CONTEXT MAP COMPREHENSIVE RECREATIONAL MASTER PLAN. to Virginia Civil War Trails. Riverside Park. Mountains to Sea Trail. Rowe Environmental Park

Similar documents
PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

STORY MILL COMMUNITY PARK

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

NEW MEADOWS PARK PROPOSED MASTER PLAN

MERRYMEETING TRAIL A&B. Topsham. Head of Tide Park Trail (Tedford Road to Cathance Road) Length: 1.79 Miles Anticipated Cost: $719,000.

Trail Feasibility Study

M E S T I Z O C U R T I S P A R K

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

6.5 DURANGO EXCELS AT PARK CONNECTIVITY

Acquisition in fee simple of approximately one-half acre of property on the shore of Spring Lake to expand the Lakeside Beach Park.

CITY COUNCIL WORK SESSION MEETING AGENDA April 17, :30 6:30pm

City of Sierra Madre STUDY AREA PROFILE

Mason Street Bike/Pedestrian Trail Project

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority.

Riverside County Transportation Department Summary of Bids

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

Capital Prioritization

City of Haslett. City of East Lansing. City of East Lansing

NORTH OF BROADWAY SECTION CONTENTS: COTTAGE PARK FARVIEW PARK GLEN GALE PARK IRVING TRIANGLE JORDAN PARK NEWTON PARK PERKINS HILL PARK

PARKS & BEACHES PROJECTS

35 Bee Tree Park Planning Zone 3

7. Plan Implementation

Welcome to the future of Terwillegar Park a Unique Natural Park

17 Mathilda Welmering Park Planning Zone 3

Table B-1: P&RS Park and Facility Inventory by Classification 1 Outdoor Recreation Amenities Park Structures

Gale Rossi Facilities and Maintenance Manager, City of Albany 548 Cleveland Avenue Albany, CA 94710

Rating: 5.0 (scale of 1-10)

Unincorporated Quartz Hill -Lancaster- Palmdale STUDY AREA PROFILE

4.0 FACILITIES INVENTORY

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Corktown Parks. Public Meeting. City of Toronto

DEPARTMENT OF PARKS & RECREATION

National Recreation Trail Update Form

City of Walnut STUDY AREA PROFILE

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

HOMER GLEN AREA COMMUNITY PARKS

Assessing Your Trails, Keeping Them Safe and Enjoyable

OR MISSION TRAIL ELEMENTARY

Outdoor Developed Areas

What s covered. What s not covered. Options for those not covered. ABA Coverage

2014 SPLOST Final Draft County-wide Parks System Rehabilitation

The Baker/Carver Regional Trail is intended to

National Recreation Trail Application for Designation

Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming

Corabelle Park. Inventory. Future Development

Trail Etiquette. Hours of Operation. Trail Accessibility

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Chapter eight. Parks and Recreation. Introduction. Crystal Lake Park District

Southwest Quadrant Distinctive Features

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND "SANDBOX"

B10. Agate Beach State Recreation Site

RIDGEFIELD PARKS February 2016

ADDENDUM NO. TWO AB

Villages at Buffalo Run East

SECTION 4. PUBLIC RECREATION

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Camping (Primitive) Camping (RV) Electrical Potable Water Grill Established Fire Pit Picnic Table

LANDING S PARK CONCEPTUAL PLAN HAMILTON ANDERSON JANUARY City of Novi, Michigan. The Park at 13 Mile and Old Novi Road

Unincorporated East Rancho Dominguez STUDY AREA PROFILE

City of Glendale - Southside STUDY AREA PROFILE

Community Input Meeting. Fairgrounds Master Planning Update. January 7, 2016, 7 pm

MONTGOMERY TOWNSHIP OPEN SPACE & PATHWAYS COMMITTEE

West Orange Trail. Clean, Green, Fun!


Header i

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

Park Design and Location Criteria

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

Eakin Community Park. Getting There

Reserve Reports Providence Master Homeowners Association

Section XIII. Cost Estimates

City of LA Valley Glen - North Sherman Oaks STUDY AREA PROFILE

Unincorporated Charter Oak Islands - Covina - Covina Islands STUDY AREA PROFILE

Lincoln Woodstock. Riverfront Park and Trail System. Project Description

THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

Unincorporated Northeast Antelope Valley STUDY AREA PROFILE

East Carolina Council Facility Study East Carolina Scout Reservation Camp Boddie Pamlico Sea Base

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

Lake Apopka Trail Loop Design Guidelines

Railroad Safety Trail

Northeast Quadrant Distinctive Features

River Parks Trail: Tulsa, Oklahoma

Business Item No

MORGAN CREEK GREENWAY Final Report APPENDICES

Town of Queen Creek Park and Facility Rentals Click on each park or facility for additional information

CAPITAL PROJECTS LIST Pierce County Parks Impact Fee Working Group

CHAPTER 5. Chapter 5 Recreation Element

4. Improvement Plan Elements

TJ Park and Community Center ::: General Information

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

SIGNATURE ELEMENTS BICYCLE RACKS & FENCING NSSD HWY. 61 CAIRN & TRAIL SIGNS INTERPRETIVE KIOSK

Webber Park Master Plan Charrette Summary

10.3 TRAIL DESIGN STANDARDS

DRAFT. Dorabelle Campground Rehabilitation

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

01. PRIMARY MONUMENT WAYFINDING, TYP. 03. RULES/REGULATIONS, INTERPRETIVE SIGN, TYP. PARK MAP, WAYFINDING

THE BIG PICTURE. Week of March 11, City of Buda Accepting Applications For Boards and Commissions

Transcription:

OMPREHENSIE REREATIONAL MASTER PLAN ONTEXT MAP to irginia ivil War Trails NOT TO SALE iver tr rara A Riverside Mountains to Sea Trail Rowe Environmental School The Ararat River reenway is located along the eastern edge of the ity of Mount Airy, North arolina and has potential for connections to regional trails such as the Mountains to Sea Trail and the irginia ivil War Trails. (Image at left courtesy of the Surry ounty Master Plan). D EE LO P M E N T O ST S 11

ARARAT RIER REENWAY reenway Phase 1: North Segment - Riverside to Puckett property (end of ity property control) Riverside Improvements + 3,975 linear feet of greenway trail development) Quantity ost Unit Subtotal Riverside Improvements Develop naturally surfaced trails on hillside 540 $2.00 lf $1,080.00 Repave and restripe existing parking lot 30,000 $0.90 sf $27,000.00 Repave existing Oak Street (canoe/kayak access road) 6,750 $0.90 sf $6,075.00 Asphalt and stone base for new parking, loading, and canoe access 20,500 $2.50 sf $51,250.00 turnaround Install vehicular lockable gates 3 $12,000.00 each $36,000.00 Install 5' wide, 4" depth concrete sidewalk 1,000 $3.00 sf $3,000.00 anoe/kayak access 1 $3,000.00 each $3,000.00 Light existing soccer field (including installation) 1 $90,000.00 each $90,000.00 Signage (replace existing entrance sign + regulatory/warning signs) 1 $12,900.00 allowance $12,900.00 Install 4' height 3-rail wood fence 2,800 $15.00 lf $42,000.00 Install 8' wide fence gate (2-4' wide sections) 3 $500.00 each $1,500.00 6' Thermoplastic coated metal bench with back 2 $400.00 ea $800.00 Large trash receptacles 13 $700.00 ea $9,100.00 Riverside subtotal $283,705.00 Quantity ost Unit Subtotal reenway Trail Development (3,975 lf) reenway trail site preparation (clearing, grubbing, erosion control) 3,975 $12.00 lf $47,700.00 10' wide multi-use asphalt trail + 2' wide gravel shoulder 3,475 $41.00 lf $142,475.00 10' wide concrete trail (beneath Pine Street bridge) 500 $300.00 lf $150,000.00 orrugated metal culvert (20 lf)* 1 $1,040.00 each $1,040.00 Weighted/lockable gates 1 $3,000.00 pair $3,000.00 6' Thermoplastic coated metal bench with back 2 $400.00 each $800.00 reenway trail signage (regulatory/warning signs) 1 $3,900.00 allowance $3,900.00 reenway trail kiosk 1 $3,700.00 allowance $3,700.00 reenway trail subtotal $352,615.00 Subtotal North $636,320.00 ontingency 20% $127,264.00 TOTAL Phase 1: North Segment - Riverside to Puckett property $763,584.00 * osts reflect 48" diameter corrugated metal pipe, however, formal design may determine smaller size is adequate. Example of greenway trail signage along the American Tobacco Trail in Durham, North arolina. Example of a trailhead along the West Orange Trail in Florida. 1 2 D EE LO P M E N T O ST S

OMPREHENSIE REREATIONAL MASTER PLAN Future connection to Lovillʼs reek reenway at rar Driv e A er Riv PHASE 1: NORTHERN SEMENT SALE: 1 =300ʼ Rive rside 15 acre Riverside 3,875 linear feet of greenway trail Riverside Mulched nature trails on hillside 10ʼ wide asphalt greenway trail Begin greenway trail Existing gravel parking lot Existing picnic shelter LEEND Trailhead New lights for existing soccer field Amenity expansion area Existing basketball court anoe/kayak access 6ʼ wide mulch nature trail Picnic area Future connection Ararat River 10ʼ wide asphalt greenway trail reenspace orrugated metal culvert Pine Street 8ʼ-0 min. Existing asphalt parking lot Future skate park Existing Build-A-Dream Playground Existing shelter and restrooms anoe access turnaround ross-section KEY MAP ing area 10ʼ wide concrete greenway trail eetn r t S tio 1 N 03 e -sec n i P oss r Public Works Department Riverside Rowe Environmental School N D EE LO P M E N T O ST S 13

ARARAT RIER REENWAY reenway Phase 2: enter Segment - Puckett property to south of Hamburg Street Rowe Environmental enter + 4,875 linear feet of greenway trail development) Quantity ost Unit Subtotal Rowe Environmental enter Lockable vehicular gate 1 $12,000.00 allowance $12,000.00 Primary path: 10' wide asphalt trail 590 $35.00 lf $20,650.00 Secondary path: 6' wide mulch nature trail 1,000 $7.00 lf $7,000.00 Environmental enter (shelter/restrooms) 1 $175,000.00 allowance $175,000.00 Utilities/Toilets/Sanitary onnection* 1 $150,000.00 allowance $150,000.00 anoe access 1 $1,000.00 each $1,000.00 rading 1 $3,000.00 allowance $3,000.00 Asphalt parking and stone base (40 parking spaces maximum) 11,000 $2.50 sf $27,500.00 Landscaping (entrance, parking, grass) 1 $14,000.00 allowance $14,000.00 Picnic areas (2 tables, benches, trash receptacles) 4 $5,000.00 each $20,000.00 Signage 1 $5,000.00 allowance $5,000.00 6' Thermoplastic coated metal bench with back 2 $400.00 ea $800.00 Rowe Environmental enter subtotal $435,950.00 Quantity ost Unit Subtotal reenway Trail Development (4,875 lf) reenway trail site preparation (clearing, grubbing, erosion control) 4,875 $12.00 lf $58,500.00 10' wide multi-use asphalt trail + 2' wide gravel shoulder 4,625 $41.00 lf $189,625.00 10' wide concrete trail (beneath Hamburg Street bridge) 250 $300.00 lf $75,000.00 orrugated metal culvert (20 lf)** 2 $1,040.00 each $2,080.00 Weighted/lockable gates 1 $3,000.00 pair $3,000.00 Pre-fabricated pedestrian bridge (10' wide, 60' span max.) 1 $75,000.00 each $75,000.00 6' Thermoplastic coated metal bench with back 2 $400.00 each $800.00 reenway trail signage (regulatory/warning signs) 1 $3,900.00 allowance $3,900.00 reenway trail subtotal $407,905.00 Subtotal enter $843,855.00 ontingency 20% $168,771.00 TOTAL Phase 2: enter Segment - Puckett property to south of Hamburg Street $1,012,626.00 * Additional utility costs may be incurred. ** osts reflect 48" diameter corrugated metal pipe, however, formal design may determine smaller size is adequate. Example of educational signage along the greenway in reensboro, North arolina. Holiday Nature enter along the White River in Indianapolis, Indiana. 1 4 D EE LO P M E N T O ST S

OMPREHENSIE REREATIONAL MASTER PLAN PHASE 2: ENTER SEMENT SALE: 1 =300ʼ 22 acre Rowe Environmental 4,875 linear feet of greenway trail Hamburg Street ross-section ive at R 8ʼ-0 min. Rowe Environmental r r Ara LEEND Trailhead Mulched nature trails Potential future land acquisition for expansion of Rowe Environmental Environmental enter Pre-fabricated pedestrian bridge 6ʼ wide mulch nature trail Picnic area Future connection Ararat River 10ʼ wide asphalt greenway trail reenspace orrugated metal culvert KEY MAP t ree t S burg ction Hamross-s e Hamburg Street anoe/kayak access Mount Airy Middle School Future asphalt parking Asphalt parking lot (40 spaces) Two-lane asphalt entrance road Riverside 10ʼ wide concrete greenway trail Rowe Environmental School N D EE LO P M E N T O ST S 15

ARARAT RIER REENWAY reenway Phase 3: South Segment - South to School School + 3,500 linear feet of greenway trail development) Quantity ost Unit Subtotal School rading/stock piling 27 $1,500.00 acre $40,500.00 Sediment and erosion control 1 $10,000.00 allowance $10,000.00 ehicular crossing 1 $16,000.00 allowance $16,000.00 Asphalt drives 22,000 $2.20 sf $48,400.00 ravel parking and drives 142,000 $0.75 sf $106,500.00 Striping 1 $3,000.00 allowance $3,000.00 Soccer Fields (includes fine grading) 4 $20,000.00 each $80,000.00 Irrigation and equipment 1 $70,000.00 allowance $70,000.00 "Premier soccer field" lighting 1 $110,000.00 allowance $110,000.00 Maintenance building 600 $90.00 sf $54,000.00 oncession building (restrooms, shelter) 1,800 $110.00 sf $198,000.00 Utilities/Toilets/Sanitary onnection* 1 $150,000.00 allowance $150,000.00 Lockable gate and columns 1 $12,000.00 allowance $12,000.00 Paved loop trail (10' wide asphalt) 3,200 $35.00 lf $112,000.00 anoe access 1 $1,000.00 each $1,000.00 Asphalt parking and stone base (40 parking spaces maximum) 11,000 $2.50 sf $27,500.00 Landscaping (trees and turf) 1 $90,000.00 allowance $90,000.00 Signage 1 $16,000.00 allowance $16,000.00 School subtotal $1,144,900.00 Quantity ost Unit Subtotal reenway Trail Development (3,500 lf) reenway trail site preparation (clearing, grubbing, erosion control) 3,500 $12.00 lf $42,000.00 10' wide multi-use asphalt trail + 2' wide gravel shoulder 3,000 $41.00 lf $123,000.00 10' wide concrete trail (beneath S. Renfro Street/US 52 Bus. bridge) 500 $300.00 lf $150,000.00 orrugated metal culvert (20 lf)** 1 $1,040.00 each $1,040.00 Weighted/lockable gates 1 $3,000.00 pair $3,000.00 6' Thermoplastic coated metal bench with back 2 $400.00 each $800.00 reenway trail signage (regulatory/warning signs) 1 $3,900.00 allowance $3,900.00 reenway trail subtotal $323,740.00 Subtotal South $1,468,640.00 ontingency 20% $293,728.00 TOTAL Phase 3: South Segment - South to School $1,762,368.00 * Additional utility costs may be incurred. ** osts reflect 48" diameter corrugated metal pipe, however, formal design may determine smaller size is adequate. roup gathering at a picnic shelter in Floyd Lamb State, Nevada. Fishing is another activity enjoyed along the Ararat River (Photo Floyd Lamb State, Nevada). 1 6 D EE LO P M E N T O ST S

OMPREHENSIE REREATIONAL MASTER PLAN PHASE 3: SOUTHERN SEMENT SALE: 1 =300ʼ 33 acre School trail 3,500 linear feet of greenway LEEND Trailhead School River Ararat reet o St enfr ection S. Rross-s Elementary School S. Renfro Street ross-section 6ʼ wide mulch nature trail Picnic area Future connection Ararat River 10ʼ wide asphalt greenway trail reenspace orrugated metal culvert 10ʼ wide concrete greenway trail Asphalt entrance drive KEY MAP (3) Recreational soccer fields 8ʼ-0 min. oncessions building ravel parking lot (typ.) Riverside Rowe Environmental Premier soccer field 10ʼ wide asphalt trail loop End of greenway trail anoe/kayak access School N D EE LO P M E N T O ST S 17

ARARAT RIER REENWAY This page left intentionally blank. 1 8 D EE LO P M E N T O ST S