Industry briefing NOVEMBER 2017

Similar documents
Industry briefing April 2018

Industry briefing SEPTEMBER 2016

Industry briefing APRIL 2017

Project update JANUARY 2017 SYDNEY METRO PROJECT OVERVIEW 1

Sydney Metro West A new railway for Western Sydney

Transforming Sydney. Program Overview

4 Transport projects underway in Western Sydney

SYDENHAM TO BANKSTOWN ENVIRONMENTAL IMPACT STATEMENT OVERVIEW

1 Sydney Metro program of works Sydney Metro Northwest Sydney Metro City & Southwest Governance 18

ABOVE + BEYOND PINNACLE OFFICE PARK 4 DRAKE AVENUE, MACQUARIE PARK, NSW

Sydney Metro West A new railway for Western Sydney. Project overview, March 2018

STAKEHOLDER AND COMMUNITY ENGAGEMENT

POSITIVE + OUTLOOK MICROSOFT CAMPUS 1 EPPING ROAD, NORTH RYDE, NSW

3 The growth of Western Sydney

Project overview SEPTEMBER 2015

Planning Approval Consistency Assessment Form

QUALITY + SPACE BINARY CENTRE 3 RICHARDSON PLACE, NORTH RYDE, NSW

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan

FREEING UP MELBOURNE'S BIGGEST BOTTLENECK

Brisbane Metro Infrastructure Association of Queensland 14 February 2018

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City

Project Overview June 2014

Waterloo Over Station Development

CUMULATIVE IMPACTS CHAPTER TWENTY-SIX

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

PRIMARY EDITION. Planning, designing and building Sydney Metro Northwest in your classroom

RETAIL AND COMMERCIAL OFFICE STRATEGY

Figure 3: Global Sydney. Draft Metropolitan Strategy for Sydney. North Sydney CBD. Second Harbour Crossing. Walsh Bay Arts Precinct.

WE ARE RAIL CONNECTING COMMUNITIES

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

WE ARE RAIL CONNECTING COMMUNITIES

Investor Report. Connecting the best of both worlds

North District Plan OVERVIEW

5 Rail demand in Western Sydney

Project update FEBRUARY 2017 SYDNEY METRO CITY & SOUTHWEST PROJECT UPDATE 1

NSW Budget Highlights

Request for Secretary s Environmental Assessment Requirements Sydney Metro City & Southwest Crows Nest Over Station Development

TRANSPORT, TRAFFIC AND PARKING ASSESSMENT REPORT


Newcastle Transport Program Newcastle Light Rail Determination Report

Northern Beaches Transport Action Plan

Update on the Thameslink programme

DIGITAL WESTERN PARKLAND CITY

AIRSPACE ASSESSMENT REPORT

OUR RAIL CAPABILITIES METRO SUBURBAN RAPID TRANSPORT FREIGHT RESOURCES. placing your needs first

IN SUMMARY. Sydney is growing; but the South is not included. A strategic hub?

1-5 RAILWAY STREET, CHATSWOOD FOR SALE

ARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL

JULY 2018 SYDNEY METRO WEST: ACCESSIBILITY MODELLING. Measuring the impact of travel times and station location on job and housing accessibility

Behind the scenes of Queensland s top priority infrastructure project. Michael Glover Chief Financial Officer

PO Box 257 PO Box 257 PARRAMATTA NSW 2124 PARRAMATTA NSW 2124

CBD bus network. a new. begins Sunday 4 October 2015

TALLAWONG STATION PRECINCT SOUTH CONCEPT PROPOSAL STATE SIGNIFICANT DEVELOPMENT APPLICATION

Toga has appointed Urbis to assist in developing a Toga response to the draft District Plans. Urbis has

SEARs strategic context and project need

CAPABILITY STATEMENT TRANSPORT

Smart Cities Plan IMPLEMENTATION. Townsville City Deal. April 2017

7.0 Bus and light rail in Sydney

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013

MELBOURNE METRO RAIL PROJECT EXPANDING MELBOURNE S UNDERGROUND RAIL NETWORK UPDATE FOR RESIDENTS OF THE DOMAIN PRECINCT APRIL 2016

TORONTO TRANSIT COMMISSION REPORT NO.

JUNE 2007 UPDATE REPORT SYDNEY METROPOLITAN STRATEGY

Why the. Building for growth. West Metro. is vital

CHATSWOOD TO SYDENHAM CENTRAL WALK MODIFICATION SUBMISSIONS REPORT

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Sydney CBD - Partnering with the coach industry for solutions

The North West Growth Precinct

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

Edinburgh Waverley capacity upgrade

RE: Victoria Road upgrade (RTA December 2007). Thank you for the briefing from your department and the invitation to comment on the above.

Draft Greater Sydney Region Plan

Shaping the Future of the Railway

Improve Sydney Public Transport (ISPUT) Improve Sydney and Rural Railways (IMSARR) EXPANSION AND UPGRADE OF THE SYDNEY METROPOLITAN AND

The State of Transport in Macquarie Park

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

Strategic Transport Forum

County of Cumberland Plan Sydney Region Outline Plan

Shaping Sydney Strategies and Action Plan

A summary report on what the community told us

Overview. Draft North District Plan. November Local Government Areas: Hornsby Hunter s Hill Ku-ring-gai. Lane Cove Mosman Northern Beaches

Draft Greater Sydney Region Plan

The West of England Partnership is the sub-regional partnership formed by the four councils working together with partners

TRANSPORT FOR A CONNECTED CITY

London and Crossrail 2. Chris Moores Transport for London

Directions. for a Greater Sydney

Draft West Central District Plan. Overview. November Local Government Areas: Blacktown Cumberland Parramatta The Hills

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Central District CENTRAL

Concord Road Interchange. Standard hours of work

TERMINAL DEVELOPMENT PLAN

Creating Connections in Niagara Region

WESTERN SYDNEY PARKLANDS PLAN 2020 CORPORATE

FEDERATION SQUARE MELBOURNE, AUSTRALIA CORPORATE PLAN

Connecting Sydney Olympic Park and GPOP with Greater Sydney. Final Summary Report 29 May 2017

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

PCAL Case Study Retail Areas: Rouse Hill Town Centre

STRATEGIC + LOCATION CAMPUS BUSINESS PARK 350 PARRAMATTA ROAD, HOMEBUSH NSW

Overview. Draft Central District Plan. November Local Government Areas: Bayside Burwood Canada Bay. Inner West Randwick Strathfield

Submission in response to. Towards our Greater Sydney 2056

Transcription:

Industry briefing NOVEMBER 2017

SYDNEY METRO AUSTRALIA S BIGGEST PUBLIC TRANSPORT PROJECT A new stand-alone railway, this 21st century network will revolutionise the way Sydney travels. Services start in 2019, using Sydney s new generation of fully-automated metro trains. From Sydney s booming North West region, metro rail will run under Sydney Harbour, through new underground stations in the central business district (CBD) and beyond to the South West by 2024 Customers won t need a timetable when Sydney Metro opens they ll just turn up and go. When Sydney Metro is extended into the CBD, there will be ultimate capacity for a metro train every two minutes in each direction under the city a level of service never before seen in Sydney. Sydney Metro, together with signalling and infrastructure upgrades across the existing Sydney rail network, will increase the capacity of train services entering the Sydney CBD from about 120 an hour today to up to 200 services beyond 2024. That s an increase of up to 60 per cent capacity across the network to meet demand. Sydney Metro is made up of: Sydney Metro Northwest formerly the 36-kilometre North West Rail Link. This $8.3 billion project is now under construction and will open in the first half of 2019 with a metro train every four minutes in the peak. Construction is progressing rapidly, with Australia s first fully-automated train arriving for testing in October 2017. Sydney Metro City & Southwest a new 30-kilometre metro line extending metro rail from the end of Sydney Metro Northwest at Chatswood under Sydney Harbour, through new CBD stations and south west to Bankstown. It is due to open in 2024 with the ultimate capacity to run a metro train every two minutes each way through the centre of Sydney. Sydney Metro West - Sydney s next big railway infrastructure investment proposed to be delivered by the second half of the 2020s. This world-scale city-shaping project would link the CBDs of Parramatta and Sydney and communities along the way. 2 The Sydney Metro Trains Facility at Rouse Hill

Cudgegong Road Rouse Hill Kellyville M7 Bella Vista Norwest Showground Castle Hill Cherrybrook Opening 2019 M2 Epping Macquarie University Macquarie Park M4 Parramatta North Ryde Chatswood Crows Nest Sydney Olympic Park Early planning underway Victoria Cross Barangaroo Bays Precinct Martin Place Pitt Street Central Campsie Hurlstone Park Bankstown Lakemba Canterbury Belmore Punchbowl Wiley Park Dulwich Hill Marrickville Sydenham Waterloo Opening 2024 Sydney Metro alignment SYDNEY METRO INDUSTRY BRIEFING NOVEMBER 2017 3

WORKING WITH INDUSTRY Industry engagement has tested, refined and optimised both Sydney Metro Northwest and Sydney Metro City & Southwest by harnessing industry expertise and world best practice. We re looking forward to strengthening relationships with our industry partners as Sydney Metro West is further developed. Industry engagement has taken place in parallel with the community consultation process. It has included industry briefings and market sounding with organisations from Australia and overseas. Industry engagement timeline 2015 Raise awareness and understanding of Sydney Metro City & Southwest Commence a structured industry engagement and market sounding process Communicate the draft reference delivery strategy Conduct focussed market sounding for the Tunnel and Station Excavation Works (TSE) package Outcome Refinement of the Sydney Metro City & Southwest Project Delivery Strategy 2016 Update industry on Sydney Metro City & Southwest and communicate the Project Delivery Strategy Continue market sounding with a focus on the Central Station Main works (CSM), Sydenham Station and Junction works (SSJ) and Southwest Stations and Corridor (SSC) packages Outcome Further refinement of the Sydney Metro City & Southwest Project Delivery Strategy Release of the TSE package to market, the first major contract package 2017 April 2017 industry briefing Communicate progress of the development of Sydney Metro City & Southwest Provide details of the updated Project Delivery Strategy Conduct focussed market sounding for the Line-wide, Integrated Station Developments and Station Construction packages Project progress TSE contract awarded for Sydney Metro City & Southwest SSJ contract awarded for Sydney Metro City & Southwest Procurement underway for CSM and SSC for Sydney Metro City & Southwest Today s industry briefing Communicate the updated Sydney Metro City & Southwest Project Delivery Strategy Outline timing of next steps, including upcoming procurement processes Introduce Sydney Metro West, including an update on the current industry engagement process NEXT STEPS Progress delivery of Sydney Metro City & Southwest Progress procurement of the next major contract packages, including Line-wide, Lifts and escalators, Integrated Station Developments and Station Construction Continue industry engagement for Sydney Metro West and develop delivery strategy options to test with industry via market sounding in 2018 4

SYDNEY METRO CITY & SOUTHWEST UPDATED PROJECT DELIVERY STRATEGY Following further work by the project team and taking into account feedback from industry engagement, the Project Delivery Strategy has been updated. The Project Delivery Strategy outlines how the Project will be taken to market including sequencing, timing, duration, funding and risk. Under the previous strategy, the construction of the underground stations and the buildings above them were to be delivered as separate contract packages. Under the new Project Delivery Strategy they will be combined, with Integrated Station Development packages to go to market at Pitt Street, Martin Place, Victoria Cross and Crows Nest stations. This means as the new metro stations are built underground, new buildings will be able to be built above them at the same time. This will help reduce community impacts and the length of time required to deliver the outcomes of integrated station developments. Bankstown Punchbowl Wiley Park Lakemba Belmore Campsie Canterbury Hurlstone Park Dulwich Hill Marrickville Sydenham Waterloo Central Pitt Street Martin Place Barangaroo Victoria Cross Crows Nest Chatswood TSOM Trains, Systems, Operations and Maintenance Line-wide Integrated Station Developments Rail Corridor Development to be confirmed Pitt Street Station and Development Martin Place Station and Development Victoria Cross Station and Development Crows Nest Station and Development SSC Southwest Station and Corridor AWARDED SSJ Sydenham Station and Junction Waterloo CSM Station Central Station Main TSE Tunnels and Station Excavation AWARDED Barangaroo Station Enabling and other works AWARDED AWARDED Demolition works Sydney Yard Access Bridge Lifts & escalators framework contract SYDNEY METRO INDUSTRY BRIEFING NOVEMBER 2017 5

PROJECT CONTRACT PACKAGING APPROACH Package TSOM: Trains, Systems, Operations and Maintenance Line-wide Integrated Station Developments: (Crows Nest, Victoria Cross, Martin Place and Pitt Street) Overview of scope Rolling stock Signalling system Central control Communications and other systems Radio systems Platform screen doors and mechanical gap fillers Depot (including stabling) and operations control centre systems integration, testing and commissioning Operations and maintenance Tunnel ventilation Track and tunnel services (drainage, lighting, fire systems, low voltage supplies), combined services Stabling High voltage power supply Overhead line and traction supply Excavation of remaining station shafts (to extent not undertaken by TSE contractor) Station structure Station fit out, including mechanical and electrical Development structure Development fit out, including mechanical and electrical Station Construction: (Waterloo and Barangaroo) Excavation of remaining station shafts (to extent not undertaken by TSE contractor) Station structure up to podium level (Waterloo) Station fit out, including mechanical and electrical TSE: Tunnels and Station Excavation works Demolition and site preparation (via novation of demolition contractors) Tunnel boring and lining Cavern mining and lining Excavation of station shafts (extent varies at different station locations) Station structure at Barangaroo only CSM: Central Station Main works Customer continuity works Temporary decommissioning of platforms and reinstatement Metro box excavation Central Walk eastern concourse and entry Station structure and fit out, including mechanical and electrical Services relocation SSC: Southwest Station and Corridor works SSJ: Sydenham Station and Junction works Station works (including demolition, upgrades) Bridge and non station civil works Services buildings and facilities Electrical works (low voltage) Cable and services routing Track and other rail infrastructure Station works Services buildings and facilities Services adjustments and relocations (rail and non rail) Signalling Track and other rail infrastructure (including stageworks) 6

SYDNEY METRO CITY & SOUTHWEST PROJECT TIMELINE MILESTONE COMMENCING Early consultation Q1 2015 ü Project scope consultation Q2 2015 ü Industry engagement Q2 2015 ü Lodgement of State Significant Infrastructure Application Report (SSIAR) Q4 2015 Reference delivery strategy Q4 2015 ü Start major contract procurement Q2 2016 ü Chatswood to Sydenham EIS exhibition Q2 2016 ü Sydenham to Bankstown planning commenced Q3 2016 ü Augmentation proposal request Q4 2016 ü Chatswood to Sydenham EIS approval Q1 2017 ü Procurement of independent certifiers and delivery partners ü 2016 2018 ü Start construction 2017 ü Sydenham to Bankstown EIS exhibition Q3 2017 ü First tunnel boring machine 2018 Operations 2024 Major contract packages indicative timing PACKAGE INDICATIVE START DATE Tunnel and Station Excavation works (TSE) Q2 2016 ü Early and enabling works 2016 2017 ü Trains, Systems, Operations & Maintenance (TSOM) Q4 2016 Central Station Main works (CSM) Q1 2017 ü Sydenham Station and Junction works (SSJ) Q1 2017 ü Southwest Station and Corridor works (SSC) Q2 2017 ü Integrated Station Developments and Station Construction Q4 2017 Line-wide Q4 2017 ü ü ü SYDNEY METRO INDUSTRY BRIEFING NOVEMBER 2017 7

Project Delivery Strategy TSE SSJ CSM SSC Enabling works Tunnels and Station Excavation works Sydenham Station and Junction works Central Station Main works Southwest Station and Corridor works N Bankstown Punchbowl Wiley Park Lakemba Belmore Campsie Canterbury Hurlstone Park Dulwich Hill Marrickville Sydenham Other contracts (not shown) include: Enabling works: Demolition Investigation Epping turnback High voltage construction power Utility relocations and protection Mobile phone tower relocations Northern Corridor works Lifts and escalators framework contract Sydenham area detail 1st N 8

TSOM Line-wide Integrated Station Developments (Four contracts) Station Construction (Two contracts) Trains, Systems, Operations and Maintenance Chatswood Northern Corridor Works Waterloo Central Pitt Street Martin Place Barangaroo Victoria Cross Crows Nest Central Station area Marrickville dive site and tunnel portal Sydney Yard Access Bridge 2nd Sydney Metro Trains Facility South N SYDNEY METRO INDUSTRY BRIEFING NOVEMBER 2017 9

SYDNEY METRO WEST New metro rail will become the fastest, easiest and most reliable journey between the Sydney and Parramatta CBDs. This means Sydney Trains and inter city services will be freed up for customers in the city s outer west in areas like Blacktown, Penrith and the Blue Mountains. In turn, these services will become more reliable, with increased capacity, reduced crowding and faster travel times. The NSW Government will integrate transport and land use planning along the corridor, with the new metro railway line expected to be built largely underground. Sydney Metro West will support existing and planned urban renewal across the corridor. It will support growth in housing and jobs, providing access to multiple destinations and facilitate active transport and liveable urban centres around high capacity public transport. Sydney Metro West also offers opportunities to explore innovative Metro product solutions and lessons learned from across the globe to develop this globally significant infrastructure project. 10 Aerial view of Parramatta

INDUSTRY ENGAGEMENT AND MARKET SOUNDING STAGES Transport for NSW is undertaking the first stage of community, stakeholder and industry consultation, which will help shape Sydney Metro West s development, including determining the alignment and potential station locations. Transport for NSW is currently engaging industry to provide feedback and help define Sydney Metro West s transport and land use objectives. The expertise and knowledge from industry, both locally and internationally, will inform the definition of the Project, and ensure a market led and innovative approach to the development of Sydney Metro West. Stage 1 of the industry engagement process is currently underway to inform the project definition report and preliminary delivery strategy concepts and options. Stage 2 of the industry engagement process will occur in 2018 and includes a series of one-onone meetings with industry participants. Market sounding in 2018 will focus on how Sydney Metro West could be packaged, procured and delivered to inform the delivery strategy and the final business case. The assessment of strategic options for additional station locations and precinct development within the Sydney Metro West study area will also occur as part of market sounding in 2018. Industry engagement stage 1 Industry engagement stage 2 Q3 2017 Registration of interest Q4 2017 Industry engagement meetings, written submissions and report Q4 2017 Preliminary delivery strategy concepts and options Q4 2017 Initial strategic options process Q1 2018 Industry briefing and market sounding process Q1 & Q2 2018 Preliminary strategic options process Q2 2018 Delivery strategy Sydney Metro Industry Briefing April 2017 SYDNEY METRO INDUSTRY BRIEFING 2017 11

Further information Web sydneymetro.info Email industry.sydneymetro@transport.nsw.gov.au Facebook.com/sydneymetro Information in this document has been prepared in good faith and is correct at the time of printing, November 17. Sydney Metro 2017 This document provides a general overview of Sydney Metro, including Sydney Metro Northwest, Sydney Metro City & Southwest and Sydney Metro West. It also outlines the proposed approach to precinct and property development opportunities associated with Sydney Metro. The document outlines progress made to date and the timeline for the next stages. As further environmental assessments and detailed engineering studies are completed, and additional input from industry is received and considered, actual construction methodologies and procurement timeframes will be confirmed. 102011 Printed on environmentally responsible paper manufactured using Elemental Chlorine Free (ECF) pulp sourced from certified, well managed forests. 17159 Nov17