Aircraft Staging & Parking Plan

Similar documents
GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

PART D SECTION 2 STAND ALLOCATION

Subject Aircraft Deicing Central Deicing Facility (CDF) Specific Procedures. Date of Issue: Effective Date:

Aircraft Maintenance Run Procedures. Date: 1 June 2015 Version: 3.0

Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting

Suvarnabhumi Airport Runway Maintenance. Air Traffic Management Situation Review Week 4: 2 8 July 2012

Restricted Hours Operating Policy

ACI-NA Winter and Irregular Operations Management April 23, Rose Agnew

Applewood Heights Community Open House

LFPG / Paris-Charles de Gaulle / CDG

Birmingham Airport 2033

Inauguration 2017 Dulles Tower

Airport Master Planning Process & Update

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

AERODROME CHART ATIS CLNC DEL 121.4

TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page

National Transportation Safety Board Washington, D.C

TABLE OF CONTENTS 1.0 INTRODUCTION...

SPRINGFIELD-BRANSON NATIONAL AIRPORT. Irregular Operations (IROPS) Contingency Plan STANDARD OPERATING PROCEDURES

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

Department of Transportation, Federal Aviation Administration (FAA). SUMMARY: Under this notice, the FAA announces the submission deadline of

Review Report Briefings

Runway Crossings at Brisbane International Airport

Chapter 2 FINDINGS & CONCLUSIONS

Chapter 1 Introduction

AIRPORT WITH NO RUNWAYS IS A MALL

PART F SECTION 2 RESPONSIBILITIES AND ACTIONS

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION

International Civil Aviation Organization. Twenty-Fourth South East Asia ATM Coordination Group (SAIOACG/7) Bangkok, Thailand, March 2017

AIRPORT IRREGULAR OPERATIONS (IROPS) PLAN. South Bend International Airport (SBN) St. Joseph County Airport Authority

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Changi Airport A-CDM Handbook

AERONAUTICAL INFORMATION CIRCULAR 1/19

6.0 AIRFIELD DEVELOPMENT PLAN

Subject: Night Flight Restriction Program Winter 2015 (2015-October-25 to March-26) and Summer 2016 (2016-March-27 to 2016-October-29)

Chapter 8.0 Implementation Plan

Appendix 6.1: Hazard Worksheet

Dallas Love Field Community Weekly Update

BNA Master Plan Update Public Meeting No. 2

CHAPTER 1 EXECUTIVE SUMMARY

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007

SECTION 4 - APPROACH CONTROL PROCEDURES

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

Irregular Operations (IROPS)

Toronto Pearson February 2019 Briefing. February 19, 2019

QUIETER OPERATIONS A GUIDE FOR PILOTS AND CONTROLLERS

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

Airline Schedule Development Overview Dr. Peter Belobaba

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

USE OF RADAR IN THE APPROACH CONTROL SERVICE

Subject: Night Flight Restriction Program Winter 2017 (2017-October-30 to March-31) and Summer 2018 (2018-April-1 to 2018-October-29)

CASE STUDY The New Guayaquil International Airport

ACRP Problem Statement: Wingtip Collisions on the Ground. Recommended Funding Amount: $400,000. ACRP Staff Comments. No staff comments.

WFC HANGER TALK SERIES This Event - Mean what you say : say what you mean Control Tower Procedures Prep for Simulator Exercise

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Community Noise Consortium Meeting (CNC)

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Runway Length Analysis Prescott Municipal Airport

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

GAWLER AIRFIELD OPERATIONAL GUIDELINES

Dallas Love Field Community Weekly Update

Appendix C AIRPORT LAYOUT PLANS

TORONTO PEARSON INTERNATIONAL AIRPORT NOISE MANAGEMENT

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM. April 10 th 2017

Toronto Pearson Master Plan Greater Toronto Airports Authority October 4, 2017

DURANGO-LA PLATA COUNTY AIRPORT TARMAC DELAY CONTINGENCY PLAN

NOTAM. Aircraft Owners and Pilots Association (AOPA) Fly-In Colorado Springs Airport (COS) Colorado Springs, CO SPECIAL FLIGHT PROCEDURES

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Massport Study Team Evaluation of CAC Noise Study Alternatives. October 2010

Regular Board Meeting August 4, 2015

AVIATION INVESTIGATION REPORT A13H0003 RUNWAY INCURSION AND RISK OF COLLISION

Intentionally left blank

Advisory Circular. File No.: Z U Issue No.: 01

Las Vegas McCarran International Airport. Capacity Enhancement Plan

BNA Master Plan Update Community Advisory Committee Meeting No. 5

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

Punta Gorda Airport Master Plan Update

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

CHAPTER 1 INTRODUCTION AND BACKGROUND

East Hampton Airport (KHTO) Noise Abatement Plan 2016 Prepared by the Eastern Region Helicopter Council

Dallas Love Field Community Weekly Update

COMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

2009 Muskoka Airport Economic Impact Study

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018

Lake Tahoe Airport Master Plan

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

Department of Transportation, Federal Aviation Administration (FAA). SUMMARY: Under this notice, the FAA announces the submission deadline of

KJFK Runway 13R-31L Rehabilitation ATFM Strategies

MASTER PLAN UPDATE Toronto Pearson International Airport. City of Toronto Planning and Growth Management Committee September 5, 2007

Toron Notio s e Pe M a a r n s a o g n e U me p n d t a at t e Toronto Pearson CENAC June 21, 2017

WHEREAS, the City operates and manages Rapid City Regional Airport (RAP); and

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Transcription:

Aircraft Staging & Parking Plan Aviation Services Creation Date: 14 September 2015 Version: 3.3

Document Control Version History Version Date Changes 3.0 1 July 2014 Updated to current style. LDS Section Removed 3.1 20 Oct 2014 Drawings updated. 3.2 6 Jan 2015 Added use of Rwy 15R/33L as alternate parking area. 3.3 14 Sep 2015 Updated to reflect new corporate structure Revision and Approval Control of Last Version Task Responsible Position Date Preparation L. Olsson Manager, Aviation Programs, Coordination & Compliance 14 Sep 15 Revision M. Belanger Director, Aviation Programs & Compliance 14 Sep 15 Approval M. Belanger Director, Aviation Programs & Compliance 14 Sep 15 Reference Documents Title Author Date Description/Comments Page ii of iii

Table of Contents 1 General... 1 1.1 Background... 1 1.2 Purpose... 1 1.3 Principles & Guidelines... 1 1.3.1 Guiding Principles... 1 1.3.2 Designated Holding Areas... 2 1.3.3 Taxi Operations... 2 2 Roles & Responsibilities... 3 2.1 Apron Management Unit (AMU)... 3 2.2 Resource Management Unit (RMU)... 3 2.3 Central Deicing Facility (CDF) (non winter event).... 4 2.4 GTAA Manager Operations AVS (MO AVS)... 4 2.5 Nav Canada... 4 2.6 T1 Carriers... 4 2.7 T3 Carriers... 4 3 Communication... 4 3.1 Conference Calls... 4 3.2 EXCDS... 5 Emergencies... 5 A Appendix A - Designated Holding Areas... 6 A.1 Infield Terminal (IFT)... 6 A.2 Central Deicing Facility (CDF)... 7 A.3 GTAA 3-Bay Hangar Apron... 8 A.4 Taxilanes 11 East and West... 9 A.5 Runway 06R/24L Staging 06L Operations... 10 A.6 Runway 06R/24L Staging 24R Operations... 11 A.7 Runway 15R/33L Staging 15R Operations... 12 A.8 Runway 15R/33L Staging 33L Operations... 13 B Appendix B - Typical Taxi Routes... 14 B.1 Runway 05, 06L/R Operations... 14 B.2 Runway 23, 24L/R Operations... 15 B.3 Runway 15 Operations... 16 B.4 Runway 33 Operations... 17 Page iii of iii

1 General 1.1 Background Weather and other events have the potential to substantially disrupt ground operations at Toronto Pearson and cause a gate shortage and create congestion on the terminal aprons. Due to a number of aircraft holding off gate for long periods of time, resuming operations becomes challenging and has significant disruption to the travelling public and airline operations. 1.2 Purpose The purpose of this plan is to establish and standardize coordination, communication and procedures for managing the movement of aircraft during irregular operations in a safe and expeditious manner. In addition, the purpose of this document is to ensure a controlled flow and release of aircraft throughout the event. The goal is to gate, park and stage the maximum number of aircraft possible minimizing the impact to the travelling public. This plan for parking and staging aircraft may be utilized in any situation which may impact the normal day-to-day operation at the airport or cause a degraded level of service or operation for any facility or segment of the airport. 1.3 Principles & Guidelines 1.3.1 Guiding Principles In order to maintain an equitable approach, the first in/first out principle, as related to aircraft holding areas, will be utilized by all gating agencies. Priority flights, as identified by the air carrier may have precedence as gates become available dependent on their holding position on the airfield. Priority flights must be communicated prior to the landing of the aircraft to facilitate the coordination of appropriate holding areas. The following fundamental principles have been segregated into two phases for each type of event: Non winter event When all gates are full and apron areas cannot support further aircraft holding: Utilize reverse flow through the Central Deicing Facility (CDF) and Infield Terminal (IFT). Stage all other aircraft for the duration of the event at designated holding areas. 06R/24L or 15R/33L; and Reduce frequency congestion between Flight Crews, Nav Canada, AMU, and the CDF. Page 1 of 17

Aircraft Staging & Parking Plan Post non winter event Maintain a controlled release of aircraft from the holding areas to available gates; and Continue to direct inbound aircraft to holding areas until the inventory of staged aircraft has cleared. If requested initiate bussing operations from aircraft parked off gate. Winter Event No gates available Minimal holding on the aprons as this will impede the snow clearing operation. Utilize the IFT and the Hotel gates and in after consultation with NavCanada Tower Supervisor, as required 06R/24L or 15R/33L. Maintain a controlled release of aircraft from the holding areas to available gates; and Continue to direct inbound aircraft to holding areas until the inventory of staged aircraft has cleared. If requested initiate bussing operations from aircraft parked off gate. 1.3.2 Designated Holding Areas In order to ensure a controlled flow and release of aircraft throughout the lightning event, designated holding areas, to be used once terminal aprons are maximized, are identified below. Diagrams of specific holding areas are referenced in Appendix A. 1. CDF: Designated for aircraft destined for T1 (Summer operations only) 2. IFT/Taxiway November west of Taxiway Echo: Designated for aircraft destined for T3 (Summer). Any aircraft during winter operations 3. 3-Bay Hangar Apron: Accessed by TC and restricted to three Jazz CRJ200/Dash 8 aircraft 4. Apron Area between DV & DT: Accessed by DV and restricted to four Code C aircraft or two Code D/E aircraft 5. In consultation with Nav Canada Tower Supervisor Runway 06R/24L or 15R/33L 6. Lanes 11E & 11W: Code C with wingspan of 28.4m or smaller. Bussing operations for Jazz CRJ and DH8 1, 2, 3 and 4 only. 1.3.3 Taxi Operations Once it is deemed necessary to hold aircraft off of the apron areas, the standard taxi flows through the holding areas will be in an east to west direction. Non-winter All aircraft destined for T1 will be directed to the CDF holding area. Aircraft destined for T3 will be segregated and instructed to stage at the IFT and on Taxiway November. Once staging is maximized at these locations, all additional T3 aircraft will then be directed to the CDF holding area. In order to accommodate routing to the CDF, Nav Canada will maintain control of Taxiway Victor as long as operationally possible to ensure inbound aircraft enter the CDF from the west. All aircraft will continue to taxi to the applicable holding area, even once the lightning Page 2 of 17

advisory has ended, until the inventory of aircraft holding for gates has cleared. Diagrams of typical taxi routes for lightning events are referenced in Appendix B. Winter All aircraft will be instructed to stage at the IFT and on Taxiway November. Once staging is maximized at this location, all additional aircraft will then be directed to Runway 06R/24L or 15R/33L. All aircraft will continue to taxi to the applicable holding area, even once gates become available until the inventory of aircraft holding for gates has cleared. 2 Roles & Responsibilities Roles and responsibilities of those agencies recognized in the Aircraft Staging and Parking Plan are described below. 2.1 Apron Management Unit (AMU) The AMU will notify the GTAA MO AVS once they are required to direct aircraft to an off apron holding area and must include information regarding the status of their apron. For example, advise the MO AVS that only one aircraft is holding due to the specific gate being occupied or that the apron is at capacity and all other arriving flights will be sent to the holding areas. To reduce radio congestion and eliminate gating queries from Flight Crews over various frequencies, all gating information from the Resource Management Unit (RMU) and ACA Gating will be communicated to the AMU Coordinator for dissemination to the CDF (as required), Nav Canada and ultimately to the Flight Crew. Essentially, the Flight Crew will be notified by either the CDF or AMU when their gate is available. The AMU will enter all gating information on the FDE accordingly, indicating the gate number and that the gate is available. Once the CDF (as required) or Nav Canada receive this visual indication on the FDE, the applicable Flight Crew will be contacted to start engines, call for taxi and will be issued taxi instructions to the appropriate gate. This strategy can be utilized in anticipation of a gate becoming available to minimize the wait time for holding aircraft. The AMU will participate in conference calls to determine the maximum airport holding capacity when notified by the MO AVS. 2.2 Resource Management Unit (RMU) The RMU will participate in conference calls to determine the maximum airport holding capacity when notified by the MO AVS. Page 3 of 17

Aircraft Staging & Parking Plan 2.3 Central Deicing Facility (CDF) (non winter event). The CDF will flow traffic in a west to east direction (non winter event). In addition, the CDF will hold a maximum of six narrow body aircraft or three wide body aircraft per pad in order to achieve the greatest number of aircraft staged in the CDF. A CDF staging diagram is referenced in Appendix A.2. Once the pads are full, and if required, the CDF will hold aircraft on Taxi Lane 1 and on Taxiways Tango and Victor east of Taxiway Mike. The CDF will notify the applicable Flight Crews as soon as their gate is assigned and will instruct crews to start their engines and call when ready to taxi. The CDF will participate in conference calls to determine the maximum airport holding capacity when notified by the MO AVS. 2.4 GTAA Manager Operations AVS (MO AVS) The MO AVS will convene a conference call with all parties once it becomes apparent that all arriving aircraft will be directed to the designated holding areas. Subsequent conference calls will be determined on an as required basis. 2.5 Nav Canada During an extended event, once gates and terminal apron areas are at capacity, Nav Canada will direct arriving aircraft to the appropriate holding areas in a west to east direction until advised of the termination phase. Nav Canada will participate in conference calls to determine the maximum airport holding capacity when notified by the MO AVS. 2.6 T1 Carriers Participate in conference calls to determine the maximum airport holding capacity when notified by the MO AVS. 2.7 T3 Carriers Participate in conference calls to determine the maximum airport holding capacity when notified by the MO AVS. 3 Communication 3.1 Conference Calls Conference calls with all agencies will be conducted and coordinated by the MO AVS via the AOC using Everbridge. The first conference call will be initiated in the pre-planning phase and during the event once gates and terminal apron areas are at capacity resulting in all inbound aircraft to be directed to appropriate designated holding areas. Subsequent conference calls will be determined on an as required basis. Conference calls will be utilized to discuss the weather forecast, aircraft inventory, the number of inbound flights en route Page 4 of 17

and ultimately to determine the airport s saturation point, the maximum airport holding capacity. 3.2 EXCDS In order to optimize operational efficiency and to reduce frequency congestion all gating information is to be communicated to the applicable AMU for data entry on the FDE by using the Extended Computer Display System (EXCDS). Emergencies All emergencies will be reported to the AOCC at 416-776-3033. All aircraft are required to be staged in a manner that would allow for the safe evacuation of an aircraft or access by emergency responders. In the event of an emergency situation at the CDF, guidelines for safety, control, care and evacuation are referenced in the Central Deicing Facility Emergency Operation Plan. Page 5 of 17

Aircraft Staging & Parking Plan A Appendix A - Designated Holding Areas A.1 Infield Terminal (IFT) Page 6 of 17

A.2 Central Deicing Facility (CDF) Page 7 of 17

Aircraft Staging & Parking Plan A.3 GTAA 3-Bay Hangar Apron Page 8 of 17

A.4 Taxilanes 11 East and West Page 9 of 17

Aircraft Staging & Parking Plan A.5 Runway 06R/24L Staging 06L Operations Page 10 of 17

A.6 Runway 06R/24L Staging 24R Operations Page 11 of 17

Aircraft Staging & Parking Plan A.7 Runway 15R/33L Staging 15R Operations Drawing under development Page 12 of 17

A.8 Runway 15R/33L Staging 33L Operations Drawing under development Page 13 of 17

Aircraft Staging & Parking Plan B Appendix B - Typical Taxi Routes B.1 Runway 05, 06L/R Operations Page 14 of 17

B.2 Runway 23, 24L/R Operations Page 15 of 17

Aircraft Staging & Parking Plan B.3 Runway 15 Operations Page 16 of 17

B.4 Runway 33 Operations Page 17 of 17