Benefits Using NM B2B Web Services Flight Planning Data

Similar documents
Paolo Nasetti Head of En-route Operations. Bruxelles, 28 January 2016

Dynamic Airspace Overview concepts, complexities, benefits and outlook

Cross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations

SWITZERLAND. AIP Services P.O. Box CH-8602 Wangen bei Dübendorf Switzerland

SWITZERLAND. AIP Services P.O. Box CH-8602 Wangen bei Dübendorf Switzerland

Free Route Airspace Maastricht (FRAM)

EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION

How CFSPs work. processes, requirements, difficulties. Tuesday, June 19th, 2018 CFPSG PRESENTATION FABEC SC OPS/AOG RADISSON ZURICH AIRPORT 1

enav.it Madrid, March 7th 2017

POLFRA IMPLEMENTATION Progress Report FREE ROUTE AIRSPACE WORKSHOP

AIP ITALIA Servizio Informazioni Aeronautiche

Free Route Airspace (FRA) Application in NMOC - Guidelines

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 1

PILOT PORTAL. User s Manual for registered users. of the COMSOFT Aeronautical Data Access System (CADAS) ARO Tallinn

Free Route Airspace (FRA) Application in NMOC - Guidelines

SWITZERLAND. AIP Services P.O. Box CH-8602 Wangen bei Dübendorf Switzerland

User Testimony SKYGUIDE

Borealis Free Route Airspace ~ Concept of Operation ~ NM User Forum 28 January 2016

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 2

MODULE 4: SIDs and STARs. Slide <#> of

The Effects of the Introduction of Free Route (HUFRA) in the Hungarian Airspace

The presentation to Externals of the NM22.5 Release via video-conference took place on the 18 th of September 2018.

FUA TEMPORARY INSTRUCTION Doc. ID : FTI/17-013

FREE ROUTE AIRSPACE IMPLEMENTATION IN ARMENIA (ARMFRA)

AIRSPACE CLASSES. All flights are provided with air traffic control service and are separated from each other. limit Communication clearance

As of Nov. 17th 2011 Sweden and Denmark implemented the concept of Free Route Airspace (FRA). This will be described in the section below.

Free Route Airspace ASM Dimension. Giuseppe Acampora

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

Assessment of the 3D-separation of Air Traffic Flows

Object: LoA between the Barcelona FIR (LECB) and the Bordeaux FIR (LFBB)

EUROCONTROL. Centralised Services Workshop. Peter Matern CS#5 EAIMS 5 March 2014

Free Route Airspace Workshop Conclusions and Future Projects Outlook

WEF General Pilot Briefing «WEF 2019» for IFR leaving and joining flights (Y/Z flightplans) For detailed information check NOTAMs

Global Information Management. Status Report: AIXM

Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

In cover a detail of new night/ week end shortest routes for overflying Sardinia Area

Letter of Agreement. IVAO United Kingdom and Ireland & France Divisions. 1. Purpose. 2. General procedures

Delivering Free Route Airspace for Northern Europe ~ Progress to date. Branka Subotić, Executive Director

LETTER OF AGREEMENT. Between

EUROCONTROL Call Sign Similarity Project

34 th Airline/ATS Safety Forum

Object: LoA between the Reims FIR (LFEE) and the Geneva FIR (LSAG)

Efficiency and Environment KPAs

Free Route Airspace Definitions

CAPAN Methodology Sector Capacity Assessment

Letter of Agreement. IVAO Switzerland & France Divisions. 1. Purpose. 2. General procedures

Case study London Heathrow & London Heathrow-Amsterdam

MEASUREMENT OF THE QUALITY OF TRAFFIC ORIENTATION SCHEMES REGARDING FLIGHT PLAN EFFICIENCY

A-CDM/Advanced ATC Towers and SWIM AFTN today, Web Services tomorrow Part 1- NM B2B Web Services

AirSpace Management. Airspace Use Plan (AUP) / Updated airspace Use Plan (UUP)

ATIEC Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL)

Ground movement safety systems and procedures - an overview

Initial Network Plan

INDICE. 1. Purpose 2 2. General procedures 2 3. ATC units description 2 4. Coordination procedures En-route coordination 6

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

VALUES UTILITY CREDIBILITY PROMPT RESPONSE MANAGE, SO THAT EVERYBODY CAN FLY.

FUA AMC CADF OPERATIONS MANUAL. NO Handbook

Dynamic Management. of the. European Airspace Network. ADR Data Catalogue. Annex A: Supported Services

APPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL

REG ASP MIL APO USE INT IND NM

AIR SUPPORT A/S Nimbusvej 9 DK-7190 Billund, Denmark Phone Fax

Flight Delays Module (External User)

MIDAD Project IDS Vision

LETTER OF AGREEMENT. between. and

FRA AIP publication and EAD data provision. Asa STANDAR

Contextual note SESAR Solution description form for deployment planning

IVAO Flight Operations Department Indonesia (ID) Division Procedures

European Route Network Improvement Plan

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

PPS Release Note

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

Network Manager Adding value to the Network 29 September 2011

SWISS Proposals SJU Large Scale Demonstration Timeline Eric Nantier, Operations Research and ATM, May 2014

IFR SEPARATION USING RADAR

Analysis of en-route vertical flight efficiency

REG ASP MIL APO USE INT IND NM

EMD ELECTRONIC MISCELLANEOUS DOCUMENT

Understanding Dynamic Airspace. Chris Woodland. The Network Manager User Forum 2018

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

ATSAW. (Airborne Traffic Situational Awareness) Presented by Laurent VIDAL - Surveillance systems manager Support to sales & programs

Module description: Traffic Sample. Pim van Leeuwen, NLR Second Demonstration Workshop Braunschweig, Germany June 25 th, 2013

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

PBN and airspace concept

NEFAB Project Feasibility Study Report Operational Concept

A presentation of the NM18.0 to externals via video-conference took place on the 10 th of January 2014.

Next Generation Airspace Developments: Key Operational Trends and Enablers

Performance Planning Environment. Bernhard Mayr, CM Financial and Performance Committee, 23 May 2014

Efficiency and Automation

NM Flight Planning Requirements - Guidelines

FareStar Ticket Window Product Functionality Guide

PBN Operational Approval Continental En Route Navigation Specifications

Honeywell.com PBN Concepts Krakow, Poland

APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

Free Routing Airspace in Europe

ATM Collaboration & Data Sharing

COALITION AIRSPACE MANAGEMNENT AND DECONFLICTION

Continuous Descent? And RNAV Arrivals

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

ATMM. Air Traffic Management Manual. Air Traffic Management Manual VACC AUSTRIA LOVV ATMM Air Traffic Management Manual

Transcription:

1 Benefits Using NM B2B Web Services Flight Planning Data Ed Rosado Senior Principal Systems Engineer III 26 January 2017

2 Once Upon a Time Paper RAD

3 Data Migrated to Spreadsheets FROM TO Lower Vertical Limit (FL) Upper Vertical Limit (FL) Available (Y) Not available (N) Utilization Time Availability ID Number SOSAR LONAM 285 660 Yes Not available for traffic ARR EB**,EH** 00:01..04:50 (23:01..03:50) at SOSAR EG5242 NALAN LARDI 245 660 Yes Only available for traffic ARR EB**/EH** Via NALAN exiting EG** 00:01..04:50 (23:01..03:50) at NALAN EG5243 With RFL above FL285 NALAN LONAM 285 660 Yes Not available for traffic ARR EB**, EH** 00:01..04:50 (23:01..03:50) at NALAN EG5244 SUXAN BEGAR 245 660 Yes 22:00..05:00 (22:00..04:00) LSLF5022 ABESI BEGAR 245 660 Yes 22:00..05:00 (22:00..04:00) LSLF5021 BEPAS VLM 345 660 Yes 16:00..10:00 (15:00..09:00) Via BEPAS then via ENORU/VAGSA/POLON/AGAVA except DEP EDDM, LOWS When LKTRA70Z is not active LK5019 VLM ENORU 345 660 Yes 16:00..10:00 (15:00..09:00) Via BEPAS then via ENORU/VAGSA/POLON/AGAVA except DEP EDDM, LOWS When LKTRA70Z is not active LK5020 UTEVO RAPET 245 660 Yes Via UTEVO then RAPET When LKTRA70Z/LKTSA4 are not active LK5018 UTEVO OKG 245 660 Yes UTEVO VARIK 245 660 Yes Via UTEVO then OKG --------------------------------------------------------- Not available for traffic ARR EDDN When LKTRA70Z is not active -------------------- H24 Via UTEVO and then VARIK When LKTRA70Z/LKSTA4 are not active LK5021 LK5017

4 Today, We Consume Data via NM B2B Web Services <adrmsg:hasmember><aixm:flightrestriction xmlns:aixm="http://www.aixm.aero/schema/5.1" gml:id="id_5381_1481102945823_401284"><gml:identifier codespace="urn:uuid:">bb70daac-ee5a-4317-bb75-5be9735cf89d</gml:identifier><aixm:timeslice><aixm:flightrestrictiontimeslice gml:id="id_5381_1481102945823_401285"><gml:validtime><gml:timeperiod gml:id="id_5381_1481102945823_401286"><gml:beginposition>2016-10-13t00:00:00</gml:beginposition><gml:endposition indeterminateposition="unknown"/></gml:timeperiod></gml:validtime><aixm:interpretation>baseline</aixm:interpretation><aixm:featurelifetime><gml:timeperiod gml:id="id_5381_1481102945823_401287"><gml:beginposition>2016-10-13t00:00:00</gml:beginposition><gml:endposition indeterminateposition="unknown"/></gml:timeperiod></aixm:featurelifetime><aixm:designator>lk5019d</aixm:designator><aixm:type>forbid</aixm:type><aixm:instruction>app4 BEPAS DCT VLM ONLY AVAILABLE $AND COMPULSORY FOR TRAFFIC VIA BEPAS THEN VIA ENORU/VAGSA/POLON/AGAVA EXCEPT DEP EDDM, LOWS</aixm:instruction><aixm:flight><aixm:FlightConditionCombination gml:id="id_5381_1481102945823_401288"><aixm:timeinterval><aixm:timesheet gml:id="id_5381_1481102945823_401289"><aixm:timereference>utc</aixm:timereference><aixm:startdate>sdlst</aixm:startdate><aixm:enddate>edlst</aixm:enddate><aixm:day>any</aixm:day><aixm:st arttime>09:00</aixm:starttime><aixm:endtime>15:00</aixm:endtime><aixm:excluded>no</aixm:excluded></aixm:timesheet></aixm:timeinterval><aixm:timeinterval><aixm:timesheet gml:id="id_5381_1481102945823_401290"><aixm:timereference>utc</aixm:timereference><aixm:startdate>edlst</aixm:startdate><aixm:enddate>sdlst</aixm:enddate><aixm:day>any</aixm:day><aixm:st arttime>10:00</aixm:starttime><aixm:endtime>16:00</aixm:endtime><aixm:excluded>no</aixm:excluded></aixm:timesheet></aixm:timeinterval><aixm:logicaloperator>none</aixm:logicaloperator><aixm:eleme nt><aixm:flightconditionelement gml:id="id_5381_1481102945823_401291"><aixm:flightcondition_directflightcondition><aixm:directflightsegment gml:id="id_5381_1481102945823_401292"><aixm:end_navaidsystem xmlns:xlink="http://www.w3.org/1999/xlink" xlink:href="urn:uuid:2d4460d6-a4b1-4dad-9eea-ed2ea3ce3a63"/><aixm:start_fixdesignatedpoint xmlns:xlink="http://www.w3.org/1999/xlink" xlink:href="urn:uuid:9a8671ae-883d-49ba-b9e2-86a4d52d94a6"/></aixm:directflightsegment></aixm:flightcondition_directflightcondition><aixm:operationalcondition><aixm:flightconditioncircumstance gml:id="id_5381_1481102945823_401293"><aixm:referencelocation>yes</aixm:referencelocation><aixm:relationwithlocation>xng</aixm:relationwithlocation></aixm:flightconditioncircumstance></aixm:operati onalcondition><aixm:flightlevel><aixm:flightrestrictionlevel gml:id="id_5381_1481102945823_401294"><aixm:upperlevel uom="fl">660</aixm:upperlevel><aixm:upperlevelreference>std</aixm:upperlevelreference><aixm:lowerlevel uom="fl">345</aixm:lowerlevel><aixm:lowerlevelreference>std</aixm:lowerlevelreference></aixm:flightrestrictionlevel></aixm:flightlevel></aixm:flightconditionelement></aixm:element></aixm:flightconditi oncombination></aixm:flight><aixm:regulatedroute><aixm:flightrestrictionroute gml:id="id_5381_1481102945823_401295"><aixm:routeelement><aixm:flightroutingelement gml:id="id_5381_1481102945823_401296"><aixm:ordernumber>1</aixm:ordernumber><aixm:pointelement_fixdesignatedpoint xmlns:xlink="http://www.w3.org/1999/xlink" xlink:href="urn:uuid:9a8671ae-883d-49bab9e2-86a4d52d94a6"/></aixm:flightroutingelement></aixm:routeelement></aixm:flightrestrictionroute></aixm:regulatedroute><aixm:annotation><aixm:note gml:id="id_5381_1481102945823_401297"><aixm:propertyname>instruction</aixm:propertyname><aixm:purpose>remark</aixm:purpose><aixm:translatednote><aixm:linguisticnote gml:id="id_5381_1481102945823_401298"><aixm:note>app4 FORBIDDEN 10:00-16:00(09:00-15:00)</aixm:note></aixm:LinguisticNote></aixm:translatedNote></aixm:Note></aixm:annotation><aixm:extension><adrext:FlightRestrictionExtension xmlns:adrext="http://www.aixm.aero/schema/5.1/extensions/eur/adr" gml:id="id_5381_1481102945823_401299"><adrext:processingindicator>tfr</adrext:processingindicator><adrext:enabled>yes</adrext:enabled><adrext:usage>operational</adrext:usage></adrext:flightrestr ictionextension></aixm:extension></aixm:flightrestrictiontimeslice></aixm:timeslice></aixm:flightrestriction></adrmsg:hasmember>

5 Benefits of Consuming NM B2B Web Services Data Improved Implementation of Eurocontrol Data Route Constraint Data Elements can be Directly Correlated to Flight Planning System Database Data Elements GML Based Waypoint Designators Virtually Eliminate Selection of Wrong Duplicate ID Waypoint Afghanistan Ireland Falkland Islands (Islas Malvinas) Laos United Kingdom Time Slice Data is Much Easier to Interpret / Implement

6 Limitations of NM B2B Web Services Data Authoritative Data for External Data References SDLST Start Daylight Savings Time EDLST End Daylight Savings Time Numerous Free Route Airspace Implementation Strategies Publication of FRA DCT Segments Restrictions Applied to Existing ATS Route Segments FRA Implementation: FAB or FIR/UIR

618 th Air Operations Center Dave Cobb, Chief Flight Plans and Airspace, 618 th AOC, USAF Enabling the Global in Global Vigilance, Reach and Power! 7

NM B2B Web Service IMPACT Every year the USAF s 618 th AOC supports 10K+ flights in Europe Each flight uses either a company route database of 3K to 4K or a flight plan built specifically for that flight Each flight plan is manually built by the office staff using the RAD and then validated on the NM NOP Next generation flight planning system uses NM B2B Web Services to: Ingest the RAD via AirspaceServices Time to build a valid company route or flight specific route will decrease by 50 to 75% Automatically validate the flight plan via FlightServices 300+ man-hour per year will saved 8