EDM RURAL ELECTRIFICATION PLAN

Similar documents

South-South Learning Exchange Visit, Mozambique IT/ITES Experiences and Challenges

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Centro de Promoção de Investimentos (Investment Promotion Centre) BOOK OF OPPORTUNITIES Joint Venture with Mozambican Companies

Business and Investment Opportunities in the Industrial Sector

Cost of PEC-Zonal Activities in Mozambique Analysis of contract costs from 2008 up to 2011 Júlia Zita, Arjen Naafs

Investment Climate and Business Opportunities for Japan

Sampling methodology Mozambique

Child-centred Disaster Risk and Vulnerability Assessment. Mozambique

Japan International Cooperation Agency

PART IV ECONOMIC FEASIBILITY STUDY

Mozambique Political Process Bulletin

MOZAMBIQUE UPDATE ON DEMINING COMPLETION

Educational inequality in Mozambique

Index. Lonely Planet 211

Nacala Business Campus

Procurement Plan National PPFD

SAPP DEMAND AND SUPPLY SITUATION

REPUBLIC OF MOZAMBIQUE

ENERGY INVESTMENT OPPORTUNITIES PRESENTATION. By Remmy Makumbe, Director, Infrastructure and Services

GROUP OF EXPERTS ON No. 15 GEOGRAPHICAL NAMES

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Reforms in Kosovo s power System

Instituto Nacional de Desminagem

On the Road. Lonely Planet 4

123% .1589$ 100% 7.5% 7.5% 100% 7.5% %12 458=5 100% OGE k FMI MOZAMBIQUE OVERVIEW OGE 458=5 100% = % 100% % 25648

MOZAMBIQUE News reports & clippings 344 Poverty survey supplement - 31 October 2016 Editor: Joseph Hanlon (

Background Beira Development Corridor Limpopo Development Corridor Walvis Bay Corridor One Stop Border Posts

Realistic Assessment of SADC Energy Demand and Supply Up to By Prof M Elmissiry ENERGY SECTOR NEPAD, Midrand South Africa

CONSERVATION STATUS OF THE LION (Panthera leo) IN MOZAMBIQUE _ PHASE 1: PRELIMINARY SURVEY

REPUBLIC OF MOZAMBIQUE SOFALA PROVINCE

Mozambique Food Security Outlook April to September 2009

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

Southern African Power Pool Report to SADC

Introduction to SAPP. Omar Vajeth Head SAPP: Project Advisory Unit. 23 June Snr. Transaction Advisor SOUTHERN AFRICAN POWER POOL

HISTORY EARLY INHABITANTS

SADC Enabling Infrastructure Initiative. Infrastructure Support for Deepening Regional Integration and Poverty Reduction in the SADC Region

Development Cooperation Ireland public expenditure review report

BUSINESS OPPORTUNITIES IN TANZANIA

Estimating Utility Consistent Poverty Lines: With Illustrations from Mozambique and Tanzania. Channing Arndt University of Copenhagen

Keywords: 1MZ/abundance/African lion/conflicts/conservation/distribution/hunting/inquiry/ lion/panthera leo/status/survey

SOUTHERN AFRICA TROPICAL CYCLONE IDAI

MOZAMBIQUE mvam Bulletin #6: January 2017

SOUTHERN AFRICA TROPICAL CYCLONE IDAI

The Southern African Power Pool. Meeting growing power demands through Southern African regional integration

Business News Mozambique

OVERVIEW FOR CABO DELGADO PROVINCE

ECOTOURISM AND BIODIVERSITY CONSERVATION

Southern African - German Chamber of Commerce and Industry. Business Delegation to Mozambique. 27 to 30 August, 2012

A GUIDE TO DOING BUSINESS WITH MOZAMBIQUE

38030 v2. The Tourism Sector in Mozambique: A Value Chain Analysis VOLUME II. Public Disclosure Authorized. Public Disclosure Authorized

Mozambique Africa s Emerging Tourism & Investment Destination. MINISTRY OF TOURISM Mozambique National Tourism Authority

Israel. Tourism in the economy. Tourism governance and funding

Appeal coverage: 116.4%; Click here to go to the attached Contributions list, or refer to Federation s website.

Mozambican. Country Water Resource Profile

Business News Mozambique

EDITION WRITTEN AND RESEARCHED BY

Nova Scotia Tourism Agency Department of Economic and Rural Development and Tourism Statement of Mandate

Smart Networks Smart Islands. Nikos Chatziargyriou Chairman and CEO

The main audience for this study

Country City gini Year gini Year Type Pop. ('000) Year Capital primacy

Mozambique News Agency AIM Reports

(Updated version, November 12, 2010)

POTENTIAL FOR COMMERCIAL

MOZAMBIQUE TRADE AND TRANSPORT FACILITATION AUDIT

INFRASTRUCTURE DEVELOPMENT IN TANZANIA

Natural Gas in Developing Countries: Investment Needs and Opportunities for International Cooperation

MOZAMBIQUE mvam Bulletin #5: December 2016

MOZAMBIQUE Bi-Weekly Summary

Export Strategies for Tourism

Southern Africa Floods Situation Update# 3 2 February 2011

Committee. Presentation Outline

Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan

Vision. MEGA programme Marth 1 st 2010, Belgrade. Presented by: Agency for Local Economic Development. Vladimir Kostic.

Resource Sector Mozambique

SOUTHERN AFRICA TROPICAL CYCLONE IDAI

Outlook: FY13 EBITDA guidance $28M - $29M. Pursuing contracted 300MW in 2013 growth strategy. FY13 maiden franked dividend payment expected

HUMANITARIAN RESPONSE PLAN

DESTINATION MOZAMBIQUE

18,669 children targeted for treatment of malnutrition

Northern Mozambique Tourism Program

Smart Networks Smart Islands. Nikos Chatziargyrio u Chairman and CEO

MAPUTO PORT DEVELOPMENT COMPANY

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

MOZAMBIQUE mvam Bulletin #8: March 2017

East African Power Industry Convention 2007, Addis Ababa, ETHIOPIA

Developing a competitive market for regional electricity cross border trading: The case for the Southern African Power Pool

POLICY QUESTIONS FOR TRAVEL FACILITATION FOR ENHANCING MOBILITY IN THE OIC MEMBER COUNTRIES. February 5th, 2015, Ankara

Trading in the Southern African Power Pool and possible coupling with the East African Power Pool

The Electric Power System

2010 FIFA WORLD CUP HOST CITY: CAPE TOWN

PORT MORESBY POWER PROJECT - UPDATE PNG Mining & Petroleum Investment Conference. 4 th December 2018

Determined nation gets set to fly

Ministry of Parks, Culture and Sport. Plan for saskatchewan.ca

~ π. TOURISM RESEARCH ANNUAL REPORT 2012

MINISTRY OF TOURISM AND RECREATION

MOZAMBIQUE. Drought Humanitarian Situation Report

PPP project prospects in the African Indian Ocean ports Opportunities for Value Optimization

Business News Mozambique

TRINITY RIVER CORRIDOR

Transcription:

EDM RURAL ELECTRIFICATION PLAN By Marcelino Alberto Executive Board Member mgildo@edm.co.mz EDM, E.P. Mozambique Maputo 16 th November 2011 1

Company Profile: The EDM as a State Company was established in 1977, two years after the independence of Mozambique. Its aim was the establishment and operation of public service of production, transmission and distribution of electricity. Within the context of restructuring the economy of the country in 1995, the EDM was transformed into public company, through Decree 28/95, inherited a burden of debt associated with the investment made in hard return of capital. Attention focused on the rehabilitation of infrastructure damaged during the war, improving the quality of service and the economic and financial profitability of the Company. 2

The company: ELECTRICIDADE DE MOÇAMBIQUE Mission: Exploration of generation, transmission, distribution and sales of electrical services of good quality safeguarding the public and environmental interests for the benefit of the consumer. Vision: Create, in a sustainable manner, value through the total satisfaction of clients' needs in electrical energy and related services. Values Integrity, Professionalism and Diligence Slogan with energy we build the future 3

Five years GoM action plan 2004-2009 Generation: Promote actions in order to construct new thermal and Hydro stations namely: Mphanda Nkuwa, Moatize, Moamba, Benga, Boroma & Lupata, Alto Malema, Lurio and Massingir; Rehabilitation of Mavuzi and Chicamba Hydro stations Transmission: Reinforcement of transmission network through construction of new lines namely to connect the follow business centers to main grid: 110 kv Nampula - Pemba; 110 kv Cuamba - Lichinga; 110kv Lichinga Metangula; 220 KV Chibata Dondo; 110 kv Pemba - Montepuez Ancuabe 110 kv Alto Molocue Gile; 400 kv Songo Maputo; 110 kv Manhiça Macia; 400 kv Songo - Nacala 4

Five years GoM action plan Distribution: Proceed with process of rehabilitation and reinforcement of distribution network and household connections increasing the reliability of electricity supply with priority of urban and peri- urban areas; Proceed with Rural electrification extension with priority the connection of more District capitals to national network; Connection of about 80.000 new customers/year 5

NATIONAL ELECTRIFICATION MASTER PLAN In 2004 EdM has developed Master plan which indicate total investment of 2.819,6 MUSD to meet the GoM strategy within the period 2005 2019, with the following main actions: Connect all the provincial capital to the main grid which is supported by the big hydro source Cahora Bassa with 2075 MW capacity; Connect all district head quarters to main grid; Elevate the number of customers from 263 000 in 2004 to 1590 985 in 2020. Indicator * 2005 2010 2015 2020 Electrification ratio 6.7% 11.4% 17.5% 25.6% HH connected 298,523 567,009 976,510 1,590,985 Population million 18.8 21.0 23.4 26.1 6

ELECTRIFICATION RATIO AND CRITERIA Key factors determinant for selection of electrification areas: o Economic; Physical conditions such as communications, access roads in particular, agro-economic potential, natural conditions in general Economic development potential in general for the area, including tourism Particular development projects, for example an industrial project, with need for electricity and the benefits that other infrastructure and the area in general can derive from this electrification Distance to the existing grid. o Social; Population characteristics such as size and density of settlements, type of housing, level of development/income Local administration planning of infrastructure for the province and individual districts, schools, hospital and health unit 7

EdM MARTER PLAN To achieve the goals 28 projects where designed to be implemented within the period 2005 2019 as follow. Master Plan Planned Projects Planned COST (MUSD) Executed Transmission 6 2.091,00 3 Grid Extension 10 320.00 9 Distribution 6 66.76 3 Intensification Projects 1 201.29 1 Generation 4 35.27 1 Load Dispatch 1 18.82 1 Total 28 2.733,14 18 64.3% 8

LOW COST RURAL ELECTRIFICATION PLAN (2005 2019) PROJECTS Package EdM Region and Province 1 Central, Zambezia 2 Northern, Cabo Delgado 3 Northern, Niassa 4 Northern, Nampula 5 Northern, Niassa 6 Central, Tete and Manica 7 Southern, Gaza 8 Southern, Maputo 9 Southern, Inhambane Districts Household Connections Development Costs in USD million Pebane, Lugela and Ile Districts 15,102 23.272 Chiure Districts 11,684 15.195 Cuamba and Mecanhelas Districts 7,343 10.789 Nacala-a-Velha, Angoche, Meconte and 16,116 16.116 Mogovolas Districts Marrupa, Nipepe and Lago Districts 7,366 12.342 Tsangano (Tete), Barue (Manica), 10,829 15.472 Gondola (Manica) Mandlakaza District 6,415 10.009 Boane District 3,024 4.363 Hormoine, Morrumbene Districts 7,073 9.539 74.916 117.097 9

National Transmission Grid in 2004 GENERATION: EDM: HCB: TOTAL: 118 MVA 2 400 MVA 2 518 MVA 2004 TRANSMISSION: EDM: HCB (IPP): MOTRACO (ITC): TOTAL 3 568 Km 2 269 Km 600 Km 6 437 Km DISTRIBUTION: MV & BT 7700 km CUSTOMERS 263.918 (5.8%) PEAK LOAD 265.8 MW 10

National Transmission Grid in 2011 GENERATION: EDM: HCB: TOTAL: 118 MVA 2 400 MVA 2 518 MVA TRANSMISSION: EDM: HCB (IPP): MOTRACO (ITC): TOTAL 6.979 Km 2 269 Km 600 Km 9 848 Km DISTRIBUTION: MV & LV 11.800 km COSTUMERS 950.000 PEAK LOAD 555 MW 2011 All Capital Districts Electrified 11

Project Implemented 2004 2011 (Southern Region) PROJECT DESCRIPTION DONNORS Valour (MUSD) Construction of 275/66KV Matola Substation (Dezember 2006) Kuwait/Opec 18.50 Reabilitation of Matola Distribution Network (December 2005) DBSA 12,00 Reabilitation of Maputo/Matola (October 2005) ICO/SPAIN 7,77 Electrification of Morrumbene, Massinga, Morrungulo e DANIDA 4,02 Mavila (April 2008) Reabilitation and reiforcement of Maputo distribution system (May 2008) Commissioning of 2 nd transformer at Machava Substatation DBSA 0.38 Electrification of Maputo Magoanine using Low-cost tecniques DANIDA 0,64 (Nov 2004) LCREP - Inhambane DANIDA 11.4 Electricity II EdM 0.4 Rural Electrification to Gaza Province (December 2009) EXIM BANK 20,00 Rehabilitation of infrastructures damaged by Paiol Explosion DANIDA 4.3 ERAP PROJECT IDA 16,00 Nacional Control Center (April 2008) DANIDA 4,86 12 DANIDA 23,50 TOTAL SOUTHERN REGION 123.77

Project Implemented 2004 2011 (Center Region) PROJECT DESCRIPTION DONNOR Valour Rural Electrification of Namacurra (Dezember 2005) Electrification de Namacurra, Maquival, Zalala, Macuse, Maganja (MUSD) NORAD 8,76 da Costa e Inhassunge. Rural Electrification of Sofala, Manica e Tete (Dezember 2008) ASDI 16.3 Rural Electrification of Chibabava-Sofala Province (Junho 2009) DANIDA 4.34 Rural Electrification of Gorongosa (Junho 2005) KFW 4,35 Rural Electrification to Zambeze Province-Gilé ( December 2008) EXIM BANK 10 Rural Electrification to Zambeze Province-Pebane ( December 2008) NORADA 6,0 SVC - Mocuba GoM 10.03 Rehabilitation of Chimoio SE and acquisition of 110/33/22 kv, 10 MVA Belgium 6.3 mobile SE Electrification of Marromeu (110kV) (Nov 2007) KFW 8,83 13

Implemented Project 2004 2011 (Center Region) PROJECT DESCRIPTION DONNOR BUDGET Rural Electrification to Districts of Tete Province (April 2009) Electrification of Furancungo, chifund, Mphend, Tsangano, Chioa, (MUSD) GdM/EU 32,0 Chipalapala, Dúmue, e Zumbo. Rehabilitation of Beira Distribution network DBSA 14,0 ERAP PROJECT IDA 6,00 TOTAL CENTER REGION 126,91 14

Implemented Project 2004 2011 (Northern Region) PROJECT DESCRIPTION DONNOR Budget (MUSD) 110 kv line Nampula - Pemba - Fase I (Dezembro 2005) BADEA/BID 27,97 Rural Electrification to Cabo Delgado-Fase II (April 2010) BADEA/BID 10,25 Electrification of Metoro, Ancuabe, Montepuez, Chiure e Namapa. Rural Electrification to Cabo Delgado-Fase III (Dez 2011) Electrification of Macomia, Meluco, Mocimboa da Praia, Nangade, Mueda Meluco, Ibo, Matemo and Quirimbas. 110 KV line Gurué - Cuamba - Lichinga (Dez 2005) Electrification of Lichinga, Maniamba, Metangula, Cuamba, Lúrio, BADE/BID/ NORAD NORAD/ ASDI 53,00 46,43 Mutuali, Malema,Gurué, Lioma, Socone, Errego e Namarroi. Rural Electrification Mecanhelas and Maua (Marrupa) Niassa NORAD/ 6,00 Province (July 2010). ASDI Feasibility study for Lurio hydropower station (Dez 2009). USTDA 6,00 Low Cost Rural Electrification Project ( For All country) DANIDA 1,00 ERAP PROJECT IDA 6,00 TOTAL NORTHERN REGION 146,65 15

Implemented Project 2004 2011 (SUMMARY) SUMMARY OF IMPLEMENTED PROJECT BUDGET (MUSD) Southern Region 123.77 Center Region 126.91 Northern Region 146.65 Total Investment 397,33 16

Item Rural Electrification Forum 2011 Ongoing Projects 2011 Name of the Project Cost in [MUSD] 1 Feasibility Study of Second Line Caia - Nampula 1.80 IDA 2 Feasibility Study for Electrification of Vilanculos 0.05 ASDI 3 Feasibility Study of the Central - South Line (Cesul) 6.00 IDA/Noroega 4 Integrated Management System (Sigem) 1. Ongoig projects 6.74 IDA Funder 5 6 Update of Master Plan 2010-2027 Capacity Building 1.30 AFD 4.00 Suecia 7 Rehabilitation and Reiforcement of Distribution network. Maputo City (Lot 1) 33.35 Portugal 8 Rehabilitation and Reiforcement of distribution network. Maputo City (Lot 2) 31.90 Portugal 9 Assembly of the Second Transformer in Matambo SS 13.00 Banco Mundial 10 110kV Transmission Line Mavuzi - Chibabava 8.50 EU 11 Rehabilitation Chimoio SS and Acquisition of Mobile SS 110/33/22 kv 10 MVA 6.30 Reino da Belgica 12 Electricity IV (Chibata - Dondo 220kV) 55.00 ADB/OPEC 13 Rural Electrification of north area of Gaza Province (110kV Lionde - Mapai) 54.00 Exim Bam k da Correia 14 LCREP of Niassa 11.40 IDB 15 EDAP (Expansion MV Network in Maputo, Manica, Tete, Nampula and Cabo Delgado) 147.70 BM/Afund/OFID/AFD/EIB 16 Rural Electrification of Chibabava and Buzi, Sofala Province 9.67 Suecia / Dinamarca 17 Rural Electrification of Niassa, Cabo Delgado and Manica Provinces 25.00 EXIM BANK/INDIA 18 MIXED CREDIT 150.00 DANIDA 19 Rehabilitation of Matambo SE 12.00 WB 20 Rural Electrification of Nampula, Zambezia and Inhambane 30.00 EXIM BANK INDIA 21 Rural Electrification of Cabo Delgado Phase III- Adendum 12.00 BADEA 22 SVC Nampula 13.00 NORAD Rural Electrification of Chimbonila 2.00 NORAD 23 Rural Electrification of Pande 3.00 GoM 24 Electricity III 19.33 ADB/OPEC TOTAL - Ongoing Projects 657.04 17

Electrified Capital Districts 2004-2011 104 Districts 18

New Connections and Number of Customers The electricity access18% today) however still very low; 19

Rural Electrification Grid Extension strategy Use of national fix tariff; Use of cross subside to maintain the rural areas were there is no profits Use of pre paid meters to stimulate the low income consumers; Use funds from the donors for investment in rural electrification; Use of different stakeholders in electrification process ( EDM operations areas, local and foreign sub contractors; local e foreign consultancies) Continuous investment in human resource skill improvement; Investment of around 70 MUSD per year in rural electrification ( 65% from de donor source and 35% from EDM); 20

consequences Implemetation of the master plan - consequences All our main transmission & Distribution corridors are running over 90% of load; Our main substation are also running 80-95% of the installed capacity and are no long able to take constantly demand of the load; The demand in the country are growing in the around 15%. And the distribution infrastructures such transformers, cables and lines needs to be rehabilitated and reinforced; 21

[ MW] Rural Electrification Forum 2011 Implemetation of the master plan - consequences Load forecasting and supplying options > 400 MW 1. HCB Allocations; 2. Rehabilitation and reconversion of the existent Power stations; 3. New Power stations: a) Short term(1-3 years) using natural gas as a resource; b) Medium term (> 4 years) using hydro and coal resources; 22

Future Plan UPDATE OF 2004 2019 MASTER PLAN to 2012 2027 PERIOD EdM has mobilized MUSD 2.5 from AFD (France Development Agency) and contracted consultancy services to update the 2004 2019 Master Plan. It is expected to be concluded by mid of 2012 2021 23

New Expansion Plan 2011-2021 Achieve a electrification ratio of 44% in 2021; Improve the quality supply in the main cities, industrial areas and expansion areas; Continue implementation of loss reduction program and reduce the losses to 18%; Implementation and consolidation of the modernization programs such SIGEM ( integrated business unity, credelec online, automatic meter reading) Mobilize investments of MUSD 3406.4 within 2011 to 2021 which implies an annual investment of MUSD 340/year 24

New Expansion Plan 2011-2021 No. Projects Budget [MUSD] 01 Generation Projects 1,414.00 02 Rural Electrification Projects 280.28 03 Reinforcement and rehabilitation projects 562.84 04 Transmission projects 1,149.28 Total planned projects 3,406.40 25

Conclusions and WAY FORWARD Even with such bigger efforts the electrification ratio still very low 18% The continues donnor support will be crucial for rural electrification and massification; Continues monitoring and proper planning of new off grid areas to be electrified; Implementation of rural electrification low cost strategy has to continue. Consolidation of the prepaid meters in rural areas must continue 26

THANK YOU 27