Inmarsat Aviation Safety Services Update

Similar documents
AVIATION > ICAO NAT PBCS/2. Inmarsat Update. ICAO NAT PBCS Workshop/2 Paris June th, 2015 Presented by Andrew Ives

Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg

Air Traffic Management/Safety Services

Services for Air Transport. The mobile satellite company

Electronic visibility via ADS-B for small aircraft. John Korna, NATS

Smart business. AVIATOR S Series. SMART FLEET TM. Next generation satcom solutions for a more connected and profitable airline.

Inmarsat Aviation update

Problem Reporting and System Performance Analysis

Sixth Meeting of CNS/MET Sub-Group of APANPIRG. Bangkok, Thailand, July 2002 SITA ENHANCED GROUND TO AIR (EGTA) VOICE SERVICE

Manufacturer updates

The benefits of satcom to airlines. Prepared by Helios for

Satcom Direct Communications, Inc. and SITA DSP Contract Program Presentation for the 2007 CNS/ATM Conference. 25 April 2007

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

Aeronautical Communications: Changes Ahead - FCI

Status of SESAR. Iris Public Event 04/02/2013 Peter Hotham (SESAR JU)

Boeing Air Traffic Service (ATS) Data Link Perspectives and Capabilities

Emerging Locator & Flight Data Technology

ICAO provisions on data link implementation

ESA Iris Programme: satellite communications for Air Traffic Management

THE NEXT GENERATION OF AIRCRAFT DATA LINK. Presented by: Rockwell Collins Cedar Rapids, Iowa 52498

Boeing Air Traffic Management Overview and Status

PBCS Flight Plan RCP RSP Codes

Manufacturer updates. Bill Peltola VP Asia-Pacific

Inmarsat GADSS Solutions Global Aeronautical Distress and Safety System

SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P Airport Surface Datalink

ESA Iris Programme Overview of results from Iris Phase 1. Briefing 28 July

ATN London, September SITA DATALINK SERVICES & APPLICATIONS Enabling CNS Evolution

Next Generation Airspace Developments: Key Operational Trends and Enablers

THE LARGEST FAMILY-OWNED BUSINESS AVIATION SERVICE CENTER IN THE WORLD

INFLIGHT INTERNET ANYWHERE

The contribution of the ATM SATCOM Safety Board (ASSB) Filippo Tomasello Rulemaking Official (EASA) Chair of the ASSB 10 Oct. 2011

Overview of Worldwide Data Link Equipage Mandates

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December

GOLD. Global Operational Data Link Document (GOLD) Implementation and Amendments. AFI CNS SG /4, Dakar, Senegal, July 2011

Air Traffic Management

SB-S. Real-time visibility into global operations. The first and only global, secure, IP connection for operations and safety communications

(Presented by the United States)

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Surveillance and Broadcast Services

Benefits of CNS/ATM Implementation for the Region

AeroMACS. Why it is important for aviation. AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL

Aircraft Systems and 4D Trajectory Management

COMMUNICATIONS PANEL. WG-I 20 Meeting

Spectral Efficient COMmunications for future Aeronautical Services. Jan Erik Håkegård ICT

SUMMARY. of the North. Reference: A B

Seeking Connec+vity Op+ons: We are here to learn!

EUR/SAM corridor airspace concept

ASPASIA Project. ASPASIA Overall Summary. ASPASIA Project

NEXT GENERATION SATELLITE SYSTEMS FOR AERONAUTICAL COMMUNICATIONS

PENS Symposium How to join PENS

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

ADS-B via Low Earth Orbiting Satellites Benefits Assessment

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

OVERVIEW OF THE FAA ADS-B LINK DECISION

Space Based ADS-B. Transforming the Way you See the Sky September 23, /22/2015

NAVISAT Middle East & Africa

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

French DSNA approach to CNS rationalization & evolution

INMARSAT. CWC update 2017

Russian Federation ATM modernization program

North Atlantic Initiatives

Space Based ADS-B. NSS 2018 AUCKLAND NZ Part 2 AIREON LLC PROPRIETARY INFORMATION

WELCOME TO THE AGE OF THE CONNECTED AIRCRAFT

Content Delivery to Aircraft: The Challenge

TAKE YOUR BUSINESS TO ANY ALTITUDE

EFB Wireless Connectivity & Security Considerations

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

European ATM Development The Big Idea

TWELFTH AIR NAVIGATION CONFERENCE

AERONAUTICAL INFORMATION CIRCULAR 33/17

Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP

Global Interoperability - Airborne Architecture and Avionics Interoperability Roadmap Project Number Project Manager

AVBUYER THIS MONTH. GAMA 2014 Year-End Shipment Analysis. Safety Focus: Keeping Pace with Technology. Aircraft Comparative Analysis - Bell 206B-3

TWELFTH AIR NAVIGATION CONFERENCE

ATC Datalink on Boeing Airplanes

COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) IPS over VDLm2 Feasibility Demonstration. CP WGI 19/IP January 2016

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales

OPERA study. Operational Requirements and Business Case. Iris public event Oct 11 th, The OPERA Consortium is SITA and SES

The evolving air navigation system and the impact on avionics

SEAMLESS SKY IN EUROPE. Carlo Maria Borghini Director Administration and Finance Muscat, OMAN October 2009

ICAO Air Navigation Panels/Study Groups Work Programme

DVB-S2/RCS Suitability for the Provision of Air Traffic Management Services

AEROMACS AIRBORNE ARCHITECTURE OPTIONS V1.0

International Civil Aviation Organization The Twentieth Meeting of the APANPIRG ATM/AIS/SAR Sub-Group (ATM/AIS/SAR/SG/20) Singapore, July 2010

SESAR CONCEPT DEVELOPMENT: AN ANSP CASE STUDY. Owen DAVIES Brussels Representative Department of International Affairs, NATS

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

Atlantic Interoperability Initiative to Reduce Emissions AIRE

SESAR RPAS Definition Phase Results & Way Forward. Denis Koehl Senior Advisor SESAR Joint Undertaking

(Presented by the Secretariat)

First Review Meeting of AFI VSAT Network Managers (AFI VSAT Review/1) (Dakar, Senegal, 3 to 5 October 2011) SUMMARY

Iris Information Event October Overview of SESAR P. Tavernise

Concept of Ops: A Strawman

User Terminal certification process considerations

Surveillance Opportunities and Challenges

UK Implementation of PBN

FAA GBAS Program Update January 29, 2010

Transcription:

Inmarsat Aviation Safety Services Update ICAO NAT PBCS Workshop, Paris, 20-22 February 2013 Andrew Ives, Gary Colledge 1

System Capacity (logarithmic scale) Inmarsat Satellites & Aeronautical Services I5 (x3) Global Xpress (Ka-Band) I4 (x3) Classic Aero SwiftBroadband Alphasat (x1) Classic Aero SwiftBroadband I2 (x4) Classic Aero I3 (x5) Classic Aero Swift64 1990-92 1996-98 2005-2008 2013 2013-14 Launch date 2

2013 L-band: Significant Milestones 4 th Inmarsat I-4 (Alphasat) More Inmarsat Ground Earth Stations Next Generation Safety Services Funding for trials phase for Continental Safety Capability 3

Satellite Coverage & Network Harmonization Classic Aero & SwiftBroadband New Classic Aero GES Racks 4

I-3/I-4 GES Harmonization Description Recent Opportunities & Objectives: Re-organizing technically and commercially Realizing efficiencies in spectrum and operations New SED stations deployed for the I-3 networks (January 2013) Locations at Perth (Australia) and Burum (Netherlands) Benefits/Provisions: Simplifies and uses same GES hardware and interconnects existing on I-4 Harmonized performance monitoring, troubleshooting, service notifications and general fault-finding tools Consistent network architecture for continued ICAO GOLD performance monitoring For use as backup to I-4 stations post I-3 satellite constellation EOL Aero-H+ users: Managed migration to Classic Aero I-4 Network 5

I-3 GES: 2013 Staggered Transition* * Illustrative & in No Particular Order Santa Paula [202] POR Perth [205] Perth Perth [305] IOR EIK [301] Aussaguel [103] AOR-E EIK [104] Burum EIK [002] AOR-W Aussaguel [005] 6

Teams involved in Perth POR transition 03:00 UTC Tuesday 26 th Feb 1. NOC London for coordination of the activity 2. SED GES System Experts at Perth 3. T&T GES System Experts at Perth 4. GES Manufacturer SED 5. Inmarsat Ops-Engineering 6. London Support team (networks, voice, packet switched data etc.) 7. SITA teams 8. Fucino I4 Classic Aero System Experts Two telecon bridges running, one technical transition, one SITA/Inmarsat management 7

Perth POR Transition Summary sequence of events: T-XX mins transition team characterise population of logged-on aircraft T-15 mins team block new log-ons and voice calls from T&T GES GES team remove POR uplink carriers After a few minutes, GES team activate the SED GES carriers Establish P channels and associated System Tables / Spot Beam map Aircraft begin to log-on, FANS datalink messaging re-establishes Team assess all okay, process continues Team make GtA voice (Q9) calls and PS call tests Team make AtG voice calls and ATS (Q12) voice calls Transition team monitors AES log-on to expected traffic load and confirms AES activity with DP, continually assessed T+120mins Decision point: confirmation of successful transition to the SED GES or roll-back to the T&T GES Transition team continue to monitor the performance of the GES until T + 8 hours If transition successful, transition team released. Return to normal operations. Reviews with SITA at T+32 hrs, T+56 hrs and T+7 days Note: At any point roll-back to the T&T GES can be actioned 8

Inmarsat monitoring during transition To include: Number of logged-on aircraft Voice performance: Ground-to-Air and Air-to-Ground, different priority levels, availability of network Data: Availability of network Data: FANS ADS Latency monitored 9

Satellite & Network Harmonization Burum Fucino Paumalu Perth Inmarsat MMP-New York Data-2 & Data-3 MMP-Amsterdam Data-2 & Data-3 MSC-Burum Voice H+ DP1 ACARS Processer + Voice Switch DP n ACARS Processer + Voice Switch PSTN Network End State: Simplified network access to Classic Aero on I3 and I4 constellations 10

I-3 Classic Aero Safety Coverage Map Burum Perth This map depicts Inmarsat s expectations of coverage, but does not represent a guarantee of service. The availability of service at the edge of coverage areas fluctuates depending on various conditions. SwiftBroadband coverage February 2009. Swift 64, Aero I Coverage Aero H/H+ services are provided in the full footprint of the global beams 11

I-4 Classic Aero Safety Coverage Map EUA1 XXF Fucino Paumalu APK1 AME1 XXA XXH I-4 Americas I-4 EMEA I-4 Asia Pacific This map depicts Inmarsat s expectations of coverage, but does not represent a guarantee of service. The availability of service at the edge of coverage areas fluctuates depending on various conditions. SwiftBroadband coverage February 2009. 12

Classic Aero Services + Sunset Info Service Consolidation Inmarsat-3 Thrane GES Inmarsat-3 SED GES Inmarsat-4 SED GES Voice (H+) Voice (H) Voice (I) SAFETY & NON-SAFETY SERVICES Data-2 Data-3 Secure Voice Broadcast Data NON-SAFETY SERVICES PC Data & Fax * + Sunset Intention: (GES-by-GES in 2013) PC Data & Fax Broadcast Data (CN50) Secure Voice (CN11) * Sunset 2016 + Service envisaged 2016 to sunset of Aero I Solutions can be found via Swift64 & SwiftBroadband 13

Roadmap & Timelines SwiftBroadband Safety Trials Airline Programme & Incentives 14

Harmonized Safety Services: Classic & SBB Voice + ACARS Aero GES Classic Aero Service Air Traffic Service Providers Classic Aero I3 Ground Segment I3 Satellite Constellation Fallback to Classic / I3 Airline AOC Centres Air Traffic Service Providers Airline AOC Centres DP 1... DP n Inmarsat DCN and DP, SP Networks ACARS + Position Reports Prioritised IP EFB IP Standard IP Ground to Air Voice PSTN Voice + ACARS ACARS Ground Gateway (AGGW) VoIP Server Classic Aero I4 Ground Segment CN Air to Ground Voice Aero GES SGSN GGSN MSC RAN BGAN Ground Segment Fallback to Classic / I4 Normal Operation Over SBB I4 Satellite Constellation High availability SB safety comms - meeting ICAO GOLD RCP240 SB Safety Service / BGAN Classic Aero Modem Antenna SBB Modem PS Voice SB Safety AES ACARS Voice ACARS Airborne Gateway (AAGW) VoIP Server ACARS Voice Prioritised IP EFB IP Standard IP Comms Management Unit Audio Management System New Prioritised IP ATS/AOC Apps Electronic Flight Bag Passenger Cabin Connectivity 15

SwiftBroadband Data Link Challenge Trials to test how close SB-Safety can compare to VHF to enable other applications requiring more stringent message latencies Existing VHF 90%: 15 secs 50%: 7 secs Existing SATCOM 90%: 30 secs 50%: 15 secs 16

SwiftBroadband Safety Benefits Low Cost Terminals 2 MCU SDU size with Enhanced Low Gain Antenna Opex expected at least 30% less than Classic Aero Anticipate up to 100 lbs in weight + drag savings Flight Deck Communications Target: Reduce ACARS data link message times Support for VoIP Advanced Features Aircraft Position Reporting and Tracking Additional to WPR and ADS-C ACARS based messaging Message rate configurable Private Network (from Cabin SBB/Ka/Ku Links) Prioritised IP link EFB Applications Maintains up to 200, 300, or 400 kbps (per antenna type) Low Cost + Light Weight Terminals SwiftBroadband Flight Tracking 17

Next Generation Avionics Flight Deck + Cabin or Flight Deck Only Solutions Multitude of capabilities to include reversion to Classic Aero ARINC 781 6 MCU IGA or HGA ARINC 781 2 MCU ELGA, IGA or HGA +More 1 x SBB Safety Channel 2 x Voice, 1 x ACARS, 1 x IP Data Up to 3 x SBB Channels For AIS or PIES Domains Up to 300 or 400 Kbps 1 x SBB Safety Channel 2 x Voice, 1 x ACARS, 1 x IP Data Data Arbitration For support to AIS Domains Up to 200, 300 or 400 Kbps Does not require wiring or rack changes e.g.: Same internal avionics from latest A781 systems, but packaged in A741/A761 form factors? 18

PARC CWG Project Plan: Objectives Venue Date Objectives PARC CWG 27 2012 Williamsburg, VA (June) Conclude FOICA Request SwiftBroadband Safety Project PARC CWG 28 2012 Livermore CA (October) Start SBB Safety Services Project Report on GOLD testing @ test benches PARC CWG 29 2013 Phoenix (Mid April) Begin Bizjet Installations Report on GOLD testing @ Airframe Manufacturers PARC CWG 30 2013 TBD (June) Begin Airline Installations Report on GOLD testing on Bizjet flights Trials Incentives PARC CWG 31 2013 TBD (October) Continue GOLD trials on Bizjet flights Report on GOLD testing on Airline flights Support from Inmarsat, Service Providers and Equipment Manufacturers PARC CWG 32 2014 TBD (January/February) Certify or Approve FANS1/A over SBB on Bizjets Continue GOLD trials on Airline flights Free Airtime* for duration of trials PARC CWG 33 & 34 2014 TBD (June) & TBD (October) Continue GOLD trials on Airline flights Savings on avionics PARC CWG 35 2015 TBD (January/February) Finalize Airline GOLD Data Package & Report Consider STC Packages PARC CWG 36 2015 TBD (June) Certify or Approve FANS1/A over SBB on Airlines PARC CWG 37 2015 TBD (October) Spare Session should data in trials not be sufficient * For SwiftBroadband Safety Voice and Data use in the Flight Deck: Subject to Fair Use Policies 19

PARC CWG Project Plan: Timeline Target High Level Implementation Phases SB Oceanic Safety System Implementation Implementation SB Safety Network Service Available SDM CP Integration & Test FANS 1/A GOLD SSP/CSP Bench Tests FANS 1/A GOLD Airframe Mfg Bench Tests Timescales subject to internal approvals and external dependencies FANS Evaluation (Flight Trials & Evaluations) Operations Start Evaluation Bizjet/Airline (SB-S) Bizjet Installation & Testing (Multiple) Airline Installation & Testing (Multiple) Q1-12 Q2-12 Q3-12 Q4-12 Q1-13 Q2-13 Q3-13 Q4-13 Q1-14 Q2-14 Q3-14 Q4-14 Q1-15 Q2-15 Q3-15 Q4-15 CWG28 CWG29 CWG30 2012 2013 2014 2015 20

Inmarsat Aviation Services Roadmap SwiftBroadband (I4 network) Classic Aero H+ (I3 and I4 networks) Classic Aero I (Supported at least until end 2018) Swift 64 (Supported at least until end 2018) Classic Aero H (Closure end 2016) PC Data & Fax Broadcast Data (CN50) Secure Voice (CN11) Closure GES by GES Transition H Service Sunset Service Provider & Airline Consultation process ends March 31 st 2013 Provide your input on Aero-H 2011 2012 2013 2014 2015 2016 I-3 GES Harmonization I-3 Constellation I-4 Constellation Est. End-of-Life Est. End-of-Life 2017 2018 2019 2020 2021 2022 2023 21

I-4 SwiftBroadband Safety Coverage Map Spot Beams for Voice & Data (FANS1/A) Burum Paumalu 22

Summary of Network Redundancy Classic Aero Only Aircraft Use I-3 and I-4 Satellites and networks Availability of 99.9% to 99.99% via 2 x networks Overlapping I-3 Satellite Coverage until approximately 2018 2 x Networks SwiftBroadband Safety and Classic Aero Aircraft Use SwiftBroadband Safety on I-4 Satellites and network Use Classic Aero as fall-back on I-4 and I-3 Satellites and networks Availability of more than 99.99% via 3 x networks Overlapping I-3 Satellite Coverage until approximately 2018 3 x Networks SwiftBroadband Safety Only Aircraft Use SwiftBroadband on I-4 Satellites and network Availability reaching 99.99% via 1 x network Post 2017 network enhancements for continental airspace satcom 1 x Network 23

Next Generation Safety Services Continental ESA IRIS Programme ARTES 10 24

ESA: Iris Pre-Cursor Programme Alphasat I-XL Test Completion: Jan 2013 Reflector: 11 m/36 ft Diameter Launch Mass: 6.5 tons Power: 12 kw Launch: 2013 Ariane5 European Space Agency commits to funding SB safety services 07-JAN-13 Inmarsat has received confirmation of a major funding commitment to validate SwiftBroadband Safety as part of the future European air traffic management infrastructure. A total of 11.5 million (about US$14.6 million) has been approved at the European Space Agency (ESA) 2012 Ministerial Council, with the UK as main contributor, followed by Norway, Ireland and Portugal. Under the ARTES-10 Iris programme, SwiftBroadband will be upgraded to provide a satellite overlay to terrestrial VHF networks through the SESAR (Single European Sky ATM Research) air traffic control modernisation programme. 25

Initial 4D Trajectory Management Fuel Saving Techniques Cruise Climb uses automated exchanges between aircraft and ground systems to enable a gradual climb as the weight of the aircraft decreases Aircraft flying higher flight levels can benefit from lower fuel consumption, less drag and better engine efficiency Continuous Descent Approach removes stack holding prior to landing Analysis for A320 aircraft using CDA at Heathrow shows that it is possible to save up to 300kg of fuel per approach* * Source: Helios 26

Timeline Envisaged 2012 2013 2014 2015 2016 2017 2018 2019 2020 SBB Oceanic Safety FANS 1/A ACARS gateway development Service approvals Equipage CPDLC + ADS-C Link 2000+ VHF Datalink B1 ATN/OSI VHF Data Link IR Initial equipage Full equipage ATN/CPDLC Iris Precursor FANS 1/A B2 ATN/OSI ATN/OSI gateway development; Associated system engineering Ground segment hardening; Monitoring systems; Deployment Service approvals Equipage CPDLC + ADS-C SB200 SB200evo Test Flight Trials Airbus Flight Trials 27

Summary I-3/I-4 GES Harmonization GES OR-by-GES OR Transitions Alphasat I-XL addition to follow Next Generation Safety Services Smaller, lighter, less expensive, faster FANS1/A with private IP Network, e.g: for EFB 2013 FANS1/A Trials Incentives based on first come, first served 2017 Initial-4D Trials of Continental Data Link Applications Action 2013 SwiftBroadband Safety Trials Programme 28

Questions? 29