Field excursion 2: ERRC2014 SEE River Project Final Event

Similar documents
Field excursion 4: ERRC2014 SEE River Final Project Event

The Lower Prut Floodplain Natural Park (Romania)

Inland waterways and extreme weather EWENT and ECCONET projects results

Geoscape Toronto The Oak Ridges Moraine Activity 2 - Page 1 of 10 Information Bulletin

Nature Conservation and Regional Development in Floodplains and Wetlands in the Central and Lower Danube River Basin

The Danube Experience

The Vjosa River in Albania

Basic criteria: Final HMWB designation for the Danube River

Population and habitat conservation of Danube salmon (Hucho hucho) in The Sava River (Danube catchment) - Slovenian case -

Europe s wild jewel - The Vjosa River in Albania

Protected Landscape Area Danube Floodplains. State Nature Conservancy of the Slovak Republic

International Sava River Basin Commission - An example of EU/non EU country cooperation in water management

2.1 Physical and Biological Description Matabitchuan River Watershed

Project Data Sheet BASIC PROJECT DATA

The Danube A Stream of Energy

The strategic importance of the Danube for a sustainable development of the region. Transnational pilot-workshop Cross-programme ETC Danube projects

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

Satoquo SEINO (Graduate School of Engineering, Kyushu University, Japan)

Cat Island Chain Background & Access Guide

Transport of Biomass on the Danube River. Bettina Matzner, viadonau 24 June 2014, JRC Danube Bioenergy Nexus Workshop

STREAKED HORNED LARK. Conservation of a threatened species in an industrial landscape. Cat Brown US Fish and Wildlife Service

Case Study: 1. The Clarence River Catchment

EU Strategy for the Danube Region framework for development of inland navigation

3.0 EXISTING PARK & RECREATION SPACE

A pilot flood retention area in La Bassée

THE ICs INTERNATIONAL BRISBANE AREA AQUA PARK PROPOSAL

International Ranger Training Eckartsau, 20th Sept Carl Manzano Nationalpark Donau- Auen

KASKASKIA RIVER NAVIGATION POOL Compartment 12 UNIT 1 Kaskaskia Lock and Dam Lands These lands are now being managed by the Carlyle Lake project

Transboundary River Management in the Danube Basin

Map 1.1 Wenatchee Watershed Land Ownership

Watchorn Provincial Park. Management Plan

BEFORE PROJECT THE BEGINNING

The Rhône, a river shaped by man

A Vision for South Skunk River and Chichaqua Bottoms Greenbelt

THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

Hungary and Slovak Republic cooperate on transboundary Ramsar site

KP Lasnaya 1 River

Damn those dams their effects on stream ecosystems

SAN ANTONIO RIVER IMPROVEMENTS PROJECT. April 27, 2009

Germany - Austria - Cycle Cruise along the Danube Bike and Barge Tour 2018 Individual Self-guided 8 days / 7 nights

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

Appalachian Power Company Smith Mountain Hydroelectric Project FERC No Debris Management Plan

Framework Agreement on the Sava River Basin and its implementation

SAN ANTONIO RIVER IMPROVEMENTS PROJECT. August 6, 2008

Segment 2: La Crescent to Miller s Corner

An Introduction. The Saginaw River/Bay Area of Concern

Tourism and Natura DI Thomas Knoll Knoll Planung & Beratung Vienna, Austria

Excursions & Social Events Programme

Specification for Grip blocking using Peat Dams

Flood Risk Management in Austria

WALKER SWAMP INFORMATION DAY Saturday 23 rd June 2018

Transboundary coopration on water management

LIFE+ URBANCOWS - Restoration of urban coastal meadow complex in Pärnu town, Estonia. Bert Holm, PhD.

Colorado s Instream Flow Program at 40. ICWP Annual Conference October 16, 2013 Denver, Colorado

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN

Phoenix Habitat Restoration Projects

Aapa Mire Wilderness Life

The Living Danube Partnership

Caring for our Lake our Future

Reaching the 2020 Targets with Blue-Green Infrastructure: Member State Perspectives ESTONIA

Michipicoten Island Regional Plan

NON TECHNICAL SUMMARY. Introduction

HYDROELECTRIC POWER PLANTS ON THE LOWER SAVA RIVER

Hydro-Electric Schemes Compliance Report June June 2013

The Austrian Federal Economic Chamber. Representing the Interests of Business

AUSTRIA 2018 DANUBE: SCHARDING OR PASSAU TO VIENNA SELF GUIDED CYCLE TOUR 9 DAYS/8 NIGHTS 350 KM

First penta-lateral biosphere reserve in the World - the story of Mura-Drava-Danube region

Gatwick Stream Riverside Garden Park, Horley

AUSTRIA DANUBE: SCHARDING OR PASSAU TO VIENNA SELF GUIDED CYCLE TOUR 10 DAYS/9 NIGHTS 350kms

PRESPA BIOSPHERE RESERVE MANAGEMENT MACEDONIAN PERSPECTIVE

Sava Commission Activities. DANUBE SKILLS KICK OFF EVENT, February 21, 2017, Bucharest

Finn Creek Park. Management Direction Statement Amendment

GOOSENECK SWAMP INFORMATION DAY - Saturday 14 th December 2013

Montenegro and Albania cooperate on Lake Skadar

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Special nature reserve and ornithological reserve Scope of implementation (local, Local national)

Policy PL Date Issued February 10, 2014

New Ramsar sites for Poland

Sava Commission Activities. KICK-OFF MEETING DANTE, February 17, 2017, Budapest

Title/Name of the area: Chwaka Bay, Zanzibar

Bike + cruise MV Theodor Körner ***+ Passau - Bratislava - Vienna - Passau Self-guided or guided

Attendance Presentation

Call or Village Travel Ladies on the Go (BC Reg 72526)

Summary Report on Workshop

The Isonzo/Soca river basin


EUROPEAN COMMISSION DG XI.D.2. COUNCIL DIRECTIVE 79/409/EEC on the conservation of wild birds. and

WILDERNESS AREA ÖTZTALER ALPS

Outstanding Balkan River landscapes a basis for wise development decisions. Slovenia

VOLUME II APPENDIX F DETAILED PHYSICAL DESCRIPTION OF PROJECT RESERVOIRS AND LANDS

Whitemouth Falls Provincial Park. Draft Management Plan

Submission on the Tukituki Catchment Proposal: EPA reference numbers; NSP 13/ , NSP 13/ , NSP 13/ , NSP 13/02.

MAIN LAKE PROVINCIAL PARK

Stability Pact for SEE. Working Table II. Sava River Basin Initiative

Protection of Ulcinj Saline

European Union Delegation in Albania Organization for Security and Co-operation in Europe Presence in Albania

MCARTHUR SWAMP PLANNING UNIT Pit-McCloud River Watershed

MAY Exploring the South

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:

Transcription:

Field excursion 2: ERRC2014 SEE River Project Final Event Restoration of Danube side-arms at Wachau The very scenic Danube gorge of the Wachau hosts one of the oldest and most attractive cultural landscapes in Europe. It combines steep mountain slopes with extended vineyards and orchards, medieval villages, castle ruins and famous monasteries (World Heritage Site) with river cruising, wine tasting and cycling along the Danube, thus making it a top tourist destination. The attractive character of the Wachau is also due to the fact that it remained one of Austria s two non-impounded Danube sections, though past waterway regulation led to various degradations. Over the last ten years several EU-LIFE projects substantially improved the river-floodplain systems. During this trip we will visit the most impressive reconnected and restored Danube side-arms (improved hydro-morphology, fish migration and flood retention). The project proponents, having consulted their plans with local stakeholders, will explain how they integrated the interests of navigation, flood protection, recreation and local land uses with ecology. The trip will start at the upper Wachau with the 4 km long Schallemmersdorf-Grimsing side-arm system and its restored large gravel banks. For re-establishing ecological dynamics, large sediment volumes had to be excavated from silted-up side-arms and used for restoring shallow bank habitats. Returning back over the Danube, next stop will be the rebuilt mouth of Pielach river, a pre-alpine tributary that is very important for spawning of Danube fish. The travel along the famous cycling route bypasses the restored Schönbühel side-branch. After lunch at the wine village of Rührsdorf, the successful combination of ecological flood protection with modern technical dike structures will be shown. A walk along the restored side-arm will serve to look at Danube salmon habitats and at Rossatz island with its new gravel banks and floodplain forest. Tentative timing: 8:30 Start at from Tech Gate Vienna (conference venue) Lunch at typical restaurant in Wachau (included!) 18:30 Arrival at Tech Gate Vienna Field trip hosts and guides: Arbeitskreis Wachau (Workgroup Wachau for Regional Development) freiwasser Consultants for Ecology, Engineering and Water Management viadonau Austrian waterways agency Danube salmon at spawning site IHG The reconnected Danube side-arms and flood Plain island at Rührsdorf. Markus Haslinger Overall trip organisation by Zinke Environment Consulting for CEE Page 1

Information about the field trip Wachau 1. Area and Overview In the cause of the so-called Major Danube Regulation in the 19th century, the Danube in the Wachau section was canalised by river regulation structures along both river banks and its side arms were cut off. This has led to a disconnection between the river and the floodplains and resulted in the drying up of large wetland areas. Due to the construction of several hydropower plants (especially the one upstream in Melk in 1982) the Danube in this reach has also been subject to river bed degradation, leading to a lowering of water levels and the groundwater table. In the past 10 years, thanks to several LIFE projects, various environmental improvements have been made on the Danube in the Wachau but also along its tributaries Pielach, Melk and Ybbs. The projects include measures on the entire free-flowing section of the Danube between Krems and Melk. The restoration works in the Wachau were done in 2003 2008 within the project LIFE Nature Wachau and were continued with the LIFE+ project "Flusslebensraum Mostviertel - Wachau" (= River Habitat Mostviertel - Wachau) which was launched in 2009 and will conclude in 2014. Actually the grant agreement for the next LIFE+ project Auenwildnis Wachau (=Wilderness Wetland Wachau) was sent by EU Commission in Juli 2014, so this will start in 2015 and is planned to be finished in 2020. The LIFE projects want to achieve measures aiming at the improvement of river habitats especially in two Natura 2000 sites Wachau and "Wachau Jauerling. These measures encourage and promote viable habitats for all fish species of the Danube River, i.e. Appendix II species of the Natura 2000 Directive. The majority of the 57 typical fish species of the Danube are on the red list, making immediate protective measures urgently required. The projects will thus make a significant contribution to the conservation of biodiversity while also improving the ecological functioning of this area in accordance with the EU Water Framework Directive. Prepared by viadonau, October 2014 Page 2

LIFE projects at the Danube: area and overview viadonau Prepared by viadonau, October 2014 Page 3

2. LIFE Nature Wachau 2.1 Organisation Grant: LIFE Nature Wachau (LIFE03 NAT/AT/000009 from 2003) Duration: 01.07.2003 30.06.2008 Overall costs: 5.200.000 Euro, EU funding rate: 50% Project organisation: Lead Partner: Partners: Arbeitskreis Wachau Regionalentwicklung (Workgroup Wachau for Regional Development) viadonau (formerly: Wasserstraßendirektion; Austrian waterways agency) Wachaugemeinden (local communes) NÖ Landesfischereiverband (Lower Austrian Fishermen Association) NÖ Landesregierung (Landschaftsfonds) (Landscape Fund of Lower Austria) Federal Ministry for Agriculture, Forestry, Environment & Water Management 2.2 Key measures Side-arm reconnection Rührsdorf/Rossatz over a total length of more than 3 km and two large inflow openings at Rührsdorf, to ensure thru-flowing of the side-arms almost all year round. The construction of two bridges ensures easy access to the floodplains and orchards between the Danube and its side- arms. Tributary system Grimsing of a length of approx. 1.4 km. The island surrounded by the Danube and its side-arm was left to its natural development and became classified as a nature reserve (Naturschutzgebiet Grimsing ). Downstream (uni-directional) connection of the old arms at Aggsbach, upstream the side- arm Grimsing, Schopperstattlacke and Sportplatzlacke/Anzuglacke through the removal of the deposited fine sediments. Restructuring of Wachau embankments: Disposal of dredged gravel from the navigation channel for the continuous setup of new gravel shores, gravel banks and islands next to the navigation channel. Thereby, the creation of wave-impact protected spawning sites for Danube fish is made possible. The gravel remains in the flowing water system of the Wachau. Between 2003 and the end of 2008, over 5 km of new gravel structures were created. These measures are still being implemented in the areas created for this purpose. Management of dry grassland (e.g. through innovative grazing projects, mowing) Preservation/ improvement of FFH- relevant forests. Prepared by viadonau, October 2014 Page 4

Side-arm reconnection Rührsdorf/Rossatz Tributary system Grimsing Haslinger Prepared by viadonau, October 2014 Page 5

3. LIFE+ Flusslebensraum Mostviertel Wachau (=River Habitat) 3.1 Organisation Grant: LIFE+ Flusslebensraum Mostviertel- Wachau (LIFE07 NAT/AT/000010 from 10.11.2008) Duration: 01.01.2009 30.06.2014 Overall costs: 6.685.000,-, EU funding rate 50% Project organisation: Lead Partner: NÖ Bundeswasserbauverwaltung (Lower Austrian branch of the Federal Water Construction Authority) Associated Partners: viadonau (Austrian waterways agency) Stadtgemeinde Amstetten (municipality) Stadtwerke Amstetten (municipal utility company) Verein Lanius (NGO) Co-Financiers: NÖ Landesfischereiverband (Lower Austrian Fishermen Assoc.) Landschaftsfonds NÖ (Landscape Fund Lower Austria) Federal Ministry for Agriculture, Forestry, Environment & Water Management 3.2 Key measures Side-arm reconnection at Schallemmersdorf over a total length of 2.2 km and one large inflow opening, to ensure thru-flowing almost all year round. The construction of a drivable bridge ensures easy access to the floodplains between the Danube and side- arm Schallemmersdorf. Side-arm reconnection at Schönbühel over a total length of 1.55 km and one large inflow opening to ensure thru-flowing all year round. The island surrounded by the Danube and its side-arm is not accessible anymore and left to its natural development. Downstream (unidirectional) connection of the Biotop Frauengärten through the removal of the deposited fine sediments. Reconstruction of the mouth of River Pielach and of the Lateiner side- arm to restore fish migration routes between the rivers Pielach and Danube At the river Ybbs, improvements of the riverbed and new habitats have been realized. The urban reach in Amstetten has been restored: a fish bypass was constructed around the weir of Greinsfurth, a branched riverbed near Winklarn and a secondary channel at Hausmening have been built. Prepared by viadonau, October 2014 Page 6

3.2.1 Side- Arm Reconnection Schallemmersdorf Reinforcement of existing remains of side- arms on a stretch of approx. 2.2 km in order to recreate habitats for young and spawning fish and wintering areas for adult fish; water bodies became protected from ship induced wave impacts. Year-round flow even at low water periods (LNWL: approx. 5 m³/s, MW: approx. 33 m³/s) with a dynamic sequence of fords and pools (depth at LNWL: ford 1.0 m, pool 2,5 m); natural structure of the riverbank (flat gravel banks, creeks, steep banks) as potential nesting habitat for birds breeding on gravel and steep walls as well as spawning grounds for fish. Reconnection of the side- arm Schallemmersdorf to the existing LIFE project Grimsing over the entire 4 km long side-arm system 2 oxbow lakes connected only downstream for fish species that may want to avoid the stream 2 small lakes for amphibians 1 wildlife refuge for deer Dismantling of three traverses (bottom weirs) Construction of a drivable bridge to replace traverse no. 1 (clearance: 25 m, road width: 3.5 m) Locally adapted reforestation along the tributary Felbringbach for the clearings required to reconstruct the side- arm of Schallemmersdorf (approx. 0.58 ha permanent clearing, approx. 2.7 ha temporary clearing). Side- branch Schallemmersdorf: inflow opening before reconstruction, 2009 viadonau Prepared by viadonau, October 2014 Page 7

Side- arm reconnection Schallemmersdorf, 2014 Haslinger (extremfotos.com) Prepared by viadonau, October 2014 Page 8

3.2.2 Reconstruction of the mouth of river Pielach and Lateiner Altarm Improvement of fish passage from River Danube into River Pielach by extension of the Pielach section at the mouth. Creation of an approximately 200 m long, new river bed to bypass the former outflow situation of River Pielach where a ramp at Danube banks is situated. The River Pielach is the most important tributary of the Danube section Wachau :several fish species migrate into the River Pielach every year to their spawning areas. The most important species is the Danube salmon (Hucho hucho). Establishment of an approximately 120 m long, natural river bed between the Lateiner arm and the new mouth of River Pielach with the aim to enable fish passage. The Lateiner, a former side branch of River Danube, was cut off from other water bodies by constructing the Danube hydro-power dam at Melk. Re-design of the river banks of the Danube at the mouth of the River Pielach. Removal of the stone-blocks and deposition of gravel, which was digged out during the construction work. Aerial view of new mouth of River Pielach Haslinger (extremfotos.com) Prepared by freiwasser, October 2014 Page 9

4. Trip guides and contacts DI Marius Radinger via donau Österreichische Wasserstraßen- Gesellschaft mbh Tech Gate Donau- City- Straße 1 A-1220 Wien T +43 504321-2604 F +43 504321-1050 marius.radinger@viadonau.org Mag. Hannes Seehofer Arbeitskreis Wachau Schlossgasse 3 A-3620 Spitz an der Donau T +43 (0)2713-30000-13 F +43 (0)2713-30000-40 seehofer@arbeitskreis-wachau.at Dr. Thomas Kaufmann freiwasser Währingerstraße 135 / 18 A-1180 Wien T +43 0699/ 18 18 02 18 F +43 01-4037794 kaufmann@freiwasser.at DI Ursula Scheiblechner via donau Österreichische Wasserstraßen- Gesellschaft mbh Servicecenter Wachau Am Schutzdamm 1 A-3500 Krems an der Donau T +43 504321-2614 F +43 504321-4050 ursula.scheiblechner@viadonau.org Prepared by viadonau, October 2014 Page 10