Sedgewick T7S N4 (43) 69-7575 (78) 583-3789 (43) 69-7576 (78) 583-2282 October, 27
Volume: 4 Alberta AEUB Plant Code: 987 83 9 Refrigeration Original plant was a dehydration/compressor station. Plant was modified to extract liquids in August 26. With the addition of compression and refrigeration capacity throughput increased to current capacity of 566.4 E3m3/d (2 MMcf/d). Prairie River 6 24 72 8 W5 LSD Sec Twp Rge Mer 2 Inlet Gas Iso - 2 23 24 25 26 793 554 45 or The mix has averaged about 5% ethane, 5% propane, 35% butanes and % pentanes plus. Last production volume was in July 25. Mixed ed to their fractionation facility, Harmattan. Suite 7 P.O. Box 2762 T2P J High Prairie TG E (43) 69-7575 (43) 523-29 (43) 69-7576 (43) 523-24 October, 27
Volume: 4 Alberta AEUB Plant Code: 6 83 Refrigeration/Turbo expande Onstream in 96 with a raw gas capacity of 9,48 E3m3/d (337 MMcf/d) and a total NGL design capacity of 4, m3/d (25,8 bbls/d). A turbo expander and Claus unit was added in 998 bringing the present raw gas capacity to,27 E3m3/d (4 MMcf/d), and total NGL design capacity to 6, m3/d (37,77 bbls/d). Processing gas from Harmattan East, Harmattan-Elkton, Garrington and other fields. Also known as "Co-Stream Harmattan". Solex Harmattan-Elkton Mountain View 9 27 3 4 W5 LSD Sec Twp Rge Mer Ownership History: Taylor NGL Limited Partnership (28) Solex Development Corp. TransCanada Midstream (22) NCL (998) Mobil (997) 398 Inlet Gas Iso - 232 39 263 32 23 24 25 26 7,27,939 8,624,64 6,974,25 8,54,2 The NGL mix goes to the Harmattan Fractionation plant on the same property, but is now treated as its own facility (plant code 672) page 83-. Mixed or : Pentanes+ and some of the butane go into the Plains pipeline. products go in the company's line to the remote loading dock at Didsbury. way: CPR, Didsbury siding, with one switch available daily. Two loading tracks, each holding up to eight jumbo rail cars, taking either propane or butanes. : Remote loading dock located on Highway 2A, north of the Secondary Highway 582 junction. The single loading spot is attended twelve hours daily. Loading is for transports and bobtails, measurement by meter. Presently no loading/unloading at the plant location. Suite 7 (43) 69-7575 (43) 69-7576 October, 27 T2P J Harmattan Gas Plant, Bag #4 Olds T4H V2 (43) 335-332 (43) 335-8623
Volume: 4 Alberta AEUB Plant Code: 9 83 Turin Taber Refrigeration Built in 975 and modified for light hydrocarbons recovery in 983. It was then expanded in August 988 from,24 to,55 E3m3/d (44-55 MMcf/d). Processing gas from Turin, Retlaw, Enchant, Vauxhall and other fields. Acid gas injection added August 24 Operator History: Taylor NGL Limited Partnership (28) Vista Midstream Solutions Ltd. (23) Northstar (Div. Devon Energy) (2) 2 9 2 8 W4 72.3 Grayley Resources 27.7 55 Inlet Gas Iso - 27 29 25 9 39,56 47,385 32,342 9,59 The mix has averaged about 3% ethane, 3% propane, 32% butanes and 34% pentanes plus. 23 24 25 26 5,823 6,24 6,24 5,225 63 Mixed or Located northeast of Turin, two miles east on Secondary Highway 52 from the Highway 25 intersection, then one and one-half miles north. Loading is for transports only, trucked to fractionation facilities. Suite 7 P.O. Box 48 T2P J Turin TK 2H (43) 69-7575 (43) 69-7576 (43) 739-3755 (43) 739-3777 October, 27
Volume: 4 Alberta AEUB Plant Code: 4 83 2 Bantry Newell + Frac. Refrigeration Built in 969 and modified for light hydrocarbons extraction in 983. The plant was expanded in 987 and fractionation was added. A further expansion was done in 2 for high pressure train and additional fractionation to 566 E3m3/d (2 MMcf/d). Processing solution gas from the Bantry field. 4 33 7 2 W4 Operator History: Beau Canada Exploration (2) 2 Inlet Gas Iso - 5 2 3 4 23 24 25 26 95,79 7,32 77,34 79,88 9,95 7,825 6,59 7,38 25,75 26,735 23,877 24,532 6,79 35,762 46,79 48,239 or 89 Mixed 573 598 : Connected to an HVP pipeline. : Located on the north side of the Trans-Canada Highway, three miles east of the Tilley exit. Loading is normally for transports, occasional bobtails for propane. Suite 7 P.O. Box T2P J Tilley TJ 3K (43) 69-7575 (43) 69-7576 (43) 377-2244 (43) 377-2346 October, 27
Volume: 4 Alberta AEUB Plant Code: 7565 83 3 + Frac. Cryogenic stripping unit onstream December 22 at a raw gas capacity of 7,66 E3m3/d (25 MMcf/d). recovery capacity,466 m3/d (9,228 bbls/d). Ownership History: Taylor NGL Limited Partnership (28) Joffre Extraction Plant Lacombe 3 29 38 25 W4 LSD Joffre Gas Liquids, LP Sec Twp Rge Mer 5 5 25 Inlet Gas Iso - 9 9 8 23 24 25 26,862,256,62,2,699,552,6,48,862,256,62,2,7,93,6,48 Residual NGL shown under condensate/other and mix breakdown is shown above. The mix has averaged about 27% propane, 33% butanes and 4% pentanes plus. Mixed or 543,277 528,862 392,33 635,78 Connected to Alberta Gathering System. : AltaGas will construct a 7-kilometre pipeline to connect the Gilby Gas Plant to the Joffre Extraction Plant "JEEP". Suite 7 Rural Route 2, Site 2, P.O. Box 24 T2P J Lacombe T4L 2N2 (43) 69-7575 (43) 34-889 (43) 69-7576 (43) 34-3799 October, 27
Volume: 4 Alberta AEUB Plant Code: 44 83 4 Parkland + Frac. Facility started operation in 984. 7 5 27 W4 Inlet Gas Iso - 2 4 5 4 23 24 25 26 36,297 37,657 38,74 36,656 36,297 37,657 38,24 36,656 or Mixed Suite 7 (43) 69-7575 (43) 69-7576 T2P J October, 27
Volume: 4 Alberta AEUB Plant Code: 7576 83 5 Pouce Coupe + Frac. The plant came onstream September 2. 3 3 8 3 W6 Inlet Gas Iso - 9 8 23 24 25 26 7,66 8, 4,969,9 7,66 8, 4,973,9 or Mixed Suite 7 (43) 69-7575 (43) 69-7576 T2P J October, 27