Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Similar documents
2012 Performance Framework AFI

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

Continuous Improvement of the Global Air Traffic Management System

30 SEP - 02 OCT, 2014

Russian Federation ATM modernization program

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWELFTH AIR NAVIGATION CONFERENCE

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Review of Air Navigation Matters 2.1 Global Air Navigation and CAR/SAM developments NAM/CAR Regional Air Navigation Implementation Plan

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

ICAO GANP Requirements and Evolution

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

PBN Airspace Concept. ATS requirements

PBN and airspace concept

TWELFTH AIR NAVIGATION CONFERENCE

Distributed Multi-Nodal ATFM Project Overview & Progress. ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/ Sep 2018

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

TWELFTH AIR NAVIGATION CONFERENCE

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

TWELFTH AIR NAVIGATION CONFERENCE

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Learning Objectives. By the end of this presentation you should understand:

Presented by: Trinidad and Tobago

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS (NAIROBI, 6-10 DECEMBER 2010) ZAMBIA

ICAO EUR Region Performance Framework

Global ATM System ~Interoperability and Harmonization ~

INTERNATIONAL CIVIL AVIATION ORGANIZATION

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

CNS/ATM Systems Interoperability and Harmonization

TWELFTH AIR NAVIGATION CONFERENCE

SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management)

Air Navigation Bureau ICAO Headquarters, Montreal

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

Packaging Tomorrow s Aviation System

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

IATA FUEL EFFICIENCY CAMPAIGN

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

MID Region Air Navigation Strategy

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

Cranfield Safety Management and Investigation Course

Bits to Blocks Aviation System Block Upgrades (ASBU)

The evolving air navigation system and the impact on avionics

ATFM/CDM ICAO s Perspective

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

Benefits of CNS/ATM Implementation for the Region

NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS (NAIROBI, 6-10 DECEMBER

TWELFTH AIR NAVIGATION CONFERENCE

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

Pacific Project. CPWG/8 - WP/6 Appendix A

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

ATFM Implementation Thailand and Southeast Asia. 55 th DGCA Conference October 2018 Nadi, Fiji

Implementation of PBN in Armenian airspace

ORGANISER HOST LEAD SPONSOR

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness

SOUTH AFRICAN NATIONAL AIRSPACE MASTER PLAN Version 1.1

ART Workshop Airport Capacity

FAA: ASBU Deployment Status. ASBU Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

RNP AR APCH Approvals: An Operator s Perspective

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

ICAO s Third Remotely Piloted Aircraft Systems (RPAS/3) Symposium Chengdu, Sichuan Province, China September 2018

Network Manager Adding value to the Network 29 September 2011

NATA 2018 AGM & CONFERENCE

(RN R A N V A V & & RN R P N

ACI-NA Conference NextGen at NAV CANADA. John Crichton President and Chief Executive Officer October 11, 2009

IMPLEMENTATION OF ADS-B BY NAV CANADA

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

On Time. Total Airspace Management. 8 th Global ATFM Conference Cancun - Mexico. 12/30/2014 Commercial-in-Confidence 1

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

NextGen and ASPIRE Environmental Initiatives

ICAO Regional Seminar on Performance - Based Navigation (PBN) Nairobi, Developments and Benefits. 4 December 2008.

Dave Allanby GM Operations SOUTH AFRICAN EXPRESS

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

ADS-B via Low Earth Orbiting Satellites Benefits Assessment

AEROTHAI Air Traffic Management Network Management Centre IATA ICAO Cross Border ATFM Workshop

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

Work Programme of ICAO Panels and Study Groups

Transcription:

Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1

WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA 2

Characteristics of The Industry High-end tourism-based /seasonal Single International Airport Geographically remote (slot times) Projected Traffic Growth = 5% Oceanic Airspace 10/12/2010 SCAA 3

Air Navigation Service Provider SCAA is a statutory board that provides air navigation services for Seychelles FIR regulated by the Safety Regulation Division of the SCAA Air Traffic Services include Aerodrome, procedural Approach and Area control 10/12/2010 SCAA 4

Major Stake-holders Airlines (in particular Air Seychelles) Neighbouring ACCs /FIRs General Aviation Military ICAO IATA 10/12/2010 SCAA 5

Problem Definition Terrain (western sector dead; VHF /Navaids coverage limited; MSA high) HF comms propagation issues Limited surveillance in FIR (ADS-C only) Aerodrome operating minima > chance of landing Large Route Spacing & large separation standards applied Operations in a single runway environment Early morning peak hour (Bunching) 10/12/2010 SCAA 6

Performance based National Air Navigation Plan The Seychelles PBN Roadmap is guided by the AFI Regional Roadmap for PBN and ICAO PBN Manual (ICAO Doc. 9613) and relevant SARPs. The primary driver for this plan is to increase safety, air space capacity, enhance services through technology in consultation with relevant stakeholders. The Seychelles Roadmap also supports national and international interoperability and global harmonization 10/12/2010 SCAA 7

Major Traffic Flows 10/12/2010 SCAA 8

Performance based National Air Navigation Plan Optimize use of existing RNAV SIDs and STARs Introduce Surveillance capability (ADS-B /Multilateration) Reduce lateral and longitudinal separation Upgrade FDPS to meet PANS/ATM requirement for new flight plan format 10/12/2010 SCAA 9

Performance Framework Forms Environment Efficiency Capacity Safety NATIONAL PERFORMANCE OBJECTIVES Optimize use of existing RNAV SIDs and STARs Performance Benefits reduction in fuel consumption and emissions. reduce pilots workload due to better airspace design increase in terminal airspace capacity reduce ATCO interventions due to better airspace design Performance Measurements Metrics 1. % of time saved during an approach ATM OC Components 2. % use of RNAV SIDS/STARs utilized per 100 mvts 2. % of RNAV approved aircraft 3. No of operations per hour 3. No. of incidents Projects /Tasks Strategy - Short-term 2008-2012 Timeframe Start /End AOM Terminal Airspace 2008-2012 Responsibility Status

Projects /Tasks Time Frame Start /End Responsibility Status Engage Stakeholders 2008-2010 ANS /SR On-going Survey on equipped aircraft 2010 SR completed Creation of Databases 2011 SR/ANS/IT Collection of Statistics on usage 2010 2012+ ANS On-going Risk Management Linkage to GPIs Risks Factors: Lack of funding; delay in aircraft equipage; insufficient database; lack of HR Risk Mitigation: identification different funding sources; involvement of aircraft operators in the decision making; recruitment of a statistician GPI/5: area navigation and required navigation performance, GPI/8: collaborative airspace design and management, GPI/9: situational awareness, GPI/10: terminal area design and management, GPI/11: RNP and RNAV SIDs and STARs, GPI/21: navigation systems 11

Performance Framework Forms NATIONAL PERFORMANCE OBJECTIVES Upgrade FDPS to meet PANSATM requirement for new flight plan format Performance Benefits Environment Efficiency reduction in fuel consumption and emissions. ability to make maximum use of aircraft capabilities ability of aircraft to conduct flights more closely to their preferred trajectories facilitate utilization of advanced technologies thereby increasing efficiency optimized demand and capacity balancing through the efficient exchange of information Safety Costeffectiveness enhance safety through ATCOs more informed decisions Reduction in fuel costs Reduction comms cost Performance Measurements Metrics 1. Number of hours of reduced flight time 2. Number of incidents 3. Cost savings (Cost centres)

ATM OC Components Projects /Tasks Strategy Short-Term (2010 2012) Timeframe Start /End Responsibility Status AUO SDM DCB 1. Conduct impact assessment on current system; define requirements; identify solutions 2. Liaise with manufacturer for system solution 3. Testing of solution delivery 4. Transition Planning Phase 1: identify key transition criteria All training completed All documentation produced and distributed Operational interfaces checked with adjacent ACCs Transition Rehearsals complete on operational system Produce a transition plan walk thru the plan Produce and validate reversion plan walk thru the plan Operation readiness demonstration Jan Dec 2010 Jan 2011 Dec 2011 Sept Dec 2011 Jan Mar 2012 ANS / CNS SCAA / Supplier SCAA Completed On-going 5. Transition Phase 2 Transit into operation 6. Transition Phase 3 Airspace users implementation 7. Closure Phase Filing of new flight plans Apr Jun 2012 July 14 Nov. 2012 15 Nov 2012 SCAA / Supplier Air space users All 12/15/2010 SCAA 13

Risk Management Linkage to GPIs Risks Factors: Lack of funding; delay in solution production; delay in air space user readiness Risk Mitigation: identification different funding sources; sourcing of alternate suppliers; involvement of aircraft operators in transition planning; GPI/5 RNAV and RNP (Performance-based navigation) GPI-12 Functional integration of ground systems with airborne system GPI/18 Aeronautical Information 14

Performance Framework Forms NATIONAL PERFORMANCE OBJECTIVES Introduce surveillance capability in Seychelles FIR (ADS C/ADS-B /Multi-lat) Performance Benefits Efficiency Safety Metrics ability to allocate aircraft their preferred trajectories optimized demand and capacity balancing through the efficient exchange of information decrease in ATCOs & pilots intervention ability to monitor aircraft positions and trajectories enhance safety by use of modern capabilities onboard aircraft increased situational awareness & timely conflict management 1. Number of incidents Performance Measurements 2. Number of alerting occurrences due to unreliability of two way communication establishment

ATM OC Components AOM, AUO,SDM,CM Projects /Tasks Strategy Short-term ( 2009-2012) Time Frame Start /End Responsibility Status Implementation of ADS C 2009-2010 ANS /CNS Completed Implementation of ADS B/Multilat CNS On-going Site survey ( coverage analysis, interconnection links availability, power, accessibility to sites) Scope definition Aircraft equipage survey Cost benefit analysis Procurement process Manufacturing Phase Installation phase Training Commissioning Mar - Dec 2010 Nov-Dec 2010 1 31 st Jan 2011 Jan Feb 2011 Mar Sept 2011 Oct 2011 Feb 2012 Mar June 2012 Risk Management Linkage to Risks Factors: Lack of funding; coverage limitation, availability of suitable sites, high operational costs Risk Mitigation: identification of different funding sources; make available transponders for aircraft. GPI/5: performance-based navigation; GPI/7: dynamic and flexible ATS route management; GPI/8: 16

The End Any questions?