Content. Price List Line Maintenance Services (German Stations only) 1/ Notes. 2/ Aircraft Handling. 3/ Ground Equipment. 4/ Fluids / Lubricants

Similar documents
VALIDITY FROM : TO MAINTENANCE SERVICES 2018

Invoicing Model - Possibility to choose between two Pricing Alternatives - Aircraft De-icing N*ICE, 7/26/2017

Invoicing Model - Possibility to choose between two Pricing Alternatives - Aircraft De-icing N*ICE, 15 th of July 2018

Line Maintenance Stations Germany

EUR BAM A/c up to 25 tons MTOW 11,00 22,00. A/c over 25 tons MTOW 14,00 27,00

These fee changes have been established in order to establish base fee recoveries for expanding infrastructure and ongoing annual maintenance.

LIST OF SERVICE CHARGES FOR NON- RESIDENTS. Valid As Of 19 July, 2018

VANCOUVER AIRPORT AUTHORITY TARIFF OF FEES AND CHARGES Effective January 1, 2019 Subject to Change PAYMENT TERMS AND CONDITIONS

Sida 1 av 7 Ivan Forsman SGHA HMV Kopia

November Attention: Airport Operators. Dear Sir/Madame: Re: Final Rates and Fees Adjustments January 1, 2013

Sida 1 av 7 Ivan Forsman SGHA externa flygbolag doc

VIP Aviation Handling Charges in Georgia

SEARD (Société d Exploitation des Aéroports de Rennes et Dinard) Handling fees Contacts

85 Heart Lake Road South Brampton, Ontario, Canada L6W 3K2 Phone: Fax:

We have attached a summary and the final revised changes and a new rates and fees schedule as posted to our website (

J. P. MEĐUNARODNI AERODROM "SARAJEVO" D.O.O.

More mobility for the world. Subline for division or product. Overline 12pt

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

Airport charges and services SION LSGS SIR

Page 1 sur 19 LFTH

Strategy. The strategy of S7 Technics Holding is based on the provision of world class aircraft and component maintenance and repair.

Denis Leger, Commissioner Transportation, Facilities and Emergency Services. SUBJECT: Airport Aeronautical and Public Parking Fees,

Region of Waterloo International Airport 2019 Fees and Charges

LIST OF FEES HANNOVER AIRPORT

COLOGNE HANOVER WEGBERG (DE) ERFURT (DE) PAFOS (CY) CITATION MAINTENANCE EXPERIENCE OF DECADES

Airport Fees and Charges List

Keflavik International Airport Airport Charges

Draft Proposal for the Amendment of the Sub-Cap on Off-Peak Landing & Take Off Charges at Dublin Airport. Addendum to Commission Paper CP4/2003

FBO Network Germany. FBO Düsseldorf Terminal & Infrastructure Charges

Plan to Provide for the Deplanement of Passengers Following Excessive Tarmac Delays

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION FAA TYPE CERTIFICATE DATA SHEET NO. A55NM

European Aviation Safety Agency

Page 1 sur 18 LFTH

Hamburg Airport Catalogue of Charges for Extra Services Ground Handling

Hamburg Airport Airport Charges Part II

BURLINGTON INTERNATIONAL AIRPORT EMERGENCY CONTINGENCY PLAN

Type Acceptance Report

Type Acceptance Report

CAAC China. CCAR 121 Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision Oct-2017

Regulations for Ground Handling and fees. Valid from 1. july 2018, V.2.5

Tariff Regulations 2018

Type Acceptance Report

Type Acceptance Report

Handlingregulations. and fees. CONTENT 1. Refuelling Regulations and Charges 2

Standard Fees & Charges.

TWO SISTERSHIPS BEECHCRAFT 1900D. Available for Sale

Type Acceptance Report

F E E S C H E D U L E. Part II-IV

Schedule of Services and Facilities

The Only Way is Up. AVIAPRIME One of the Fastest Growing MRO Organizations in Central and Eastern Europe

Maintaining a success

AIRPORT CHARGES REGULATION

Zarges Tubesca Group

Diamond Aircraft Industries GmbH N.A. Otto-Str.5 A-2700 Wiener Neustadt Austria

Tariff Regulations. ODE / EKOD Hans Christian Andersen Airport

Airworthiness Directive

Boeing Shanghai Overview BOEING SHANGHAI PROPRIETARY

Catalogue of Charges for Extra Services

F I N A L R E P O R T ON SERIOUS INCIDENT OF THE AIRCRAFT SR-20, REGISTRATION D-ELLT, WHICH OCCURED ON MAY , AT ZADAR AIRPORT

AIRPORT CHARGES DEBRECEN INTERNATIONAL AIRPORT DEB / LHDC

AEROSPACE & ELECTRONICS BRENDAN CURRAN PRESIDENT

EASA PART 21 + AMC/GM. Syllabus

Components Forecast & Trends. Matthew T. Harman Analyst, Aerospace Industry MRO Arlington, VA

Technical Operations Division. LATIN MRO 2018 Panamá

TAXIBOT. May Technical Partner

More mobility for the world. Services for the Airbus A320. Family business NEW

(PPL/NPPL) >20lt Avgas >50lt Avgas >100lt Avgas

Succeeding with Entry into Service MRO Europe: Engineering & Maintenance

(PPL/NPPL) >20lt Avgas >50lt Avgas >100lt Avgas

Type Acceptance Report

Type Acceptance Report

FRA CDM. Airport Collaborative Decision Making (A-CDM) Flight Crew Briefing FRANKFURT AIRPORT. German Harmonisation

Notice for commencement of consultations on airport charges at Sofia Airport,

Maintaining the dream

Request for Proposal for Hiring of Ground Support Equipments for All Airports of Pakistan

Type Acceptance Report

Type Acceptance Report

Tallinn Airport Ltd CONDITIONS OF USE

Air Berlin PLC Frankfurt, 29 August 2012 DVFA Small Cap Conference

Tariff Regulations. ODE / EKOD Hans Christian Andersen Airport

ROMANIAN AIRCLUB ROMANIAN AERONAUTICAL FEDERATION

Type Acceptance Report

TYPE CERTIFICATE DATA SHEET

Aircraft Details. Airframe Status (as of 03-May-2018)

Type Acceptance Report

AIRPORT CHARGES REGULATION

EUROCAE ED-250: ROAAS MOPS

DEPARTMENT OF AIR ACCIDENT INVESTIGATION

PRATICAL USER GUIDE HANDLING

Page 1 sur 21 LFLB - W1819

Lee County Port Authority. Southwest Florida International Airport Emergency Contingency Plan

2015 Scheduled Maintenance Outlook

Type Acceptance Report

7/24/2013. Ramp Service Operations. Definition. Apron

Tariff Regulations. valid from 21 st to 27 th January Airport Altenrhein AG Flughafenstrasse Altenrhein Switzerland

AIRPORT CHARGES & FEES

SR Technics Training Services

REQUEST FOR PROPOSAL FOR GROUND HANDLING AT COPENHAGEN & OSLO

Air Transport Industry

Guidelines for Life Limited Part (LLP) Movement History Sheet

Transcription:

Content 1/ Notes 2/ Aircraft Handling 3/ Ground Equipment 4/ Fluids / Lubricants 5/ Fluids / Facilities 6/ CyClean Engine Water Wash (according LHT approved method) 7/ Engineering Services 8/ Material Management 9/ Non Cold De-/Anti-Icing of Aircraft 10/ Computational Examples Page 1 of 14

1/ Notes LHT/LTMI has the full rights to modify at any time this price list without any written notice. Delivery subject to availability, specifications subject to change with out notice, correction of errors and omissions excepted. Actual latest revision can be found on www.lufthansa-technik.com Line Maintenance Services. All prices listed are given without value-added tax or other similar taxes that may be added to the price, when required, in accordance with German legislation. The charges listed under are only applicable for customers holding a valid IATA SGHA Agreement with LHT or LTMI. For non contracted customers a Work Order signed by the authorized customer representative is required before any work commences. Editor: All charges listed in EURO ( ) Currency. Lufthansa Technik Line Maintenance Sales & Procurement Frankfurt International Airport South 60549 Frankfurt/Main, Germany Phone: +49-69-696-69660 Fax: +49-69-696-69666 Email: linemaint.agrmts@dlh.de Internet: www.lufthansa-technik.com/linemaintenance Page 2 of 14

2/ Aircraft Handling (Part 1) Transit Check 300 As contracted --- --- Event Daily Check 302 As contracted --- --- Event Weekly Check 304 As contracted --- --- Event Routine NLG wheel change All Aircraft except 310,00 405,00 -A320/B737 318 285,00 618 370,00 Event -A350 340,00 440,00 (includes use of Nitrogen/Tools/Man Hours and Ramp Transport) Routine MLG wheel change All Aircraft except 425,00 552,00 -B777/A350 319 470,00 619 610,00 Event -A380 510,00 665,00 (includes use of Nitrogen/Tools/Man Hours and Ramp Transport) Routine Brake replacement, incl. wheel replacement All Aircraft except 660,00 858,00 327 627 Event -B777/A380/A350 775,00 1.008,00 (includes use of Nitrogen/Tools/Man Hours and Ramp Transport) Temporary personal Assignment per Working Day (8,0 h) (excluding Travel Cost and Travel Time + Daily 328 1.800,00 628 2.340,00 Day allowance) Station Engineer 350 As contracted 355 300,00 MH Engineer with special qualifications (NDT, landing gear, borescope, sheetmetal 357 180,00 --- --- MH specialist) Cockpit window cleaning Wide Body (incl. High Access Working Platform, Consumables 372 275,00 672 358,00 Event and Man Hours) Cockpit window cleaning Narrow Body (incl. Working Ladder, Consumables and Man 373 135,00 673 176,00 Event Hours) Stretcher installation or removal 394 550,00 580 time&material Event Page 3 of 14

2/ Aircraft Handling (Part 2) Aircraft Push Out (Aircraft < 100t MTOW) Aircraft Push Out (Aircraft 101t 200t MTOW) Aircraft Push Out (Aircraft > 200t MTOW) Aircraft Towing (Aircraft < 100t MTOW) Maximum duration 60 Minutes Aircraft Towing (Aircraft 101t 200t MTOW) Maximum duration 60 Minutes Aircraft Towing (Aircraft > 200t MTOW) Maximum duration 60 Minutes 447 150,00 647 195,00 Event 448 195,00 648 254,00 Event 449 250,00 649 325,00 Event 450 280,00 650 364,00 Event 451 330,00 651 429,00 Event 452 435,00 652 566,00 Event 2/ Aircraft Handling Non Ad-Hoc Maintenance Support Call In for non contracted customer (incl. first Mh) --- --- 367 800,00 Event Station Engineer (non contracted customer) --- --- 355 300,00 Mh Page 4 of 14

3/ Ground Equipment (Part 1) Without Operation Working- Ladder/Step 425 30,00 625 40,00 Hour Engine Change Equipment A320 428 6.380,00 637 8.295,00 Event Excluding Engine Stand and Cradle Engine Change Equipment A330/A340/B747 429 8.550,00 638 11.200,00 Event Excluding Engine Stand and Cradle Aircraft Jacking Set (3 each) Narrow Body 430 510,00 630 663,00 Hour B737 / B757 / A320 Aircraft Jacking Set (up to 4 each) Wide Body 431 660,00 631 860,00 Hour A330/A340/A350/B767/B787/B747/MD11/A380 Wheel Jack < 50t 433 50,00 633 65,00 Hour Wheel Jack up to 95t 434 110,00 634 145,00 Hour Salving Support Jack 90t 436 560,00 636 730,00 Hour High Access Working Platform (> = 3 meters elevation) 441 310,00 641 405,00 Hour Motorized Working Platform (< = 3 meters elevation) 442 195,00 642 255,00 Hour Oxygen Supply Car incl. use of Oxygen and Man Hours for filling 445 390,00 645 508,00 Event Nitrogen Supply Car incl. use of Nitrogen excluding man power 446 180,00 646 235,00 Event Stationary Ground Power 100KVA 454 140,00 654 182,00 Hour Airstarter for Wide Body Aircraft 455 340,00 655 445,00 Event Airstarter for Narrow Body Aircraft 456 260,00 656 338,00 Event Air Condition 457 410,00 657 535,00 Hour Cabin Heater 458 250,00 658 325,00 Hour Tow Bar 459 50,00 659 65,00 Hour Page 5 of 14

3/ Ground Equipment (Part 2) Mobile Ground Power 100KVA 466 345,00 666 450,00 Hour Wheel Change Dolly 467 120,00 667 156,00 Hour Light Mast 481 50,00 681 65,00 Hour Borescope Equipment 482 470,00 682 612,00 Hour Refill of Oxygen Bottles (removed from A/C) Crew / Portable Excluding removal and installation 519 250,00 683 325,00 Event Not available at all LHT Line Stations FMS Loading and Software Update (data loader provided by customer) 460 290,00 660 377,00 Event FMS Loader and Software Update with Operator 462 365,00 662 475,00 Event Wali Clean Equipment (for Narrow and Wide Body) 580 7.500,00 580 9.750,00 Event + Shipment Cost 580 time&material 580 time&material Event Page 6 of 14

4/ Fluids / Lubricants Turbonycoil 600 501 15,00 601 19,50 Ltr Eastman Turbo 2389 502 23,00 612 30,00 Ltr MOBIL JET 387 503 23,00 607 30,00 Ltr MOBIL JET II 504 18,00 604 24,00 Ltr Eastman Turbo 2380 505 18,00 605 24,00 Ltr AERO SHELL TURBO OIL 390 506 23,00 606 30,00 Ltr AERO TURBINE ENGINE Oil Shell 560 508 18,00 608 24,00 Ltr Hydraulic Oil PRF-5606 / Mobil Aero HF 509 15,00 609 20,00 Ltr Eastman Turbo 2197 510 18,00 610 24,00 Ltr Aeroshell Grease 7 511 25,00 611 33,00 Kg Jetcleaner 513 2,50 613 4,00 Ltr Hyjet 4 / Skydrol 529 19,00 629 25,00 Ltr Water usage in hangar 533 0,40 635 1,00 Ltr Miscellaneous Fluids Crushed Ice for vacuum toilet line cleaning Charges may vary from station to station due to local procurement. 514 72,00 614 95,00 Event Page 7 of 14

5/ Facilities (Part 1) - Summer 347 Winter 348 Hangar Fee Charges are for min.8.0 hours Hangar Time, additional hangar utilization above the initial 8 hrs. Period will also be charged in segments of 8.0 hours. Summer Season 01.04. - 31.10. max. 8.0 hrs Winter Season 01.11. 31.03. max. 8.0 hrs. Apron Fee for 8.0 hrs 349 Apron Fee (minimum 8,0 hours will be charged) Aircraft Type Aircraft with MTOW < 50 t. 540,00 750,00 208,00 A320-Series 879,00 1238,00 361,00 A330 / A340 Series 2.530,00 3.505,00 1.135,00 A340-600 / A350-Series 3.451,00 4.845,00 1.495,00 A380 4.945,00 6.955,00 2.270,00 348/ 349 B737-Series 878,00 1.240,00 361,00 B757-Series 1.240,00 1.735,00 464,00 B767-Series 1.810,00 2.525.00 538,00 B787-Series 60,00 Spannweite 2.990,00 3.918,00 830,00 B777-Series 3.450,00 4.842,00 1.133,00 B747-Series 3.605,00 5.050,00 1.495,00 B747-800 4.225,00 5.975,00 1.598,00 MD-11 2.575,00 3.605,00 815,00 Aircraft not listed, with MTOW above 50 t. will be charged with listed rate per t. MTOW for 8.0 hours 11,30 17,00 6,20 flat. The above charges listed, are without aircraft towing, but includes wing walker for aircraft hangar positioning. AOG Hangar Access Surcharge If Hangar Space is requested less than 24 hrs ahead of the required access period, the request is considered as AOG. A surcharge of 45% on the first 24 hours applies. Non The charges listed above will be increased by 30% for customer not holding a valid SGHA Agreement. Info: Computational examples see last page. Page 8 of 14

5/ Facilities (Part 2) Hangar Space Cancellation Fees If a Hangar Space reservation is cancelled by the customer, a cancellation fee applies. The fee is related to the lead time of cancelation. Lead time of cancellation Fee (as a fraction of the reservation period) Capping at the equivalent charge for 72 hrs. 14 days 10% of reservation period 7 days 30% of reservation period 24 hrs 80% of reservation period Engine Test Run/Silencer Facilities Use of Run Up Noise Protection Area according local requirement applicable at FRA only Use of Noise Protection Hangar according local requirement applicable at HAM only 550 1.600,00 580 2.080,00 Event 550 1.515,00 580 1.970,00 Hour Use of Engine Run Up Area 553 410,00 580 533,00 Hour Disposal Costs (only for Non ) Disposal Basic Fee --- --- 580 300,00 Event Used Oil, Kerosene --- --- 580 10,00 Ltr Chemicales, Solvent, Color and Varnish --- --- 580 20,00 Ltr Flouresenct Tube --- --- 580 10,00 Piece Page 9 of 14

6/ CyClean Engine Water Wash (according LHT approved method) 464 Engine Water Wash Narrow Body Aircraft per Engine * 3.950,00 Event 464 Engine Water Wash Wide Body Aircraft per Engine * 5.050,00 Event 464 Engine Water Wash Wide Body Aircraft MD11 Engine 2 * 6.950,00 Event * The Engine Water Wash charges are understood without aircraft towing, run up, and Hangar usage. 7/ Engineering Services 375 Engineering Support out of FRA / HAM 250,00 Hour 374 EASA Part-21J Engineering Support Issuing of CRAS (Change/Repair Approval Sheet, type minor only) on request, per event and sheet issued. Does not include: any manufacturer support required Additional engineering hours required for investigation and clarification, same will be charged according 375 6.000,00 Event Page 10 of 14

8/ Material Management (Part 1) Storage: 391 Basic Storage Fee 120,00 Month Spare Part Storage (per part number), except Wheel and Brakes Nbr. 1 2 3 4 5 6 7 8 9 0 56 84 112 140 168 188 226 236 258 10 280 300 318 338 358 378 398 418 438 458 20 478 494 510 526 542 558 574 590 606 622 Month 30 638 652 666 680 694 708 722 736 750 764 40 778 790 802 814 826 838 850 862 874 886 50 898 Each subsequent part number, additional 12,00 EUR Example for Storage of 15 part numbers : 378+120=498 EUR/Mth Wheels / Brakes per Item 65,00 ea. monthly 393 Handling: Material Shipping/Receiving Additional charge for each component above 40 kg 69,00 75,00 per part handled per item Page 11 of 14

8/ Material Management (Part 2) Sale of consumable Material: 523 Parts below or equal 100,00 EUR list price: Sale of consumable Material will be subject to a handling charge as following: 30,00 On top of LHT material list price Per Part Number or P/N set provided 523 Parts above 100,00 EUR list price: Sale of consumable Material will be subject to a handling charge as following: 25 % On top of LHT material list price Per Part Number or P/N set provided Non 523 Minimum Administration/Handling Fee per each single Sale order of LHT Stock Available Material. 400,00 on top of LHT material list price Per Part Number or P/N set provided Page 12 of 14

Station 9/ Non Cold De-/Anti-Icing of Aircraft Aircraft Category 1 NON COLD s Equipment per Event Aircraft Category 2 Aircraft Category 3 Aircraft Category 4 Fluid per Litre Variable Cost per Event Hot Water per Litre Disposal Fee per Litre Fluid 338 338 338 338 340 341 334 EUR EUR EUR EUR EUR EUR EUR BRE 376,- 878,- 1753,- 2633,- 6,00 0,20 0,10 CGN 387,- 812,- 1622,- 2438,- 6,50 0,20 0,70 STR 503,- 1167,- 2339,- 3523,- 6,30 0,20 0,30 A/C Definition of Aircraft Categories MTOW (t) Cat. 1 incl. and up to King Air 350 / Beech 1900 / EMB120 and similar Aircraft < 5,7 2 CRJ / ATR42 / ATR72 / EMB170-195 / F50 / F100 / DH8 / Bae146 / B737 / A320 Fam. / 5,8-100 B717 / MD8 and similar A/C 3 A300 / A310 / B757 / B767 and similar Aircraft 101-200 4 A330 / A340 / A350 / MD11 / L1011 / B787 / B777 / B747 and similar Aircraft 201-400 5 A380 and similar Aircraft 401 - open Note: Reduced conditions for COLD Pool Members apply as contracted. Definition of Winter Season: The winter season starts 1 st October of the present calendar year and ends 30 th April of the forthcoming calendar year. 335 Hands on Check - subject to qualification and customer procedure training. - equipment, if required, will be charged in addition. 115,00 Event Page 13 of 14

10/ Computational Examples Hangar space invoice example per 8 hours period. - Contracted customer AOG (only first 24 hours): Summer Saison / AC Type A330 / Hangar Fee 2.530,00 2.530,00 x 45% = 1.138,50 (AOG surcharge) 1.138,50 + 2.530,00 = 3.668,50 - Non contracted customer AOG (only first 24 hours) Summer Saison / AC Type A330 / Hangar Fee 2.530,00 2.530,00 x 45% = 1.138,50 (AOG surcharge) 1.138,50 + 2.530,00 = 3.668,50 3.668,50 x 30% = 1.100,55 (non contracted surcharge) 3.668,50 + 1.100,55 = 4.769,05 Page 14 of 14