PPP Projects. Ministry of Finance. PPP Central Unit

Similar documents
Investment Opportunities In Transport Sector

Land Tendered by the Egyptian Government in 2016

Social Housing Report 2016

Contents. A TSA Implementation Project: Main aspects of Egypt s Experience. Introduction. Share in the World Market Tourism Statistics

Mohamed M. Abou El Enein

Ministry seeking to overcome slow growth in real estate sector in past years: Mostafa Madbouly

Content. Suez Canal Project North Coast Development Project Golden Triangle Project

Tourism Satellite Accounts (TSA) In Egypt

Promoting Tourism as an Engine of Inclusive Growth and Sustainable Growth in Africa. Egyptian Minister of Tourism YEHIA RASHED

Reshaping Egypt s Economic Geography: Domestic Integration as a Development Platform. The World Bank Cairo July 2012

Quarterly Report Egypt Hotels Q Egypt Quarterly Review & Forecast 4 Key Cities

Central bank of Egypt Supervision &Control Sector First : Stores Licensed to accept Foreign Currency Moreover Egyptian Pound ( From : 2002)

CHAPTER 4: BASIC ANALYSYS ON ROADSIDE INTERVIEW SURVEY

IAT Annual Conference 'Driving Forward

Actively supporting aviation growth in the Middle East

It s Time to Facilitate Growth. Global Eco Asia-Pacific Conference Ms Karla Way-McPhail Director, NAIF

Egypt 02. Upgrading of The Gabalaya Fish Park Zamalek, Cairo. Cost: L.E. 280,000,000

GENERAL AUTHORITY FOR SUEZ CANAL ECONOMIC ZONE SCZone. presented by Amir Abdel Ghaffar Head of Projects June 2018

Aswan Investment Opportunities

The Civil Aviation Sector as a Driver for Economic Growth in Egypt

1.2 Tourism Products and Tourism Market

Egypt. Tourism in the economy. Tourism governance and funding. Ref. Ares(2016) /06/2016

The nearest destination to the sea from Cairo, it is called Beach of Cairo now.

Copyright(C) 2014 JETRO, All rights reserved. 禁無断転載. Content. Who We Are Economic Situation Dynamic Economy Foreign Direct Investment in Egypt

Walvis Bay and its role as a logistics hub for the SADC region. Christian Faure Executive: Marketing and Strategic Business Development

TECHNICAL SPECIFICATION (OBJECTIVES, PROJECT SCALE)

Port of Tallinn Estonia s Biggest Maritime Gateway

Cairo, November 15, 2016 TMG holding reports EGP 3.9 BN consolidated revenues, EGP 616 MN consolidated net profit

Quarterly Report Egypt Hotels Q Egypt Quarterly Review & Forecast 4 Key Cities 1 Hot Spot City

Panama Canal Stakeholder Working Group Meeting

The Built Environment Budget FY 2015/16 An Analysis of Spatial Justice in Egypt

Israeli-Egyptian Trade: In-Depth Analysis

Partnering for Prosperity

International Rail Opportunities

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *

Cairo, May 21, TMG Holding reports EGP BN consolidated revenue, EGP 161 MN consolidated net profit

Background. Minart is considered one of the integrated leading factories in the field of furniture and interior design in Egypt, established in 1989

Jill L. Jamieson Senior PPP Advisor, BearingPoint. USAID Workshop on PPP Ain Sokhna, Egypt

The View Sharm El Sheikh, Egypt

Prices from 250,000 EGP

Master Plan of Costa Rica Atlantic Coast Limon - Moin. November, 2008 Costa Rica

Infrastructure Progress in Egypt

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID

SELECTED INVESTMENT O P P O R T U N I T I E S i n E G Y P T. P r o j e c t s B r i e f - April 2016

No Commission From buyers

ELE-EG-E-1985 Senior Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

GROWTH IN EGYPT S TOURISM INDUSTRY

Ministry of Electricity & Renewable Energy New & Renewable Energy Authority (NREA) Egypt's Renewable Energy Activities and Strategy

State of South Africa s Maritime Industry Transport Portfolio Committee. 08 May 2012 Commander Tsietsi Mokhele Chief Executive Officer

Monthly Report August 2017

Magnetic Heart of Queensland

Belgrade lies at the point where the Sava River meets the Danube. It is surrounded on three sides by riverways. Hence its appellation as the Gateway

1 st US - Kosovo Trade Forum New York, New York

SHIPBUILDING IN BANGLADESH

Setting the Stage for an Independent and Vibrant Life

Policy Research Corporation

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:

Fritz Pinnock EXECUTIVE DIRECTOR CARIBBEAN MARITIME INSTITUTE

Israel. Tourism in the economy. Tourism governance and funding

Innovation based development of Klaipeda Port technologies

Viva Reef Sharm El Sheikh, Egypt

K.I.A where it all starts! Ghana Airports Company Ltd

From: OECD Tourism Trends and Policies Access the complete publication at: Chile

Republic of Turkey - Ministry of Economy,

Rakennusalan mahdollisuudet Latinalaisessa Amerikassa. Heta Pyhälahti Region Americas

NAP Expo 2018: Advancing National Adaptation Plans INFORMATION FOR PARTICIPANTS

SAMOA PORTS AUTHORITY

Monthly Report January 2017

Eastern Economic Corridor Development project Driving Forward 15 th February 2017

IMPACT HOMES Introducing The Meadows Estate 3

Developing Environmental Measures for Tourism in the Kingdome of Saudi Arabia

CAIRNS A STRATEGIC PORT

The Future Role of Groundwater and Desalination in Reallocation of Domestic Water Sources in Egypt

OPERATOR OF NEW INDUSTRY CITIES

C o m p a n y p r o f I l e

Efficiency that delivers GENERAL PRESENTATION UCSD FRONTERA FRIDAY APRIL 1 ST. 2016

Benchmark. Middle East Hotel Benchmark Survey Report March 2013

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of

ELE-CES-E-1985 Senior Electrical Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

From Early Pioneer To Long-standing Partner. 50 years of dedicated service to the Middle-East

NSW METS LEVERAGING GLOBAL ADVANTAGE SYDNEY 13 MAY 2016

Excel Travel your Egyptian Partner

Benchmark. Middle East Hotel Benchmark Survey Report April 2014

Action Plan Celebration of International Year of Biodiversity (IYB) 2010 in Egypt

Benchmark. Middle East Hotel Benchmark Survey Report January 2014

Outlıne of the Presentatıon

Number 1 Gross Regional Product per capita in Queensland

As we entered the harbor here is what we saw. The large white ship was the Oriana and lots of small boats were visible.

Your agency in Egypt

Nubia Sharm Residence. No Commission From buyers. 4 Star Beach front Residence

Marine Façade. ade ST. PETERSBURG RUSSIA

STUDY OF ALAQI SECONDARY CHANNEL IN LAKE NASSER

Benchmark. Middle East Hotel Benchmark Survey Report July 2013

Key Projects Carmichael Rail Line (CRL)

NAFTA Next Chicago, Illinois April 23 rd, 2014

Benchmark. Middle East Hotel Benchmark Survey Report April 2013

Khon Kaen Light Rail Transit

Benchmark. Middle East Hotel Benchmark Survey Report August 2013

Middle East Hotel Benchmark Survey. September 2011

LATEST LOGISTICS AND FORWARDING NEWS

Transcription:

PPP Projects Ministry of Finance PPP Central Unit

Tendered Projects (2013)

1- Abu Rawash wastewater plant Upgrading level of treatment from primary to secondary treatment for Abu Rawash Wastewater plant with a Capacity of 1.2 Million m 3 /d, including co-generation plant. Project Objective: Raising The efficiency in the treatment form the primary to secondary treatment to the total energy of 1.2 Million m3/day of Abu Rawash station in Giza Governorate, in addition to a power plant. Location: Abu Rawash. Government: Giza Governorate. Issuing the invitation to tender in the Q4 of 2012, and the expected period of the signing of the contract the Q4 of 2013.

Projects Under Prefeasibility Studies To be Tendered Shortly

1- Recycling Solid Waste into Energy Construction of industries to recycle solid waste into energy, starting with phase 1 (about 7 locations) based on the pre-feasibility studies, which will be finalized by mid September 2012 then presented to the Ministerial Committee to decide the Governorates of phase 1. The project will be tendered via Governorates. Location: about 7 locations based on the pre-feasibility studies to present to the Ministerial Committee to decide the Governorates of phase 1. Expected Time to finalize pre-feasibility studies in October 2012. Expected Time for tendering is January 2013. Expected time for Contract signature is Q1 2014.

2- Safaga Industrial Port Development and Upgrading of Safaga mining port. Project Objective: The Project include exporting for exporting crud phosphate to be an industrial port with 8 platforms to receive bigger vessel and adding 3 more industries (Exporting phosphoric Acid Importing & exporting Grain importing live stock maintenance dock Shipyard). Location: Safaga Port. Government: Red Sea Governorate. Expected Time to finalize pre-feasibility studies in February 2012. Expected Time for tendering is July 2013. Expected time for Contract signature is Q4 2014.

3- Cairo Contact Centers Park in Al- Maadi Construction of phase 2&3 (27 Buildings) of Cairo Contact Centers Park in Maadi which is designed and implemented to fulfill the needs and the increasing demand of the domestic and international offshore outsourcing call centers, and Business Process Outsourcing (BPO) companies which will provide about 40,000 Job Opportunities. Phase 1 (11 Building) 3 are already constructed and 8 will start Operation soon. Project Objective: Designed and implemented to fulfill the needs and the increasing demand of the domestic and international offshore outsourcing call centers, and Business Process Outsourcing (BPO). Location: Maadi. Area: Phase 1 (11 Building) 3 are already constructed and 8 will start Operation soon. Government: Cairo Governorate. Expected Time to finalize pre-feasibility studies in January 2013. Expected Time for tendering is April 2013. Expected time for Contract signature is Q2 2014.

4- Suez Canal Specialized University Hospital Financing, Refurbishment, Equipping and furnishing of the existing building of the Suez Canal specialized university hospital, that was built 9 years ago with the capacity of 230 beds, but did not operate due to the lack of financing. Location: Suez Canal. Government: Port Said Governorate. Expected Time to finalize pre-feasibility studies in March 2012 Expected Time for tendering is June 2013 Expected time for Contract signature is Q4 2014

5- Ain Shams / 10 th of Ramadan Railway Construction (Design, Develop, Duplicate, Finance, Operate and maintain) of Passenger and freight link from Ain Shams (Cairo Suburb) to 10 th of Ramadan (Inudstrial City), Passing by Belbes City. Total length 72 Km, with 17 Stations. Project Objective: Construction of Passenger and freight link from Ain Shams (Cairo Suburb) to 10th of Ramadan (Inudstrial City), Passing by Belbes City. Location: Ain Shams / 10th of Ramadan. Area: 72 Km. Government: Cairo / Sharqeia Governorates. Expected Time to finalize pre-feasibility studies in February 2013. Expected Time for tendering is June 2013. Expected time for Contract signature is Q1 2015.

6- Shubra / Banha Highway The Project consists of dual five lane motorway parallel and East Located to the existing road between the Cairo Northern Ring Road and the North of Banha. The motorway would be constructed an elevated route with 4 meter height along 40 km long. It would start on the Northern Ring Road at a location about 4 km in the East of Existing agricultural road serving more than 130.000 cars/day. Project Objective: serving more than 130.000 cars/day. Location: Shubra / Banha. Area: Constructed an elevated route with 4 m height along 40 km long. Government: Cairo / Qalubeya Governorates. Expected Time to finalize pre-feasibility studies in February 2013. Expected Time for tendering is June 2013. Expected time for Contract signature is Q1 2015.

7- Develop Tour Sinai port Development the docks to double its energy capacity in the field of general cargo and petroleum services and supply vessels and maintenance of commercial and tourist ships. Establish a platforms and services for the reception of yacht tourism. Project Objective: The development of the docks to double its energy capacity in the field of general cargo and petroleum services and supply vessels and maintenance of commercial and tourist ships. Establish a platforms and services for the reception of yacht tourism. Create 10,000 jobs opportunities (Direct and indirect). Location: Tour port is located on the eastern coast of the Gulf of Suez and at a distance of about 280 km to the south of the city of Suez, which have been established in 1985 to replace the old marina, which was receiving fishing vessels at anchor.

7- Develop Tour Sinai port Investment Cost of the Project: USD 200 Million. Government: South Sinai Governorate. The distance between the port of Sharm el-sheikh and developed port 100 km and so when developing the port will be developed to reduce the burden on the port of Sharm el-sheikh. Port has scaffold consists of a length of 200 meters and a depth of 8 meters, and pavement of iron curtains length of 75 meters and a depth of 8 meters. There is also a port hinterland length of 150 meters and width of 75 meters, where the port to receive vessels operating in the field of petroleum services, and bunkering mineral water, and replace rigs for maintenance for commercial ships and tourist no more than Rasfha 5 meters, as the Annual Return for Port EGP 1.4 million other than maintenance and development work.

8- Establish (2) Desalination Plants Financing, design, construction, operation and maintenance for 2 desalination plants in 2 Governorates: South Sinai (Sharm El Sheikh), Red Sea (Hurgada). Project Objective: Financing, design, construction, operation and maintenance for 2 desalination plants. Government: South Sinai, Red Sea Governorates. Coordination with Ministry of Utilities to prepare the prefeasibility study and to determine the capacity of each plant and the available lands, in order to start tendering procedures.

9- River Bus Re-habitation of existing river bus stations, and increasing number of stations from 16 to 31 station connecting Helwan to Kanater Khayreya, having a good river transport facility. Location: Helwan and Qanater EL Khaireya. Government: Cairo / Qaluobeya Governorates. Coordination with Ministry of Transport to provide with the available studies.

Near Future Pipeline Projects To be Tendered in Phases Starting Q4 2013

1- Establish a City exhibitions and conferences in Sharm El Sheikh Establish a city of international exhibitions to promote tourism fairs and shopping. Establish an international conference hall multi-purpose card 5,000 and services to promote conference tourism. Establish Monorail to link the airport of Sharm El-Sheikh and Naama Bay Nabaq Bay and the Hadaba in exhibitions and conferences. Project Objective: Providing the infrastructure for shopping tourism and international exhibitions. Providing the infrastructure for tourism conferences. Create a tourist attraction points to achieve the occupancy rate of hotels built in Sharm El-Sheikh. Create 100,000 jobs Opportunity (Directly and indirectly). Location: Sharm El-Shekh.

1- Establish a City exhibitions and conferences in Sharm El Sheikh Area: 60 acres next to the land of golf was allocated from the Governorate of the Egyptian General Authority for Exhibitions and Conferences. Investment Cost of the Project: USD 2 Billion for City exhibitions, conferences and monorail project. Government: South Sinai Governorate. The profitability study has been prepared architectural and structural designs and drawings by the International Advisory Zaha Hadid has won the project designs several international awards. Cooperation protocol was signed between the Egyptian General Authority for Exhibitions and Conferences and the General Authority for industrial and mining projects as a consultant for the project. Project land has been allocated from the Government and the Egyptian General Authority for exhibitions, conferences and Gary dependence of the Council of Ministers. Immediately after the adoption of the Higher Committee for participation between the state and the private sector will take executive action to put locally and internationally between specialized companies.

2- Establish a City exhibitions and conferences in New Cairo Establish a city for international and domestic exhibitions. Establish of an international conference for multipurpose. Establish 2 global hotels. Establish Monorail to link the airport in exhibitions, conferences, New Cairo City. Project Objective: Transfer and development of the current fairgrounds in Nasr City to New Cairo City. Providing infrastructure for shopping tourism and international exhibitions. Provision of infrastructure for tourism conference. Establish and development hub for extension of New Cairo City. Create 300,000 jobs opportunities (Direct and indirect). Location: New Cairo City.

2- Establish a City exhibitions and conferences in New Cairo Area: 1000 Acres in the New Cairo City. Investment Cost of the Project: USD 3 Billion for the First Phase. Government: Cairo Governorate. The profitability study has been prepared architectural and structural designs and drawings by the International Advisory Zaha Hadid has won the project designs several international awards. The initial identification of the project's land knowing the New Urban Communities Authority and Gary complete allocation procedures. Cooperation protocol was signed between the Egyptian General Authority for Exhibitions and Conferences and the General Authority for Industrial and Mining projects as a consultant for the project.

3- Al Zaqazeeq University Hospital Finance, design, construct, maintain, equip, furnish and provide non-clinical services for a university hospital with the capacity of 250 beds. Location: Zaqazeeq. Government: Sharqiya Governorate. Expected Time to finalize pre-feasibility studies in Q3 2013. Expected Time for tendering is Q4 2013. Expected time for Contract signature is Q4 2014.

4- River Transport Construct of 3 river transport ports to develop river transport to be one of the main and important transportation facilities in Egypt. The first proposed 3 pilot locations are Qena, Sohag, Assiut (Upper Egypt). Location: Upper Egypt. Government: Qena, Sohag and Assiut Governorates. Expected Time to finalize pre-feasibility studies in Q3 2013. Expected Time for tendering is Q4 2013. Expected time for Contract signature is Q4 2014.