TORONTO TRANSIT COMMISSION REPORT NO.

Similar documents
TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

York Region Rapid Transit Corporation Board of Directors. Mary-Frances Turner, President

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

9 VIVA DIRECT UNDERGROUND CONNECTION TO THE TORONTO-YORK SPADINA SUBWAY EXTENSION AT THE VAUGHAN METROPOLITAN CENTRE

TORONTO TRANSIT COMMISSION REPORT NO.

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report

Ossington Station Easier Access Project - Construction & Public Art Concept Update

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION STATION NAMES IN THE CITY OF VAUGHAN

St. Clair West Station Easier Access Project Community Update Open House

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

Dufferin Jog Elimination Project

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

York Region Rapid Transit Corporation Board of Directors

MEETING DATE: February 17, 2010 SUBJECT: ACTION ITEM TORONTO TRANSIT COMMISSION REPORT NO. ACCESSIBLE TRANSIT SERVICES PLAN: 2009 STATUS REPORT

4 YORK REGION TRANSIT DON MILLS SUBWAY STATION ACCESS AGREEMENT

TORONTO TRANSIT COMMISSION REPORT NO.

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE

STAFF REPORT ACTION REQUIRED

Eglinton-Scarborough Crosstown LRT Update

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

TORONTO TRANSIT COMMISSION REPORT NO.

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016

First published December 2006 Copyright China Trend Building Press Limited

AMBIENCE IMPROVEMENT PROJECT O.R TAMBO INTERNATIONAL AIRPORT CONCEPT DESIGN

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

STAFF REPORT ACTION REQUIRED

TORONTO TRANSIT COMMISSION REPORT NO.

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Improving Directional Signage for TTC Services at Pearson Airport

architectural stabilized aluminium foam

Marymount University Ballston Center Redevelopment

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

York Region Rapid Transit Corporation Board of Directors

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

2600 COLORADO ENTRY DESIGN

Spadina Avenue which would include two new underground stations located at Yonge Street and at University Avenue.

SECTION 106 ACTIVITIES ANNUAL REPORT

A travel description of the Brisbane Airport Domestic Terminal Precinct. Author: Mr Terry Boyle of the Tactual Mapping Committee (September 2013)

INFORMATION ONLY. Subject: Metrolinx Presentation Date: June 22, 2015

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

Mt. Hood National Forest

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

Building the transportation network we need for the future in Niagara Region

places Mooloolaba s heart five

1 TP-08 3 TP-08 TP-06 EX.RL SPRINKLER STORAGE TANKS SPRINKLER PUMP ROOM RETAINING WALL WITH HANDRAIL TOW

Chairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

MOVING AHEAD 62% LINE TIME CROSSRAIL PROJECT AUGUST UPDATE 96% OF CONTRACTS AWARDED BY CROSSRAIL ARE TO COMPANIES WITHIN THE UK PROJECT

tt1ll rati;a Ocala International Airport General Aviation Charrette TECHNICAL MEMORANDUM February 28, 2017 Submitted to: Ocala International Airport

Memorandum / Letter of Intent

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Wellesley Station Second Exit and Automatic Entrance Public Open House. Tuesday, September 23, 2014 Central YMCA 20 Grosvenor Street

Claremont Project Background and Update Community Meeting September 11, 2017

During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

IT S BACK TO SCHOOL WITH YRT

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN

A. CONCLUSIONS OF THE FGEIS

Union Station Queens Quay Transit Link Study

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Live Life Healthy 2 C HAMPAGNE D R IVE, TOR ONTO, ON. M3J 0K 2

waterview connection Completing the Western Ring Route the Waterview Connection

2017 Annual Service Plan

WATERFRONT PROGRAM PROGRESS REPORT

Capilano Substation Upgrade

YORK UNIVERSITY BUSWAY SERVICE CHANGES

25 th Avenue Grade Separation. September 13, 2017

FORT YORK PEDESTRIAN & CYCLE BRIDGE

Kaufland, Chirnside Park

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

WHO IS METROLINX?

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016

York Region Rapid Transit Corporation Pg. 1. edocs: York-#

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF

Director, Community Planning, Toronto and East York District

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Waukee Trailhead Public Art and Amenities Project

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Memorandum. Committee of the Whole. Paul Jankowski Commissioner of Transportation Services. Date: September 4, 2018

STAFF REPORT ACTION REQUIRED

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

MBTA WOLLASTON. Station Improvements Public Meeting. January 14, 2016

EP8.2 Presentation Exhibition GO Station Improvements

STAFF REPORT INFORMATION ONLY

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

Director, Community Planning, Toronto and East York District

Transit System Performance Update

Transcription:

Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: February 2, 2011 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF FINAL DESIGN, FINISHES AND ARTWORK ACTION ITEM RECOMMENDATION It is recommended that the Commission approve the following changes to the previously approved conceptual design, and the station finishes and artwork for Steeles West Station, which will be presented through the public consultation process: Relocation of the main entrance located on the north side of Steeles Avenue; Redesign of the two station entrances; Relocation of TTC traction power substation to grade; and The addition of a new east-west road linking Northwest Gate to Track & Field Road, and an additional bus driveway from Northwest Gate to the north end of the TTC bus terminal. FUNDING Sufficient funds for this expenditure are included in the Toronto-York Spadina Subway Extension (TYSSE) Project, as set out on pages 1447 to 1449R of the TTC 2011-2015 Capital Program (Category - Expansion) which was approved by the Commission on January 12, 2011. BACKGROUND The TTC is planning the design and construction of a subway line from the existing Downsview Station on the Spadina Line located in the City of Toronto, to the future Vaughan Metropolitan Centre located in the City of Vaughan, Region of York, as shown in Exhibit 1. The new 8.6 km long line will include both tunnelled and cut and cover sections. The TYSSE project is being funded by the Government of Canada, the Province of Ontario, the City of Toronto, and the Regional Municipality of York. The TTC is managing the design and construction of the TYSSE project and will own and operate the subway extension.

TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF FINAL DESIGN, FINISHES AND ARTWORK Page 2 At the Commission meeting of October 23, 2008, Contract A85-75A for the design of Steeles West Station was awarded to the design team lead by The Spadina Group Associates (TSGA). The architectural teams are Richard Stevens Architects and Will Alsop. At its meeting of September 24, 2009, the Commission approved the TYSSE Station Design Philosophy with additional emphasis on achieving high quality architecture, urban design, streetscape, and landscape architecture as follows: Integrated design of all elements with strong aesthetics and public artwork; Column-free structures wherever possible with high ceilings and simple flow of space; Bright, open spaces with daylight penetrating deep into stations where possible; Barrier-free with at least one fully accessible entrance; Use of TTC standard elements; and Sustainable design to meet the Toronto Green Standard. At the Commission Meeting of October 29, 2009, the Commission approved the conceptual design for this station. Value engineering and the continued development of the station design resulted in changes to the approved conceptual design. Recently identified property constraints on the north side of Steeles Avenue necessitated the relocation of the main entrance including the associated reconfiguration of the north end of the subway station, the reconfiguration of the York Region Bus Terminal, the relocation the TTC traction power substation to grade level and the redesign of the light cone. In order to improve TTC bus operations, a new east-west road linking Northwest Gate to Track & Field Road, and an additional bus driveway from Northwest Gate to the north end of the bus terminal have been provided. The two entrances on Steeles Avenue were redesigned to a concept which was acceptable to both City of Toronto and City of Vaughan planning staff. The project has been reviewed by the public and all stakeholders, including the City of Toronto and the City of Vaughan Planning Departments. The station elements north of Steeles Avenue West were presented to Vaughan Council on January 10, 2011. DISCUSSION Steeles West Station straddles the boundary between York Region and the City of Toronto at an oblique angle to Steeles Avenue West. The station will comprise: A 2-track box structure with an island platform located between the tracks; Concourses located at both ends of the platform providing a connection between the platform and the entrance structures at grade;

TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF FINAL DESIGN, FINISHES AND ARTWORK Page 3 Entrance structures located north of Steeles Avenue West in York Region and south of Steeles Avenue in the City of Toronto; A TTC bus terminal located south of Steeles Avenue West and located on top of the subway running structure; A YRT bus terminal located north of Steeles Avenue West and separated from TTC facilities; A traction power substation at grade; A passenger pick-up and drop-off (PPUDO) facility north of Steeles Avenue in the form of street parking opposite the bus terminal; and A surface parking lot in the hydro corridor with 1850 parking spaces. Elements associated with this station as shown on Exhibit 2 include: A new north-south road on York University lands (Track & Field Road), parallel to Northwest Gate from Steeles Avenue to a new east-west road, providing access to the bus terminal for buses and pedestrians; A new north-south road (Proposed Street C), between Steeles Avenue and the hydro corridor as an extension of Northwest Gate, providing access to the parking lot, PPUDO and YRT bus terminal; A new road from Jane Street parallel to the hydro corridor, providing access to the commuter parking lot; A bus driveway from the access road identified above to facilitate access for buses only to the YRT bus terminal; Emergency exit building (EEB #5) relocated from the tunnel structure between York University Station and Steeles West Station into the Steeles West Station TTC bus terminal. The design of the York Region Transit (YRT) bus terminal has yet to be finalized. The design shows buses will enter from Jane Street via the bus driveway and circulate through a perimeter bus terminal with canopied bus platforms. Patrons from the parking lot cross the bus driveway and walk under the canopied platforms, joining with bus passengers, to the main entrance via a covered pedestrian route. DESIGN: Exhibit 2 Overall Site Plan Exhibit 3 Longitudinal Section Steeles West Station is diagonally located under the intersection of Steeles Avenue West and Northwest Gate and is intended to provide access for existing and future facilities and developments, particularly along Steeles Avenue West. Station surface elements have been laid out in workshops with stakeholders to maximize the potential for transit oriented development (TOD) to occur.

TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF FINAL DESIGN, FINISHES AND ARTWORK Page 4 Located in the hydro corridor to the north of the station is commuter parking for 1,850 vehicles and associated access roads. The main entrance is located on the north side of Steeles Avenue West and provides access to the TTC from the 5-bay YRT bus terminal, the on-street PPUDO and the commuter parking. Between the main entrance and the YRT bus terminal is the TTC substation and associated service rooms located at grade. The YRT bus terminal will be operated and maintained by York Region. A pedestrian route from the commuter parking lot through the YRT bus terminal will be designed to provide a protected route to passengers moving to and from the main entrance. A light cone structure is located between the main entrance and Steeles Avenue West to allow daylight to penetrate down to the concourse fareline. An automatic entrance is located south of Steeles Avenue West on the east side of Northwest Gate, adjacent to the 12-bay TTC bus terminal with bus access off Track & Field Road, Northwest Gate, and a new East-West Road link south of the bus terminal. A second automatic entrance is located at the south end of the TTC bus terminal. It will be necessary to design for this entrance to be staffed at certain times; for example, following special events, and the final design will provide for this requirement. There are two concourses, one at each end of the station, allowing utilities and future underground LRT tunnels, if required, to cross over the top of the station. The additional weight of backfill also helps reduce the impact of buoyancy caused by the high water table. The Steeles West Station project incorporates the following environmental initiatives: Cool roofs and green roofs; Increased daylight levels to reduce electric lighting power usage; LED lighting in pylon signs, and energy efficient lighting in illuminated wayfinding signage to reduce power consumption; Water efficient plumbing fixtures; Energy efficient HVAC system; Reduced stormwater runoff into the municipal drainage system by utilizing green roof landscaping and soft landscaping areas adjacent to other building runoff areas; Short term bicycle parking spaces; and Landscape with native and drought tolerant species provided. EXTERNAL AND PUBLIC REVIEW: The Steeles West Station functional design concept has been reviewed with, and is supported by, the planning departments of the City of Vaughan and the City of Toronto. The Steeles West Station functional design concept has been reviewed with the public as follows: Advisory Committee on Accessible Transportation (ACAT) on October 26, 2009; Commission meeting on October 29, 2009;

TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF FINAL DESIGN, FINISHES AND ARTWORK Page 5 Public open house on February 3, 2010; Public presentation of TYSSE station designs on April 28, 2010; and Advisory Committee on Accessible Transportation (ACAT) on December 8, 2010. The conceptual design was reviewed with the ACAT Design Subcommittee on October 26, 2009, at which time they recommended providing a barrier-free route to enter the station at the bus terminal automatic entrance, and expressed concern on the connection between para-transit systems. The final design was reviewed with ACAT on December 8, 2010, and contains an easier access portal unit (EAPU) to address their recommendation. Staff will confirm the location of the para-transit connection to a future ACAT meeting. The February 3, 2010 open house was held specifically to exhibit functional design. There were approximately 25 attendees with 5 written comment forms submitted. All comments received were supportive of the station s functional design. Of the comment cards completed, two commented on the need for green roofs; one specifically for the YRT bus terminal. One comment suggested an underground walkway from the closest York University building. The station design, finishes, and artwork will be taken to a second public open house in March 2011. STATION DESIGN AND FINISHES: Exterior: Exhibit 4 Exterior View Main Entrance Exhibit 5 Exterior View Bus Terminal Entrance The roofs over the entrance buildings and substation are cool roofs, and the roofs to the TTC bus terminal and substation building are green roofs. Glazing is clear bird-friendly fritted glass. The façades are clad with weathering steel metal panels with matching porcelain enamel panels in the touch zone. The TTC bus terminal, entrance buildings and substation are clad in solid weathering steel panels above the touch zone with glass or porcelain enamel in the touch zone. Hard landscaping will be white and grey concrete in a pattern to match the architecture. Soft landscaping will be generally hardy and low maintenance for durability in the local environment. Grade Level: Exhibit 6 Plan at Grade Main & Automatic Entrance Exhibit 7 Interior View Main Entrance Exhibit 8 Plan at Grade Bus Terminal Exhibit 9 Interior View Bus Terminal

TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF FINAL DESIGN, FINISHES AND ARTWORK Page 6 Passengers arriving at the station from the commuter parking, PPUDO, or the YRT bus terminal will enter the main entrance through doors at the north end of the building with views down to the fareline at concourse level below. Passengers approaching from the north will be sheltered by canopies linking the main entrance to the bus terminal. The main entrance is fully accessible with an elevator, two escalators and a stair. Passengers from Steeles Avenue West will enter the main entrance through doors on the south side of the building. An automatic entrance is located at the intersection of Northwest Gate and Steeles Avenue West and contains an automatic fareline with stairs to the concourse level. A second automatic entrance is located at the southern end of the bus terminal off Track & Field Road and is fully accessible with an EAPU. Passengers entering through this entrance move through the automatic fareline and the bus terminal to access the subway. Similarly, passengers from the TTC bus terminal paid area move to concourse level using stairs, escalators and an elevator at the northwest end of the bus terminal. The interior walls of the entrance buildings are also clad in weathering steel panels with matching porcelain enamel panels in the touch zone. The bus terminal interior walls are clad with porcelain enamel panels in a blue/grey colour. Floors are grey terrazzo with brickcoloured aggregate and stairs are dark grey with nosings in a paler colour to provide the contrast required to meet TTC design standards. A field of TTC detectable warning tile is located at the top landing. The guardrails around the vertical circulation openings are tempered-laminated glass panels with stainless steel railings. Structural steel columns in the bus terminal are painted with intumescent paint and finished in an iron-oxide colour. Ceilings will be painted aluminium acoustic panels and the exterior soffit will be weathering steel panels. Concourse: Exhibit 10 Upper Concourse Plan Exhibit 11 Lower Concourse Plan The north concourse contains the collector s booth and low fareline and directs passengers from the parking, PPUDO, and YRT bus terminal to the platform level by stairs, escalators, and elevator. From the top of the escalators there is a view through the large open space over the platform toward the south concourse. A knockout panel in the unpaid side of the concourse protects for future connection to transit oriented development (TOD) to the east. The concourse level also contains TTC service spaces. The south concourse level is fully fare paid to allow free movement of TTC passengers, and links the passengers coming from the TTC bus terminal with passengers from the automatic entrance at the Steeles Avenue West and Northwest Gate intersection. From here there is an elevator, two escalators and a stair to platform level. From the top of the escalators there is a view through the large open space over the platform towards the north concourse.

TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF FINAL DESIGN, FINISHES AND ARTWORK Page 7 Knockout panels in the south concourse protect for future connection to TOD to the east and west. The concourse level also contains TTC service spaces. Walls are clad with porcelain enamel panels in a blue/grey colour. Floors are grey terrazzo with brick-coloured aggregate and stairs are dark grey with nosings in a paler colour to provide the contrast required to meet TTC design standards. A field of TTC detectable warning tile is located at the top landing. The guardrails around the vertical circulation openings are tempered-laminated glass panels with stainless steel railings. Ceilings are exposed concrete in the main box with gold coloured acoustic panel ceilings in other areas. Platform: Exhibit 12 Platform Plan Exhibit 13 Interior View Platform Two elevators, four escalators, and two sets of stairs serve the subway platform level from the north and south concourses. Walls around the vertical circulation elements and the platform end walls are clad with blue/grey porcelain enamel panels. Trainway walls and ceiling soffit will be exposed architectural concrete, with the ceiling of the trainway treated with spray applied acoustic treatment. Floors are grey terrazzo with brick-coloured aggregate with TTC standard wayfinding tile and yellow platform edge tiles. Stairs are dark grey terrazzo with nosings in a paler colour to provide the contrast required to meet TTC design standards. The guardrails around the vertical circulation openings and the mezzanine walkway are tempered-laminated glass panels with stainless steel railings. The ultimate location for the platform edge sign band is to have it integrated into the header of the future platform edge doors. In the interim, the information is contained on the signs mounted on the train wall. Artwork: Exhibit 14 Artwork LightSpell A public art selection process resulted in the selection of realities: united, a studio led by brothers Jan and Tim Edler, as the public artist for Steeles West Station. The artists have worked in close collaboration with the architectural design team to develop a concept for a public art that is called LightSpell. LightSpell is a super sculpture ; a hybrid between art installation and the lighting of the subway station. The interactive installation consists of a suspended array of 62 light elements. Each element is made of 16 individually controllable luminaires and can produce all letters of the alphabet, as well as special characters and numerals from 0 to 9.

TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF FINAL DESIGN, FINISHES AND ARTWORK Page 8 Regardless of the character displayed, the light intensity of the active segments is automatically adjusted so that the illumination of the space below is kept at a constant level. The artists have stated: LightSpell is an experiment in public interaction and will entail various aspects regarding the freedom of the individual versus the interest of the larger group. It is a democratic installation: Whatever message by an individual is projected the installation always serves the demands of the community of other waiting people by providing light for everybody. This concept has been developed and approved by the Steeles West Station Art Design Review Committee (ADRC). Project Impacts: This site and the surrounding area are partly developed with potential for impact on the surrounding community during the construction period. Steeles West Station will be the site of the tunnel boring machine (TBM) launch shaft for construction of the twin tunnels south through York University Station to Finch West Station, and the retrieval shaft for the tunnels from Highway 407 Station. To address these impacts, the following steps have been taken during design development: A report detailing the potential impacts to Black Creek Pioneer Village (BCPV) from construction and operation of the Toronto-York Spadina Subway Extension Project has been completed (October 2010). Noise, vibration, dust, stormwater, erosion and sediment control and construction traffic were evaluated for both the construction of Steeles West Station and north tunnel construction, on the BCPV and surround areas. No permanent effects were identified, and construction effects can be mitigated through contract requirements for erosion, noise and dust controls and the implementation of traffic management plan; The York University Woodlot Environmental Management Plan (EMP) is being completed and proactive mitigation will be incorporated into contract specifications to address the effects of dewatering, stormwater management, and erosion and sediment control. A year of preconstruction monitoring of effects on the Boyer and Boynton Woodlots precedes construction monitoring. Monitoring will continue during launch shaft, north tunnel, EEB 5 and the Steeles West Station construction dewatering. Post construction monitoring will continue for an additional year; Instrumentation, inspection and response procedures will be in place to monitor and mitigate construction noise, vibration and dust control;

TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF FINAL DESIGN, FINISHES AND ARTWORK Page 9 A noise and vibration analysis was completed for all station and tunnel construction, (J.E. Coulter, September 17, 2010) which confirmed no permanent noise effects from the Steeles West Station and no particular construction noise effects. Detailed considerations of subway operation across the York University Campus were looked at through a specialized additional study, York University Vibration Sensitive Equipment Impact Study (September 2010); A traffic management staging plan will be developed in consultation with York University to address traffic issues for the northwest quadrant of their campus; and The traffic staging plan will be developed in consultation with the City of Toronto and the City of Vaughan to address traffic issues on Steeles Avenue. Cost and Schedule: The design changes on the north side of Steeles Avenue will result in cost avoidance related to property issues. However, this will result in increased fees for the station designer which will be the subject of a future Commission report. The estimated final cost of construction costs for Steeles West Station is $159 million, exclusive of taxes. Steeles West Station is scheduled for award in the summer of 2011 with substantial completion by spring of 2015. Next Steps: A second public open house will be held in March 2011. JUSTIFICATION Approval is required to allow the station design to be finalized. January 12, 2011 70-14-31 03-04-000022319 Attachments: Exhibits 1 to 14 - - - - - - - - - - - -

Located under the intersection of Steeles Avenue West and Northwest Gate: 1850 space Commuter Parking Lot Passenger Pick Up and Drop Off (PPUDO) 12 bay TTC bus terminal 5 bay YRT bus terminal STEELES WEST STATION Exhibit 1 TYSSE Map 03-04-000022320

Commuter Parking Lot YRT Bus Terminal TTC Substation Main Entrance Steeles Avenue West Northwest Gate Exhibit 2 Overall Site Plan East West Link Tr rack & Field Rd. Automatic Entrance TTC Bus Terminal Automatic Entrance

Steeles Avenue West Main Entrance Platform Automatic Entrance Crossover Structure TTC Bus Terminal Emergency Exit from Tunnel (EEB #5) Automatic Entrance LEGEND Paid Area Unpaid Area TTC Service Spaces Retail Emergency Egress Exhibit 3 Longitudinal Section Barrier-Free Route

Exhibit 4 Exterior View Main Entrance

Exhibit 5 Exterior View Bus Terminal Entrance

Main Entrance Automatic Entrance LEGEND Paid Area Unpaid Area TTC Service Spaces Retail Emergency Egress Barrier-Free Route Exhibit 6 Plan at Grade Main & Automatic Entrance

Exhibit 7 Interior View Main Entrance

LEGEND Stairs, elevator and escalators to Upper Concourse Emergency Exit from Tunnel (EEB #5) Automatic Entrance Paid Area Unpaid Area TTC Service Spaces Retail Emergency Egress Exhibit 8 Plan at Grade Bus Terminal Barrier-Free Route

Exhibit 9 Interior View Bus Terminal

Stairs, elevator and escalators from Main Entrance Elevator to Platform Stair and escalators to Lower Concourse Stair from Automatic Entrance LEGEND Paid Area Unpaid Area TTC Service Spaces Retail Emergency Egress Exhibit 10 Upper Concourse Plan Barrier-Free Route

Elevator to Platform Collectors Booth Escalators to Platform Escalators to Platform Stair and escalators from Upper Concourse Stair and elevator to Platform Stair to Platform LEGEND Paid Area Unpaid Area TTC Service Spaces Retail Emergency Egress Exhibit 11 Lower Concourse Plan Barrier-Free Route

Elevator from Concourse Escalators from Concourse Escalators from Concourse Stair and elevator from Concourse Exhibit 12 Platform Plan Stair from Concourse LEGEND Paid Area Unpaid Area TTC Service Spaces Retail Emergency Egress Barrier-Free Route

Exhibit 13 Interior View Platform

Exhibit 14 Artwork LightSpell