South West Scotland Developer Forum

Similar documents
Transmission Investment Programme

Managing Director of Transmission. Report for the year 2012

Southwest Scotland Transport Mitigation Forum. 5 May 2015 Dumfries Arms Hotel, Cumnock

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

Terms of Reference: Introduction

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

PERTH AND KINROSS COUNCIL. 5 October 2016 COMMUNITY PLANNING PARTNERSHIP UPDATE

The Strategic Commercial and Procurement Manager

Performance monitoring report for 2014/15

TAYplan SDPA. Main Issues Report. Options for Scotland s s SusTAYnable Region (Strategic Development Planning Authority)

LAMP 2 - FASI(S) Network

Scotland s Water Industry: Past, Present and Future

Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia Lodged via

Local Development Scheme

Strategic Transport Forum 7 th December 2018

SESSION 1: Q&A summary of session with Will Apps (Head of Energy Development) and Helen Elphick (Senior Development Manager)

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

FUTURE AIRSPACE CHANGE

Further Scottish Leasing Round (Saltire Prize Projects) Discussion Paper on Proposed Geographic Areas March 2010

South Fremantle Solar Farm Agenda 1 March 2018

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009

Performance monitoring report for first half of 2015

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Northfield to Ingle Farm #2 66 kv Sub transmission line

Local Government and Regeneration Committee Public Service Reform Strand 3 January 2013 SUBMISSION FROM THE HIGHLAND COUNCIL

ANGLIAN WATER GREEN BOND

Cabinet 16 December Cabinet, 16 December At a Special Cabinet Meeting of North Ayrshire Council at 2.30 p.m.

Transport Delivery Committee

Strategic Transport Forum

1.2. The meeting agreed a set of guiding principles that officers were to use in developing the revised Terms of Reference.

Lorg Wind Farm. Addendum To Pre-Application Consultation Report

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

Economic Development Sub- Committee

Performance monitoring report for the second half of 2015/16

National Park Authority Board Meeting

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Decision Strategic Plan Commission Paper 5/ th May 2017

Prospect ATCOs Branch & ATSS Branch response to CAP Terminal Air Navigation Services (TANS) contestability in the UK: Call for evidence

Draft Strategic Plans for Coillte s eight Business Area Units ( )

Colindale Gardens Site Visit

Update on the development of the Regional Real Time Passenger Information (RTPI) System

Economic regulation: A review of Gatwick Airport Limited s commitments framework

AGENDA ITEM No.?.::...

Situational Analysis. Issue: 1. Date: November 2017

The Traffic Management Act (TMA) 2004 and roadworks; and lane rental under the New Roads and Streetworks Act (1991) in England

LINCOLNSHIRE PARKING POLICY DRAFT

Statement of Community Consultation

PERTH AND KINROSS COUNCIL. 20 June 2018

Sustainable Tourism in Wales Peter Davies Sustainable Development Commissioner Chair of the Climate Change Commission for Wales

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

Islay Offshore Wind Farm

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Wolverhampton City Council

LINCOLNSHIRE PARKING POLICY DRAFT

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.

Agenda item no 7. Strathclyde Bus Alliance - Proposal. Committee. Strategy and Programmes. Date of meeting 20 May 2016 Date of report 25 April 2016

Introduction 3. Part 1: Defining and Measuring a High Quality Planning Service 4. Part 2: Supporting Evidence 34

Community Transport update

.org.uk. Regional. Transport. Strategy. Revised June Serving Dumfries and Galloway. South West of Scotland Transport Partnership

Yorkshire s Offshore, Renewable Energy and Operations and Maintenance Centre. 7 th October 2014

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

Performance monitoring report 2017/18

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment

20 February 2018 AMENDMENT TO HSCP INTEGRATION SCHEMES TO SUPPORT THE IMPLEMENTATION OF THE CARERS (SCOTLAND) ACT 2016

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

Agenda 11. Strathclyde Bus Alliance progress update. Date of meeting 9 December 2016 Date of report 15 November 2016

NATIONAL MINIMUM STANDARD FOR RESPONSIBLE TOURISM

Pre-application submission for Committee: Phase 4 development at West Hendon

CAP 1616: Airspace Design: Guidance on the regulatory process for changing airspace design including community engagement requirements

Submission to NSW Koala Strategy Consultation Process. March 2017

AIRSPACE PRINCIPLES CONSULTATION DOCUMENT JANUARY 2018

Insight Department: Scotland The key facts on tourism in 2016

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

Great Portland Estates Trading Update Strong Operational Performance

1.1 To qualify for an Air Service Licence, an applicant (Company) has to fulfil a number of conditions and requirements which include, among others;

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003

Disruptive technologies and societal trends are changing everyday lives and shaking up competition across all industries

THE HIGHLAND COUNCIL. Acting Head of Development Management Highland. Purpose/Executive Summary

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

Water Industry Commission for Scotland Integrating customer perspectives in a regulatory setting

Tourism Development Plan for Scotland Questionnaire

London Bridge station opens upgrade works

A Master Plan is one of the most important documents that can be prepared by an Airport.

ENVIRONMENT ACTION PLAN

An Introduction to HS2

GLASGOW PRESTWICK AIRPORT CONSULTATIVE COMMITTEE 192nd QUARTERLY MEETING HELD ON 8 th September 2017, Meeting Room 1, GLASGOW PRESTWICK AIRPORT

REVALIDATION AND VALIDATION: PROCESSES AND PROCEDURES

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

Stakeholder Briefing The Bays Precint Urban Transformation Program

Waterways Management Program

Insight Department: Scotland The key facts on tourism in 2016

Transcription:

South West Scotland Developer Forum 10 th June 2016 Grand Central Hotel, Glasgow www.spenergynetworks.co.uk 1

Agenda Introduction Pearse Murray System Design Diyar Kadar SPD Update Elaine Forsyth Land and Planning Bob McGuire Programme Update David Raftery, Bob McGuire, John Rodger Questions Pearse Murray Feedback Cheryl Blenkinsop www.spenergynetworks.co.uk 2

10 th June 2016 SWS Developer Forum SPT System Design Diyar Kadar www.spenergynetworks.co.uk 3

Generation Background www.spenergynetworks.co.uk 4

Current Status 3000 Contracted Position in SWS Generation Status in SWS - April 2016 2500 2000 Connected 23% MW 1500 Apr-15 Apr-16 Contracted 48% 1000 500 Consented 29% 0 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Initial delay (up to 2017) is due to consenting issues in SWS, later delays is due to change of connection dates by developers Only 23% of the total generation is currently connected 48% of the generation is contracted but not consented www.spenergynetworks.co.uk 5

Baseline system in SWS At New Cumnock 132kV Board A has a firm capacity of 480MVA and non-firm of 720MVA At New Cumnock 132kV Board B will be running as two radial circuits, each with a 240MVA nonfirm capacity 6 of the original 9 baseline wind farms are consented. Works at these substations are continuously being reviewed www.spenergynetworks.co.uk 6

Future Developments Utilisation of non build solutions to provide access to non-firm capacity on the system. Implementation of load management schemes to enable non-firm access to the system. Provision of restricted availability access for consented wind farms to achieve early connections. Once all non-firm capacity has been contracted, further infrastructure developments are planned. The reinforcements mainly entail the enhancement of transmission system capacity at major nodes. Changes in the contracted background are continuously monitored to develop the system in a coordinated, efficient and economic manner. www.spenergynetworks.co.uk 7

Future System Plans - New Cumnock New Cumnock create new Board (C). Install three new transformers. Run Board B solid. This will provide three 132kV Boards. Boards A and B with firm capacity of 480MVA, Board C with firm capacity of 240MVA www.spenergynetworks.co.uk 8

Future System Plans - Glenglass Extend the 132kV collector at Glenglass to create a double busbar 132kV collector to connect three large contracted wind farms. This will maximise the utilisation of the OHL between Glenglass and New Cumnock www.spenergynetworks.co.uk 9

Future System Plans Kendoon North Establishment of a substation North of Kendoon (Kendoon North) to enables the connection of further wind farms. However significant changes to the contracted position requires the re-design of Kendoon North to ensure an economic and efficient development of the system. www.spenergynetworks.co.uk 10

In Summary Baseline system developments in SWS are progressing as originally designed and as per our RIIO T1 submission. However against the contracted background more capacity is required The system in SWS, from a design perspective, is being developed to ensure it can be scaled up or scaled down due to significant uncertainties in the generation background With current contracted background and proposed developments, the non-firm capacity of the system has almost been reached. Further connections require plans for additional reinforcements to develop collector substations and exit routes to the wider system. www.spenergynetworks.co.uk 11

SP Distribution June 2016 Distribution Update www.spenergynetworks.co.uk 12

SP Energy Networks Overview Distribution (Scotland, England & Wales) - 3.5million connected customers - 16% of annual electricity bill - 30% UK s distributed renewable generation but only 14% customers Transmission (Scotland only) - 4% of annual electricity bill - 56% of Scotland s transmission connected renewable generation - Gateway South for all of Scotland s renewable generation www.spenergynetworks.co.uk 13

www.spenergynetworks.co.uk 14

Our New Business Model We have implemented a geographical business model, based on three aims: Local autonomy More staff in local areas giving improved storm response and customer service Better coordination and greater flexibility of workforce Building enduring local relationships Improved processes and systems Lower back office costs Improved flow of information through organisation. Recruiting from the local area More customer and stakeholder facing Increasing flexibility to deal with future demands of smart networks and the low carbon transition. www.spenergynetworks.co.uk 15

Incentive through Connections Engagement (ICE) OFGEM* incentive Penalty only To drive electricity distribution network operators (DNOs) to understand and meet the needs of larger customers - Led the development of Heat Maps Launched our new Heat Maps in March - Receiving around 300 hits per week - Launched a our Export Limiting Device Policy in January success - Releasing Capacity by tackling under-utilised capacity limited success - Addressing the issue of Queue Management good feedback - Proposed a new Statement of Works Process should streamline process - Providing Alternative Connection Offers limited uptake to date www.spenergynetworks.co.uk 16

SPD Current and Future Generation SPD Connected (MW) Accepted (MW) Offered (MW) Biomass 119 6 1 CHP 46 6 2 Diesel 7 Feed In Tariff 107 105 Gas (non-chp) 84 57 10 Hydro 130 0 PV 5 0 Wind 1,132 1,280 33 Other 2 3 260 Total 1,633 1,457 306 www.spenergynetworks.co.uk 17

SP Transmission / SP Distribution Joint Approach Work together on projects which impact the community Consultations Public Meetings Jointly support local events Working in the Community Who to contact www.spenergynetworks.co.uk 18

10 th June 2016 SWS Developer Forum Consenting Update Ross Baxter www.spenergynetworks.co.uk 19

SWS Project Key Stages: Landowner and Planning Consents Network Overview Diagram www.spenergynetworks.co.uk 20

SWS Project Key Stages: Stage 1 Key Infrastructure Works COYLTON SUBSTATION NEW CUMNOCK SUBSTATION Extension to existing 275kV substation at Coylton New 275kV substation at New Cumnock 14Km of 275kV overhead line www.spenergynetworks.co.uk 21

SWS Project Key Stages: Stage 1 Key Planning & Landowner Consents SECTION 37 CONSENT Section 37 consent granted Dec 12 includes substations Work on Overhead line complete, commissioning concluded 5 th June 2016 Substation works progressing Coylton complete, New Cumnock to complete July 2016. landscaping to follow Removal of access tracks and reinstatement to progress 2 nd half 2016 Ongoing interaction with East Ayrshire Council Option for materials to contribute to opencast restoration being concluded www.spenergynetworks.co.uk 22

SWS Project Key Stages: Stages 2-3 Key Infrastructure Works Stage 2 NEW CUMNOCK SUBSTATION - BLACK HILL SUBSTATION 15km of 132kV steel tower line Stage 3 BLACK HILL SUBSTATION GLENGLASS SUBSTATION 13km of 132kV steel tower line www.spenergynetworks.co.uk 23

SWS Project Key Stages: Stages 2-3 Key Planning & Landowner Consents SECTION 37 CONSENT Section 37 consents granted Nov 14 LAND AGREEMENTS Dunhill, Black Hill and Glenglass substations concluded Blackhill, Brownhill Rig, Gallowrig, Whitehill Quarries Mineral agreements - concluded Wellhill Quarry concluded June 2016 WAYLEAVES/SERVITUDES Wayleaves are concluded One remaining servitude being concluded will not delay construction D&G - One quarry active, three quarries subject to D&G condition discharge EAC Black Hill quarry subject to legal agreement for restoration and bond. Drafts progressing with lawyers CONDITIONS D&G and EAC - All conditions discharged. Trees being felled and site preparation / ground works being mobilised / progressed www.spenergynetworks.co.uk 24

SWS Project Key Stages: Stage 4 Key Infrastructure Works NEW CUMNOCK SUBSTATION -KENDOON CABLE SEALING END COMPOUND (CSEC) MARGREE SUBSTATION New 275kV substation at New Cumnock Kendoon Cable Sealing End Compound 24 Km of 132kV steel tower overhead line 10.4Km of 132kV woodpole overhead line www.spenergynetworks.co.uk 25

SWS Project Key Stages: Stage 4 Key Planning & Landowner Consents SECTION 37 CONSENT Scottish Government Section 37 determination Feb 15 LAND AGREEMENTS Margree and Blackcraig substations Complete WAYLEAVES/SERVITUDES One remaining servitude to conclude anticipated end July 2016 CONDITIONS EAC & D&G suspensive conditions discharged for steel tower element / Trees being felled and site preparation / ground works being mobilised / progressed D&G remaining suspensive conditions for wood pole and substations anticipate by mid June 2016 www.spenergynetworks.co.uk 26

SWS Project Key Stages: Stage 5 Key Infrastructure Works KENDOON NORTH SUBSTATION (ON ROUTE OF STAGE 4 OVERHEAD -NEW CUMNOCK KENDOON CSEC) Substation location now defined. www.spenergynetworks.co.uk 27

SWS Project : Consents Summary Stage 1 Overhead line works complete, reinstatement to progress this year Substation works complete by July 2016 Stages 2 / 3 - consent conditions all approved. Site works under way Stage 4 - Section 37s granted Discharge of conditions for steel tower complete. Site works underway. Final condition for D&G (wood pole section) anticipated mid June 2016. Agreement reached to commence site tree clearance works at Blackcraig. Stages 2,3,4 - last remaining landowner agreements key Stage 5 Revised design solutions being progressed by SPEN www.spenergynetworks.co.uk 28

10 th June 2016 SWS Developer Forum Delivery Update David Raftery Bob McGuire www.spenergynetworks.co.uk 29

Project Progress Stage 1: Coylton - New Cumnock All works substantially complete Access removal delayed in some cases to allow landowners to seek consent to keep tracks Energisation of 275kV New Cumnock Substation and WA Route Overhead Line successfully completed on 5 th June 2016 Delay from Q1 in part due to availability of network outages Energisation of windfarm connecting direct to New Cumnock scheduled to complete Q3 2016. www.spenergynetworks.co.uk 30

Project Photographs Completing Final Overhead Line Connection at new Cumnock Tower Reinstatement www.spenergynetworks.co.uk 31

New Cumnock 275/132kV Substation www.spenergynetworks.co.uk 32

SP-RI-142 Kilmarnock South Coylton 275kV (XY Route) Uprating Uprating of Coylton to Kilmarnock Cumnock Circuits Current rating 600MVA New rating 1500MVA New twin Drake ACCR Conductor 2016 OHL outage works ongoing Civil works at new Chipperlagan GIB compound have commenced Completion planned for end of 2016 www.spenergynetworks.co.uk 33

SWS Project Progress (Stages 2 4) Stage 2 New Cumnock Blackhill Stage 3 Blackhill - Glenglass Progress since Dec 2015 SWS Developer Forum Land Agreements: Target indicated at last forum was completion of all agreements Dec 2015 Actual: Blackhill S/S lease secured Jan 2016 Glenglass S/S lease secured April 2016 Quarries 2 x secured Jan 2016 / 2 x secured April 2016 / 1x secured June 2016. Wayleaves / Servitude: Target indicated at last forum was completion by Dec 2015 Actual: 1 x servitude secured Dec 2015 / 1 x servitude secured Feb 2016 Consent Discharge: Target indicated at last forum was completion Dec 2015 Actual: EAC consent conditions discharged Feb 2016. Quarries 1 x discharged with D&G April 2016 / 3 x pending D&G anticipated June 2016 1 x pending EAC anticipated July. www.spenergynetworks.co.uk 34

SWS Project Progress (Stages 2 4) Stage 4 New Cumnock - Margree Progress since Dec 2015 SWS Developer Forum Land Agreements: Previously completed Wayleaves / Servitude: Target indicated at last forum was completion by Jan 2016 Actual: 1 x servitude secured Jan 2016 1 x servitude remains outstanding for 7 towers, agreement in principle reached targeting July conclusion Consent Discharge: Target indicated at last forum was completion D&G Dec 2015 EAC Jan / Feb 2016 Actual: D&G consent conditions discharged Dec 2015 steel tower section EAC consent conditions discharged May 2016 steel tower section D&G remaining consent conditions anticipated Jun 2016 for wood pole section www.spenergynetworks.co.uk 35

SWS Project Progress (Stages 2 4) Stage 2 New Cumnock Blackhill Stage 3 Blackhill - Glenglass Stage 4 New Cumnock - Margree 71m expenditure to date. 87m future expenditure in 2016 / 2017. Steel tower overhead line main construction mobilisation complete / access works in progress. Quarry operations commenced Brownhill Rig Tree cutting works in progress 60% route corridors cleared / 350 Hectares felled / mulched. Platform clearance / mobilisation commenced Blackhill and Glenglass Substations sites. Dunhill platform and civil works in progress. Manufacture of 275kV transformers and 132kV GIS and 33kV switchgear in progress. Network Overview Diagram www.spenergynetworks.co.uk 36

SWS Project Progress (Stages 2 4) Platform / civil / control building construction contracts now awarded for Blackhill and Glenglass substations. Tender evaluation in progress for remaining cable and electrical works packages for Blackhill and Glenglass Substations. Contract awarded wood pole overhead line Margree Blackcraig. Q2 of 2017 for completion of SP-RI-114 /145 infrastructure to Dunhill. Q3 of 2017 for completion of SP-RI-116 / 022 infrastructure to Blackhill and Glenglass substations. Q3 of 2017 for completion of SP-R1-111 infrastructure. SP-R1-034 Margree collector substation on hold. Progressing detailed design to bypass Margree collector site. Energisation of customer connection Q2 2017 from Dunhill Substation in line with current contract date. Energisation of customer connections Q3/4 2017 Blackhill / Glenglass Substations and Blackcraig in line with current contract dates. www.spenergynetworks.co.uk 37

SWS Project (Stages 2 4) Key Risks Remaining Discharge Conditions Stage 4: Remaining conditions to discharge for wood pole section Conclusion of land agreements with 1 x remaining landowner (Stage 4) agreements in principle reached. Conclude discharge of consent conditions for 3 quarries in D&G area. Conclude planning permission / consent discharge for 1 x quarry in EAC area. Major construction activities through winter period. www.spenergynetworks.co.uk 38

SWS Tree Cutting Progress www.spenergynetworks.co.uk 39

SWS Project Tree Cutting Route B www.spenergynetworks.co.uk 40

SWS Project Tree Cutting Route B www.spenergynetworks.co.uk 41

SWS Project Tree Cutting route D www.spenergynetworks.co.uk 42

SWS Project Progress Photos Brownhill Rig Quarry www.spenergynetworks.co.uk 43

SWS Project Progress Photos Access Installation www.spenergynetworks.co.uk 44

TORI 143 Kilmarnock South Uprating Construct new 275kV and 400kV GIS Substation and Installation of a third 1000MVA 400/275kV auto wind transformer www.spenergynetworks.co.uk 45

Overview Construct new 275kV and 400kV GIS Substation and Installation of a third 1000MVA 400/275kV auto wind transformer Programme review in conjunction with initial electrical design, detailed construction phasing and outage planning now complete - the outcome of which drives a November 2019 project completion date. Subject to overload protection design works, system access in 2018 for developments currently contracted for 2018 will be maintained. Tripartite engagement has been undertaken with affected Users on completion of the design work www.spenergynetworks.co.uk 46

Project Progress Planning Consents in place for new GIS buildings 275kV and 400kV GIS contracts awarded Civil enabling contract awarded site works commenced 30 th May GIS Building tender currently in progress, Q2 2016 award Civil works tender in progress OHL contract due for award by end of June Transformer tender in progress In summary: on programme www.spenergynetworks.co.uk 47

Transmission Programmes 10 th June 2016 South West Scotland Forum Development Update John Rodger www.spenergynetworks.co.uk 48

Kilmarnock South Uprating now in delivery Kilmarnock South to Coylton 3 rd Circuit To Maybole Reduced Kendoon North 132kV Substation Coylton to Maybole OHL Uprating New Cumnock Extension Coylton to New Cumnock WA route Uprating Glenglass Double Bus Substation 49

TORI 134 Kendoon North Substation December forum discussed constructing new 132kV GIS substation and install new 275/132kV 240MVA transformer at New Cumnock 275kV substation Due to changes in the contracted background we have halted the tendering of the GIS that was in progress to review the system design requirements and separated the New Cumnock transformer into a new TORI Kendoon North site location public consultation complete and progressing towards planning submission Q3 2016 subject to design review Currently on programme for Q4 2019 completion Contracted generation 198MW (254MW in Dec) with zero MW consented www.spenergynetworks.co.uk 50

TORI 158 - New Cumnock Substation Extension Extend double bus bar to create Board C and install 2 new 275/132kV 240MVA units (SGT1C and SGT2C) Contracted generation has increased since December (372MW) to 472MW now with 48 MW consented Target completion date Q4 2020 www.spenergynetworks.co.uk 51

TORI 146 Coylton to Maybole Circuit Uprating Sealing end tower south of Coylton substation. Existing X route shown, which will be replaced by new line. Construct 23km of new 132kV double circuit overhead tower line Environmental consultants now completed route options with view to progress to public consultation in Q3 2016 High level technical review of route options now complete Target completion Q4 2022 Contracted generation has increased from December (30MW) to 52.6MW and 30MW consented with now only 33MW (150MW) on offer awaiting acceptance www.spenergynetworks.co.uk 52

TORI 147 Kilmarnock South to Coylton Kilmarnock south to Coylton existing line. Construct 16km of new 275kV double circuit overhead tower line and reinforce Coylton SGT1 and SGT2 to 240MVA Environmental consultants now completed route options with view to progress to public consultation in Q3 2016 High level technical review of route options now complete Target completion date Q4 2022 Contracted generation has increased from December (857.2MW) to 1022.9MW with 120.7MW consented www.spenergynetworks.co.uk 53

Project Progress (Stage 5 and Beyond) TORI 160 - WA Route Uprating Reconductor 14.5km between Coylton and New Cumnock Contracted generation has increased from December (438MW) to 538MW with 48MW now consented Largest standard conductor used for existing project, change in contracted position now requires reconductoring using HTLS, currently being trialled. Target Completion date Q4 2022 TORI 173 - Glenglass Double Busbar Substation At the proposed Glenglass 132kV Substation, install a new 132kV GIS double busbar substation with eight bays. Continually reviewing design requirements based the contracted background No change in contracted capacity since December, 277.4MW contracted but now with 48 MW consented Target completion date October 2020 www.spenergynetworks.co.uk 54

Project Progress (Stage 5 and Beyond) Following the completion of the reinforcement works we will have increased the capacity in the SWS area south of Kilmarnock South Substation by 1000MVA firm capacity creating a combined Firm capacity of 2000MVA and 3000MVA non-firm. www.spenergynetworks.co.uk 55