A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure and services.

Similar documents
TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

The Statutory Quality Partnership Scheme for Inverclyde

Update on the development of the Regional Real Time Passenger Information (RTPI) System

May 2011 to April 2012.

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

Passenger Promise and Rights: National Express Bus

May 2011 to April 2012.

The Airport Charges Regulations 2011

Agenda 11. Strathclyde Bus Alliance progress update. Date of meeting 9 December 2016 Date of report 15 November 2016

Quality Partnership Scheme. Greater Bristol Bus Network

2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS

KEY FACTS 2011/ million passenger journeys were made on Stagecoach in the Highlands services 9 million miles operated across the Highlands and O

Quality Partnership Scheme MetroBus

Quality Partnership Scheme MetroBus

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

LINCOLNSHIRE PARKING POLICY DRAFT

National Park Authority Board Meeting

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

SOUTH WEST. annual report. May 2012 to April

20 February 2018 AMENDMENT TO HSCP INTEGRATION SCHEMES TO SUPPORT THE IMPLEMENTATION OF THE CARERS (SCOTLAND) ACT 2016

LINCOLNSHIRE PARKING POLICY DRAFT

Bus Priority Package. Presentation to Leigh Business Forum. 11 December 2015

Air Operator Certification

Agenda item no 7. Strathclyde Bus Alliance - Proposal. Committee. Strategy and Programmes. Date of meeting 20 May 2016 Date of report 25 April 2016

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

BOROUGH OF POOLE TRANSPORTATION ADVISORY GROUP 16 MARCH 2017

LOCAL GOVERNMENT AND TRANSPORT COMMITTEE PETITION PE This paper invites the Committee to consider for the third time the following Petition:

This annual report covers the year from May 2013 to April 2014

COASTAL CAR PARK CHARGING TRAFFIC REGULATION ORDER FREQUENTLY ASKED QUESTIONS

Part 149. Aviation Recreation Organisations - Certification. CAA Consolidation. 1 February 2016

A Master Plan is one of the most important documents that can be prepared by an Airport.

SIAFI Europe 2005 Paris, Passenger Rights: Problems at issue and latest developments (passenger charter, etc.)

This report is PUBLIC [NOT PROTECTIVELY MARKED] Board Meeting. Councillor Roger Lawrence Transport

EASA PART 21 + AMC/GM. Syllabus

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

Agreement Between the West Somerset Railway PLC and the West Somerset Steam Railway Trust Ltd

Safety & Airspace Regulation Group Code of Practice. Issue 13, August 2013 CAP 1089

REGULATIONS (10) FOREIGN AIR OPERATORS

greener, smarter travel stagecoachbus.com/manchester

Transition of the framework for the economic regulation of airports in the United Kingdom CAP 1017

UK Experience with Bus Restructuring

2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Transport Outcomes Reports 2015/16 Date of meeting Date of report Report by Assistant Chief Executive (Operations) 1. Object of report 2.

ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC

Written evidence submitted by National Express West Midlands (BSB 15)

(i) Adopted or adapted airworthiness and environmental standards;

Glasgow City Region City Deal Guide to Information Available City Deal Publication Scheme

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

Stagecoach South. annual performance. May 2010 to April greener smarter travel

The Collection and Use of Safety Information

Report. on an investigation into complaint no 06/B/15306 against Plymouth City Council. 21 January 2008

California State University Long Beach Policy on Unmanned Aircraft Systems

2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS

2 THE MASTER PLAN 23

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Perth and Kinross Council Development Management Committee 27 March 2013 Report of Handling by Development Quality Manager

Auckland Regional Public Transport Plan

Park and Ride Update. Committee. Strategy and Programmes. Date of meeting 29 November 2013 Date of report 6 November 2013

Community Transport update

Annual Performance. East Scotland

The Strategic Commercial and Procurement Manager

Transport Focus 2016 Bus Passenger Survey Briefing 22 March Liverpool

2.3 On 27 November, the Department for Transport issued guidance on the use of the powers contained in the Act.

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

Government Decree on Inspecting Foreign Ships in Finland (1241/2010)

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA

4 Rights and duties in connection with the conduct of petroleum activities

The Bus Services Bill and Municipal Bus Companies

AGREEMENT APPOINTING [NAME OF AGENT] AS THE AGENT OF THE UK HOLIDAY GROUP LIMITED ATOL 5024 PURSUANT TO ATOL REGULATIONS 12 AND 22

Environment Committee 24 September 2015

Annual Performance. South West May 2016 to April

Supplement No. 17 published with Gazette No. 22 dated 25 October, THE AIR NAVIGATION (OVERSEAS TERRITORIES) ORDER 2007, S.I No.

Invitation to participate in the ATOL Reporting Accountants scheme CAP 1288

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

Economic Development Sub- Committee

Communication and consultation protocol

AGENCY AGREEMENT PURSUANT TO ATOL REGULATIONS 12 AND 22

North West London Hospitals NHS Trust

Date 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.

This Section 1 contains the requirements for the approval of Master Minimum Equipment Lists and Minimum Equipment Lists.

PORTABLE LIGHT SIGNALS

Strathclyde Partnership for Transport

SOUTH WEST. annual report. May 2011 to April

AnnualReport. introduction. key facts. information. May 2013-April stagecoachbus.com/south

Aircraft Maintenance Organisations - Certification. Contents

CIVIL AVIATION REQUIREMENT SECTION 3 AIR TRANSPORT SERIES C PART I ISSUE IV, 24 th March 2017 EFFECTIVE: FORTHWITH

BOUGHTON PARISH COUNCIL

Local Development Scheme

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

AIRPORT VOLUNTARY COMMITMENT ON AIR PASSENGER SERVICE

Aircraft Leasing Manual

1. Citation, commencement and interpretation

PART 39 CONTINUED AIRWORTHINESS REQUIREMENTS

COMMISSION IMPLEMENTING REGULATION (EU)

Basic Policies on Operation of National Airports Utilizing Skills of the Private Sector

PERTH AND KINROSS COUNCIL 1 OCTOBER 2008 ADULT SUPPORT AND PROTECTION. Report by the Executive Director (Housing & Community Care)

GAMA 2020 PUBLIC TRANSPORT VISION

GUERNSEY AVIATION REQUIREMENTS. (GARs) CONTINUING AIRWORTHINESS PART 39 REQUIREMENTS

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy

Transcription:

BRIEFING NOTE FOR BUS OPERATORS Inverclyde statutory Quality Partnership Scheme - 2015 What is an sqps? A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure and services. The Transport (Scotland) Act 2001 (received Royal Assent on 25th January 2001) provides powers for local transport authorities to make statutory quality bus partnerships known as Quality Partnership Schemes (QPS) and also Quality Contracts (QC). The 2001 Act was amended by the Transport (Scotland) Act 2005 (received Royal Assent on 5 August 2005- section 51(2) amends section 48 of 2001 Act) to allow local authorities in the SPT area to have the same powers as SPT to make Quality Partnership Schemes and Quality Contracts. An authority, or authorities acting jointly, may make a QPS covering a corridor or area, provided: the authorities are satisfied that the Scheme will to any extent implement the relevant policies to which it relates (relevant policies is defined in the Act) and either improve facilities and services to bring material benefits to users and/or reduce or limit traffic congestion, noise or air pollution. Inverclyde Council or SPT could therefore promote Schemes independently or together. Bus operators wishing to participate in a QPS must give a written undertaking to the Traffic Commissioner that they will provide the specified standard of service when using the facilities. Adherence to this commitment then becomes a condition of continued registration. Some exemptions may apply, for example, for longer distance express services or seasonal services. The Traffic Commissioner is empowered to act against any operator who fails to meet conditions of registration. What can be included? Under a QPS, the authority provides specified facilities and only those bus operators meeting specified standards will be permitted to use the specified facilities. The specified standards may, for example, include vehicle requirements and minimum frequency of services. Specified facilities can typically include improved infrastructure, including shelters and bus priority measures. The level of fares, timetables and frequencies (over and above any agreed minimum) and the routes served cannot be included in a QPS and will remain wholly controlled by the operators.

Existing facilities provided up to 5 years before the date on which consultation on the Scheme commenced can be included in a QPS. Facilities implemented between 5 and 10 years before this date can also be included subject to the consent of bus operators. A QPS requires all facilities to be in place for a period of 3 months before the date for commencement of operation of the Scheme (though these can subsequently be varied). A Scheme may operate for a period from 3 to 7 years. The Scheme must set out the procedures for determining disputes between the authority and operators. Consultation Best practice for the establishment of a QPS is for the proposing authority to enter into preliminary voluntary discussions with local operators during the first drafting of proposals. Having drafted a QPS, the local authority making it is obliged to publish it and undertake a formal consultation exercise in accordance with section 5 of the Transport (Scotland) Act 2001. If an operator considers that any obligation being placed upon it which would permit it to use the facilities provided under the QPS is unreasonable, in that it raises a barrier to entry which is considered to be excessive, then it may call for the application by the authority of the Competition Test. Procedure An authority wishing to make a QPS should:- i. consider the extent of area or corridor in which it would like to see the QPS introduced; ii. identify what the authority would bring to the QPS in terms of infrastructure and other measures, such as funding, promotion and monitoring; iii. desirably undertake preliminary voluntary consultation with the affected parties as part of the scoping exercise and to assist in drafting proposals for the QPS. iv. draft the QPS in detail; v. publish a notice in at least one local newspaper, setting out the authority s proposals for facilities and standards to be provided under the Scheme; vi. consult with affected parties including bus operators, the Traffic Commissioner and any other relevant parties about the aims, quality standards and operation of such a QPS. (There is no set time limit for statutory consultation, but sufficient time should be allowed to ensure that those who are likely to have views have reasonable time and opportunity to make a considered response); vii. review/re-consult; viii. make the Scheme and inform. The legislation does not specify what is meant by making a Scheme. However the effect of a Scheme being made is clear enough - it

means that the Scheme is finalised. This would generally mean that the approval of the Council s Executive Committee has been obtained and the QPS has been signed by the Council s legal representative; ix. within 14 days of making the QPS, publish a notice in at least one local newspaper setting out the Scheme and stating where and in what form the Scheme may be inspected. This final Scheme, identified in the notice, should clearly specify:- the facilities and standards to be provided under the QPS; the date on which the Scheme comes into operation; and the period during which it remains in operation. x. provide the facilities; xi. Commence the Scheme, operate and monitor the QPS from the specified date of operation of the Scheme and submit annual monitoring reports thereafter to the Scottish Ministers on the performance of the QPS with regard to meeting the Scheme objectives. The specified date for commencement of operation of the Scheme has to be at least 3 months after a Scheme and any required TROs are made and after the date it will be reasonably expected for the authorities to provide the specified facilities and for operators to provide the specified services. Ministers may by regulations make further provisions re procedures etc required. What are the broad objectives of the Inverclyde sqps? Improve access for all to facilities e.g. shopping, healthcare, education, leisure) within the sqps area. Environmental improvements through attracting car drivers into using public transport more often thus improving bus patronage. Environmental improvements through improved bus journey times. Encourage modal shift to buses. Reduce traffic congestion and emissions and thus improve air quality. Improve bus quality. Better access to information relating to bus routes and timetables. Improve safety & security for those using buses (liaise with police). Regular and reliable operation and scheduling. What is proposed in the Inverclyde sqps? The Scheme will apply within a designated area in and around Greenock, Gourock and Port Glasgow. Operators will be expected to provide specified standards of service in order to participate in the Scheme. These will relation to such things as (further details on these can be found within the document):- General: 1) Punctuality of services 2) Network stability 3) Presentation of vehicles 4) Driver training 5) Customer care and journey promises 6) Journey promises 7) Driver appearance

8) Information 9) Fare revisions 10) Smoking 11) Provision of patronage data 12) Fleet list Vehicle specification:- 1) Accessibility all journeys to use accessible low floor buses 2) CCTV all journeys after 2000 hours to have a minimum of 3 cameras in each saloon 3) Communication drivers must be able to communicate with depot after 2000 hours 4) Emissions 50% of all journeys at commencement date to be operated by vehicles with Euro 3 engines (or Euro 2 with TfL approved CRT devices) 5) Heating and ventilation/climate control fitted to maintain passenger comfort 6) Lighting and ancillary equipment 7) Route and destination displays 8) Real Time Information To actively co-operate with Inverclyde Council on introduction and development of RTI Vehicle maintenance: 1) Obligation Comply with VOSA standards and also swiftly investigate passenger complaints 2) Lighting and ancillary equipment 3) Exterior and interior vehicle presentation 4) Exterior and interior cleanliness 5) Litter 6) Notification of Faults Vehicle Branding/Livery: 1) To improve passenger confidence and save passenger confusion Services: 1) Service reliability 2) Breakdown and recovery 3) Last journeys Driver standards: 1) General drive in a safe and professional manner 2) Picking up/setting down arrangements 3) Passenger assistance drivers provide assistance when requested for elderly/disabled etc 4) No Smoking 5) Distractions 6) Heating and ventilation drivers to be fully conversant with all vehicle systems Timescales for vehicle defect rectification: 1) Defects to be rectified within 7 days wherever reasonably practicable this timescale will apply to all equipment specified in the Scheme document and will include CCTV, radio or telephone communication equipment.

Inverclyde Council in partnership with SPT and Transport Scotland will provide and maintain the following facilities for the duration of the Scheme:- 1) Improve passenger Infrastructure and facilities (including key interchanges Greenock, Gourock and Port Glasgow bus stations) selected bus stopping places new shelters, poles, raised kerbs, bus boarders, lighting, and security. Further investigate the roll-out of CCTV monitoring and real time passenger information (RTPI). 2) Investigate Bus priority measures including priority bus lanes, traffic signal priority, bus pre-signals and CCTV route monitoring. 3) Traffic Regulation Orders (TROs) on routes and bus stop Clearways and protections at bus stopping places. 4) Decriminalised parking enforcement. 5) Maintenance of facilities provided for the duration of the Scheme. The Scottish Government has also produced a guide to implementation for Statutory Quality Partnership Schemes and this is available on the web. This document gives clear and concise detail on the background and reasoning behind sqp Schemes. http://www.scotland.gov.uk/resource/doc/277937/0083501.pdf Current Proposed Programme for Inverclyde sqps 1. Briefing note and draft to bus operators September 2014 2. Comments back from bus operators by November 2014 3. Publish Notice by January 2015 4. Formal statutory consultation February 2015 5. Review sqps and re-consult during March 2015 6. Operators sign undertaking March 2015 7. Committee approvals March 2015 8. Inverclyde/SPT make Scheme March 2015 9. Commence Scheme July 2015