Scheme Evidence Update Planning & Sustainable Development. Adran yr Economi a r Seilwaith Department for Economy and Infrastructure

Similar documents
Summary Proof of Evidence Traffic

The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29. The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29

SUMMARY PROOF OF EVIDENCE. Gerald Kells Transport Policy and Campaigns Advisor

Major Scheme Business Case Summary Report for Programme Entry

THE WELSH MINISTERS STATEMENT OF REASONS

PUBLIC INQUIRY QUESTION

Hearing Statement. M4 Corridor Around Newport Public Inquiry. St Modwen Developments Ltd

Welsh Assembly Government Transport Wales New M4 Project - Magor to Castleton Contents Page 1 INTRODUCTION 1 2 OPTIONS CONSIDERED Intermediate J

A465 Heads of the Valleys Dualling Sections 5&6: Dowlais Top to Hirwaun. Statement of Case / Proof of Evidence

TfL Planning. 1. Question 1

201- No. (W. ) HIGHWAYS, WALES

Cuadrilla Elswick Ltd

THE WELSH MINISTERS STATEMENT OF REASONS

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Treasure Island Supplemental Information Report Addendum

ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016

M2 Junction 5. improvements scheme. Preferred route announcement

201- No HIGHWAYS, WALES THE HIGHWAYS ACT 1980

PROOF OF EVIDENCE. Simon Turl. On behalf of Roadchef Limited

Councillor Briefing on Elvetham Chase

EXPLANATORY STATEMENT

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure

M621. Junctions 1 to 7 Improvement scheme. Share your views

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

A31 Ringwood improvement scheme

Trigger Point Justification Note 30 th August 2013

A. CONCLUSIONS OF THE FGEIS

Submission to the Airports Commission

M621 Junctions 1 to 7 Improvement Scheme Public Consultation Report

Meeting the capacity challenge: The case for new lines

Transport Business Case Report Maidstone Integrated Transport Package

Planning Approval Consistency Assessment Form

LINCOLNSHIRE PARKING POLICY DRAFT

CHAPTER ONE LITERATURE REVIEW

M56. New Junction 11a Summary of the consultation report

Non-technical summary

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007

HEART OF THE SOUTH WEST STUDY ECONOMIC APPRAISAL OF RAIL NETWORK UPGRADE PROPOSALS

THE WELSH MINISTERS STATEMENT OF REASONS

Annex 1 Revised TEE, AMCB and Public Accounts Tables Print Version

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

Lower Thames Crossing

Gatwick Airport Limited. Response to Airports Commission Consultation. Appendix. Ian H Flindell & Associates - Ground Noise Report

Re-opening of the Skipton to Colne Railway Executive Summary

About ABTA. Executive summary

Consultation by Luton BC on Planning Application for expansion of London Luton Airport (our ref: CB/13/00088/OAC)

lighting road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts to bs en 12767: 2007

LINCOLNSHIRE PARKING POLICY DRAFT

2. Our response follows the structure of the consultation document and covers the following issues in turn:

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

1. Summary of key points 2

THIRTEENTH AIR NAVIGATION CONFERENCE

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL

YORKSHIRE DALES NATIONAL PARK AUTHORITY ITEM 10 CHARGING FOR THE USE OF AUTHORITY OWNED PUBLIC TOILETS

Capital & Counties. October 2007

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

Monitoring and data acquisition for the safety related traffic information services

Consumer Council for Northern Ireland response to Department for Transport Developing a sustainable framework for UK aviation: Scoping document

The Rail Network in Wales

A carbon offsetting and reduction scheme for international aviation

Sky Temporary Car Park Transport Statement

Paul Griffiths, BEng (Hons), IENG, MCIHT

All Door Boarding Title VI Service Fare Analysis. Appendix P.3

Would a new UK hub airport need public subsidy? Grounded? Assessing whether a new UK hub airport would need public subsidy

Bus and Community Transport Services in Wales

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

Borders Rail Monitor BORDERS RAILWAY PERFORMANCE YEAR 1 REPORT

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard

East West Rail Consortium

John Betts School Crossing Review

Produced by: Destination Research Sergi Jarques, Director

SAMTRANS TITLE VI STANDARDS AND POLICIES

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Lake Erie Commerce Center Traffic Analysis

The promotion of tourism in Wales

Draft airspace design guidance consultation

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

Questions inviting views and conclusions in respect of the three short-listed options

The decision on whether to take enforcement action falls outside the scope of delegated powers.

London Borough of Barnet Traffic & Development Design Team

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

The Mayor s draft The London Plan Consultation. Response from the Richmond Heathrow Campaign 2 March 2018

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

Regulatory Committee

an Inspector appointed by the Secretary of State for Communities and Local Government

Lower Thames Crossing Consultation

Subpart H. 2042/2003

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Table 1 overleaf summarises the changes in planned growth between the 2016 and 2017 iterations of the plan.

an engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as

Laxon Terrace - Sarawia. Click to add title. Street Rail Level Crossing. Public Forum. December

5.7 Local road upgrades

Produced by: Destination Research Sergi Jarques, Director

Aboriginal and Torres Strait Islander Life Expectancy and Mortality Trend Reporting to 2014

Report on the Crafthole Traffic Light Project 3 rd July th September 2017

Independent Auditor s Report

Transcription:

Adran yr Economi a r Seilwaith Department for Economy and Infrastructure This document is an update to the Proof of Evidence Planning & Sustainable document. It contains an update following the addition of the eastbound off-slip in the DRAFT SUPPLEMENTARY (NO. 2) SCHEME ORDER and a general update on the sections related to the Magor Services Area. Scheme Evidence Update John Davies, MBE, BSc, MRTPI Welsh Government, Planning and Sustainable Document Reference: WG 1.23.4 C:5174523v1 Page 1

Contents 1. 2. 3. Author 3 Scope and Purpose of this Proof of evidence 4 SCHEME EVIDENCE UPDATE 5 3.1. The EastBound Off-Slip Road 5 3.2. Magor Services 5 C:5174523v1 Page 2

1. AUTHOR 1.1 My name is John Davies. I currently work as a self-employed planning consultant under the title John Davies Planning as a sole trader. My professional qualifications are set out in my main proof of evidence and are not repeated here. 1.2 The evidence provided in this Proof of Evidence has been prepared and is given in accordance with the guidance of my professional institution and I confirm that the opinions expressed are my true and professional opinions. C:5174523v1 Page 3

2. SCOPE AND PURPOSE OF THIS PROOF OF EVIDENCE 2.1 This Proof of Evidence provides updated evidence for the Welsh Government s Scheme as modified by the March 2017 draft Orders Supplement to include proposals for an eastbound off-slip road at Junction 23A. 2.2 This evidence supersedes my previous evidence in respect of all matters concerning the rest area. The following sections of my main evidence are thus withdrawn to be replaced with this evidence: John Davies Planning & Sustainable Main Evidence (WG 1.23.1) Sections 192 & 193 2.3 In order to reach conclusions I draw on the updated evidence of other witnesses specifically Matthew Jones (WG1.1.6), Bryan Whittaker (WG1.2.6), Stephen Bussell (WG1.3.5), Dr Peter Ireland (WG1.7.4) and Ben Sibert (WG1.5.5). 2.4 My evidence is presented in the following structure, with a detailed contents provided at the start of the document. 1. Author 2. Scope and Purpose of this Proof of Evidence 3. Scheme Evidence Update C:5174523v1 Page 4

3. SCHEME EVIDENCE UPDATE 3.1. The EastBound Off-Slip Road 3.1.1. 3.1.2. The Welsh Government published a supplement to the draft Orders in March 2017 to include an additional eastbound off-slip road at Junction 23A, affording a direct connection for eastbound traffic on the proposed new motorway. These supplementary proposals are described in PLI document 2.5.17. To summarise the key features that make up the changes in the supplement: a) a new slip road with single lane cross section, diverging from the mainline to the north of the Llandevenny railway bridge, which would remain as in the original proposals; b) modifications to the size and position of the roundabout between the A4810 and the B4245 west of Magor, to which the supplementary slip road would connect; c) a route for non-motorised users of the B4245 would change from a grade separated route passing under the A4810 using an existing bridge and would be replaced by an at-grade route with signal-controlled crossing points of the proposed slip road and the A4810 Steelworks Access Road south of the roundabout. 3.2. Magor Services 3.2.1. Roadchef, the operators of the services at Junction 23A, and Rontec, the landowners, object to the access arrangements to and from the new section of motorway; even with the addition of the eastbound offslip. The access/egress arrangements to/from the Magor Services with the eastbound off-slip in place are described in detail in the Proofs of Mr Ben Sibert (WG1.5.5) and Mr Matthew Jones (WG1.1.6). Motorists travelling in some directions on the new section of motorway C:5174523v1 Page 5

would take longer and travel further to use the Services than from the existing M4 (refer to Proof of Evidence of Mr Bryan Whittaker (WG1.2.6)). The impact on the Services in terms of visitor numbers and associated revenues is analysed by Mr Stephen Bussell (WG1.3.5), who also updates the economic appraisal and wider economic impact of the Scheme with the addition of the eastbound off-slip. Dr Peter Ireland (WG 1.7.4) sets out the environmental impacts of the proposed eastbound off-slip road. 3.2.2. 3.2.3. As set out by Mr Whittaker and Mr Bussell, depending on the route and time of day, the extra travel time incurred by drivers on the proposed M4 who choose to stop at Magor Services would increase by some 2.5 to 3.0 minutes eastbound and around 3 to 5 minutes westbound. I share Mr Bussell s view that the extra time taken would be likely to have an impact by deterring some travellers from stopping at the Services with some consequent loss of trade. However, the impact needs to be qualified in terms of the convenience of alternative service areas; the types of customers most likely to be affected; and the increased traffic and hence potential customers approaching the Services because of the Scheme. Mr Bussell sets out a detailed analysis of the impact of potential loss of customers on the Services taking account of the high visitor numbers; degree of competition, and growing market for the Service Area in terms of passing traffic. Based on that analysis, whilst acknowledging a detrimental impact on the Service Area, he concludes that the Magor Services would only cease to be viable if the Scheme were to result in an improbably large reduction in the inclination of M4 users to stop at the Service Area. Based on his thorough and detailed analysis and reasoning, I am satisfied that whilst there may be a reduction in customers this would not be on a scale likely to threaten the continuation of Magor Services. C:5174523v1 Page 6

3.2.4. 3.2.5. 3.2.6. With the addition of the eastbound off-slip, Mr Bussell in his updated evidence calculates that for the core traffic growth scenario and Severn Crossing tolls at half their current level, an initial benefit to cost ratio (Initial BCR) of 1.66, with an Adjusted BCR taking account of the wider economic impact of 2.27. These figures are marginally higher than those in my original proof (WG1.23.1, para 171) but the difference is not such as to affect my conclusions on the economic benefits of the Scheme (WG1.23.1, para 196). Mr Sibert and Mr Jones deal with convenience and safety. Eastbound traffic on the new M4 would use the eastbound off-slip at Junction 23A, whilst westbound traffic would use the new westbound free flow link from Junction 23 and the existing Junction 23A slip road. Whilst the distance between Magor and Leigh Delamere Services exceeds that recommended in Government guidance (TD 69/07), this is already the case, and the Scheme would increase this only marginally, by 0.2 miles. The eastbound off-slip at Junction 23A and the westbound free flow link from Junction 23 to Junction 23A would therefore provide convenient access to the Services from both directions on the proposed M4. Advance information signs would direct drivers to the Services and allow them to decide whether to stop or not. Whilst travellers would have a more indirect route to exit the Services and rejoin the motorway network, there are several options in the westbound direction as described by Mr Jones and Mr Sibert. Those travelling east would exit onto the J23-J23A Trunk Road Link to join the motorway at Junction 23. Ease of access and egress would not be significantly different from the existing situation. Bearing in mind the Services at Junction 30 (Cardiff Gate) and the convenient access to the Magor Services, I am satisfied that the Scheme with the inclusion of the eastbound off-slip at Junction 23A, properly provides for the needs of motorway travellers, should they desire to stop. C:5174523v1 Page 7

3.2.7. 3.2.8. 3.2.9. Dr Peter Ireland deals with the environmental impacts of the proposed eastbound off-slip. The Welsh Government published a third supplement to the Environmental Statement in March 2017 (the March 2017 ES Supplement) that assessed the proposed off-slip road. This change would cause traffic on the proposed new section of motorway to the east of Glan Llyn to increase. Traffic patterns on the B4245 would change with an increase in traffic entering Magor from the west and a decrease in traffic entering Undy from the east. Dr Ireland describes the main effects as the loss of part of a mature linear woodland belt bordering Magor Brewery; an imperceptible noise change of less than 0.1 db at the nearest noise sensitive receptors; and the route for non-motorised users no longer being entirely offroad. These effects are not significant in environmental terms. The eastbound off-slip would not significantly affect the conclusions of the March 2016 ES assessments on all other aspects of the Scheme. I therefore conclude that the inclusion of the eastbound off-slip at Junction 23A would not have a significant environmental impact. To summarise, the inclusion of the proposed eastbound off-slip at Junction 23A would improve access to Magor Services for eastbound drivers on the new section of motorway, thereby providing convenient access to the Services from both directions on the new M4. Its inclusion in the Scheme properly provides for the needs of motorway travellers. The addition of the proposed off-slip road to the Scheme would have no significant environmental impacts. Whilst there may be a reduction in customers, this would not be on a scale likely to threaten the continuation of Magor Services. The marginal changes to the Initial and Adjusted BCRs do not change my conclusions on the economic benefits of the Scheme. The inclusion of the eastbound offslip at Junction 23A does not alter my conclusion that the adverse economic impacts of the Scheme, including the potential effect on Magor Services, are heavily outweighed by its likely cumulative economic benefits. C:5174523v1 Page 8