Dynamic Airspace Overview concepts, complexities, benefits and outlook

Similar documents
How CFSPs work. processes, requirements, difficulties. Tuesday, June 19th, 2018 CFPSG PRESENTATION FABEC SC OPS/AOG RADISSON ZURICH AIRPORT 1

Cross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations

Free Route Airspace Maastricht (FRAM)

Flight Efficiency Initiative

Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014

Airspace Organization and Management

REG ASP MIL APO USE INT IND NM

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

The Network Manager tasks and the ASM improvement initiative

Dynamic Management. of the. European Airspace Network. ADR Data Catalogue. Annex A: Supported Services

Free Route Airspace ASM Dimension. Giuseppe Acampora

EUROCONTROL. Centralised Services Workshop. Peter Matern CS#5 EAIMS 5 March 2014

REG ASP MIL APO USE INT IND NM

2012 Performance Framework AFI

Enter here your Presentation Title 1

AIP ITALIA Servizio Informazioni Aeronautiche

TWELFTH AIR NAVIGATION CONFERENCE

Free Route Airspace Workshop Conclusions and Future Projects Outlook

Civil-Military Cooperation. Advanced Flexible Use of Airspace

Performance Review Body 18

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

User Forum ASM Recent Improvements. Anders HALLGREN Manager, ASM/ATFCM Procedures EUROCONTROL Network Management

TWELFTH AIR NAVIGATION CONFERENCE

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

Free Route Airspace (FRA) Application in NMOC - Guidelines

Advanced Flexible Use of Airspace (AFUA) Kris DELCOURTE, EUROCONTROL Davide BARDELLI, LUFTHANSA SYSTEMS

Concept of Operations Workshop

Operations Control Centre perspective. Future of airline operations

NM Interoperability Strategy. Idalina Mendes Videira Network Strategy and Development EUROCONTROL

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

The European Experience Flexible Use of Airspace (FUA)

RNP AR and Air Traffic Management

Continuous Improvement of the Global Air Traffic Management System

Airspace User Forum 2012

Flexible Use of Airspace. in ITALY. EUROCONTROL, 11 December 2018

European ATM Development The Big Idea

POLFRA IMPLEMENTATION Progress Report FREE ROUTE AIRSPACE WORKSHOP

Temporary Airspace Allocation TAA & setting the scene for Egyptian Civil/Military Cooperation

ORGANISER HOST LEAD SPONSOR

Understanding Dynamic Airspace. Chris Woodland. The Network Manager User Forum 2018

The situation before the FUA

NEW CALEDONIA PBN PLAN

AIRPORTS AUTHORITY OF INDIA S AIRPORT COLLABORATIVE DECISION MAKING SYSTEM. (Presented by Airports Authority of India) SUMMARY

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

Air Space Management - ASM Workshop March 2013 Rabat, Morocco. Advanced Flexible Use of Airspace. Presented by Petri Hartikainen, Integra A/S

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

FREE ROUTE AIRSPACE IMPLEMENTATION IN ARMENIA (ARMFRA)

Sven Kaltenhäuser, Frank Morlang, Dirk-Roger Schmitt German Aerospace Center DLR

The Network Manager User Forum 2017

FLIGHT EFFICIENCY PLAN

TWELFTH AIR NAVIGATION CONFERENCE

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

Considerations for Facility Consolidation

Aeronautical Communications: Changes Ahead - FCI

ATC Simulators. The manufacturer of

Operational Evaluation of a Flight-deck Software Application

Multi Profile Training Areas. Col Azmi Al Abaddi Royal Jordanian Air Force

Free Route Airspace (FRA) Application in NMOC - Guidelines

Free Routing Airspace in Europe

CONNECT Events: Flight Optimization

WEST ATLANTIC ROUTE SYSTEM (WATRS) PLUS AIRSPACE REDESIGN AND SEPARATION REDUCTION INITIATIVE. (Presented by United States of America) SUMMARY

Leader/Follower Static Pairwise (RECAT Phase II) RECATEGORIZATION WORKSHOP June 20, 2011

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

SDM Workshop on PBN Airborne Perspective. Michael Hopp, Lufthansa Group Brussels,

User Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management

Efficiency and Automation

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

EUR/SAM corridor airspace concept

ATC automation: facts and steps ahead

Air Traffic Management and Space Transportation System Wide Information Management and Integration into European Airspace

ASBU-Bloc0 Moroccan achievements and planned activities

Making the World A better place to live SFO

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

Airspace User Forum 2012

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

ENAIRE DEVELOPMENTS NM B2B WEB SERVICES TECHNICAL FORUM. enaire.es. Network Manager nominated by the European Commission

khz CHANNEL SPACING

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

Leveraging on ATFM and A-CDM to optimise Changi Airport operations. Gan Heng General Manager, Airport Operations Changi Airport Group

Bits to Blocks Aviation System Block Upgrades (ASBU)

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

ICAO GANP Requirements and Evolution

The VINGA project. Henrik Ekstrand Novair Flight Operations Aerospace Technology Congress

Civil and military integration in the same workspace

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

Alternate WX SIDs And Routes Ernst Potzel / Klaus Lang, DFS ACC Munich

TWELFTH AIR NAVIGATION CONFERENCE

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

Hosted by General Civil Aviation Authority (GCAA)

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory

Transcription:

KUNDENNAME NM User Forum 2018 Dynamic Airspace Overview concepts, complexities, benefits and outlook CFSP view

Agenda 01 Concepts 03 Benefits 02 Complexities & Issues 04 Outlook & Recommendations 2

Concepts

FRA concepts not just one approach Models Full FRA all published and unpublished points (LAT/LONG) FRA IP (Intermediate Points) published points only Entry/Exit Cross border operations Vertical connectivity Applicability Period 24H During night hours only 4

SAXFRA (Full FRA, H24) FL660 FRA GND 5

FRA Italy (FRA IP, H24) FL660 FRA FL335 FL265 Transition ATS GND 6

FRA Germany (FRA IP, some night hours only, some H24) FL660 FRA FRA FRA FRA FL315 FL285 FRA FRA FRA FL245 ATS GND 7

FRA Germany (FRA IP) 8

FRA Concepts a few more things FIR/UIR vs. ATC Sector Data FRA rules and conditions are often linked to ATC sectorization and not to state published FIR/UIR bounderies FUA Replacing CDR1 and CDR2 Dynamic airspace activations Conditional airspace availability RAD Number of restrictions (conditional usage) constantly growing, way too many and too complex... 9

Complexities & Issues

Complexity The flight planning environment has become too complex and dynamic for human beings Integrated system support and process automation is a must Things happen in the background (B2B) Back Office support becomes more and more important for daily operations 11

Implementation Issues FRA data initialization FRA rule implementation RAD and FUA implementation Software adaptions if required Testing of software, rules and data changes Pre-validation (4-6 weeks) Tracking of changes Deployment to customer environment Maturity of AIP information (2 AIRAC cycles prior effective date) Last minute changes 12

Performance Issues Complexity of FRA, RAD and FUA requires more and more iterations to identify optimum PLANNABLE trajectories. This has a measurable impact to calculation times which can not only be solved by additional hardware but requires software enhancements. Recent Optimizer enhancements by 30% introduced to Lido/Flight in 2017 have been more or less compensated for increasing number of iterations to find optimum trajectory caused by FRA implementations. Reduces flexibility for AO to react on short notice to changes/improvements. 13

Benefits

FRA benefits - CFSP view Best AVAILABLE route at time of planning, actual trajectories still differ a lot FRA IP is too complex (vertical connectivity, applicability period) and still quite restrictive and therefore offers limited benefits only Full FRA can provide tangible benefits However, AO plan minimum cost NOT distance considering Upper Air Data (winds) and costs: Fuel price ATC charges Crew cost Aircraft cost AO feedback required! High effort involved during implementation High effort involved during operations (support) Step by step approach increases effort on top 15

Outlook & Recommendations

Outlook (1) Joint AO consulting approach by NM and Lufthansa Systems starting next week Helping AO (Lido/Flight customers) to improve IFPS acceptance rate Aim is to identify and eliminate possible route causes for flight planning errors: @NM (CACD, IFPS) @ANSP (Publication) @CFSP (Data & Rules, Software) @AO (Data & Rules, Processes) Idea presented together with Andy Woolin from NM at the last Lido/Flight User Group Forum in November 2017 Customer feedback very positive 17

Outlook (2) Pre-validations by Lufthansa Systems Pre-validations by AO based on preloaded data and rules in the dynamic Lido/Flight Database utilizing Statistical Upper Air Data for testing Introducing TAXI & TOW information to ICAO ATS Plan field 18 in 2018 New Optimizer (VOLAR) planned for 2019 18

Recommendations CFSP Involvement Early involvement of CFSPs already during conception phase and for pre-validations RAD housekeeping Removal of obsolete rules Replacement of very complex rules by rather simple rules 19

Summary Lufthansa Systems is committed to support FRA implementations. CFSPs are key enablers for AOs to generate the best plannable route and profile for a flight based on their operational needs and commercial interest. Close cooperation between all stakeholders is essential to develop, test and deploy new procedures and regulations. Variety and complexity of FRA, rules and restrictions need to be reduced, keep it simple and consistent! Further harmonization between the different FRA implementations is required! 20

NM USER FORUM 2018 Thank you for your attention! 21