VOLUME 26 NUMBER 5 JANUARYMARCH 1996 SPECIAL USE NEW YORK CITY PROJECT TYPE

Similar documents
IBO. Fiscal Brief January Costs Climb for Replacing Parks Displaced by New Yankee Stadium. Now Also Available. IBO s Weblog

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

17 Mathilda Welmering Park Planning Zone 3

TEMPE BEACH PARK - RECOMMENDATIONS

Public Park System. Township of Derry. Providing natural open space for the recreational use of our residents and guests.

The City of Durango Community Interest and Opinion Survey Executive Summary

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

FY20 BUDGET PRESENTATION

North Tonawanda Memorial Pool Feasibility Study. Council Presentation October 23, 2018 PRELIMINARY PRESENTATION

TOWN OF WARWICK LOCAL LAW NO. 4 OF 2015 A LOCAL LAW TO AMEND THE ZONING LAW

Park Design and Location Criteria

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

Madison Metro Transit System

STUDENT NAME: Nakeita Clarke INTRODUCTION. Learning Places Fall 2018 SITE REPORT #la Zuccotti Park

PARKS & BEACHES PROJECTS

and plant some trees, but that was only accomplished through state and federal work-relief programs.

NORTH HEMPSTEAD BEACH PARK MASTER PLAN

SECOR AND RIDGE ROADS MEETING APRIL 29, 2008 Break Out Group Visioning

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Airport Planning Area

Tahoe Donner Association Public Scoping Meeting DUDEK

SHINGLE CREEK SECTION CONTENTS: BOHANON PARK CREEKVIEW PARK SHINGLE CREEK PARK SHINGLE CREEK REGIONAL TRAIL WEBBER PARK

35 Bee Tree Park Planning Zone 3

NORTH OLMSTED PARKS & RECREATION RESERVATIONS

Manhattan s Premiere Waterfront Destination

Chapter 6. Action Program. Heart of the Lakes Area Recreation Plan

THE ALBERTA GAZETTE, SEPTEMBER

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Project Purpose: Project History and Status:

CHAPTER 5. Chapter 5 Recreation Element

HIGH LINE VENUES. Chelsea Market Passage

Frederickson LUAC. Community Plan Update. Parks & Recreation. September 25, 2017

FOLWELL PARK LOCATION AND HISTORY LOCATION

VENTURA PORT DISTRICT

DEVELOPMENT OPPORTUNITY 630 Central Park Yonkers, NY 10704

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

6.5 DURANGO EXCELS AT PARK CONNECTIVITY

Pioneer Events Center

CLEVELAND PARK LOCATION AND HISTORY EXISTING CONDITIONS AND CHARACTER LOCATION

2420 AMSTERDAM AVENUE. OFFICE - 145,000 SF RETAIL - 8,000 SF HOTEL - 93,000 SF/221 Rooms

COMMUNITY LOS PRIORITIES

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

TOWN OF CANANDAIGUA PARKS AND RECREATION MASTER PLAN PUBLIC OPINION QUESTIONNAIRE

Waukee Trailhead Public Art and Amenities Project

Dufferin Jog Elimination Project

ORDINANCE NO. 15,156

D1 January 8, 2014 Public Hearing APPLICANT: HUNT CLUB FARM

Request Conditional Use Permit (Indoor Recreational Facility) Staff Planner Kevin Kemp

A. CONCLUSIONS OF THE FGEIS

MINUTES OF THE OAK CREEK PLAN COMMISSION MEETING TUESDAY, NOVEMBER 8, 2011

National Forests and Grasslands in Texas

SAMTRANS TITLE VI STANDARDS AND POLICIES

20 Grant s Trail. Planning Zone 3. Visit Date: September St. Louis County Parks Master Plan

The Narrows Waterfront Park A Crown Jewel for Southern Brooklyn

Appendix L Technical Memorandum Aesthetics

Town of Danvers Planning Board

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

4.0 FACILITIES INVENTORY

Great Wolf Lodge Fact Sheet & Frequently Asked Questions Potential Location in Gilroy, California 8/30/17

BALCONIES. protect against falling ( Bauteile, die gegen Absturz sichern ) must be observed.

TJ Park and Community Center ::: General Information

Chapter eight. Parks and Recreation. Introduction. Crystal Lake Park District

4MRV Parks Master Plan: Site Analysis

Webber Park Master Plan Charrette Summary

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

HARP AUTHORITY GATEWAY CENTER BOATHOUSE & CHANNEL EXTENSION TO SANTA FE AVENUE. Pueblo City Council Presentation September 17, 2018

Wilds. Headwaters. Lakes. Oxbows. Falls

2014 SPLOST Final Draft County-wide Parks System Rehabilitation

WEST CENTRAL SECTION CONTENTS: FARWELL PARK NORTH COMMONS PARK OLIVER TRIANGLE RUSSELL PARK THEODORE WIRTH REGIONAL PARK VALLEY VIEW PARK WILLARD PARK

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Treats 2,271,000 gallons of greywater from the water park using the constructed lagoon and wetland, saving $8,539 in sewer charges annually.

Town of Castle Rock Parks and Recreation 1

Historic Property Report

CITY PLANNING COMMISSION AGENDA ITEM NOS: 5.A, 5.B STAFF: MICHAEL SCHULTZ

CORPORATE ACCOMMODATION SOLUTIONS

Nelson/Tasman Recreation Cross Boundary Partnerships. Presented by Richard Kempthorne Mayor Tasman District

ORDINANCE NO. JACKSON TOWNSHIP, CAMBRIA COUNTY

Dogpatch Project Descriptions Summary DRAFT UNDER REVIEW January 11, 2017

City of Haslett. City of East Lansing. City of East Lansing

Section 5.16 Parks and Recreation Facilities

Photopoint Monitoring in the Adirondack Alpine Zone

EXISTING CONDITIONS AND CHARACTER

We offer a wide variety of facilities including meeting rooms, two gymnasiums, parks, pavilions, multi purpose fields baseball/softball fields,

Chelsea Piers: branding opportunties

CatExes vs. EAs When and How to Prepare

Pinkowski & Company Proposed Hotel & Convention Center, Tunica, MS 13

1. Overview of Atlantic Highlands and Its Waterfront

hudsonriverpark.org 2017 Brand Activation and Partnership Opportunities

THE RESERVE III AT SUGAR MOUNTAIN, NORTH CAROLINA

FEASIBILITY CRITERIA

Like many transit service providers, the Port Authority of Allegheny County (Port Authority) uses a set of service level guidelines to determine

Design Standards. Utility Manhole Covers

CITY COUNCIL AGENDA MEMORANDUM

RANCHO CIENEGA SPORTS COMPLEX

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

REVITALIZING BUFFALO S WATERFRONT

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

River Parks Trail: Tulsa, Oklahoma

Transcription:

VOLUME 26 NUMBER 5 JANUARYMARCH 1996 SPECIAL USE RIVERBANK STATE PARK NEW YORK CITY PROJECT TYPE A 28-acre park, with 200,000 square feet of building space, located atop the North River Water Pollution Treatment Facility, situated adjacent to the Hudson River in West Harlem, Manhattan. Two bridges provide access to this year-round recreational facility containing an indoor swimming pool complex; multipurpose structures for athletic and cultural activities; playing fields; court games and a running track; picnic areas and a riverfront promenade; an amphitheater; and a restaurant with views up the river. SPECIAL FEATURES Innovative construction State park with multipurpose facilities Resourceful land use Extensive neighborhood involvement OWNER AND DEVELOPER New York State Office of Parks, Recreation, and Historic Preservation Agency Building No. 1 Empire State Plaza Albany, New York 12238 212-387-0271 ARCHITECT Richard Dattner Architect P.C. 154 West 57th Street New York, New York 10019 212-247-2660 LANDSCAPE ARCHITECT Abel, Bainnson, Butz 80 Eighth Avenue New York, New York 10011 212-206-0603

GENERAL DESCRIPTION Riverbank State Park represents the transformation of an unwanted but necessary facility into a heavily used community resource. In 1965, when New York City was ordered to treat its raw sewage before discharging it into the Hudson, the city began the unpopular process of identifying a site for the plant, which ultimately was the western edge of Harlem, on the Hudson River. From the start, the state was committed to an extensive beautification process. By 1978, numerous "rooftop" park and open space development alternatives were evaluated, including Philip Johnson's plan to build a reflecting pool and several plans for elaborate recreational facilities. Ultimately, in 1980, architect Richard Dattner was chosen by a committee of state officials and community representatives to spearhead the design and development of a rooftop state park and recreational facility. Opening in 1993, Riverbank State Park includes five major structures: a 50-meter pool that can be divided into three pool areas by two movable bulkheads; a covered skating rink with ice skating in the winter, roller skating in the summer; a cultural arts center; a multiuse athletic building designed for basketball, volleyball, gymnastics, and martial arts; and a 150-seat restaurant with a 100-seat outdoor terrace. Outdoor facilities include a 25-yard lap pool; an 18-foot-diameter wading pool; four basketball courts; four handball/paddleball courts; four tennis courts; a waterfront amphitheater; a running track surrounding a football/soccer field; a community garden and greenhouse; picnic areas; and a children's playground. The sewage treatment plant is located on a site owned by the city. The state, which owns and operates the park, secured an easement for the air rights above the plant in order to develop the park. The $1 billion sewage treatment plant was in operation for six years before the park opened. DEVELOPMENT PROCESS AND FINANCING Throughout the project's first year of design, planning sessions were held every other week with community residents, local elected officials, and representatives from the major federal, state, and city agencies that would oversee, construct, pay for, and operate the park. The design team inventoried existing parks and recreational facilities, defined public transportation opportunities, studied adjoining community facilities and land use patterns, analyzed the demographics, and studied the technical limits to construction at this difficult location. The residents of West Harlem objected vociferously to the development of the sewage treatment plant, but when they realized that the plant was going to be built despite their objections, they turned their attention to the park itself, hoping to get the amenities the community needed. Transportation and access issues were studied in detail as the site is located 400 feet from a major traffic artery, Riverside Drive, and 58 feet above ground level, requiring a bridge across a railroad right-of-way and the six-lane Henry Hudson Parkway. After extensive studies and meetings with neighborhood groups, a 50-foot-wide, two-lane vehicular bridge with a wide pedestrian walkway was built at West 145th Street. A second bridge, a 40-foot-wide, single-lane bridge for emergency vehicles and pedestrians, connected at West 138th Street, giving the park access at both ends of its nine-block length. Riverbank also can be reached via the 145th Street crosstown bus and a subway station one block east of Riverside Drive at Broadway. Financing for Riverbank's development came from multiple public sources of which 19 percent were federal, 45 percent state, and 36 percent city. At various stages in the eight-year development process, the park was threatened by lack of funds and the state insisted that the project undergo the process of value engineering, which resulted in minor design changes that lowered the overall cost. The major design features and program areas were retained. CONSTRUCTION Most of the design and construction challenges of the site were related to the limited amount of weight that the building below the park could support. Concerns included the load-bearing

capacity of the plant's caissons, columns, and roof spans. Load equations also had to take into account expected live loads (people, vehicles, and snow). And much of the construction had to take place while the sewage treatment plant was fully operational, without interrupting its service, adding to the project's design and development challenges. To comply with targeted load-bearing criteria, the park's buildings could only be made of lightweight steel with metal or tile-faced panels. Sections of the park requiring soil (for plantings) were lightened by using a honeycomb of environmentally friendly (non CFC) Styrofoam panels. The 28-acre roof, which is almost a half-mile long, consists of 14 separate sections that move independently as the roof contracts and expands with changes in temperature. Each of the park's buildings is completely contained within one roof plate to avoid damage from movement at expansion joints. Every park building column is located directly over a corresponding sewage plant column below. Original plans called for the roof to carry 400 pounds per square foot throughout. However, the design team was able to shave off $10 million from the project by selectively identifying the roof plates that needed to support up to a maximum of 400 pounds per square foot, and designing other areas for lighter loads. Weight limitations also made it necessary to limit the depth of the pool to four feet, to use wood instead of concrete for the handball court walls, and to clad the facade in five-eighth-inch-thick prefabricated brick tiles instead of using whole bricks. Because the project's pipes, drains, and electrical conduits had to run over the plant roof, utilities required special attention. Stormwater collected by the park's sophisticated drainage system is channeled through the sewage plant below for treatment. DESIGN The siting of the park's buildings had to take into account the treatment plant's location on the riverbank and the subsequent potential for flooding, wind exposure, views of the river, and the aim not to block river views from nearby buildings. Four major park buildings are clustered inward around a south-facing courtyard for protection against winter winds blowing off the Hudson. Fiberglass skylights are set in pyramids at the four corners of each building. Delineating the bridges are decorative entrance gates that respect Frederick Olmsted's design of Riverside Park, which abuts the entrance. At the 145th Street bridge entrance, the first visible building will house a carousel. The only unfinished part of the park, the carousel is expected to be completed by August 1996. The nearby restaurant is encased by windows and features a large terrace with views up the Hudson River. The cultural building was designed for maximum flexibility with three wings radiating from a central stage area. Motorized bleachers can be retracted or extended to create performance space. The building also houses the administrative offices for the park as well as dressing rooms, lockers, and storage. The covered skating rink is not fully enclosed and is maintained as an ice facility from late fall to early spring. It also has a concrete surface for roller skating during warmer seasons. The rink has bleachers, lockers, skate rentals, and a food concession area. The park is ringed by a promenade high above the Hudson. Knee-high striated concrete along the promenade discourages graffiti. Fifty feet below the athletic building, at river's edge, is a boat landing and an outdoor amphitheater. This location below the park shields neighbors from noisy concerts and events. From there, the sewage treatment plant is highly visible. Its design is inconspicuous, clad in concrete with arched openings that respect the form of a nearby bridge. OPERATION AND MANAGEMENT

Riverbank State Park has become the second most heavily used New York State Park over 3 million park users visited it in 1994. It is operated and managed by the state. Security is provided by state park police, but thus far has not been a notable problem. Closed circuit televisions monitor the entrances and other areas of the park. Though not planned as such, the limited access to the park has proven to be a security bonus as comings and goings can be easily monitored. While the park is not always odor free, when there is a slight odor, it is not one of raw sewage, but rather of chlorine. Originally known as the "smelly park," the odor seems to have decreased as various adjustments to the treatment process have been made, and most of the open tanks have been covered. EXPERIENCE GAINED Careful work with the community, although time consuming, resulted in a park that met the needs of the neighborhood and that has become a popular meeting spot for children and adults. A week of value engineering analysis with the design team and outside engineers led to an $8 million savings while retaining the basic character of the project. Although seemingly incompatible uses, a recreational park and a sewage treatment facility can provide a community with multiple benefits, neutralizing the NIMBY factor. Original plans had called for a full-service restaurant that would draw people to the park to enjoy the views of the Hudson River. However, the first vendor was unsuccessful causing the State Parks and Recreation Department to reconsider its objectives for the restaurant, and to seek a new concessionaire.

PROJECT DATA LAND USE INFORMATION Site Area: 28 acres 1 Gross Building Area: 196,900 square feet LAND USE PLAN Components Square Feet Acres Percent of Site Buildings 196,900 4.5 16.1% Athletic building 34,460 - - Swimming pool 48,000 - - Cultural center building 43,200 - - Skating rink building 50,240 - - Restaurant 9,000 - - Maintenance 12,000 - - Softball playing field - 5.0 17.8 Childrens playground - 1.0 3.6 Running track and field - 5.0 17.8 Community garden and picnic area - 2.0 7.1 Amphitheater - 2.0 7.1 Surface parking - 0.5 2.0 Roadways - 2.5 8.9 Miscellaneous walkways - 5.5 19.6 SOURCES OF FUNDS Amount (In Millions) Percent Federal Funding Sources $23.85 19% USEPA - - Cleanwater Aesthetic Treatment - - State Funding Sources 58.17 45 NYS Pure Water Bond Fund 4.77 - NYS Parks 53.4 - New York City Funding Sources 46.98 36 NYC Department of Clean Water 3.18 - Plant construction funds 43.8 -

Total $129 100% DEVELOPMENT COST INFORMATION (IN MILLIONS) Site Acquisition Costs N/A 2 Site Improvement Costs Sewer/water/drainage $7.0 Paving/curbs/sidewalk 10.2 Landscaping/irrigation 6.3 Roof strengthening 16.0 Total 39.5 Construction Costs Superstructure 48.7 HVAC 3.3 Electrical 4.1 Plumbing/sprinklers 4.0 Graphics/specialties 0.2 Access bridges 20.2 Total 80.5 Soft Costs Architecture/engineering 5.0 Project management 4.0 Total 9.0 Total Development Costs $129.0 Notes: 1 The entire park is located on the rooftop of a 2.2 million-square-foot sewage treatment plant. 2 New York State secured an easement from New York City for the air rights 59 feet above the site for the development of the park. DEVELOPMENT SCHEDULE Site Purchased: 1968 Planning Started: 1968 Construction Started: 1988 Park Opened: 1993 Project Completed: 1993 DIRECTIONS

Directions from LaGuardia Airport: Go west on the Grand Central Parkway to the Triborough Bridge. Turn west on 125th Street and follow to Broadway. Go north on Broadway to West 135th Street. Follow 135th Street one block north to Riverside Drive. Go north on Riverside Drive to entrance at 145th Street. Driving Time: Twenty-five minutes in non-peak-hour traffic from LaGuardia Airport. The Project Reference File is intended as a resource tool for use by the subscribers in improving the quality of future projects. Data contained herein were made available by the Development team and constitute a report on, not an endorsement of, the project by ULI - The Urban Land Institute. Copyright 1996, 1997, by ULI - the Urban Land Institute 1025 Thomas Jefferson Street, N. W. Ste. 500w, Washington, D. C. 20007-5201

DOCUMENT IMAGES