WOKING INTEGRATED TRANSPORT PROJECT

Similar documents
Event Title - Isle of Wight Festival MEMBERS BRIEFING June 2011

The Point Roundabout Improvement Scheme

Chapter 21 Route window W6 West Ealing station. Transport for London

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

PARKING ENFORCEMENT IS NOW IN PLACE USE THE DESIGNATED CAR PARKS.

Road Closure & Traffic Mangement Information during the 2018 ASICS Windermere Marathon Race.

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

NEWSLETTER #04 June 2018

Event Travel Plan. Poppies: Wave. Southend-on-Sea Borough Council

Enterprise Way. The new Airport City link road. June 2017 Progress Update

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Road Signs, Markings and Their Meaning

Chertsey - Base, travel and arrival information

Chapter 16 Route Window NE15 Brentwood station. Transport for London

M2 Junction 5. improvements scheme. Preferred route announcement

Environment Committee 24 September 2015

M56. New Junction 11a Preferred route announcement

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

M4 Junctions 3 to 12 Smart motorway

Board meeting

Monthly Traffic Update

TRAFFIC, TRANSPORT & PEDESTRIAN MANAGEMENT PLAN. Weymouth Carnival 2018

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

London Borough of Barnet Traffic & Development Design Team

Joint Transportation Board

The decision on whether to take enforcement action falls outside the scope of delegated powers.

Major Scheme Business Case Summary Report for Programme Entry

Figure 1: Little Dry Creek Trail Crossing

A31 Ringwood improvement scheme

Felixstowe Branch Line FAQ

Chapter 13 Route Window NE12 Harold Wood station. Transport for London

Business Case Approved. Under Construction. Business Case Approved. Under Construction

RESPONSE TO REVISED DRAFT, ADUR LOCAL DEVELOPMENT PLAN 2013

Chapter 2 Route window W25 Maidenhead station. Transport for London

Guidance for Blue Badge holders on parking in Weymouth and Portland

Notice of Road Closures & Parking Restrictions

CITY OF NEWCASTLE UPON TYNE JOHN DOBSON STREET AREA. Traffic Regulation (Consolidation) Order 2009 (John Dobson Street Area Variation) Order 2015

Chapter 4 Route window W23 Taplow station. Transport for London

Section 1 approximately 90 metre section of road on the R610 from Toureen House to Passage West Library Road Closure of 4 weeks.

Ermine Street Environmental Enhancements

Capital & Counties. October 2007

JOINT TRANSPORTATION BOARD. 10 June Non-key. That subject to the views of the Board,

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Queen s Circus Roundabout

Construction Staging Adelaide Street West

INTRODUCTION. delegated responsibility for its delivery and the management of the company.

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT.

D L R C C T R A F F I C N E W S

Notice of Road Closures & Parking Restrictions

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

M621. Junctions 1 to 7 Improvement scheme. Share your views

TORONTO TRANSIT COMMISSION REPORT NO.

Transport Assessment Appendix M: Avonmouth Impacts

1.2 If the Council is satisfied that traffic on a road should be prohibited for the purpose of:

ACORNS PROJECTS LIMITED

NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT

D L R C C T R A F F I C N E W S

To the residents and businesses of The Borough of Bournemouth Council and Borough of Poole Council.

Business Forum. 16 March 2016

Proposed Housing Developments In Great Horkesley

Trigger Point Justification Note 30 th August 2013

Information for Visitors

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement

All reports. 1. Governance Service receive draft report Name of GSO DPR

The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order. Transport Assessment

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

1. CONTINUATION OF RIGHT LANE CLOSURE TOWARDS SLIP ROAD OF JALAN KUCHAI LAMA & NEW PANTAI EXPRESSWAY (NPE) (NORTH-BOUND)

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

ECC Councillor Andrew Sheldon. ECC Councillors Dave Blackwell and Jill Reeves

Ashton Vale Industrial Estate alternative access report on second micro-consultation. MetroWest Phase 1

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

AN GARDA SIOCHANA TRAFFIC PLAN INFORMATION FOR PAPAL VISIT TO KNOCK

STAGECOACH SERVICES. Northern Pride Parade 2017 in Newcastle City Centre on Saturday 22 July 2017 affecting all City Centre services

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure

Cabinet Member Report

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

Off Street Parking Report 2017

A358. Taunton to Southfields Dualling Scheme Public consultation

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015

Wolverhampton City Council

Map and Directions. Brighton Centre, Kings Road, Brighton, East Sussex, BN1 2GR. Telephone: Travelling to the Brighton Centre

CITY OF EDINBURGH COUNCIL WRITTEN SUBMISSION

D L R C C T R A F F I C N E W S

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015

Ian Saxon Assistant Executive Director, Environmental Services

ATTACHMENT A. P a g e 6 I t e m #

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Cabinet. The Future of Wareham Foot Level Crossing. Date of Meeting 24 February 2016

Sky Temporary Car Park Transport Statement

Context. Site Development. Brassington Avenue

Public Realm & Landscape

M56. New Junction 11a Summary of the consultation report

SATURDAY 4 th NOVEMBER BONFIRE NIGHT 2017

Little Borough. Borough Farm Road Milford Surrey GU8 5JZ

Transport Assessment Appendix L: Match Day Impacts

to provide a stimulating, educational, comfortable and entertaining destination venue to Victorians, and to interstate and international visitors.

Transcription:

Civic Offices Gloucester Square Woking Surrey GU21 6YL Telephone (01483) 755855 Facsimile (01483) 768746 DX 2931 WOKING Email wokbc@woking.gov.uk Website www.woking.gov.uk 20 January 2017 Dear Resident/Business Owner, WOKING INTEGRATED TRANSPORT PROJECT I am writing to inform you that Surrey County Council and Woking Borough Council will commence essential highway improvement works to Woking Town Centre on Monday 30 January 2017. This multi-million pound highway enhancement project will, when completed, significantly improve traffic flow in the area and make it safer for pedestrians and cyclists, whilst stimulating economic growth in Woking Town Centre. The works, which begin on Monday 30 January 2017, will see: High Street and The Broadway (from Duke Street) become one-way to west-bound traffic only. No left turn from Victoria Way to Church Street West from Victoria Way to Cawsey Way/High Street. Create a new link road connecting High Street with Victoria Way. The closure of Church Street West and Cawsey Way to all traffic (from May 2017*). The relocation of the taxi rank from High Street to The Broadway. Improved bus facilities along High Street and The Broadway. The realignment of Chertsey Road to improve pedestrian and cycle connectivity. From May 2017*, an Experimental Traffic Regulation Order (ETRO) will be introduced along High Street that will restrict vehicle access, parking, loading and unloading. It is anticipated that these highway works and associated changes to the road network will take several months, with completion expected later this year. Whilst much of the works won t affect you directly, there will be times when the necessary diversion routes will have an effect on your movements, such as during utilities works. Please see Appendix 1 for more information. Please see overleaf for more information about the road enhancement works.

Beginning at the junction between Locke Way and The Broadway on Monday 30 January 2017, the works will be phased to help minimise disruption to road users as outlined below. The Broadway Monday 30 January August 2017* Church Street West Monday 30 January March 2017* Chertsey Road March April 2017* High Street and Chapel Street March December 2017* High Street link road complete May 2017* Bus diversions Whilst we carry out these important works, it is necessary to make changes to existing bus routes and, where required, provide temporary bus stops. For more information about these changes, please visit www.surreycc.gov.uk/buses Next steps Residents and businesses will be affected in different ways, so it is important that you study the enclosed information and if necessary, consider making alternative arrangements whilst the works continue. We recognise that our works are likely to cause disruption to local residents and businesses and therefore would like to apologise for any inconvenience caused. We are fully committed to keeping disruption to a minimum in order to deliver significant highways improvements that will benefit everyone in Woking Borough.

Further information You can find out further information about the project by visiting www.woking.gov.uk/wokingitp If you have any queries regarding the project, or would like to receive regular updates about the project, please email wokingitp@woking.gov.uk Alternatively, if you have any queries regarding the construction process, please contact Farrans Construction, on 02890 394043. Yours sincerely, Ray Morgan Chief Executive Woking Borough Council

Appendix 1 - Essential utilities works To continue to support the economic growth of Woking Town Centre, it is necessary to carry out essential utilities works, such as installing gas and water supplies, to Victoria Way. By carrying out these works now, we hope to minimise future disruption to the highway network. Victoria Way will be closed south-bound between Lockfield Drive and Goldsworth Road. Victoria Way north-bound will remain open. Church Street West will be closed between the junctions with Forge End and Victoria Way. Due to the closure of Victoria Way, the spiral exit from the Shoppers Red Car Park will be suspended. Drivers are asked to use the main car park exit.

Victoria Way (south-bound carriageway) will be reduced to one lane contra-flow only from the junction of Lockfield Drive to Victoria Arch. Traffic travelling north-bound will be diverted along Goldsworth Road, Church Street West and Forge End onto Victoria Way. Church Street West between the junctions of Forge End and Victoria Way will remain closed to through traffic. To support the movement of traffic through the diversion, there will be no access to Goldsworth Road from the Morrison s Roundabout. Saturday 11 February to Sunday 19 February 2017 Victoria Way (west-bound carriageway) will close between Brook House Roundabout and the junction with Chobham Road. Traffic travelling south-bound along the A320 will be diverted along the A245 at Six Crossroads Roundabout before turning left along the A3046 Chobham Road to rejoin Victoria Way. Access to Double Tree Hilton Hotel and Victoria Way Car Park will be maintained at all times.