For personal use only

Similar documents
ASX RELEASE. Erdenet to Ovoot Concession Agreement Executed

For personal use only

ASX Announcement. Appointment of Preferred Contractor for CHPP Construction at Colton Mine

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES

JUNE 2017 QUARTERLY ACTIVITIES REPORT

For personal use only

Highlights. Quarterly Activities Report: September Kurnalpi Project. Lindsays project

For personal use only

For personal use only

Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter

ASX Announcement. Company Update

Department of Employment, Economic Development and Innovation. Current Queensland coal infrastructure developments

For personal use only

Correction to Quarterly Report for quarter ending June 2016

For personal use only

Outlıne of the Presentatıon

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE

Matilda Zircon Limited (ASX: MZI) (formerly Olympia Resources Ltd) Quarterly Activities Report for Period Ended. 30 June 2009

December Quarterly Report 17 February 2014

For personal use only

For personal use only

For personal use only

QUARTERLY ACTIVITIES REPORT 31 JANUARY 2019

Altera Resources Ltd

2 September The Manager Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 AURORA TANK PROJECT

For personal use only

31 MARCH 2018 QUARTERLY REPORT

Updated Quarterly Activities Report

For personal use only

Australian Mines increases Marymia ground holding

SADC PPP Network PPPs in SADC

For personal use only

29 December Canada Transportation Act Review Secretariat 350 Albert Street Ottawa ON K1A 0N5

December 2017 Quarterly Report

Gruyere Project Development Update

Haoma Mining NL A.B.N

For personal use only

Mr. David Peng, General Manager, Kings Aviation. Set Up an AOC and Operating Helicopters in China

For personal use only

INTERNATIONAL LEGAL FRAMEWORK FOR TRANSPORT IN NORTH-EAST ASIA

SPITFIRE RESOURCES LIMITED SPITFIRE DIVERSIFIES WITH TASMANIAN COAL ACQUISITION

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp===

Crossing Canada s Other Border. Northern Perspective on a Multi-Use Transborder Corridor Through Canada to Alaska

Haoma Mining NL A.B.N

Gruyere Gold Project Update

Aviation, Rail, & Trucking 6-1

For personal use only

Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe

Quarterly Activity Report Period ending 31st March 2016

Market Release 11 March 2019

Activities Report for the quarter ended 30 th June 2011

The Upcoming Opportunities of Rail Transportation Development in Southeast Asia MANAGING DIRECTOR OF PROFREIGHT GROUP

EPI announced its 2011 interim results

For personal use only

CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE

Lorena Gold Project Malachite AGM 29 November 2017

COMMUNICATION THE RT. HON. PERRY G. CHRISTIE PRIME MINISTER AND MEMBER OF PARLIAMENT FOR CENTREVILLE

Market Announcement ASX:NTL, NZX:NTL For Immediate Release

This transaction is at the securityholder level and will not impact the day-to-day operations, management or employees of SP AusNet.

CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED

AUSSEN WIRTSCHAFT B2B-PLATTFORM INFRASTRUKTUR UND VERWANDTE TECHNOLOGIEN

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION

For personal use only

SVP, Treasurer Interstate Hotels & Resorts (703) (703)

Premiere Era July.2017

DECEMBER 2017 QUARTERLY ACTIVITIES REPORT

QUARTERLY ACTIVITIES REPORT 31 OCTOBER 2018

For personal use only

Project Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825

Overview. Eero Ailio European Commission

For personal use only

For personal use only

U.S. Regulatory Amendments to Cuba Sanctions Since December 17, 2014

CROWN ANNOUNCES 2015 HALF YEAR RESULTS

For personal use only

Update on the Thameslink programme

For personal use only

JUPITER MINES LIMITED Q4 FY2019 QUARTERLY ACTIVITIES REPORT

QUARTERLY ACTIVITIES REPORT SEPTEMBER 2018

REPORT OF THE CHAIRMAN AND MANAGING DIRECTOR. Report of the. Chairman and. Managing Director

December 2018 Quarterly Production Report

CONTACT: Investor Relations Corporate Communications

Auckland International Airport FY19 Interim Results: Positive start to year as airport progresses anchor infrastructure projects

LAS OPEÑAS DRILLING COMMENCED

QUARTERLY ACTIVITIES REPORT. For three months ended 31 March Highlights. 2. Operating Summary

QUARTERLY REPORT 1 JULY 2017 to 30 SEPTEMBER 2017

Quarterly Report HIGHLIGHTS CORPORATE. For the quarter ending 31 March 2014

PPIAF Assistance in Swaziland

For personal use only

MASSACHUSETTS PORT AUTHORITY REQUEST FOR LETTERS OF INTEREST DEVELOPMENT OF THE MASSPORT MARINE TERMINAL

BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES. July 2002 September 2002

Cathay Pacific Airways Limited Abridged Financial Statements

AIRGAS INC. FORM 8-K (Current report filing) Filed 3/14/2007 For Period Ending 3/9/2007

2008 INTERIM ANNOUNCEMENT

NEWS RELEASE 8 NOVEMBER Gladstone LNG Project Arrow-AGL Joint Venture Acquires Enertrade s Gas and Pipeline Business

2001/02 Financial review of the Ministry of Transport. Report of the Transport and Industrial Relations Committee

MARCH 2018 QUARTERLY ACTIVITIES REPORT

For personal use only

BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES. September 2002 December 2002

MATRIX METALS LIMITED

Transcription:

Aspire Mining Limited ABN: 46 122 417 243 Suite B3, 431-435 Roberts Road Subiaco WA 6008 PO Box 1918 Subiaco WA 6904 Tel: (08) 9287 4555 Fax: (08) 9388 1980 Web: www.aspiremininglimited.com Email: info@aspiremininglimited.com ASX RELEASE For Immediate Release 6 January, 2016 Northern Railways Update for Erdenet to Ovoot Railway Rail Connection Point and Final Alignment approved Mongolian metallurgical coal explorer and infrastructure company, Aspire Mining Limited (ASX: AKM, the Company or Aspire), is pleased to provide an update on rail project progress being undertaken by its Mongolian rail infrastructure subsidiary, Northern Railways LLC (Northern Railways). As previously announced on 1 December 2015, Northern Railways received its Construction License for the Erdenet to Ovoot Railway (Rail Project) from the Mongolian Government. Subsequent to the granting of this Construction License, the Company entered into negotiations with the Government of Mongolia, and in particular the Ministry of Roads and Transportation, to establish two commissions to deal with outstanding alignment matters. These negotiations also included some re-design and re-engineering by Northern Railways to accommodate: 1. A rail route into the city of Erdenet that would avoid significant relocation of established infrastructure and competing land uses; and 2. To make amendments to the rail alignment to take account of the road and power line requirements of the Egin Golin Hydro Power Project which was also recently approved by Government. The paths for both the Erdenet to Ovoot Railway and the Egin Golin Hydro Power Project both require access through a 40 km long valley system to the west of Erdenet. The rail route and the point of connection to the UBTZ Railway at Erdenet have now been agreed between UBTZ, the Ministry of Roads and Transportation and Northern Railways. The route into Erdenet avoids existing infrastructure and provides a buffer of at least 1 km from existing housing. UBTZ is the Mongolian Russian Joint Venture which owns and manages existing rail services in Mongolia. The amendments to the design of the railway to deal with the competing needs of the Egin Golin Hydro Project took additional time but have now been resolved by a joint Government and Northern Rail Commission with a relatively minor change to the Erdenet to Ovoot Railway alignment. Northern Railways received the signed rail concession in September 2015. However in order to fix the alignment path for detailed design, the specific alignment and connection point with the UBTZ Railway needed to be approved. Given the delays in receiving the Construction License and then the alignment and connection point approval (which needed to be achieved in that order) and given the difficulties of operating during the Mongolian winter, there is little benefit to press on with additional interim Rail 1 P a g e

Feasibility Studies for packages of work with China Railways Corporation s subsidiary, First Design Institute at this time. The Company is therefore not expecting to drawdown on the loan facility provided by Signum Resource Corporation for that purpose (Refer announcement 31 August 2015). During the December 2015 Quarter, Northern Railways has been active in searching for funding sources that would complete both the Rail Bankable Feasibility Studies (refer announcement of Feasibility Study contract dated 27 January 2015) and other environmental permitting activities. These negotiations have included Chinese and Russian contractors and potential investors and are ongoing. However, there can be no certainty that these negotiations will result in the provision of the necessary funding required to take the Erdenet to Ovoot Rail Project to final funding drawdown. The Rail Project spans 547km and forms part of Mongolia s Rail Policy to provide rail access to its northern provinces through the extension of its existing rail network from Erdenet to the Russian/Mongolian border at Arts Suuri with a Russian connection planned to Kyzyl (refer Figure 1). At full operation, the Rail Project will have capacity to move 30 Mtpa of bulk commodities, agricultural, general and passenger freight including transit freight between Russia and China. Aspire s Managing Director, Mr David Paull said that With the continued support of the Mongolian Government, Northern Railways and its dedicated staff have been able to progress the development of the Erdenet to Ovoot Railway to the point where all the necessary approvals are in place to prepare the way for the Bankable Feasibility Study and environmental surveys and permitting. Northern Railways continues to actively pursue funding options in Northern Railways to complete the other Rail Concession conditions precedent including environmental permitting and the completion of the Bankable Feasibility Study. These negotiations are continuing, Mr Paull said. 2 P a g e

For personal use only Figure 1: Erdenet Ovoot railway forming part of the Mongolian rail policy and the trilateral Economic Corridor between Russia, Mongolia and China END 3 P age

About Aspire Mining Limited Aspire Mining Limited is listed on the ASX (ASX: AKM) and is the largest coal tenement holder in Mongolia s Northern provinces and is focused on identifying, exploring and developing quality coking coal assets. Aspire currently owns a 50% interest in and is the operator of the Ekhgoviin Chuluu Joint Venture (ECJV), and has an option to increase its ownership to 100% of the ECJV. The ECJV owns a 90% interest in the Nuurstei Coking Coal Project (Nuurstei), and following a successful 2014 exploration program conducted additional exploration work through 2015 with the aim of identifying a JORC 2012 coal resource and defining coal quality across the deposit. Depending on the results of the 2015 program, future positive economic studies, funding and the grant of necessary approvals and licenses, Nuurstei could commence a road based production operation as early as 2016, and access the new Erdenet to Ovoot railway as early as two years from commencement of its construction. Aspire is also the owner of the world class Ovoot Coking Coal Project (Ovoot) which is the second largest coking coal project by reserves in Mongolia. The Ovoot project development is dependent on the construction of the Erdenet to Ovoot railway which is being progressed by Northern Railways LLC (Northern Railways). Northern Railways has been granted a rail concession in August 2015 and is progressing the negotiations and completion of a bankable feasibility study, funding, EPC contract, applications for licences, permits and approvals to commence railway construction. Production from the Ovoot project can coincide with the commissioning of the Erdenet to Ovoot railway. About Northern Railways LLC Northern Railways LLC (Northern Railways) is a Mongolian registered rail infrastructure Company, and mandated to pursue the development of the Erdenet to Ovoot Railway, is supported by a consortium consisting of Aspire Mining, and subsidiaries of fortune 500 listed China Railway Construction Corporation China Railway 20 Bureau Group Corporation (CR20G) and China Railway First Survey & Design Institute (FSDI). The Erdenet Ovoot Railway extends 547km between the town of Erdenet to Aspire s Ovoot Project, which connects northern Mongolia to China and international markets. In accordance with Mongolian National Rail Policy, the Erdenet Ovoot Railway is a multi-user rail line and will be available for the transport of bulk materials, agricultural and general freight from the region to export markets including China, Russia and seaborne markets. The Erdenet to Ovoot Railway will play an important part in the establishment of an Economic Corridor through Mongolia, the subject of a trilateral agreement signed by the Presidents of China, Russia and Mongolia. The Economic Corridor through Mongolia is primarily aimed at improving trade by reducing regulation, improving capacity at borders and to improve road and rail infrastructure to meet this increased demand for transport services. This Economic Corridor through Mongolia links closely with Chinese policies to establish a New Silk Road to improve Euro-Asian trade, and Russia s policy of establishing a Euro-Asian economic zone. In August 2015 Northern Railways was granted an exclusive 30 year concession by the Mongolian Government to build and operate the Erdenet to Ovoot Railway. Northern Railways is now progressing the completion of a bankable feasibility study and other studies to support applications for licences, permits and approvals, as well as progressing negotiations for the EPC contract and financing of the railway construction. 4 P a g e

For more information contact: Corporate David Paull Aspire Mining Ltd +61 8 9287 4555 Managing Director Follow us on Twitter @AspireMiningLtd; and LinkedIN. 5 P a g e