Architect and Consulting Engineers - Established in 1964

Similar documents
(Formerly known as S.N.BHOBE & ASSOCIATES Pvt. Ltd.)

Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra

Now Available. Urban Rail Transport. in India Urban Bus Transport. in India India Infrastructure Research.

Need of Urban & Regional Rail Based Transport


Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity

CURRENT PASSENGER BUSINESS

PPP Days 2010 PPPs Lessons from the Last 18 Months

Key Projects Carmichael Rail Line (CRL)

UNIVERSITY CAMPUSES IRRIGATION CANALS PLAYING A KEY ROLE IN INFRASTRUCTURE DEVELOPMENT

S. No. State Name of the Field Office Nodal Office I. Uttar Pradesh 1) Agra Kanpur. II. Uttarakhand 9) Dehradun Dehradun

mahindralifespaces.com

Maha Metro comes into existence

LAND VALUE CAPTURE FOR RAILWAY STATION DEVELOPMENT. Changing perception of Railways

Japan India Cooperation on Railway Sector

Railways in India 2012

Investment Opportunities DMIC UP Region

Pedro B. Ortiz MEGA-MUMBAI / MAHARASHTRA SOUTH ASIA S CAPITAL REGION

WESTERN INDIA REGIONAL COUNCIL OF THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

(ii) DESCRIPTION OF DUTIES - PROJECT MANAGEMENT, FINANCIAL CURRICULUM VITATE 1. NAME: SUDHIR TENGSHE

Network Size and Growth

LIST OF ESIC HOLIDAY HOME

Maharashtra Automotive Sector. Knowledge Partner

CORPORATE PRESENTATION MARCH

DCB Bank Regional Nodal Officers

Property at Devanahalli 25 Acres Suited for upscale Leisure resorts

Making of Mumbai. P. Balabhaskaran

ROADS April Contents. Advantage India. Market overview. Investments. Regulatory framework. Opportunities. Industry associations

The Antheia Life beckons.

GENSOL S SOLAR PV EPC PORTFOLIO

M.P. POLICE HOUSING CORPORATION LTD. Multi-Storey Residential Complex for Police Personnel At 15 th Battalion, INDORE (Madhya Pradesh)

How many shades of Green can you think of?

L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

RAILWAY RECRUITMENT BOARD (RRB) EXAM - QUESTION PAPER SOLVED

Railway Recruitment Board (RRB) Exam - Question Paper Solved

8. Karnataka Cooperative Consumers Federation Ltd. No. 4, Pampamahakavi Road, Chamarajpet, Bangalore (Karnataka)

Bandra Worli Sea Link

Domestic Travel Policy CMS

TRANSPORTATION: Airports and Aviation Services

Visit to METSO Alwar (22Mar.2014) A Brief Review

Development of Road Infrastructure in India

Construction of Sardar Mandir at Surat. Urban development. Government of Gujarat

ICT LIBRARY UPDATE. Bi-monthly March June 2016 Vol. 14 : No. 2 & 3. Contents

ROAD DEVELOPMENT IN INDIA 2015

Alternatives Study of Alignment

Indiabulls Real Estate Limited (CIN : L45101DL2006PLC148314)

ROADS For updated information, please visit March 2019

the total length of railway lines in the country and the length out of that electrified in terms of kilometre and percentage, State-wise;

15-18 May 2018 Proposal for Government of Bihar to participate in GES 2018

Aviation Sector Services. Transportation / Aviation

Session with Hon ble Members of Parliament from Kerala. 4 August 2014, New Delhi. Confederation of Indian Industry

Maharashtra Defence Sector. Knowledge Partner

LOCATION ANALYSIS PURVA ATTRIA. March 2013

11 th Annual Conference Road Development in India Telangana State Initiatives

RAILWAY STATION REDEVELOPMENT

AIRPORT MODERNISATION IN INDIA By K Roy Paul Secretary, Ministry of Civil Aviation, India and Chairman, Air-India Limited

A Brief Company Profile

Presentation on Indian Tourism Industry

Connectivity continues to remain one of the biggest concerns for north Chennai residents with thousands of commuters struggling every day

The presentation has been prepared for information purpose, it is not a solicitation of any offer to buy or sell any security or instruments.

Capability Statement SUNJAAY ATHANKI PROJECTS MANAGEMENT PVT LTD

Premium Bungalow Residences. Unwind, Rejuvenate, Energize

Presentation on City Gas Distribution (CGD) Pipeline Network Projects in Smart Cities

LIST OF DGCA APPROVED AME TRAINING INSTITUTES. (as on )

PROJECT INFORMATION. Place of the Project Bangalore City District. Bangalore Urban Sector. 30 years (concession period)

A Brief Company Profile

SBIBRCODE CIRCLE BRANCH CITY 847 HYDERABAD HYDERABAD MAIN HYDERABAD 3257 HYDERABAD YELLAREDDYGUDA HYDERABAD 4031 HYDERABAD CB SECUNDERABAD HYDERABAD

NET India Trainings AUGUST th noon. 6 th pm. 8 th am. 9 th am. 13 th noon. 15 th noon. 16 th 11.

Featuring intelligent lighting technology and applications October 2018

12. Bank of Baroda Nodal Officer. :Sonu A. Arekar

Capital Mall. The best of retail, entertainment and hospitality under one roof!

RAILWAYS. November 2010

Sub. Rev Eng. Ad. Rev Hin. Ad. Rev Ver. Ad. Rev.

Unbox the lifestyle you desire

DAINIK EXPRESS. Largest, Highest and Biggest in India. Team of DAINIK EXPRESS

VOLLEYBALL FEDERATION OF INDIA

LEAD-UP EVENT, PORT AND COASTAL INFRASTRUCTURE AT VISAKHAPATNAM (APR 3-4, 2018) FOR AIIB ANNUAL MEETING 2018 Mumbai

your own Relive a world of Dronagiri

M E P I N F R A S T R U C TU R E D E V E LOP E R S L I M I T E D. Q1 FY16 & FY15 Results Update

Safe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~

Chapter 3. Medical Tourism in Maharashtra

BESTECH GROUP. BESTECH has an envious portfolio to its credit, with a formidable in-house construction arm engaged across the four verticals.

From the Government of Maharashtra-MIDC. MahaConnect. The Business Newsletter 75 th Edition July 2016

Investor Update Q1 FY18.

BHARTI REALTY LIMITED

MINISTRY OF URBAN DEVELOPMENT DEMAND NO. 95 Ministry of Urban Development

Sl. No. 1. God father Communication Pvt Ltd 9/36/2013-BP & L. Name of MSO Address of MSO Applied date and for Area Status

1 st US - Kosovo Trade Forum New York, New York

During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects

IT S THE PLACE TO BE. TODAY AND TOMORROW. OLD WORLD CHARM. REDISCOVERED. Roads and Transport

Hyderabad Metro Rail in PPP Mode

Multimodal Logistics Professionals

DAVP OP WING. Flex extra Ambedkar Nagar to Siri. 300 sq. ft. to 700 sq. ft. -Do- Delhi NCR 177 sq. ft. or meters.

AIRPORTS. November 2010

SOUTH AP & TG 4209 Warangal SOUTH AP & TG 4221 Rajmundry SOUTH AP & TG 4224 Bajarang Retail - Chandanagar SOUTH AP & TG 4223 Felicity Mall - Nellore

38 Delhi Integrated Multi-Modal Transit System Limited (Dimts) 39 Delhi Jal Board 40 Department Of Commercial Taxes Government Of Jharkhand 41 DGFT -

Denmark/Chennai Sunday 15 June 2014 Trident Hotel Chennai Monday 16 June 2014 Meeting at CWET Programme: Meeting with Mr. A.

Integrated Design Services (IDS), NID, Ahmedabad. List of Clients

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

Transcription:

BROCHURE Architect and Consulting Engineers - Established in 1964 S.N. BHOBE & ASSOCIATES Pvt. Ltd. 4th Floor, Pudhari Bhavan, Sector-30A, Near Sanpada Railway Station, Vashi, Navi Mumbai 400705. INDIA. TEL. : +91 22 4127 3303 / 04 / 05 FAX : +91 22 4127 3306 e-mail: tenders@snbapl.com, www.snbapl.com, www.tpf.eu

INTRODUCTION S.N. BHOBE & ASSOCIATES Pvt. Ltd. S.N. Bhobe & Associates has been operating since 1964. In April 2003, the firm was converted to a Company namely S.N. BHOBE & ASSOCIATES Pvt. Ltd., and continued to retain the original expertise and talent. S. N. BHOBE AND ASSOCIATES Pvt. Ltd. (SNBAPL) is one of the oldest and a highly respected Engineering consulting firms in India and is an ISO 9001: 2008 certified organization. Year of Establishment : Partnership Firm since 1964 Converted into Pvt. Ltd. in 2003 PAN No. : AAICS1085J Incorporation No. : U74210MH2003PTC1 40074 Service Tax No. : AAICS1085JST001 Amount of Solvency Certificate held : Rs.216 Million CONTACT: Mr. Amarnath Chatterjee Associate Vice President (Business Development) e-mail: amornath@snbapl.com / tenders@snbapl.com ANNUAL TUNOVER : (INR in Millions) Particulars 2014-15 2013-14 2012-13 2011-12 2010-11 Annual turnover From Consulting business 365.62 321.21 288.18 267.83 236.59 Values in INR Million 400 350 300 250 200 150 100 50 0 365.62 321.21 288.18 267.83 236.59 Annual Turnover from Consulting Business

OUR MISSION OUR VISION OUR SERVICES ENGINEERING Planning: Engineering (Feasibility report, detailed project report), Architecture: Preparation of tender documents, Specifications, Standards, Design: Structural design, Design review, Geometric designs, Detailed execution drawings, Maintenance manuals, safety manuals and Record drawings. PROJECT MANAGEMENT Supervision:, Independent Quality Audit, Operation and main tenance of structures. Project management by latest techniques to achieve successful completion of project within time frame & budget. INFRASTRUCTURE PLANNING Water Supply, Sewerage, Solid Waste Management, Roads & mass transportation and Utility Services ARCHITECTURE Planning And Designing of commercial, residential, Industrial and leisure and recreational areas, Medical facilities, Interio r Designing Offices Shops, Restaurants, Clinics, Banks, Landscape designing of parks, gardens, nature parks, Theme pa rks, Amusement Parks, Water Parks, Aquariums, Conservation Reports, Documentation, Structural Conservation, Restoration and Policy Planning for Conservation. ENVIRONMENT Environmental Profiles, Environmental Impact Assessment, Pollution Control, Public health And Waste Disposal, Environmental Status Reports, Coastal Zone Management Plan, Chemical Zone Plan, Tree Plantation and Tree transplantation and Soil Conservation Projects. TOWN PLANNING & URBAN MANAGEMENT Preparation of Development Plans, Other Statutory plans, Master Plans, Layout Plans, Policy Planning, Town planning Schemes, Subdivision layout and Land Amalgamation, Project Appraisal & Project Formulation, Project Implementation. SURVEYS AND ANALYSIS Plane Table Survey, Contour Surveys, Quantity Surveys, Estimates, Trigonometric Survey, Reconsinance Survey, Theodolite Survey, Topographical Surveys with Total station and latest instruments & Software, Land use Surveys, Traffic Surveys and Tree Surveys.

ASSOCIATION WITH TPF GROUP TPF Group is one of the fast growing engineering, architecture, and management consultancy, with more than 4200 employees working in 59 countries and reached in 2014 a turnover of EUR 244 euros Millions. TPF Group is continuously undertaking projects and programs around the world in different roles, from designer and manager to contractor. TPF s teams are permanent ly focused in finding a better way to work in different sectors, from cement factories and energy projects to railways and buildings, in order to keep on providing the best services and quality to its customers TPF Group s growth strategy focuses on the development of and excellence in engineering and consultancy

AWARDS S. N. BHOBE & ASSOCIATES Pvt. Ltd. has been nominated for several awards all over India for the contribution made to design & project management of several infrastructure related projects in the last 10 years. A list of the recent awards received by the Company Sr. No. Name of Project Award For From Year 1 Prestressed concrete Design National Design Award concrete Outstanding Concrete Design Institution of Engineers (India) 2006 2 Basket Handle Bridge on River Pawna, Ravet S.B. Joshi & P.V. Raj Memorial & L & T National award Most Outstanding Bridge Indian Institution of Bridge Engineers 2008 3 Kengri Grade Separator on the Bangalore Mysore Highway. Essar Steel Infrastructure Excellence award Infrastructure Design Excellence award CNBC TV18 2010 4 Flyover between Sion Hospital and Hindmata Junction on Ambedkar road. Essar Steel Infrastructure Excellence award Infrastructure Design Excellence award CNBC TV18 2010 For photographs & more information on the projects, we invite you to visit our website www.snbapl.com

SOME OF OUR ESTEEMED CLIENTS National Highway Authority of India Mumbai Metropolitan Region Development Authority Maharashtra State Road Development Corporation Ltd. Karnataka Road Development. Corp. Ltd. Thane Municipal Corporation Municipal Corporation of Greater Mumbai Goa State Infrastructure Development Corporation City & Industrial Development Corporation of Maharashtra Limited Rail Vikas Nigam Limited Indian Railway IRCON International Ltd. Navi Mumbai Municipal Corporation Bihar Rajya Pul Nirman Nigam Ltd. Pimpri Chinchwad Municipal Corporation Dedicated Freight Corridor Corporation of India Ltd Pune Municipal Corporation Rajasthan State Road Development & Construction Kalyan Dombivli Municipal Corporation Corporation Ltd. Surat Municipal Corporation Goa State Road Development Corp. Ltd Bruhat Bangalore Mahanagar Palika Bangalore Metro Rail Corp. Ltd Tuljapur Development Authority Bihar State Road Development Corp. Ltd City Corporation of Belgaum Tamilnadu Highway Department Amravati Municipal Corporation Indian Bank, Kolkata Bangalore Development Authority Airport Authority of India Municipal Corporation of New Delhi Hindustan Aeronautics Limited Nagpur Municipal Corporation Mumbai International Airport Pvt. Ltd Indore Municipal Corporation Mahanagar Telephone Nigam Ltd. Konkan Railway Corporation Ltd. Maharashtra Maritime Board NABARD & Rural Roads Hyderabad Urban Development Authority Public Works Department, Uttarakhand Ashoka Buildcon Ltd.

PROJECTS HANDLED S. N. BHOBE & ASSOCIATES Pvt. Ltd. has completed a number of projects in different areas of infrastructure works as consultants. Some of our recent achievements are featured below: BRIDGES Consultancy services for Rehabilitation of Mahatma Gandhi Setu on NH 19 in Patna in the State of Bihar on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis. Concept - High Level River Bridge Total length of bridge - 5.5 km Project Cost -. 10,000 M ( 125 Million) Year of realization - 2011 - National Highway Authority of India Scope - Consultancy services for Rehabilitation of Distressed Bridge ( 1=INR 80) Cable stay bridge across Mapusa river, Goa Concept - Cable Stay River Bridge Cable stay portion Length - 185 m Project Cost -.207 million ( 2.59 Million) Year of realization - 2005 - Goa State Infrastructure Development Corporation Ltd. Scope - Design, Tender Preparation, Project Management Consultant Widening and improvement of Sion Panvel Special State Highway (SSH) from Kalamboli Junction (Ch. 115/800) to B.A.R.C. Junction (Ch. 140/690) under BOT (5 + 5 CC lane - 25 km Highway) on NH-4 Length of Highway 25 Km 1. Taloja Creek Bridge (Length 134.120m) 2. Jui Creek Bridge (Length 89.2 m) 3. CMLR flyover (Length 739.360 m) 4. Kamothe flyover (Length 704.050 m) 5. Sanapada flyover (Length 706.047 m) 6. Taloja flyover (Length 581.390 m) 7. Uran flyover (Length 964.028 m) 8. Turbhe R.O.B (Length 1578 m) 9. Mankhurd R.O.B (Length 43.6 m) 10. 8 Nos. Minor Bridges 11. 11 Nos. FOBs 12. CD Work Project Cost -.17000 M ( 212.50 Million) Year of realization - 2014 Sion Panvel Tollways Private Limited Scope - Design Consultancy

Cable stay bridge across Tapi river, Surat Concept - Cable Stay River Bridge Cable stay portion Length - 300 m (75 + 150 +75) Project Cost -.1436.50 M ( 17.96 Million) Year of realization - 2010 - Surat Municipal Corporation Scope - Structural Design Consultant High level bridge across Pawana River, Ravet, Pune Concept - Basket Handle, River Bridge Length of Bridge - 195 m Project Cost -.119.82 million ( 1.50 Million) Year of realization - 2008 - MSRDC Ltd. Scope - Design, Quality Assurance, Tender Preparation, Project Management Consultant Construction of New Major Bridge across South Kasheli and North Kasheli Creek on Thane-Bhiwandi-Wadpa road (Special State Highway (SSH)) on BOT Total Length - South Kasheli Bridge: 552.5 m and North Kasheli creek: 139 m Project Cost -.1765.70 M ( 22.07 Million) Year of realization - 2011 - Supreme Infrastructure India Ltd. / PWD-Thane, Maharashtra Scope - Structural Design Construction of bridge across Tungabhadra river on Devasugar-Kattagoda (SH-13) in Raichur Length of Bridge 600 m, Span 40 m each, Nos of Span: 15 Nos, 15 Fabricated Steel Struss (200 T/Span) Project Cost -.431.50 M ( 5.39 Million) Year of realization 2012 - Karnataka Road Development Corp. Ltd Scope - Rehabilitation Studies, Detailed Engineering Design, Supervision & Quality Assurance

Design Consultancy for the work of Construction of bridge across river Tapi between Kapodra (Bharwad Falia) and Utran in Surat city. Project Cost -.721.80 M ( 9.02 Million) Year of Realization - 2012 - Surat Municipal Corporation Scope - Design Consultant River bridge between Amona and Khandola, Goa Total length of Bridge - 510 m Cost -.400 M ( 5 Million) Year of realization - 2006 - Goa State Infrastructure Development Corporation Ltd. Scope - Structural Design Consultant High level bridge across river Koyna, Pune Total length of Bridge - 176 m Cost -.86.50 M ( 1.08 Million) Year of realization - 2007 - Water Resources, Maharashtra Scope - Structural Design Consultant High level bridge across Tapi river, Amroli, Surat Concept - High level river Bridge Total length of bridge - 655.20 m Cost -. 290.90 million ( 3.64 Million) Year of realization - 2010 - Surat Municipal Corporation Scope - Project Management Consultant

Bridge across river Chapora connecting Pirna and Ozrim, Goa Total length of Bridge - 450 m Project cost -.87.99 M ( 1.10 Million) Year of realization - 2006 - Goa State Infrastructure Development Corporation Ltd. Scope - Design, Tender Preparation, Techno Feasibility Study, Project Management Consultant Bridge across river Mapusa connecting Poira and Corjuem, Goa Total length of Bridge - 54.09 m Project cost -.42.35 M ( 0.53 million) Year of realization - 2009 - Goa State Infrastructure Development Corporation Ltd. Scope - Design, Tender Preparation, Techno Feasibility Study, Project Management Consultant Construction of Bridge connecting Camurlim in BarbezTaluka to Tuem in PernemTaluka across River Chapora including approaches Total Length - 1240 m Project Cost -.1260 M ( 15.75 Million) Year of realization - 2013 - Goa State Infrastructure Development Corporation (GSIDC), Goa Scope Detailed Project Report includes Preliminary Project Report, Techno Feasibility and Economic Viability Study, Detailed Soil Investigation, Detailed Survey, EMP, R & R, Detailed Estimate, Preliminary Drawings, Preparation of Tender Document, Carrying out Evaluation of Tenders and necessary drawings. FLYOVERS / VIADUCTS 4 Nos. of Flyover on Dr. Ambedkar Road, Mumbai Total Length - 4910 m, No. of lanes - 4 Project Cost -.3770 M ( 47.13 Million) Year of realization - 2011 - Mumbai Metropolitan Region Development Authority (MMRDA) Scope - Detailed Project Report, Tender Preparation, Project Management Consultant

Consultancy service for preparation of Detailed Project Report and Bid Process Management for selection of agency for Work of connectivity from Sewri to Worli (East - West Corridor) for Mumbai Trans Harbour Link (MTHL) Dispersal. Concept Elevated Corridor Total length of bridge 4.5 km Project Cost -.4907 M ( 61.34 Million) Year of realization Dec.2013 - Mumbai Metropolitan Development Authority (MMRDA) Scope - Detailed Project Report and Bid Process Management Consultancy services for pre-tender and post-tender activities including design for the work of construction of flyover at Swargate and Market Yard Junction in Pune City. Total length of bridge 1.8 Km Project Cost -.1400 M ( 17.50 Million) Year of realization Jan.2015 - Maharashtra State Road Development Corp. Ltd. (MSRDC) Scope - Pre-tender activities including Detailed Project Report and post-tender activities including design, Project Management Consultancy Grade separator, Kengri Junction, Bangalore Total length - 1114 m, No. of lanes - 2 Project Cost -.229.90 M ( 2.87 Million) Year of realization - 2009 - Karnataka Road Development Corporation Ltd. Scope - Detailed Project Report, Feasibility Study, Design, Quality assurance, Tender Preparation, Project Management Consultant Flyovers at Manpada, Patlipada, Waghbil junction, Ghodbunder Road, Thane, Maharashtra (On SH42) connecting to NH-3 & NH-8 Total length - 2993.47 m, No. of lanes - 4 Project Cost -.870 M ( 10.88 Million) Year of realization 2009 Maharashtra State Road Development Corporation Ltd. Scope Detailed Project Reports, Topographical Survey, Preparation of Estimates, Proof Checking, Project Management Consultancy

Flyover at Nana Varachha junction, Surat Total Length - 463.00 m, No. of lanes - 4 Project cost -.85.85 M ( 1.07 Million) Year of realization - 2008 - Surat Municipal Corporation Scope - Design, Project Management Consultant Flyover at Yeshwanthpur Circle, Bangalore Total Length - 348.75 m, No. of Lanes - 4 Project Cost -.193 M ( 2.41 Million) Year of Realization - 2009 - Bruhath Bangalore Mahanagara Palike Scope - Detailed Project Report, Design, Project Management Consultant Construction of Rail Over Bridge near Seawood Darave Railway Station at Belapur end Length of ROB Bridge 745.10 m, 6 Lane, 22 No. spans of 20 m and 2 spans of 25 m, 4 No. of spans of 38 m, Approach road 103.05 M. All spans are Prestressed concrete I girder Project Cost -.350 M ( 4.38 Million) Year of realization - 2011 - City and Industrial Development Corp. of Maharashtra Ltd. (CIDCO) Scope - Design Consultancy Construction of Khanda ROB on Diva Panvel Railway Line (Ch.66/12) Khanda Colony in New Panvel Length of ROB Bridge 775.50 m, 4 Lane Project Cost -.433.6 M ( 5.42 Million) Year of realization - 2012 - City and Industrial Development Corp. of Maharashtra Ltd. (CIDCO) Scope - Design Consultancy

Flyover at Kapodra fire station junction on Varachha road, Surat Total Length - 549.00 m, No. of lanes - 4 Project cost -.107.34 M ( 1.34 million) Year of realization - 2010 - Surat Municipal Corporation Scope - Design, Project Management Consultant for works of Construction of: New Bridge over River Roopnarayan at Kolghat, (LHS) (Ch km 73/500 of NH-6) in Midnapur District, West Bengal (Length 1019.11 m, width 15 m) and Construction of an incomplete Bridge over River Roopnayaran at Koghat, (RHS) (Ch. km 73/500 of NH-6) in Midnapur District, West Bengal (Length 323.10 m, width 15 m) including both bridges approaches (retaining structures), Widening & Rehabilitation of ROB at Km 18.094 (LHS) & km 23.831 (LHS), for project Six lanning of Dhankuni - Kharagpur section of NH-6 from Km 17/600 to Km 129/000 in the state of West Bengal Project cost -. 1159.1 M ( 14.49 Million) Year of realization - 2013 - Ashoka Buildcon Ltd. Scope - Construction of Flyover Bridge at Gujarat Gas Circle, Adajan Road in Surat Total Length - 1365 m Project cost -.280 M ( 3.50 million) Year of realization - 2012 - Surat Municipal Corporation Scope - Flyover/ Grade Separator, Magadi Road, Bangalore Total length - 323.50 m Project cost -.337.20 M ( 4.22 Million) Year of realization - 2010 - Bangalore Development Authority Scope - Quality Assurance, Project Management Consultant

Under pass at Ramamurthy Nagar on Outer Ring Road at Bangalore No. of lanes - 6 Project Cost -.171.76 M ( 2.15 Million) Year of realization - 2007 - Bangalore Development Authority Scope - Consultancy Services for Project Management and Quality Assurance Construction of Flyover near Times of India Building at Malad on western express highway-appointment of project management consultancy. Project cost -.180 M ( 2.25 Million) Year of realization - 2012 - Maharashtra State Road Development Corporation. Ltd Scope -

HIGHWAYS & ROADS Feasibility Study and pretender activities for the proposed four laning of existing two lane / New construction of Nagpur-Aurangabad-Sinner-Ghoti-Mumbai Road basis (BOT) Phase I" a) Singhkhedraja to Jalna 26.30 km b) Aurangabad -Lasur - Vaijapur - Puntamba Phata 85.55 km Total Length - 121.228 km, 4 Lane No. of Major Bridges : 4 Nos (Width 26.5m ) No. of Minor Bridges : 52 Nos No. of ROBs: 1 (Length 320 m) Project Cost -.6200 M ( 77.50 Million) Year of realization 31 st July, 2012 - Maharashtra State Road Development Corp. Ltd. (MSRDC) Scope - Feasibility Study& Pre Tender Activities including Detailed Project Report, Traffic Survey & Traffic Studies Consultancy for Pre and Post Tender activities for Construction / Improvement to Aundh Ravet Road, Pimpri Chinchwad, Pune, Maharashtra on B.O.T. Basis Total Length - 14.5 Km, 4+4 Lane 45 m for 7.50 m 30 m for 7.00 m Project Cost -.2436 M ( 30.48 Million) Year of realization - Dec.2014 - Pimpri Chinchwad Municipal Corporation (PCMC) Scope - Feasibility Study & Pre Tender Activities including Detailed Project Report, Traffic Survey & Traffic Studies, Consultancy Service for "Feasibility Study and pretender activities for the proposed four laning of existing two lane / New construction of Nagpur-Aurangabad-Sinner-Ghoti- Mumbai Road basis (BOT) Phase II c) Puntamba Phata-Sinner-Ghoti (including Sinner Bypass) 107.80 Km Total Length - 107.80 km, 4 Lane No. of Major Bridges : 4 Nos (Length more than 90 m each) No. of Minor Bridges : 49 Nos No. of ROBs: 1 (Length approx.. 250 m) Project Cost -.5290 M ( 66.13 Million) Year of realization - 31 st July, 2012 - Maharashtra State Road Development Corp. Ltd. (MSRDC) Scope - Feasibility Study& Pre Tender Activities including Detailed Project Report, Traffic Survey & Traffic Studies

Preparation of JNNURM complaint Detailed Project Report for High Quality up graded road network in new zones of BBMP area Package-II, Zone-II, Mahadevpura Zone Total Length - 55 Km Project Cost -.2300 M ( 28.75 Million) Year of realization June 2008 - Bruhat Bangalore Mahanagara Palike (BBMP) Scope - Detailed Project Report including Topographical survey, Soil Investigations, Planning, Traffic studies, Design, Preparation of Estimates, Tender documents& assisting clients in finalization of contracts Preparation of JNNURM complaint Detailed Project Report for high quality up graded road network in New Zones of BBMP area Package-I, Zone I, Baytaranypura Zone Total Length - 40 Km 18 m road for 10.00 km (2 Lane) 24 m road for 24.00 km ( 4 Lane) 30 m road for 6.00 km (4 Lane) Project Cost -.1900 M ( 23.75 Million) Year of realization Dec 2008 - Bruhat Bangalore Mahanagara Palike (BBMP) Scope - Detailed Project Report, Topographical Survey, Soil Investigations, Planning, Traffic Survey, Preparation of Estimates Consultancy services for conducting Topographical survey, Identification Properties, Investigations, Transportation & Planning & Surveying, preparation of Engineering Design cost Estimates with Techno commercial study, Detailed Project Report& Bidding documents for widening & construction of 13 nos. High / Medium density corridor roads as per JNNURM Norms (35 Kms) in Bangalore City of dual C.W. of 2 & 3 lanes (24 m & 30 m width) Total Length 64.51 Km Project Cost -.2100 M ( 26.26 Million) Year of realization - 2013 - Bruhat Bangalore Mahanagara Palike (BBMP) Scope - Detailed Project Report including Topographical survey, Identification Properties, Investigations, Transportation & Planning & Surveying, preparation of Engineering Design cost Estimates with Techno commercial study, detailed project report & Bidding documents Consultancy services for conducting, Topographical survey, identification properties, Investigations, Transportation, Planning & Surveying, Preparation of Engineering Design Cost Estimates with Techno commercial study. Detailed Project Report& Bidding Documents for Widening & construction of 35 Nos. of High / Medium density corridor roads as per JNNURM Norms in Bangalore City. Total Length - 42 Km 24 m R.O.W. (4 Lane) for 30.00 km 30 m R.O.W. (6 Lane) for 12.00 km Project Cost -.2892 M ( 36.15 Million) Year of realization - Dec.2008 - Bruhat Bangalore Mahanagara Palike (BBMP) Scope - Detailed Project Report including Topographical Survey, Soil Investigations, Planning, Design, Traffic survey, Preparation of Estimates, Tender Documents& assisting client in finalization of contracts

Four laning and improvement, Toll collection and operation and maintenance of Bhiwandi Kalyan Shilphata Highway. (B.O.T) Value of the works INR 1210.16 million Realization Date 2013 Maharashtra State Road Development Corporation Kalyan, Indian Scope of Work Four laning of Aurangabad - Jalna Road including Beed and Zalta bypass, Aurangabad Value of the works INR 1990 million Realization Date 2009 Maharashtra State Road Development Corporation Ltd. Aurangabad, India Scope of Work Independent Consultants Cement concrete pavement and improvement of existing Roads, Indore Value of the works INR 443.26 million (EUR 7.38 million) Realization Date 2010 Indore Municipal Corporation Indore, India Scope of Work Cement concrete pavement on Udhna Magdalla and Adajan Roads, Surat Value of the works - INR 354.35 million (EUR 7.38 million) Realization Date 2010 - Surat Municipal Corporation, Surat - Surat, India Scope of Work -

Development of Roads from Chopdem to Mandrem, Goa Value of the works INR 50.88 million ( EUR 0.78 million ) Realization Date 2005 Goa State Infrastructure Development Corporation Ltd. (GSIDCL) Goa, India Scope of Work Preliminary Design, Techno feasibility Study, Preparation of estimates Asphalting works of 16 nos. of Roads, Bangalore Value of the works INR 150 million (EUR 2.30 million) Realization Date 2009 Bruhath Bangalore Mahanagara Palike Bangalore, India Scope of Work Project Management Quality Assurance Mastic asphalt wearing course from Sion to Mulund on Eastern Express Highway, Mumbai Value of the works INR 330.24 million (EUR 5.08 million) Realization Date 2011 Mumbai Metropolitan Region Development Authority (MMRDA) Mumbai, India Scope of Work Supervision, Quality Control Recording of Measurements, billing and certification. Construction of Footpath and Cycle Tracks on Feeder Roads of BRTS System, Pune Value of the works Realization Date Scope of Work INR 1170 million (EUR 19.50 million) Ongoing Pune Municipal Corporation, Pune Pune, India Concept and design Project Management Consultancy SKYWALKS Skywalk way at Bandra station (West), Mumbai - SATIS Value of the works INR 280 million (EUR 4.30 million) Realization Date 2010 Mumbai Metropolitan Region Development Authority (MMRDA) Mumbai, India Scope of Work Detailed Project Report Proof Checking

Skywalk way from Bandra station (E) to Kalanagar, Mumbai - SATIS Value of the works INR 130 million (EUR 2.00 million) Realization Date 2008 Mumbai Metropolitan Region Development Authority (MMRDA) Mumbai, India Scope of Work Preliminary Design Pre and Post Tender Activities Techno feasibility study Skywalk way at Virar Station (E), Mumbai - SATIS Value of the works INR 111.37 million (EUR 1.71 million) Realization Date 2010 Mumbai Metropolitan Region Development Authority (MMRDA) Mumbai, India Scope of Work Architectural and Structural Design Skywalk way at Kandivali Station (E), Mumbai - SATIS Value of the works INR 307 million (EUR 5.2 million) Realization Date 2010 Maharashtra State Road Development Corporation Ltd. (MSRDC) Mumbai, India Scope of Work Design and detailed engineering Supervision of Work Skywalk at Grant Road (Nana Chowk) Mumbai Value of the works INR 504.6 million (EUR 7.76 million) Realization Date 2010 Maharashtra State Road Development Corporation Ltd. (MSRDC) Mumbai, India Scope of Work Detail Engineering RAILWAYS Dedicated Freight Corridor from JNPT (CR) (KM 92) to Sachin (WR) (KM 252) Value of the works INR 61.03 million (EUR 0.93 million) Realization Date 2009 Dedicated Freight Corridor Corporation Of India Ltd. Central - Western, India Scope of Work Staking out alignment, Detail engineering construction survey Preparation of Land Plan Geotechnical investigation Preparation of schedule of quantities Preparation of Tender document

Supply and installation of tracks, signaling and Electrical works with the doubling of railway line from Panvel to Jasai, JNPT, Navi Mumbai (Kms 16.10) Value of the works INR 63 million (EUR 0.96 million) Realization Date 2007 Rail Vikas Nigam Limited. Navi Mumbai, Maharashtra Scope of Work Implementation of supply and installation of road bed, facilities, bridges, tracks, signaling and electrification with doubling of Mohol Solapur - B.G. Line (Kms 33.16) Value of the works INR 3.5 million (EUR 0.05 million) Realization Date 2007 Rail Vikas Nigam Limited. Solapur, Maharashtra Scope of Work Construction of road bed, major and minor bridges, new line between Dankuni - Furfura Sharif (20 Km) on Howrah division of ER, West Bengal. VALUE OF THE WORKS INR 14.10 million (EUR 0.22 million) Realization Date Ongoing Rail Vikas Nigam Limited. West Bengal, India Scope of Work Construction of road bed, major and minor bridges, signaling works with doubling of Hotgi Gulbarga section (98 Km) part of Daund Gulbarga doubling in Solapur division of CR, India. Value of the works Realization Date Scope of Work INR 54.65 million ( EUR 0.87 million) Ongoing Rail Vikas Nigam Limited Solapur, India AIRPORTS Construction of extension of additional taxi track and apron, Ojhar Airport, Nashik Value of the works INR 97.80 million (EUR 1.55 million) Realization Date 2010 Hindustan Aeronautics Limited Nasik, India Scope of Work Structural Design

Construction of airport terminal building, Ojhar Airport, Nashik Value of the works INR 100 million (EUR 1.53 million) Hindustan Aeronautics Limited Nasik, India Scope of Work Concept, Design and PMC UTILITIES Project implementation of 100 MLD Sewage Treatment Plant, Nerul, Navi Mumbai Value of the works INR 699.90 million (EUR 9.18 million) Realization Date 2009 Navi Mumbai Municipal Corporation Ltd. Navi Mumbai, India Scope of Work Concept and Design Project Implementation of 80 MLD Sewage Treatment Plant, Airoli, Navi Mumbai Value of the works INR 597.85 million (EUR 9.12 million) Realization Date 2009 Navi Mumbai Municipal Corporation Ltd. (NMMC) Navi Mumbai, India Scope of Work Concept and Design Project Implementation of 100 MLD Sewage Treatment Plant, Vashi, Navi Mumbai Value of the works INR 699.33 million (EUR 10.72 million) Realization Date 2009 Navi Mumbai Municipal Corporation Ltd. Navi Mumbai, India Scope of Work Concept and Design ARCHITECTURE AND PLANNING Construction of Engineering College for VIT, Wadala Value of the works INR 120 million (EUR 1.84 million) Realization Date 2005 Vidyalankar Dnyanpeeth Trust Mumbai, India Scope of Work Pretender Activity Structural Design

Construction of Rajasthan Bhavan, Navi Mumbai Value of the works Realization Date Scope of Work INR 250 million (EUR 3.84 million) Ongoing Project Rajasthan State Road Development & Construction Corporation Ltd. Navi Mumbai, India Detailed Project Report Construction of Building for Tuljapur development authority, Osmanabad Value of the works INR 148.20 million (EUR 2.28 million) Realization Date Ongoing Project Tuljapur Development Authority Tuljapur, Osmanabad, India Scope of Work Construction of Pavana riverfront development for river Pavana, Pune Construction of Agro-Commercial mall, Mapusa sub-yard, Goa Value of the works INR 670 million (EUR 10.30 million) Goa State Agricultural Marketing Board Panaji, India Scope of Work Concept and Design Structural Design Value of the works Realization Date Scope of Work INR 60 million (EUR 0.95 million) On going Project Pimpri Chinchwad Municipal Corporation, Pune Pune, Maharashtra, India Concept and Design Construction of riverfront development of Mandovi River, Goa City beautification work, Pune Value of the works INR 60 million (EUR 0.95 million) Realization Date 2006 Goa State Infrastructure Development Corporation Ltd. Goa, India Scope of Work Design Value of the works INR 50 million (EUR 0.76 million) Realization Date 2009 Pune Municipal Corporation, Pune Pune, Maharashtra, India Scope of Work Architectural Planning Designing

S.N. BHOBE & ASSOCIATES Pvt. Ltd. Our Presence Countrywide CORPORATE OFFICE: MUMBAI S. N. BHOBE & ASSOCIATES Pvt. Ltd. 4th Floor, Pudhari Bhavan, Plot No. 29 to 30,36 & 37, Sector 30 A, Near Sanpada Railway Station, Vashi, Navi Mumbai - 400 705 Tel. No. +91 22 41270037 Regional Offices Pune #5, Chaitraban Complex, 1st Floor, Above Hotel Samrat, Wakdewadi, Shivajinagar, Pune 411 003 Tel No. +91 20 25540041 Fax No. +91 20 25540041 Email: pune@snbapl.com Bangalore #181, Bethel Bhavan, K.G.E. Layout, RMV IInd Stage, Bangalore - 560 094, Karnataka Tel No. + 91 80 23412120 Fax No. +91 80 23412120 Email: snbaplblr@yahoo.com Kolkata 51, Central Road, Jadavpur, Block I, Flat 3D, Kolkata 700 032 West Bengal, India Delhi Unit 305, Suncity Business Tower, Golf Course Road, Sector-54 Gurgaon-122 002, Haryana, India Mob: +91 844 749 9626 (Ph.): +91-124-4087153 Goa House no. 1801, 1 st Floor, Shreelaya, Green Circle, Alto-Betim, Bardez-Goa - 403521 Email: goa@snbapl.com Nagpur 19 Lata Appartment, Flat No. 101, Kadbi Chowk, Nagpur - 440004 Fax No. +91 674 274 1789 Indore MIG 122, Nalanda Parisar, Near Kesherbag Mandir, Kesherbag Road, Indore - 452001 Tel No. +91 81 2000 0901 offices Mumbai Multiple sites Surat Multiple sites Patna Bilaspur Chennai Multiple sites Tuljapur Bhopal Solapur Kolhapur Bhopal