Area Planning Overlaps Eastern Neighborhoods (SF Planning) Central Waterfront Area Plan (SF Planning) Pier 70 Preferred Master Plan (Port of SF) San Francisco Better Streets Plan (City of SF) 22nd Street Greening Master Plan (GreenTrustSF) Blue Greenway Guidelines (Port of SF) Green Vision Plan (D-NWPH GBD) Green Conections (City of SF) Pier 70 Development (Port of SF / Forest City) Core Area Plan Area
Public Realm Plan Outputs IDENTIFY PROJECTS DEVELOP DESIGNS EIMATE COS Through a robust community engagement process, finalize a prioritized list of streetscape, open space, and other public realm projects. Working with neighborhood residents, businesses, and property owners, produce detailed design for the highest priority projects. Develop conceptual designs for the remaining projects. Provide robust cost estimates for each of the projects identified in the plan.
Scoped Capital Projects C A 22nd Street Streetscape B Bridge Footpath Lighting $3.0 M $183 K 1 1 C Arts Plaza $850 K 2 A B D Blue Greenway (Illinois) E Warm Water Cove Park $18 M $5.0 M D F Cesar Chavez East C.W. New Parks & Rehab. $8.3 M $5.3 M 1 E plus over forty unscoped project ideas 1 - funded through Eastern Neighborhood Impact Fees 2 - Eastern Neighborhood In-Kind
MICHIGAN HUBBELL SIXTH FIFTH GENE FRIEND WAY CAMPUS WAY 03RD S SOUTH BRIDGEVIEW WAY UNNAMED 191 CENTRAL WATERFRONT - DOGPATCH PUBLIC REALM PLAN DAGGETT 07TH 17TH OWENS 16TH 04TH TERRY A FRANCOIS BLVD TERRY A FRANCOIS BLVD Potential Capital Projects 1 MARIPOSA 44 MISSISSIPPI 18TH 2 MISSOURI TEXAS 19TH 8 3 6 5 4 7 UNNAMED 044 UNNAMED 042 20TH 20TH MINNESOTA LOUISIANA UNNAMED 043 10 9 45 23 48 22ND SIERRA TURNER TER PENNSYLVANIA AVE 14 14 15 19 17 18 20 12 IOWA INDIANA 13 TUBBS 22ND 21 TENNESSEE 24 ILLINOIS 22 HUMBOLDT 42 23RD WATCHMAN WAY 23RD MISSISSIPPI 25 28 26 23RD DAKOTA TEXAS 41 11 30 33 36 50 24TH 29 MICHIGAN MARYLAND MASSACHUSETTS 49 35 34 MINNESOTA 37 25TH CONNECTICUT 40 DELAWARE 26TH 26TH MISSOURI YELLOW CAB ACCESS ROAD MISSISSIPPI 32 26TH CESAR CHAVEZ 43 MICHIGAN MARIN MARIN MARIN NAPOLEON ISLAIS Public_Realm_Plan_Area_ TOLAND GALVEZ AVE HUDSON AVE SELBY I-280 N OFF RAMP SELBY EVANS AVE RANKIN CUER AVE DAVIDSON AVE QUINT ARTHUR AVE CARGO WAY BURKE AVE AMADOR MUNI Lines PRP_Project_Polys Open Space Caltrain
Project Identification & Prioritization PUBLIC WORKSHOPS PUBLIC REALM PLAN PRIORITY LI WINTER 2015 NEIGHBORLAND POLL INITIAL PRIORITY LI SUMMER 2015 GBD VISION PLAN NOV 2013 22ND GREENING MAER PLAN MAY 2011
Project Identification & Prioritization https://neighborland.com/dogpatchpublicspace
Public Realm Planning Timeline SPRING 2015 FALL 2015 JAN 2016 FEB 2016 MAR 9 2016 APR 2016 MAY 2016 JUN 2016 AUG 2016 Begin Community Outreach and Briefings to stakeholder groups RFP for Urban Design Consultant Select Urban Design Consultant; Finalize Contract Existing Conditions Documentation Public Workshop 1: Project Identification & Prioritization Design Development, Focus Groups Public Workshop 2: Design Charette of Priority Projects Design Development Publication of Plan and Public Presentations Adoption by Board of Supervisors
Ongoing Engagement: Stakeholder Organizations 2nd TUES 2nd TUES LA TUES 3rd WEDS 1st THURS AS NEEDED AS NEEDED Dogpatch Neighborhood Assn. (DNA) Potrero-Dogpatch Merchants Assn. (PDMA) Potrero Boosters Central Waterfront Advisory Committe Penninsula Joint Powers Board of Directors (Caltrain) Dogpatch - NW Potrero Hill Green Benefit District Port of SF / Office of Economic & Workfoce Devel In addition to holding Open House Workshops, Planning s Public Realm Plan Team will also attend select monthly meetings organized by various stakeholders to provide updates and gather feedback.