PARTICIPATORY ARCHITECTURE AND URBANISM

Similar documents
THE BOMBAY COASTAL PROJECT ABRAHAM JOHN ARCHITECTS

Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra

IMPORTANCE OF MANGROVES

FINAL REPORT - CSR ACTIVITY AWARENESS DRIVE ON ENVIORNMENT SUSTAINABILITY

Connecting Sydney Olympic Park and GPOP with Greater Sydney. Final Summary Report 29 May 2017

All Postal Codes under MUMBAI District

Premium Bungalow Residences. Unwind, Rejuvenate, Energize

Downtown Mobility Hub: Draft New Precinct Plan. Art Gallery of Burlington September 7, 2017

Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Civil work contracts awarded to five contractors Mumbai, July 5, The Mumbai Metro Line-3

West of England. Priority Places Requiring Public Investment

Bandra Worli Sea Link

FORT YORK NEIGHBOURHOOD PUBLIC REALM PLAN. du Toit Allsopp Hillier February 2004

Dhananjay Bansal Dharavi Makeover Plan. Dharavi: Analysis of the Redevelopment Proposal Prepared by: Dhananjay Bansal. Image Source: Google Images

Toronto and East York Community Council. Acting Director, Community Planning, Toronto and East York District

Mumbai. All work, no play. Mumbai

Overview of Ford Land Projects PTY Limited aspirations

FORT YORK PEDESTRIAN & CYCLE BRIDGE

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

Draft report on the Study of Lakes on Mumbai.

Magnetic Heart of Queensland

MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES. November 6, 2017 Regular Meeting of Council

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

Paradise Community Niagara Falls Canada

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

MMHP INVESTMENT SALES OPPORTUNITY. Investment Highlights. Property Overview. Manassas Mobile Home Park & 9011 Centreville Road Manassas, VA

EKTA BHOOMI A T B O R I V A L I - E A S T

Director, Community Planning, Toronto and East York District

Our Future City. Tuesday 5 th July, 4pm-6pm Suite 1, Jurys Inn Brighton

PERTH CITY SWAN PERTH AIRPORT CURTIN UNIVERSITY WESTFIELD CAROUSEL TANGNEY CITY OF CANNING JANDAKOT AIRPORT SWAN TANGNEY

LIVE. WORK. PLAY. STATUS OF DEVELOPMENT FALL Produced for information by the Town of Markham

Greenfield Design: Transforming Suburbia

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment.

Presentation to Planning Panel

C R E S C E N T E N C L AV E

URBAN INDIA USING GEOGRAPHICAL TOOLS

SALIENT FEATURE OF GDCR Regulation No (i) WIDTH OF ROADS IN WALLED CITY & GAMTAL Sr. No.

M.P. POLICE HOUSING CORPORATION LTD. Multi-Storey Residential Complex for Police Personnel At 15 th Battalion, INDORE (Madhya Pradesh)

ARLINGTON COUNTY, VIRGINIA

A NEW DESTINATION IN MAKING #WHATACITY. ODC, Goregaon (W)

ABOUT US OUR FOOTPRINTS MUMBAI

THE VENUE CITY MUMBAI

HISTORY IN THE MAKING. The UK s most important city centre development outside London. Being delivered by:

Draft report on the Study of Lakes on Mumbai.

With the success of Petra Tower we present you Colosseum Tower.

Alliant Energy Center Visioning Workshop Input Madison, WI July 20, 2017

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

M A S T E R M I N D VENUE CONSTRUCTION & MGMT. - WEDDING EXHIBITION EVENT

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

EAST-WEST STITCH. Connecting the Western Edge of the City to the Centre

Draft Western District Plan

Connected to memories. And the future.

Welcome to public consultation for the redevelopment of the existing leisure centre site.

Oshiwara District Centre (ODC) the new BKC of Mumbai

Fabulous Residential Development Site on the Peninsula

Llandudno Junction. Regeneration Proposals for the Future. December 2009

SLUM UPGRADATION. Sangay Wangdi Tshewang Giacho Krishna Kafley

SOUTH INTERCHANGE AREA

Slum Situation Analysis

DIGITAL WESTERN PARKLAND CITY

San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee

ON BEHALF OF CENTRAL BEDFORDSHIRE COUNCIL DEVELOPMENT OPPORTUNITY DOWNING VIEW, 1-3 LORING ROAD, DUNSTABLE LU6 1DZ

ORION B A N G A L O R E ' S F I R S T L I F E S T Y L E M A L L

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

visits4u Case Studies: Historical Centre of Athens Athens, Greece

October 23, 2017 Council Workshop

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017

The beauty of Seavilla goes beyond seaside living

A Brief Company Profile

Live Life Healthy 2 C HAMPAGNE D R IVE, TOR ONTO, ON. M3J 0K 2

Clackamas County Development Agency

Set within 400 acres of

Western Sydney Australia's development site

PROMENADE AT THE QUAY LOWER LONSDALE NORTH VANCOUVER

The Coalition s Policy

David Tickle, Principal, Urban Design, Hassell

HIGGS INDUSTRIAL ESTATE Welcome to our public exhibition

draft planning controls

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

PCAL Case Study Retail Areas: Rouse Hill Town Centre

SUBJECT: Downtown Mobility Hub draft New Precinct Plan and Policy Framework

KAMPALA: THE GARDEN CITY

(ii) DESCRIPTION OF DUTIES - PROJECT MANAGEMENT, FINANCIAL CURRICULUM VITATE 1. NAME: SUDHIR TENGSHE

Creating a High Quality Business District

FOUNTAINHEAD INSPIRED WORK SPACES

Draft Greater Sydney Region Plan

PPP Days 2010 PPPs Lessons from the Last 18 Months

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE

The Atlanta BeltLine. & Sustainable Development GAFM Conferance. // March 25, 2014

MANOMAV SHOWCASE PROJECTS PORTFOLIO

Key. Cotswold Water Park

Sunrise City, SH-17, Mansa Road, Bathinda , Punjab

DEVELOPMENT LAND FOR SALE

Area Profile Our Vision:

A VISION FOR EL MIRAGE

Chapter eight. Parks and Recreation. Introduction. Crystal Lake Park District

One Under-rated achievement of the Delhi Master Plan MPD 2021 wins the ISOCARP award 2008 for Urban planning.

Places of interest. Climate. General information

APEX RELATY : , Punjab

LEASING OPPORTUNITIES

Transcription:

FEED, PUNE 23 RD JUNE, 2011 PARTICIPATORY ARCHITECTURE AND URBANISM P K Das, Architect - Activist, Mumbai

1 RECLAIMING PUBLIC SPACES - MUMBAI S SEAFRONTS DEVELOPMENT 2 THE NEIGHBOURHOOD WAY FORWARD - VISION JUHU PLAN 3 RE-VISIONING CITIES - A PEOPLE S PLAN FOR MUMBAI

RECLAIMING PUBLIC SPACES - MUMBAI S SEAFRONTS DEVELOPMENT

THE WESTERN SHORELINE

BANDRA BANDSTAND 1.2 kms

CARTER ROAD 1.2 kms

LAND S END

THE MOVEMENT CONTINUES.

DADAR-PRABHADEVI BEACH NOURISHMENT MITHI RIVER MAHIM FORT VSNL TOWER MAHIM BAY WORLI KOLIWADA LANDSEND, BANDRA

GATEWAY OF INDIA PRECINCT

THE NEIGHBOURHOOD WAY FORWARD - JUHU VISION

Vision Plan Highlights 1 Development of Public Spaces. Public spaces.

Vision Plan Highlights -2 Irla Nala Development and Creation of Public Spaces. Walking and Cycling along Irla Nala Irla Nala.

Irla Nala.

Irla Nala.

Irla Nala.

Vision Plan Highlights -3 Conservation of Juhu Beach and Its Connectivity. Juhu Beach.

Vision Plan Highlights 4 Locating the Metro Rail. Metro Rail.

Vision Plan Highlights 5 Integration of Social Amenities and Institutions. Social Amenities.

Vision Plan Highlights 6 Improvement of amenities in slum and conservation of Goathans. Slums and Gaothans.

RE-VISIONING CITIES - A PEOPLE S PLAN FOR MUMBAI

MUMBAI S OPEN SPACES MAP

OPEN SPACES MAP WARD A

OPEN SPACES LISTING

CONCEPTUAL NETWORK PLAN OF OPEN SPACES - ILLUSTRATIONS 1 Avenues along roads. Typical Example 2 Avenues along railway corridors Mahim area 3 Avenues and promenades along rivers Mithi river / BKC 4 Avenues and promenades along creeks 5 Edges along wet lands Sewri Wetlands 6 Edges of ponds and lakes Bandra Talao 7 Avenues along nala s Irla Nala 8 Walks / board walks along mangroves Versova -Juhu 9 Beaches conservation Dadar Prabhadevi Beach & Juhu 10 Sea front Promenades Carter Rd, Bandstand, Nariman Pt & Chimbai fishing village 11 Public squares at Stations, Markets & Public buildings Khar Station Square 12 City forest idea Juhu 13Gardens and parks 14Green Railway Stations Kaifee Azmi / Central Park Nariman Pt. Dadar station

ILLUSTRATIONS: MANGROVE EDGES NOW AFTER

ILLUSTRATIONS: ALONG RAILWAY CORRIDORS NOW AFTER

ILLUSTRATIONS: DEFINING EDGES- SEWRI WETLANDS NOW AFTER

ILLUSTRATIONS: GREEN STATIONS,DADAR STATION AFTER

ILLUSTRATIONS: RIVER EDGES MITHI RIVER NOW AFTER

ILLUSTRATIONS: SEA FRONT S - BANDSTAND BEFORE

ILLUSTRATIONS: SEA FRONT PROMENADE- BANDSTAND AFTER

ILLUSTRATIONS: SEA FRONT PROMENADE- CARTER ROAD AFTER

ILLUSTRATIONS: SEA FRONT S CHIMBAI FISHING VILLAGE

ILLUSTRATIONS: SEA FRONT S - BANDRA LANDS END BEFORE

ILLUSTRATIONS: SEA FRONT CULTURAL SQUARE- BANDRA LANDS END AFTER

NOW AND AFTER ILLUSTRATIONS: EDGES OF PONDS & LAKES- BANDRA TALAO

ILLUSTRATIONS: STATION SQUARES- KHAR STATION PEDESTRIANIZATION

WASTE AND ABUSED LANDS ILLUSTRATIONS: GARDENS- KAIFI AZMI UDYAN AFTER

ILLUSTRATIONS: NALLA EDGES- IRLA NALA BEFORE & AFTER

ILLUSTRATIONS: SEA FRONT PROMENADE- NARIMAN POINT AFTER

ILLUSTRATIONS: CENTRAL PARK NARIMAN POINT

ILLUSTRATIONS: MAIDAN CONNECTIVITY

RE-VISIONING CITIES - SLUM REDEVELOPMENT & AFFORDABLE HOUSING

VISION OF HOPE S A N G H A R S H N A G A R NATIONAL PARK SLUM DWELLERS REHABILITATION AT CHANDIVILI N I V A R A H A K K

SANJAY GANDHI NATIONAL PARK BEFORE & DURING DEMOLITION 80,000 FAMILIES TO BE EVICTED 25,000 FAMILIES ELIGIBLE FOR REHABILITION NIVARA HAKK IS THE DESIGNATED NGO S A N G H A R S H N A G A R NATIONAL PARK SLUM DWELLERS REHABILITATION AT CHANDIVILI N I V A R A H A K K

CHANDIVALI REHABILITATION SITE Location: Chandivali Village Surroundings: Nahar Amrit Shakti Residential Complex Tata Symphony Residential Towers Behind Hiranandani Development., Powai. Adjacent to Khairani Rd, Ghatkopar (E) 15 minutes to Ghatkopar Station. Land Details: Plot CS No.6, part 11, part 12, part16, part 20, part 25, ward-l, Land area 305466.35mt ( approx 75.46Acres) S A N G H A R S H N A G A R NATIONAL PARK SLUM DWELLERS REHABILITATION AT CHANDIVILI N I V A R A H A K K

MASTER PLAN Total land area 3,13,621 sq mt ( 77.47 acres) Total built-up area 6,58,604 sq mt Density achieved - 550 units/ha POSTER FOR PUBLIC PARTICIPATION & DISCUSSION 1. Houses 18,362 (26.62 %) 2. Social infracture 13.5 % Primary schools 8 Secondary schools 2 High schools 2 Community halls 2 Women s welfare centres/creches 180 Balwadis 80 Society offices 60 Religious institutions 4 3. Facilities 8.6% Markets 13 (800 shops) Hospital 1 Consulting rooms 12 Clinics and polyclinics 6 Day care centre/nursing homes 6 4. Commercial development 6.1% Shops, banks, post offices, communication centres, restaurants,cinemas, Industrial estates etc. 19432.83 sqmt 5. Open spaces 15.03% Central maidan 1 10,250 sqmts Neighbourhood parks 3 2550x3 sqmts Courtyards 60 450x60sqmts S A N G H A R S H N A G A R NATIONAL PARK SLUM DWELLERS REHABILITATION AT CHANDIVILI N I V A R A H A K K

REHABILITATION PLANS Poster 1-TYPICAL CLUSTER Poster 2-AMENITIES Poster 3-TYPICAL HOUSE POSTERS FOR PUBLIC PARTICIPATION & DISCUSSION S A N G H A R S H N A G A R NATIONAL PARK SLUM DWELLERS REHABILITATION AT CHANDIVILI N I V A R A H A K K

S A N G H A R S H N A G A R NATIONAL PARK SLUM DWELLERS REHABILITATION AT CHANDIVILI N I V A R A H A K K

S A N G H A R S H N A G A R NATIONAL PARK SLUM DWELLERS REHABILITATION AT CHANDIVILI N I V A R A H A K K

S A N G H A R S H N A G A R NATIONAL PARK SLUM DWELLERS REHABILITATION AT CHANDIVILI N I V A R A H A K K

LESSONS FROM CHANDIVILI OPEN SPACES STANDARDS SPACE BETWEEN BUILDINGS, SET-BACKS, PG & RG TYPICAL DEVELOPMENT S A N G H A R S H N A G A R NATIONAL PARK SLUM DWELLERS REHABILITATION AT CHANDIVILI CHANDIVILI EXAMPLE N I V A R A H A K K

PRESENT FACTS AND FIGURES Total area of Greater Mumbai- 482 sq. kms. Total Slums land area- 42.30 sq. kms ( approximately 9%) - As per the Slums Map Slums area on Housing reservation (MH, PH, H, HD & R) 20.07 sq kms. 47.6% Slums area on Industrial reservation 2.55 sq kms. 6.0% Slums area on Commercial reservation 0.72 sq kms. 1.7% Slums area on services reservation (Depots, substations, etc) 1.02 sq kms. 2.4% Slums area on amenity reservation 2.37 sq kms. 5.6% Slums area on open spaces reservation-rg, PG, P, & G 7.47 sq kms. 17.7% Slums on NDZ 4.22 sq kms. 10.0% Slums on Natural assets (hills, forests, mangroves, wetlands) 0.32 sq kms. 0.8% Slums on Airports, railways, ports & defense 0.44 sq kms. 0.4% Mumbai s population 12.50 million Slum-dwellers population (being 60%) Say 7.50 million

AFFORDABLE LOW COST HOUSING PRODUCTION Target = 2.70 million units 42.30 sq km slums land area is available for slums rehabilitation and additional low-cost housing. With 2.5 FSI we get 105.75 sq kms or 105 million sq meters to build. Existing slum dwellers population is approximately 7.5 million or 1.5 million families. 1.5 million famlies x 30 sq mt. house area = 45 sq mts million FSI area. Balance FSI is 105 million sq mts less 45 million sq mts = Say 60 million sq mts ( ie 60 sq kms) Build additional affordable housing stock with say 50 sq mts average unit area ( 30,40,50 and 60 sq mts units) Therefore 60 million sq mts = 1.20 million additional housing stock logistically possible 50 sq mts Note: Additional housing stock is required for displaced slums from untenable sites, PAPs, population in-growth and new demands.

THANK YOU