QEW - ALTERNATIVE 3. Ÿ Widen QEW by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange.

Similar documents
Federal Avia on Administra on and Landfills NM Recycling and Solid Waste Conference

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905)

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

5.1 Traffic and Transportation

I-66 Inside the Beltway Feasibility Study

Appendix C Public Comments

Major Projects Overview

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

PRIORITIES COMMITTEE MEETING

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

1.0 Purpose and Organization of the Community Impact Assessment Addendum

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Pedestrian Safety Review Spadina Avenue

HIGHWAY 26 /GREY ROAD 2 INTERSECTION IMPROVEMENTS. The Town of The Blue Mountains

A VISION FOR I-95. January 12, Delaware Department of Transportation

Ministry of Transportation

San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1

SR 934 Project Development And Environment (PD&E) Study

November 21, 2012 Barbara Kelleher, (954)

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

Transform66: Inside the Beltway

Fairfax County Parkway Widening Fairfax County

Eleven things you should know about the carpool lanes in Los Angeles County.

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

Capital Beltway HOT Lanes Project

Proposed. Days & Hours. Frequency. Service Notes: Central Maryland Transit Development Plan Planning the Future of Transit in Our Region

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Managed Lanes, Transit Access, and Economic Development: Implementing the Region s First Highway BRT Corridor

CALIFORNIA HIGH-OCCUPANCY VEHICLE LANE DEGRADATION ACTION PLAN

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

GTO ANNUAL AWARDS GALA DINNER Registration Guide

ST. CLOUD LAKE WOBEGON TRAIL OPEN HOUSE

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

IEPCHECKLIST. Internal Evaluation Program Checklist. Attention: PRISM PRO Subscribers SCALE OF 1-5

City Update. March 24, 2016 Committee of the Whole 1 p.m. Council Chambers, Second Floor, City Hall

State Project Reconstruction I-84

Changes in TIP projects Draft vs. Final Draft

Monk Fryston and Hillam Village Plan

PROGRESS PARK CONNECTOR

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

Progress Report for Projects of Regional Significance

Union Station Rail Corridor East Enhancements Project

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

Master Plan EXECUTIVE SUMMARY

Fairfax County Transportation Advisory Commission (TAC)

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

Age 2 thru Pre K Registra on Packet

Texas Transportation Institute The Texas A&M University System College Station, Texas

DHS Consolidation at St. Elizabeths Master Plan Amendment. Transportation Interstate 295 / Malcolm X Avenue Interchange

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

395 Express Lanes Project Update

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation

Need County Priority Needs Identification Major Projects/Emerging Taking Care of the System (TCOS) 1=High 2=Medium 3=Low

10.0 Recommendations Methodology Assumptions

Grades K thru 9 Registra on Packet

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

SANDAG s Regional Transportation Plan

Pattullo Bridge Replacement Project

Northeast Anthony Henday Drive. Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation

Report to the Strategic Development Committee

Route 29 Solutions Projects

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor

Important Lane Closures, April 3 9, 2011

Mission Statement. Spur 601 Project Highlights

DOWNTOWN BRT ALTERNATIVE - 19th AVE

Appendix B Connecting Track Options Evaluation Criteria

2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION

Hospital Link Project Project Update Winter 2018

Proposal for the South-west Commonwealth Marine Reserves Network

RW Bruhn Bridge and Approaches Project

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP

AB-LT_PC11-B1_H488 Project Cargo Corridor - Pre-Approved Permit Conditions

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

2018 Notre Dame Baseball Prospect Camp CONFIRMATION PACKET

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES

Southwest LRT Alignment Video Narration

McLean Citizens Association Transportation Committee Project Briefing

Hampton Roads Express Lane Network

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Transcription:

SKYVIEW DRIVE KERNS and Highway 403 Freeman Interchange - ALTERNATIVE 3 Ÿ Widen by one HOV lane in both direc ons through Freeman Interchange to North Shore Boulevard Interchange. Ÿ Widen Highway 403 by one HOV lane in both direc ons and dedicated connec on to HOV lanes through Freeman Interchange. Ÿ HOV lane connec on through interchange requires numerous bridge replacements. 407 ETR BRANT STREET LEIGHLAND PLAINS EAST ü Direct HOV connec on between and Highway 403 ü Provides most opportunity for capacity expansion on and Highway 403 ü Can provide desirable shoulder widths throughout û Property impacts in northwest and northeast quadrants û Very high cost û Challenging construc on staging û Requires replacement of several bridges Recommendation: Do Not Carry Forward

SKYVIEW SKYVIEW SKYVIEW DRIVE DRIVE DRIVE KERNS KERNS KERNS and Highway 403 Freeman Interchange HIGHWAY 403 / FREEMAN WESTBOUND ALTERNATIVE 1A Ÿ Realign south-to-west inner loop-ramp to merge with Highway 403 at a more westerly point. Ÿ Mi gate lane / Highway 403 lane balance issue by adding an addi onal westbound lane. Ÿ Widen Highway 403 by an addi onal general purpose lane or HOV lane. 407 407 407 ETR ETR ETR BRANT BRANT BRANT STREET STREET STREET WATERDOWN ü Addi onal capacity for east-to-west traffic ü Rela vely low cost û Challenging constructability at 407 ETR ramps û Does not provide addi onal capacity for south-to-west ramp û Minimal property required Recommendation: Carry Forward as Possible Interim Solution

KERNS and Highway 403 Freeman Interchange HIGHWAY 403 / FREEMAN WESTBOUND ALTERNATIVE 1B Ÿ Provide two-lane loop ramp for the to Highway 403 westbound ramp. Ÿ Realign south-to-west inner loop-ramp to merge with Highway 403 at a more westerly point. Ÿ Provide separate two-lane ramp for to Highway 407 northbound 407 ETR ramp. Ÿ Mi gate lane / Highway 403 lane balance issue by adding an addi onal westbound lane. Ÿ Widen Highway 403 by an addi onal general purpose lane or HOV lane. ü Addi onal capacity for east-to-west and south-to-west traffic ü Rela vely low cost û Challenging constructability at 407 ETR ramps û Requires new NB to 407 ETR ramp û Minimal property required LEIGHLAND WATERDOWN Recommendation: Carry Forward

SKYVIEW DRIVE BRANT STREET and Highway 403 Freeman Interchange HIGHWAY 403 / FREEMAN WESTBOUND ALTERNATIVE 2A Ÿ Provide new semi-direc onal ramp for the to Highway 403 westbound. Ÿ Mi gate lane / Highway 403 lane balance issue by adding an addi onal westbound lane. Ÿ Widen Highway 403 by an addi onal general purpose lane or HOV lane. KERNS 407 ETR LEIGHLAND WATERDOWN ü Addi onal capacity for east-towest and south-to-west traffic ü Improved geometry for south-towest ramp û Rela vely high cost due to long bridge û Challenging constructability under EB 403 ramp û Poten al traffic weaving impacts between Plains Rd./Fairview St. Interchange and new WB ramp û May require modifica on to Plains Rd./Fairview St. Interchange ramps to mi gate weaving issues û Property impacts in northwest quadrant Recommendation: Carry Forward

SKYVIEW DRIVE KERNS and Highway 403 Freeman Interchange HIGHWAY 403 / FREEMAN WESTBOUND ALTERNATIVE 2B Ÿ Provide new semi-direc onal ramp for the to Highway 403 westbound. Ÿ Provide separate two-lane ramp for to Highway 407 northbound. Ÿ Mi gate lane / Highway 403 lane balance issue by adding an addi onal westbound lane. Ÿ Widen Highway 403 by an addi onal general purpose lane or HOV lane. 407 ETR BRANT STREET LEIGHLAND PLAINS WATERDOWN ü Addi onal capacity for east-towest and south-to-west traffic ü Improved geometry for south-towest ramp û Rela vely high cost due to long bridges û Challenging constructability under EB 403 ramp û Property impacts in northwest quadrant û Requires new ramp from to 407 ETR to mi gate weaving issues û Reduced design speed between NB and 407 ETR Recommendation: Do Not Carry Forward

BRANT BRANT BRANT STREET STREET STREET and Highway 403 Freeman Interchange HIGHWAY 403 / FREEMAN WESTBOUND ALTERNATIVE 3A Ÿ Provide new direc onal ramp for the to Highway 403 westbound. Ÿ Mi gate lane / Highway 403 lane balance issue by adding addi onal westbound lane. Ÿ Widen Highway 403 by an addi onal general purpose lane or HOV lane. Ÿ Direc onal ramp has a broken-back (less desirable) to mi gate property impacts. SKYVIEW DRIVE KERNS KERNS 407 ETR LEIGHLAND HWY HWY 403 403 NORTH NORTH NORTH SERVICE SERVICE SERVICE PLAINS PLAINS FAIRVIEW STREET WATERDOWN ü Addi onal capacity for east-to-west and south-to-west traffic ü Improved geometry for south-towest ramp ü Avoids weaving issues û Rela vely high cost û Significant impacts to exis ng hydro transmission corridor and towers û Broken-back curve on new south-to-west ramp less desirable than simple curve û Inner-loop ramp (Alterna ve 1A) must be used to avoid weaving issue. û Rela vely minor property impacts Recommendation: Do Not Carry Forward

BRANT STREET and Highway 403 Freeman Interchange HIGHWAY 403 / FREEMAN WESTBOUND ALTERNATIVE 3B Ÿ Provide new direc onal ramp for the to Highway 403 westbound. Ÿ Mi gate lane / Highway 403 lane balance issue by adding addi onal westbound lane. Ÿ Widen Highway 403 by an addi onal general purpose lane or HOV lane. Ÿ Use of single curve for direc onal ramp results in property impacts. SKYVIEW DRIVE KERNS 407 ETR LEIGHLAND PLAINS PLAINS PLAINS FAIRVIEW STREET WATERDOWN ü Addi onal capacity for east-to-west and south-towest traffic ü Improved geometry for south-to-west ramp ü Avoids weaving issues û Rela vely high cost û Significant property impacts on North Service Road û Significant impacts to exis ng hydro transmission corridor tower û Inner-loop ramp (Alterna ve 1A) must be used to avoid weaving issue. Recommendation: Do Not Carry Forward

SKYVIEW DRIVE KERNS and Highway 403 Freeman Interchange HIGHWAY 403 / FREEMAN EASTBOUND ALTERNATIVE 1 Ÿ Provide new ramp for the Highway 403 to eastbound. Ÿ New ramp provides addi onal capacity for eastbound traffic as exis ng bridges cannot be widened. Ÿ Provide addi onal capacity on Highway 403 to study limits. 407 ETR BRANT STREET LEIGHLAND PLAINS WATERDOWN ü Addi onal capacity for Hwy 403 EB to EB ramp ü No property requirements ü Minimal staging impacts û Requires replacement of exis ng eastbound bridges Recommendation: Carry Forward

SKYVIEW SKYVIEW SKYVIEW DRIVE DRIVE DRIVE BRANT BRANT BRANT STREET STREET STREET and Highway 403 Freeman Interchange HIGHWAY 403 / FREEMAN EASTBOUND ALTERNATIVE 2 Ÿ Provide new ramp for the Highway 403 to eastbound. Ÿ New ramp provides addi onal capacity for eastbound traffic as exis ng bridges cannot be widened. Ÿ Provide addi onal capacity on Highway 403 to study limits. Ÿ Provide addi onal capacity for the Highway 403 to southbound ramp. KERNS KERNS KERNS 407 407 407 ETR ETR ETR KING KING LEIGHLAND PLAINS PLAINS WATERDOWN ü Addi onal capacity for west-to-east and west-to-south traffic û Requires replacement of Fairview St. off-ramp bridge over CN Rail û Requires widening / replacement of bridge over 407 ETR ramp û Minimal property requirements Recommendation: Carry Forward

and Highway 403 Freeman Interchange SHORT-LIST OF ALTERNATIVES Alterna ve Carried Forward? - Alterna ve 1 ü - Alterna ve 2 ü - Alterna ve 3 û Hwy 403 / Freeman Westbound - Alterna ve 1A ü * Hwy 403 / Freeman Westbound - Alterna ve 1B ü Hwy 403 / Freeman Westbound - Alterna ve 2A ü Hwy 403 / Freeman Westbound - Alterna ve 2B û Hwy 403 / Freeman Westbound - Alterna ve 3A û Hwy 403 / Freeman Westbound - Alterna ve 3B û Hwy 403 / Freeman Eastbound - Alterna ve 1 ü Hwy 403 / Freeman Eastbound - Alterna ve 2 ü *Interim only Note: the following op ons may be par ally or wholly combined in the preferred alterna ve.

and Highway 403 Freeman Interchange EVALUATION CRITERIA The following evalua on criteria has been iden fied by the Project Team to review and evaluate the design alterna ve. Natural Environment Fish and Fish Habitat Wildlife and Wildlife Habitat Species at Risk Surface Water / Groundwater Transporta on Infrastructure Transporta on network capacity Interchange opera on and transporta on efficiency Promotes effec ve movement of people and goods Geometrics and Highway Safety Cost Socio-Economic Environment Community Impacts Exis ng and Planned Land Uses Waste/Contamina on Noise and Air Quality Constructability & U li es Complexity and Difficulty of Construc on Impacts to U li es Property Impacts Climate Change ² Cultural and Built Heritage Resources Archaeology Built Heritage Cultural Heritage Let us know if addi onal evalua on criteria should be included.

and Highway 403 Freeman Interchange TRANSITWAY ALTERNATIVES This study includes conceptual design of a transitway connec ng Aldershot GO Sta on to the future 407 Transitway. A poten al connec on to local transit and Burlington GO Sta on will be considered. The study will consider various routes for the Transitway along Highway 403. The Transitway alignment through Freeman Interchange will depend on the iden fied improvement alterna ve. What is a transitway? A transitway is a transporta on corridor which is dedicated for public transit vehicles (e.g. buses, trains, etc.). Sta ons may be planned at various loca ons throughout the transitway. N WATERDOWN WATERDOWN 403 SKYVIEW SKYVIEW DRIVE DRIVE KERNS KERNS BRANT STREET BRANT STREET LASALLE PARK LASALLE PARK ENFIELD ENFIELD PLAINS EAST PLAINS EAST Poten al Transitway Alignments

and Highway 403 Freeman Interchange POTENTIAL CARPOOL LOT Carpool lots promote efficient means of travel and encourage use of transit and High Occupancy Vehicle (HOV) / High Occupancy Toll (HOT) lanes. MTO s Central Region Carpool Lots Opportunity Study (2007) recommended a carpool lot at the Fairview Street / Plains Road Interchange. This current study will confirm the recommenda on in considera on to the proposed highway improvements, and undertake preliminary design of the carpool lot site. N P Plains Road East Plains Road East Fairview Street Fairview Street Maple Avenue Maple Avenue MAPLEVIEW MALL

and Highway 403 Freeman Interchange NEXT STEPS AND CONTACT INFORMATION A er this Public Informa on Centre, the Project Team will: Ÿ Ÿ Ÿ Ÿ Review and respond to comments received. Meet with stakeholders and external agencies, as necessary. Complete the evalua on of the short-list of alterna ves. Review the poten al impacts on the natural, cultural, socio-economic and transporta on environments. Ÿ Ÿ Select a preliminary preferred alterna ve. Prepare for Public Informa on Centre # 2. Informa on presented today is available online at the study website: www.qew403freeman.ca. Please feel free to ask ques ons and fill out a comment sheet before you leave. Comments can be le in the box provided or forwarded to the Project Team by email, mail, or fax. Freedom of Informa on and Protec on of Privacy Policy Informa on collected during this study will be used to assist the Ministry of Transporta on in mee ng the requirements of the Provincial Environmental Assessment Act. This material will be maintained on file for use during the study and may be included in the study documenta on. Informa on collected will be used in accordance with the Freedom of Informa on and Protec on of Privacy Act. With the excep on of personal informa on, all comments will become part of the public record. Project Team Contacts: Mr. Cameron Bevers Project Manager Ministry of Transportation 159 Sir William Hearst Avenue 4th Floor Toronto, ON M3M 0B7 Mr. Michael Chiu, P.Eng. Consultant Project Manager WSP 610 Chartwell Road, Suite 300 Oakville, ON L6J 4A5 project-team@qew403freeman.ca project-team@qew403freeman.ca