Technical Resources - Automation European AIS Database (EAD)

Similar documents
Airspace User Forum 2012

EAD 2019 Annual Plan

EAD 2018 Annual Plan

10+ years of EAD: picking the low-hanging fruit. guido HAESEVOETS EAD Customer Management 29/01/2015

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

User Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

Avitech GmbH AIXM Capabilities & Experiences

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

Managing Aeronautical Data

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

ADQ Regulators Working Group

MIDAD Project IDS Vision

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

NCLB-AIM Workshop (Cairo, Egypt, September 2017) Your complete AIS/AIM Training baseline

QMS for AIS/MAP Service Implementation Workshop

Development of the Global AIM Strategy (AIM Projects)

Terms of Reference for a rulemaking task

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

Quality Management System (QMS)

Single European Sky II

NNF Work-shop on Navigation, Safety and Technology. Dato: 2. February Gunn Marit Hernes Luftfartstilsynet

30 SEP - 02 OCT, 2014

Terms of Reference for a rulemaking task. Requirements for Air Traffic Services (ATS)

EUROCONTROL SPECIFICATIONS SYNOPSIS

RMT.0464 ATS Requirements The NPA

IAL 2 INTERNATIONAL AIR TRANSPORT ORGANIZATIONS

- Implementation and use of European AIS Database (EAD) -

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

Certification Procedure

EUROCONTROL. Centralised Services Workshop. Peter Matern CS#5 EAIMS 5 March 2014

AIS/AIM System in South Africa (ATNS)

MID Region AIM SG/2. AIS-AIM Study Group 31 August Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG

Aeronautical Information Services Issue 1 30 May 2012

SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM

EUROPEAN COMMISSION DIRECTORATE-GENERAL MOBILITY AND TRANSPORT

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

EUROCONTROL Guidance for Military Aeronautical Information Publications Consistency with ICAO Annex 15 EUROCONTROL

This working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES.

Air Traffic & Navigation Services

EASA: The European regional approach for aviation safety

SWIM Technical Infrastructure (ATC-ATC and EAD Profiles)

COMMISSION IMPLEMENTING REGULATION (EU)

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

PENS Symposium How to join PENS

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

AIXM/WXXM CONFERENCE 2010

FRA AIP publication and EAD data provision. Asa STANDAR

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

AIM in support of ATM

L 342/20 Official Journal of the European Union

What is safety oversight?

Advisory Circular. File No.: Z U Issue No.: 01

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

Cross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations

Curriculum for AIM Training Module 2: ARO Officer

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

ATC PROCEDURES WORKING GROUP. Transition Level

FOLLOW UP TO APIRG/17 CONCLUSION 17/86 (AIM)

Work Programme of ICAO Panels and Study Groups

Network Manager Adding value to the Network 29 September 2011

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

Airport AIM as a Service Presented at World ATM Congress 2016

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

The SES Performance Scheme. ICAO Regional Performance Framework Workshop Bishkek, Kyrgyzstan May 2013

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICAN OFFICE

Introduction to Amendment 40 to Annex 15

DRAFT AGREEMENT BETWEEN THE EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION (EUROCONTROL) AND THE KINGDOM OF MOROCCO

The contribution of the ATM SATCOM Safety Board (ASSB) Filippo Tomasello Rulemaking Official (EASA) Chair of the ASSB 10 Oct. 2011

ATIEC Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL)

Aeronautical Information Management

AIS-AIM Study Group Working Status

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

SRC POSITION PAPER. Edition March 2011 Released Issue

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

TWELFTH AIR NAVIGATION CONFERENCE

Session 2.2 Data Catalogue

This working the purpose gathering and

Digital NOTAM Preliminary Business Case

FOLLOW UP TO APIRG/17 CONCLUSION 17/86 (AIM)

ICAO Performance Based Approach

Centralised Services 4 Advanced Flexible Use of Airspace Service

Terms of Reference for rulemaking task RMT Regular update of ATM/ANS rules (IR/AMC/GM)

ACI World Safety Seminar Beijing November 2008 AN OVERVIEW OF ICAO SAFETY PROGRAMMES

COST RECOVERY OF AERONAUTICAL INFORMATION. Presented by Julián de la Cámara (ICAO EPM) AIS-AIMSG First Meeting Montreal, 2-4 December 2008

ESSP EGNOS Service Provider. ICAO APV Workshop (26/05/2011)

WORLD METEOROLOGICAL ORGANIZATION AFRICAN CONFERENCE ON METEOROLOGY FOR AVIATION (ACMA -2018)

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

Official Journal of the European Union L 283/25

Single European Sky. Anforderungen und Entwicklungschancen für nationale Flugsicherungen. Sven Halle DG TREN Air Transport Unit (F2)

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

Excerpts from ICAO PBCS Manual

Transcription:

Technical Resources - Automation European AIS Database (EAD) Workshop for the development of AIS management and oversight for Civil Aviation Authorities CAA) and Air Navigation Service Providers (ANSPs) 31 July 4 August 2017 Dakar Gaston Liegeois Directorate Network Manager gaston.liegeois@eurocontrol.int

History Creation of EAD PC approval: Approval EAD concept and Start CFT PC Decision 83: Creation of EAD & Operating EAD PC Decision 101 - Directive 03/62: Service Charge Policy & Client agreement 1995 1997 1999 2001 2003 2005 2007 2009 2011 2013 2015 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 Feasibility Development Operations Feasibility study Creation of EAD concept Call for Tender System Development & Service Development Service Provision DOP-TRG-ITP SW maintenance & Evolution

Concept of EAD EAD is a central service provided and owned by EUROCONTROL on behalf of its Member States. Data Providers Direct data maintenance EAD Ops Staff Static Data NOTAM Data Users PIB, NOTAM, AIP, Charts Non migrated & worldwide states Data Quality Harmonisation and Consistency

AIS Process Example - Issue an AIRAC AIP Amendment Data Originator AIS Officer

AIS Process with EAD SDO CHART Data Originator AIS Officer AIP INO PAMS

Objectives Increase the level of service of the overall AIS in the EUR region: Migrate of AIS/AIM Service Providers of European States to EAD Provide access to worldwide aeronautical data Provide consistent, up-to-date and complete collection of aeronautical information Decrease overall cost for provision of aeronautical information within EUR

Objectives Based on: ICAO, EUROCONTROL Recommendations Annex 15, OPADD, SDP, AICM/AIXM European Commission Aeronautical Data Quality (ADQ) IR Service Availability 7/7d 24/24h, Service Desk Data consistency and completeness Validation rules / Data Harmonisation Coordination of cross border conflict resolution Safety Case (ESARR compliance), ISO, EASA certification Evolution according to SES, SESAR, etc.

Principles Implementation by EUROCONTROL of a system/service for AIS Providers supporting the delivery of AIS Services as defined by ICAO Annex 15 EUROCONTROL operates and manages EAD on behalf of its Member States States remain responsible for providing their AIS Service and the information to be published Provision of the EAD IT, Data Operations and Training services are outsourced to private Service Provider Companies or consortium after open Call for Tender (CFT)

EAD Business Model Contractual Relation DP DP DP EAD client community Data Providers (DP) & Data Users (DU) DU DU DU Client agreement Contract signed EAD Service EUROCONTROL / NM PENS Network Service Provider Service Level Specifications Service Provider DOP/TRG Service Provider ITP Application Maintenance per sub-system

EAD Service Provider contract ITP DOP - TRG Provision of IT, Data Operations, and Training is performed by external service providers (outsourcing) via Call for Tender process Objectives of the Call for Tender : Benefit from state of the art technology from industries, and Open competition to get the best operational services for the cheapest price. EUROCONTROL shall ensure that the Service is rendered satisfactorily, in accordance with appropriate and agreed Service Level Specifications(SLS) Service provision contracts together with the SLS represent the tool through which the quality of the service can be monitored. 25-07-2017 10

EAD Service Provider contract ITP DOP - TRG Performance based contract: Definition of Key Performance Indicators (KPI) for each service allow to monitor the performance associated to each service KPIs associated to the different services are subject to bonus-malus factors Monthly reports are delivered to EUROCONTROL for review and approval. Payment schema is driven by the bonus-malus principle and the volume coefficient Limited time contract: As service provision contracts resulting from call for tender process are valid for a period from 5 to 8 years maximum, A transition and hand-over periods is specified in order to manage the possible change of service provider Service Provider shall assist EUROCONTROL in order to hand-over all or part of the services to the new Service Provider 25-07-2017 11

Challenges EAD System/Service Centralised service - Outsourcing model Ensure adequate quality and performance for all EAD services (data operations, IT, and training) provided by Service Provider companies SLS, KPI, performance monitoring, bonus-malus Services (DOP / ITP) and application software evolution according to: User expectations, ICAO, EC IR, etc. Capacity, performance, etc. User Relation Migration of Data Providers: All ECAC area AISP, and additional world-wide States Migration of Data Users: Airlines, airports, commercials, SW developers, Education, etc.

Challenges Contribute to European ATM delivery in accordance to key performance areas of safety, capacity and flight efficiency Availability of harmonised/complete/accurate AI contributing to success of NM functions In future, Expansion of SES to adjacent States bordering European airspaces Middle East Ai Database South Africa, Canada, etc.

gaston.liegeois@eurocontrol.int Public access: AIP from ECAC and ECAC+ areas Consultation of static data Pre-Flight Information Bulletins EAD Basic: http://www.ead.eurocontrol.int/eadcms/e adsite/index.php.html enter your presentation title 14