RSPO NOTIFICATION OF PROPOSED NEW PLANTING

Similar documents
RSPO NOTIFICATION OF PROPOSED NEW PLANTING

PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES

COMMISSION IMPLEMENTING REGULATION (EU)

Please find our reply to you request to respond to the report remitted to the RSPO of which we received on Thursday, 13 February 2014.

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

INDONESIA TOURISM INVESTMENT INVITATION

Sasi and the Dynamics of Marine Conservation Governance in Raja Ampat, West Papua, Indonesia : Preliminary Finding

PART III ALTERNATIVE TRADING SYSTEM (SPA)

ICAO Regional Seminar on CORSIA Session 1: Overview of CORSIA CORSIA Administrative Aspects and Timelines

WWF view on the EU Eco-label and APP products December 2011

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules

BEST PRACTICES GUIDE v1.0

YOUR REGULATORY COMPLIANCE GUIDE.

INDONESIA TOURISM INVESTMENT INVITATION

Tax Contribution Report 2017

Official Journal of the European Union L 7/3

REVALIDATION AND VALIDATION: PROCESSES AND PROCEDURES

Welcome to the Republic of Indonesia The Land of Smiles... Presenting: Pontianak City O Missions: 1. To recognize and promote the great natural beauty

INDONESIA TOURISM INVESTMENT INVITATION

ANGLIAN WATER GREEN BOND

For personal use only

City and County of San Francisco

The DAAO Inspectors should be thoroughly familiar with the regulatory and advisory references when using these instructions.

INDONESIA TOURISM INVESTMENT INVITATION

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:

CAA Stakeholder Survey Results. Part 139 Aerodromes. Introduction:

BILATERAL AGREEMENT BETWEEN THE GOVERNMENT OF THE REPUBLIC OF BOTSWANA AND THE GOVERNMENT OF THE REPUBLIC OF SOUTH AFRICA ON THE RECOGNITION OF THE

4 Rights and duties in connection with the conduct of petroleum activities

INDONESIA TOURISM INVESTMENT INVITATION

Civil Society Forum on Social Forestry in ASEAN INREDD+ Benefit Sharing in Cambodia HERE use for

LAW ON CITIZENSHIP OF REPUBLIKA SRPSKA

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager

ORDINANCE NO WHEREAS, Ordinances 8081 requires project labor agreement (PLA s) in City

Submission to NSW Koala Strategy Consultation Process. March 2017

Procedures of obtaining the exploitation permit for the utilization of geothermal energy


NIAGARA MOHAWK POWER CORPORATION. Procedural Requirements

Branding Strategies for Origin-Based Products Case of Kampot pepper

DISCLOSEABLE TRANSACTION IN RELATION TO ACQUISITION OF AIRCRAFT

Monitoring the Environmental Status of the Heart of Borneo

INTERNATIONAL INSTITUTE FOR DEMOCRACY AND ELECTORAL ASSISTANCE

MEETING CONCLUSIONS. Andean South America Regional Meeting Lima, Peru 5-7 March ECOTOURISM PLANNING

Assessment of Environmental Impacts of the proposed Sectoral Operational Programme for Tourism and Spa Industry

INDONESIA INVESTMENT WEEK

INDONESIA TOURISM INVESTMENT INVITATION

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation

AIRLINE SCHEME RULES. (Updated July 2017)

Welcome to the Republic of Indonesia The Land of Smiles... Presenting Palembang City Missions 1. To recognize and promote the great natural beauty and

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

NATIONAL MINIMUM STANDARD FOR RESPONSIBLE TOURISM

AUDIT COMMITTEE CHARTER

EAST 34 th STREET HELIPORT. Report 2007-N-7

Technical Arrangement on Aircraft Maintenance between the Transport Canada Civil Aviation Directorate and the Civil Aviation Authority of New Zealand

INDONESIA TOURISM INVESTMENT INVITATION

(i) Adopted or adapted airworthiness and environmental standards;

Goldtree is a large scale commercial palm oil plantation and milling company in Sierra Leone, committed to creating sustainable agriculture.

BAB Membership / Association Guidelines for Data Protection

INDONESIA TOURISM INVESTMENT INVITATION

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar

ATTORNEY-CLIENT AGREEMENT

Amerisearch Background Alliance Privacy Policy

San Mateo County Airports Policies and Procedures for Hangars, T-Shades, Tiedowns and Waiting Lists

INDONESIA TOURISM INVESTMENT INVITATION

Terms of Reference: Introduction

Implementation Framework for the South African Off-Road Sector Self-Regulation Strategy

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

National Civil Aviation Security Quality Control Programme for the United Kingdom Overseas Territories of

Transportation Working Group Proposed Work Plan for 2018

Sustainable Procurement Policy for Heathrow Airport Limited

REGULATION NUMBER 66/2015 REGARDING UNSCHEDULED INTERNATIONAL NON-COMMERCIAL AND COMMERCIAL AIR

An Unclaimed Intangible Property Program for Ontario

PASSENGER JOURNEY. Our vision: a seamless, secure and efficient walking pace journey that is highly personalized throughout.

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS

This attorney-client retainer agreement (hereafter referred as Agreement ) is entered into by and. (your name as it appears on passport) (hereafter

Provincial Railway Guides Section:

DMA RO Circular no. 002

Project Progress Report #1

PRACTICAL GUIDE FOR AIR ACCIDENT VICTIMS AND THEIR RELATIVES

Alternative Dispute Resolution

Project Data Sheet BASIC PROJECT DATA

Table of Contents. Overview Objectives Key Issues Process...1-3

Policy PL Date Issued February 10, 2014

Audit. 6 Most Important Ways to Avoid an Unclaimed Property Audit

Cathay Pacific Airways Limited Abridged Financial Statements

Aeronautical Information Services Issue 1 30 May 2012

AGREEMENT. The Department of Civil Aviation of Bosnia and Herzegovina represented by its Directors General, hereinafter referred to as DCA,

PART I GENERAL INFORMATION OF KENT COUNTY WATER AUTHORITY

STATE OF FLORIDA DEPARTMENT OF FINANCIAL SERVICES DIVISION OF UNCLAIMED PROPERTY

Revalidation of UKPHR s registrants: Guidance

Kinross acquires mining rights to land adjacent Fort Knox mine, adds more than 2 million ounces to mineral resource estimates

North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange,

Community-based tourism at Gunung Gede Pangrango National Park, Indonesia

Ecological Corridors: Legal Framework for the Baekdu Daegan Mountain System (South Korea) Katie Miller* Kim Hyun**

FILE NO. ANMICALGIC-1

The Collection and Use of Safety Information

Transcription:

RSPO NOTIFICATION OF PROPOSED NEW PLANTING This notification shall be on the RSPO website for 30 days as required by the RSPO procedures for new plantings (http://www.rspo.org/?q=page/535 ). It has also been posted on local on-site notice boards. Date of notification: 24 July 2014 Tick whichever is appropriate This is a completely new development and stakeholders may submit comments. This is part of an ongoing planting and is meant for notification only. COMPANY SUBSIDIARY (If any) : PT AUSTINDO NUSANTARA JAYA AGRI : PT PUTERA MANUNGGAL PERKASA RSPO Membership Number : 1-0032-07-000-00, 27 February 2007 Location of proposed new planting : Company name : PT Putera Manunggal Perkasa Location : District of North Kokoda and Kais, South Sorong Regency; District of East Aifat, Maybrat Regency,West Papua Province, Indonesia. Geographical location : 01 0 45 46-01 0 53 53 South and 132 0 20 21-132 0 39 04 East Surrounding Entities : a. North. Forest concesion area of Wana Galang Utama b. South. PT. Permata Putera Mandiri concession area c. West. Other Land Use (APL/Area Penggunaan Lain) d. East. Forest concesion area of Wana Galang Utama New Planting Area : ± 22,295.28 Ha Permit : a. Deed of Company on behalf PT Kebun Hutan Abadi dated 18 November 1999 Number 58 based Notary Darby S.H (Ministry of Justice Decree RI No.C-18903.HT.01.03-Th.99 dated 16 September 1999). Change of Company name into PT.Putera Manunggal Perkasa based on Ministry of Justice Decree RI No. C-05938 HT.01.04.TH.2004 dated 22 August 2003

b. Taxable letter Inauguration: PEM-01476/WPJ.04/KP.0203/2013 dated 24 July 2013 from Republic of Indonesia Ministry of Finance Regional Office of Directorate General of West Jakarta Taxation with tax number 02.097.807.8-018.000 dated 22 May 2003 on behalf PT Putera Manunggal Perkasa Jl.HR.Rasuna Said Kav.B10-B11, Setiabudi, South Jakarta, 12910, Jakarta. c. Location Permit: Location Permit for Oil Palm Plantation Development Purposes under name PT. Putera Manunggal Perkasa based on West Papua Governor Decree No. 522/30/II/2011 Tahun 2011 dated 9 February 2011 for an area of ± 22,195.28 ha of land located in Kais District, South Sorong Regency and East Aifat, Maybrat Regency. Location permit is valid for 3 years. Change of Location Permit for Oil Palm Plantation Development Purposes under name PT. Putera Manunggal Perkasa based on West Papua Governor Decree No.522.2-6/206/10/2012 Tahun 2012 dated 12 October 2012 for an area of ± 22,195.28 ha of land located in Kais District, South Sorong Regency and East Aifat, Maybrat Regency. Location permit is valid for 3 years. d. Converted Forest area release by the Republic Indonesia Ministry of Forestry Number:SK. SK.606/Menhut-II/2012 dated 31 October 2012 on release of Forest Production Convertible For Oil Palm Plantation on Behalf of PT Putera Manunggal Perkasa located in Kais District, South Sorong Regency and East Aifat, Maybrat Regency, West Papua Province Covering an area of 23,424.38 (twenty three thousand four hundred and twenty four point three eight) hectares. e. Timber Utilization Permit of PT Putera Manunggal Perkasa based on the Head of West Papua Provincial Forestry Office Decree no.kep-522.2/247/dishut-pb/ix/2013 dated 9 September 2013 on Approval of Timber Utilization Permit Area of Oil Palm Cultivation on behalf PT.Putera Manunggal Perkasa located in South Sorong and Maybrat Regency, West papua Province which explain the permit agreement covering 3,509 hectares with nuber of tress ± 79,611 and tree volume ± 88,640.19 M 3.

f. Plantation Business Permit (Izin Usaha Perkebunan/IUP). According to West Papua Governor Decree No. 525/90/V/2011 Tahun 2011 dated 10 May 2011on Oil Palm Plantation Business (IUP) Permit to PT.Putera Manunggal Perkasa for 25,159 Ha oil palm plantations and 60 Ton FFB/Hours plant. Adjustment of plantation area According to West Papua Governor Decree No. 525/584/GPB/2013 dated 30 April 2013on Oil Palm Plantation Business (IUP) Permit to PT.Putera Manunggal Perkasa for 23,424.38 Ha oil palm plantations and 60 Ton FFB/Hours plant. g. Social Environment Impact Assessment/ Analisa Dampak Mengenai Lingkungan (SEIA/AMDAL). Environmental Feasibility Permit of Plantation Activities (Area and ± 22,195.28 Ha) and the Palm Oil Processing Plant (Plant Capacity 60 Ton FFB/hour) By PT.Putera Manunggal Perkasa in Kais District, South Sorong Regency and East Aifat, Maybrat Regency, West Papua Province by a West Papua Governor Decree Number. 660.1/58/II/2012 Tahun 2012 dated 16 February 2012.

Figure 1. Location Map of PT. Putera Manunggal Perkasa

Figure 2. Location Permit Map of PT. Putera Manunggal Perkasa

Figure 3. Map of HCV Area and Operational Project area of PT. Putera Manunggal Perkasa

Figure 4. Map of Forest Area Status of PT Putera Manunggal Perkasa

Figure 5. Land Cover Map of PT Putera Manunggal Perkasa

Figure 7. Topography Map of PT. Putera Manunggal Perkasa

Figure 8. Soil Map of PT. Putera Manunggal Perkasa

Figure 9. Map of Customary Land Release from Ikana Village

Figure 10. Map of Customary Land Release from Karirif Village

Figure 11. Map of Customary Land Release from Sumano Village

Figure 12. Map of Customary Land Release from Womba Village

SUMMARY FROM SEI ASSESSMENTS: A Participative PT Putera Manunggal Perkasa Social Environmental Impact Assessment (SEIA) has been conducted separately. The Social Impact Assessment (SIA) conducted by Yana Hermana, S.Hut; Ir. Hery Prastyo; Karmo Darsono Sudrajat,SPd; Ratjimo; Stevanus, ST, Msi; Moh.Yasin, S.Fil.Ma on 11-28 November 2013 and the Social Environmental Impact Assessment (AMDAL) conducted by government accredited assessor (Ir. Achmad Djazuli; Ir. Yunus Arifin, M.Si; Wage Indra Rukmana, S.Hut; Ir. Darmawan Senoadjie; Syamsul Arifin, S.Hut; Ir. Dasa Iskandar O.; Drs. Supriyanto Margono, M.Si). The SEIA main issue studied in the assessment is company profile and general condition of the project covering demographic data, economic as well as availability of public transportation. The assessment is also conducted to identify the demand of transparency aspect (principal 1) and legal compliance as well as applicable law (principal 2) stated in P&C RSPO Indonesia, land availability, community perception upon project, as well as the existence of conservation area based on HCV toolkit Indonesia. The SEIA covered a review of documentary sources are collected through Focus Group Discussion (FGD), in-depth interview, government policy, and village profile data; besides, the assessment also covered field observation and public consultation meetings for the villages within the project area and for affected landowners of surrounding communities. Summaries and findings of the interviews and public consultation meetings are included in the SEIA report. SUMMARY FROM HCV ASSESSMENT(S): HCV assessment of PT Putera Manunggal Perkasa project conducted on 11-28 November 2013 by the RSPO approved assessors; Junser Naibaho, M.Si (Team leader), Yana Hermana, S.Hut (Discipline Specialist on forest management and planning), Ir. Darmawan Senoadji (Discipline Specialist on biodiversity), R. Sukasmianto, SP (Discipline Specialist on Environmental Services), R. Sigit Pamungkas, S.Hut (Discipline Specialist on social, economic and culture), Koko Erliyanto, S.Hut (Discipline Specialist on GIS Specialist), Dwi Putra Jaka W. S.Hut (Discipline Specialist on biodiversity) and Andri Wibisono S.Hut (Discipline Specialist on social, economic and culture). The HCV assessment is peer reviewed by Ir. Kresno Dwi Santosa on March 2014. The assessment included satellite imaginary analysis, extensive field surveys, and public consultations with the communities living in the project area (Village of Womba, Village of Kais, Kampung Atori, Kampung Karirif, Kampung Bubuko, Kampung Sumano, Kampung Benawa II, Kampung Kamundan II, kampong Ikano). The HCV assessment report included recommendations for the management and improvement of the HCV found within the project area.

The HCV identified in the PT Putera Manunggal Perkasa project area clearly mapped. Based on identification and analyisis of HCV presence in the area of PT. Putera Manunggal Perkasa there are found HCV 1.1, HCV 1.2, HCV 1.3, HCV 2.3, HCV 4.1, HCV 4.3, HCV 5 and HCV6 with total area coverage of 3,788.40 ha. No area supporting HCV 3 is identified. Location Plan and the area will be opening new land was not in the area of primary forest, however on the Conversion Production Forest/Hutan Produksi Konversi (HPK) Table 1. Identification and Analysis of HCVs Presence (HCV1-6) in the Area of PT. Putera Manunggal Perkasa No. High Conservation Area (HCV) Hectare of HCV (Ha) HCV 1 Secondary forest of Hulu Sungai Kiotoni 500 Sarifin 1.2; 1.3 2 Riparian of Kais 42,43 1.1; 1.2; 1.3; 2.3; 4.1; 4.3; 5 3 Riparian of Kamundan 515,59 1.1; 1.2; 1.3; 2.3; 4.1; 4.3; 5 4 Riparian of Sarifin 963,95 1.1; 1.2; 1.3; 2.3; 4.1; 4.3; 5 5 Riparian of Robate 301,38 1.1; 4.1; 5 6 Riparian of Tero 83,42 1.1; 4.1 7 Riparian of Masabino 80,59 1.1; 4.1 8 Riparian of Jofo 38,81 1.1; 1.2; 1.3; 4.1 9 Riparian of Keimehiri 36,97 1.1; 1.2; 1.3; 4.1 10 Riparian of Haman 153,76 1.1; 1.2; 1.3; 4.1; 5 11 Riparian of Kavehiri 87,80 1.1; 4.1 12 Riparian of Kiotoni 206,64 1.1; 1.2; 1.3; 4.1 13 Riparian of Aingek 10,11 1.1; 4.1 14 Riparian of Aimana 24,73 1.1; 4.1; 5 15 Sarifin Swamp 438,68 1.1; 4.1; 4.3 16 Tero Swamp 260,29 1.1; 4.1; 4.3 17 Perdamaian Hill 42,91 6 18 Kampung Lama Sumano 0,25 6 19 Maseba Bathe cemetery 0,01 6 20 Korega Hohame cemetery 0,01 6 21 Ireiye Hohame cemetery 0,01 6 22 Cemeteries of Yakop Kakana, Mesak Keime, 0,04 Abraham Tairare dan Danya Tairare 6 23 Sahair cemetery 0,01 6 24 Stepanus Hohame cemetery 0,01 6 Total Bruto KBKT di PT PMP 3.788,40 17.07 % from location permit (22,195.28 ha) DOCUMENTATION OF FREE, PRIOR AND INFORMED CONSENT. In accordance with RSPO requirements PT Putera Manunggal Perkasa obtained free, prior and informed consent from the local community that would be affected by the development of the

concession area or land that would be opened. Until the new planting verification there land compensation has been shown, company has conducted the socialization for plan of PT Putera Manunggal Perkasa oil palm plantation and documented as follows: a. Statement Letter from seigniorial of customary territory (Wilayah Pertuanan Adat) of Kais Districts, South Sorong Regency, West Papua Province which sent to Governor of West Papua Province and head of South Sorong Regency at February 10 th, 2011 which explain that head of Sumano Village represent of all communities stated that they support development of PT Putera Manunggal Perkasa at Awe e Customary territory (Wilayah Pertuanan Adat Suku Awee). b. Affidavit of support dated December 8 th, 2010 from head of tribe (marga) and customary figures (tokoh adat) to develop PT Putera Manunggal Perkasa and continue to conducts survey at their customary land (tanah ulayat/adat). c. Available evidence of the land acquisitions process on the operational area of PT Putera Manunggal Perkasa contained: Customary land of Maybrat Tribe which located on Ikana Village, Kais District, South Sorong Regency, West Papua Province that width + 1,940 Ha at July 24 th, 2013 No. 002/LR/PMP-EA/01.B/VIII/2013 which representative of each tribe. Customary land of Awe e Tribe which located on Sumano Village, Kais District, South Sorong Regency, West Papua Province that width + 13,908 Ha at July 14 th, 2013 No. 001/LR/PMP-EA/02.B/IV/2013 which representative of each tribe. Customary land of Maybrat Tribe which located on Womba Village, South Aifat District, Maybrat Regency, West Papua Province that width + 322 Ha at August 28 th, 2013 No. 003/LR/PMP-EA/04.B/VIII/2013 which representative of each tribe. Customary land of Awe e Tribe which located on Karirif Village, North Kokonda District, South Sorong Regency, West Papua Province that width + 7,436 Ha at July 31 st, 2013 No. 004/LR/PMP-EA/03.B/VIII/2013 which representative of each tribe. Statement letter which has been approved by head of District and also there are map of customary land release from each tribe that approved by representative of each customary head and agreed by head of district and head of village. All documentation of all land acquisitions was available. SUMMARY OF PLANs: The management plan of PT Putera Manunggal Perkasa has incorporated the findings from SEIA (AMDAL), Social Impact Assessment (SIA) and HCV assessment for implementing the operational plans. Recommendations and also conclusion as result of SEIA and HCV has integrated in the management plan and consistent with RSPO P&C for New Plantings.

VERIFICATION STATEMENT: PT Putera Manunggal Perkasa opted for a document verification and field observation to conduct the New Planting Procedure. Mutuagung Lestari auditors have conducted desk study and discussions with sustainability officers during the desk audit. Two Mutuagung Lestari auditors were conducted the audit at their office in Jakarta on 23 June 2014 to review and verify the relevant document and also interview with the management representatives. Field observation conducted on 25-28 June 2014 to project area of PT Putera Manunggal Perkasa. During the field observation to project area of PT.PMP there was identified land cleared for ±500 Ha since March 2014 for road access, nursery and infrastructure; however the cleared location was not in identified as HCV area. The SEIA (AMDAL) conducted by the government approved consultants as well as the HCV and SIA assessments conducted by RSPO accredited and approved assessors. PT Putera Manunggal Perkasa has adhered to RSPO New Planting Procedure and documented the assessments and plans are comprehensive and professionally carried out according to RSPO requirements and comply with the applicable RSPO Principles, Criteria and indicators for new plantings. Land preparations activities carried out by PT.PMP were not in accordance with the RSPO new planting procedure regarding growers shall not commence any land preparation prior to the expiry of the 30-days period of notification, however following the RSPO New Planting Procedure process, any party wishing to dispute the verification may pursue through the relevant RSPO Complaints and disputes procedures. Signed for, on behalf of, Mutuagung Lestari PT Putera Manunggal Perkasa Octo HP Nainggolan Indra Pangasian Hutabarat Lead Auditor Head of Sustainability 21 July 2014 21 July 2014