GOVERNMENT OF ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT

Similar documents
LIST OF RETAINED PROJECTS FROM PRIORITY LIST OF to PENDING FOR SANCTION FOR FUNDING UNDER NLCPR INDICATING IT S LATEST STATUS.

Accelerated Road Development Programme (SARDP-NE) and Border Highways under Border Area Development Programme (BADP) in Arunachal Pradesh

List of schemes under SPA during to be monitored Sl. Name of Project No TAWANG DISTRICT

APPROACH TO XI th FIVE YEAR PLAN IN RESPECT OF COMMUNICATION SECTOR UNDER PWD ARUNACHAL PRADESH

G0VERNMENT OF ARUNACHAL PRADESH PUBLIC WORK DEPARTMENT

LIST OF VALID ENLISTED/RE-VALIDATED CONTRACTORS / FIRMS UNDER PWD, ARUNACHAL PRADESH. Class II ( Civil ) Category as on

ARUNACHAL PRADESH LAND OF THE RISING SUN

G0VERNMENT OF ARUNACHAL PRADESH PUBLIC WORK DEPARTMENT

Largest hydropower potential in India. Railways as a new means of transport. Orchid paradise. Carpet making. Largest state in Northeast

The Arunachal Pradesh Gazette

Ministry of Development of North Eastern Region

Development of Road Infrastructure in India

11 th Annual Conference Road Development in India Telangana State Initiatives

Development of infrastructure

GEO-ENVIRONMENTAL BACKGROUND

PLACEMENT IN SPA SECTOR

Arunachal Pradesh. The Subansari River Expedition Fixed Departure December 13-23, 2018

SALIENT FEATURE OF GDCR Regulation No (i) WIDTH OF ROADS IN WALLED CITY & GAMTAL Sr. No.

Helicopter Connectivity in North East

INFRASTRUCTURE DEVELOPMENT IN THE NORTH-EAST

CONSTRUCTION PROJECT. INFORMATION REGARDING STATUS OF R/A/FINAL BILL PAYMENT OF CONTRACTOR'S BILL (November MONTH)

SALARIED & PROFESSIONALS

A comparative analysiss on impact of rural tourism on environment in Arunachal Pradesh, India

SmartCity (Kochi) Infrastructure Private Limited SEZ

Hong Kong International Airport (Chek-Lap Kok Airport)

Assistance to States for Developing Export Infrastructure and Allied Activities (ASIDE) Scheme of Ministry of Commerce & Industry, State Cell

Arunachal Pradesh: Reh & Boori Boot Fes6val 14 days

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

Pradhan Mantri Awas Yojana (PMAY-U)

MARKETING PRM ON 12 TH JUNE 2018

DESPITE GLOBAL ISSUES, TOURISM IS ON A GROWTH PATH

DETAIL NOTE ON PROJECT

Mammals of the high altitudes of western Arunachal Pradesh, eastern Himalaya: an assessment of threats and conservation needs

CONSTRUCTION OF HOSTELS FOR OBC BOYS AND GIRLS (AS REVISED W.E.F ) GUIDELINES

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

PRE FEASIBILITY REPORT TABLE OF CONTENTS

TRAINING & LICENCING DIRECTORATE FLIGHT CREW LICENSING CIRCULAR No. 1/2010

Karnataka Evaluation Policy and Karnataka Evaluation Authority

August 30, Revised Cost Estimate for setting up of India Post Payments Bank from Rs. 800 crore to

2. Wages and Earnings

PROJECT UPDATES: March 15, th Street Water Tower Painting Project:

Centrally Sponsored Scheme of Construction of Hostels for OBC Boys and Girls (Revised w.e.f )

M56. New Junction 11a Summary of the consultation report

Nanaji Deshmukh Scheme of Construction of Hostels for DNTs Boys and Girls. (Centrally Sponsored Scheme)

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

CONSTRUCTION OF HOSTELS FOR OBC BOYS AND GIRLS (AS REVISED W.E.F ) GUIDELINES

BOOKLET NO. ITEWS/NWAY1/LZ...

RFP Corrigendum No. 01

CENTRALLY SPONSORED SCHEMES

Ecosystem Services Awareness Building Through Quality Control in Tourist Destination: A Possible Methodological Approach

AN ANALYSIS OF INCOME AND EMPLOYMENT OF SOME SELECTIVE TOURIST RESORTS OF ZIRO VALLEY, ARUNACHAL PRADESH

Recent amendment to Annex 14, Volume I and an update on PANS-Aerodromes

the total length of railway lines in the country and the length out of that electrified in terms of kilometre and percentage, State-wise;

AIR INDIA CHARTERS LIMITED

G.O.Ms.No.142 Dated:

RURAL TOURISM DEVELOPMENT: AN OVERVIEW OF TOURISM IN THE VILLAGE THANEDHAR AND NARKANDA IN SHIMLA DISTRICT, HIMACHAL PRADESH (INDIA)

A303 Stonehenge Amesbury to Berwick Down

MINISTRY OF URBAN DEVELOPMENT DEMAND NO. 95 Ministry of Urban Development

Table. Population Statistics of Kerala

State Budget Breakfast

MINISTRY OF PETROLEUM & NATURAL GAS ECONOMIC DIVISION

ANNEXURE. Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation)

Six Months of 3% Rebate from 30 June 2018 when New MTR Fares Take Effect No Actual Fare Increase for Octopus Passengers in 2018

TNPSC BITS NATIONAL. Logo, Web Portal launched - 150th birth anniversary of Mahatma Gandhi

Date: Dear Sirs,

HOMES 2 SHIVALIK. Homes For Happiness COSMOS. Road Map INFRAESTATE PVT. LTD.

Centrally Sponsored Scheme of Construction of Hostels for OBC Boys and Girls (Revised w.e.f )

National Conference on

NAMDAPHA TREK NAMDAPHA RAIN FOREST TREK Dec 22-31, 2019

ANALYSIS OF SOCIO-ECONOMIC BACKGROUND OF TOURISTS IN MADURAI DISTRICT

Presentation on Indian Tourism Industry

Denis Connolly. Hecny Transportation Consultant 2003 Nov 2005

Key Tourism Indicators January to September 2017

Welcome & Introduction. Steve Sawyer, Executive Director Manor Royal Business District

GOVERNMENT OF INDIA AERONAUTICAL INFOFUvlAT!ON SERVICES DIRECTOR GENERAL OF CIVIL AVIATION OPPOSITE SAFDARJUNG AIRPORT

Queensland Competition Authority

Capability Statement SUNJAAY ATHANKI PROJECTS MANAGEMENT PVT LTD

Electoral Roll, 2013 : State - Arunachal Pradesh

TRAVEL POLICY. At FICCI, we enjoy a high level of transparency and have a strong faith in empowerment.

UNITED NATIONS ECONOMIC AND SOCIAL COMMISSION FOR ASIA AND THE PACIFIC (ESCAP)

Queensland Budget. August 2017

MECON LIMITED, RANCHI. CSR & Sustainability Programme. Report for the period April,2015 to June,2015

Tourism and Hospitality AUGUST. For updated information, please visit

AIRLINE ALLIED SERVICES LIMITED (A wholly owned subsidiary of AIL)

ROAD DEVELOPMENT IN INDIA 2015

South Australian Budget June 2014

One Under-rated achievement of the Delhi Master Plan MPD 2021 wins the ISOCARP award 2008 for Urban planning.

Northern Rockies District Value of Tourism Research Project December 2007

Table 1 Achievements of Youth Hostels in 10 th Five Year Plan

16. COMMITTEE SECTION (T&T)

HOTEL/LEISURE/COMPLEMENTARY RETAIL OPPORTUNITY

THE REPUBLIC OF THE UNION OF MYANMAR

Waterways Ireland. Largest of the six North/South Implementation Bodies

Volume 21 JANUARY 2011

Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan

India Post - Leveraging the power of Rural Post Office Network for EBT & DBT. SaiRamVenkatesha

Department of Archaeology & Museums, Haryana

न दय ल जन आव स य जन क अतग

Daily Current Affairs Capsule 19 th January 2019

Domestic LPG Stove INTRODUCTION MARKET POTENTIAL

Transcription:

GOVERNMENT OF ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT SPECIAL ASSISTANCE PACKAGE (SAP) ANNUAL OPERATING PLAN 2007-2008 VOLUME H COMMUNICATION SECTOR NON-LAPSABLE CENTRAL POOL OF RESOURCES (NLCPR) STATE SHARE

I N D E X NON-LAPSABLE CENTRAL POOL OF RESOURCES (N.L.C.P.R.) SCHEME Page No. Sl. No. Name of Division From To 1 2 3 4 FORMATS Districtwise Format 1 2 CSS-I (PART-I) 1 2 Western Zone 1 Tawang 1 2 Jang 2 3 Bomdila 3 4 Bameng 4 5 Sagalee 5 Eastern Zone 6 Daporijo 6 7 Along 7 8 Rumgong 8 9 Yingkiong 9 10 Hayuliang 10

Sl. No. Name of District Name of Division SPECIAL ASSISTANCE PACKAGE (SAP) NON-LAPSABLE CENTRAL POOL OF RESOURCES (N.L.C.P.R.) : 2007-2008 Name of the Scheme Anticipated Cummulative Expenditure during 10th Plan period till Balance Bank of Sanction Proposed Outlay 2007-2008 (Rupees in lakhs) March 2008 State Share State Share State Share State Share 1 2 3 4 5 6 7 8 Remarks Page - 1 1 Tawang Tawang Construction of Porter Track from Nuranang to Mago 25.90 21.90 4.00 4.00 Non-Divertable 2 Tawang Tawang Improvement of Porter Track from Tungri to Mago (70.00 Km) 31.06 31.06 31.05 Non-Divertable 3 Tawang Jang Construction of Link Road from Lhou Nallah to Mukto Circle HQ via Mirba, Gomkelling and Serjong (15.00 Km) in Tawang District 180.30 180.30 74.10 Non-Divertable 4 West Kameng Bomdila Improvement of Palizi-Thrizino Road (17.00 Km) 74.39 9.60 64.79 29.80 Non-Divertable 5 West Kameng Bomdila Construction of Road from Nafra to Nakhu and Nachiban in West Kameng District (11.00 Km) 75.40 75.40 35.00 Non-Divertable 6 East Kameng Bameng Construction of Road from Pakke to Wai (18.00 Km) 112.72 17.30 95.42 20.25 Non-Divertable 7 East Kameng Bameng Construction of Road from Dipulamgu Bridge point to Pipu (14.00 Km) 41.72 4.50 37.22 23.20 Non-Divertable 8 East Kameng Bameng Construction of Road from Bameng to Lada (40.00 Km) 89.02 9.75 79.27 59.25 Non-Divertable 9 Papumpare Sagalee Improvement/Construction of Road from Sagalee to Sakiang (50.00 Km) 349.38 51.85 297.53 100.00 Non-Divertable 10 Papumpare Sagalee Improvement of Doimukh-Toru Road (40.00 Km) (from NH-52A) Nirjuli to Sagalee 11 Upper Subansiri Daporijo Construction of Steel Suspension Bridge over Subansiri river near Siyum (span 174.00 Mtr) 204.84 22.10 182.74 95.00 Non-Divertable 86.16 7.10 79.06 39.05 Non-Divertable 12 Upper Subansiri Daporijo Improvement and Upgradation of Menga-Giba Road (8.00 Km) 35.67 5.00 30.67 30.65 Non-Divertable 13 West Siang Along Nyorak to Rime Putok Road 98.97 98.97 29.20 Non-Divertable 14 West Siang Rumgong Construction of Bridge over Siyom on Kaying to Paksing Road (span 122.00 Mtr) 76.38 76.38 36.40 Non-Divertable

Sl. No. Name of District Name of Division NON-LAPSABLE CENTRAL POOL OF RESOURCES (N.L.C.P.R.) : 2007-2008 Name of the Scheme Anticipated Cummulative Expenditure during 10th Plan period till Balance Bank of Sanction Proposed Outlay 2007-2008 (Rupees in lakhs) March 2008 State Share State Share State Share State Share 1 2 3 4 5 6 7 8 Remarks Page - 2 15 Upper Siang Yingkiong Construction of Motorable Suspension Bridge over river Siang at the site of Gandhi Bridge. 16 Upper Siang Yingkiong Construction of Steel Suspension Bridge over Siang River and Approach Road at Kodak near Tuting. 17 Upper Siang Yingkiong Construction of Road from Jengging to Ramsing in Upper Siang District (35.00 Km) 18 Anjaw Hayuliang Construction of Motorable Bridge over river Lohit to connect Manchal Administrative Circle (span 156.55 Mtr) 196.15 15.85 180.30 20.00 Non-Divertable 89.60 18.00 71.60 31.60 Non-Divertable 53.66 53.66 53.65 Non-Divertable 89.68 17.00 72.68 22.70 Non-Divertable Total: 1911.00 199.95 1711.05 734.90 NOTE : STATE SHARE EARMARKED IS NON-DIVERTABLE

Sl. No. Name of the Scheme SPECIAL ASSISTANCE PACKAGE (SAP) ANNUAL OPERATING PLAN : 2008-2009 NON-LAPSABLE CENTRAL POOL OF RESOURCES (N.L.C.P.R.) : 2008-2009 Technical Sanction Revised outlay for 9th Plan (1997-2002) Actual Expenditure for 9th Plan (1997-2002) Cummulative Expenditure during 10th Plan period till March 2008 Sanction FORMAT-C.S.S.-I (PART-I) Proposed Outlay 2008-2009 (State Share) (Rupees in lakhs) 1 2 3 4 5 6 7 9 10 Remarks Page - 3 1 Construction of Porter Track from Nuranang to Mago 25.90 21.90 4.00 4.00 Non-Divertable 2 Improvement of Porter Track from Tungri to Mago (70.00 Km) 3 Construction of Link Road from Lhou Nallah to Mukto Circle HQ via Mirba, Gomkelling and Serjong (15.00 Km) in Tawang District 31.06 31.06 31.05 Non-Divertable 180.30 180.30 74.10 Non-Divertable 4 Improvement of Palizi-Thrizino Road (17.00 Km) 74.39 9.60 64.79 29.80 Non-Divertable 5 Construction of Road from Nafra to Nakhu and Nachiban in West Kameng District (11.00 Km) 75.40 75.40 35.00 Non-Divertable 6 Construction of Road from Pakke to Wai (18.00 Km) 112.72 17.30 95.42 20.25 Non-Divertable 7 Construction of Road from Dipulamgu Bridge point to Pipu (14.00 Km) 8 Construction of Road from Bameng to Lada (40.00 Km) 9 Improvement/Construction of Road from Sagalee to Sakiang (50.00 Km) 10 Improvement of Doimukh-Toru Road (40.00 Km) (from NH-52A) Nirjuli to Sagalee 11 Construction of Steel Suspension Bridge over Subansiri river near Siyum (span 174.00 Mtr) 41.72 4.50 37.22 23.20 Non-Divertable 89.02 9.75 79.27 59.25 Non-Divertable 349.38 51.85 297.53 100.00 Non-Divertable 204.84 22.10 182.74 95.00 Non-Divertable 86.16 7.10 79.06 39.05 Non-Divertable

Sl. No. Name of the Scheme SPECIAL ASSISTANCE PACKAGE (SAP) ANNUAL OPERATING PLAN : 2008-2009 NON-LAPSABLE CENTRAL POOL OF RESOURCES (N.L.C.P.R.) : 2008-2009 Technical Sanction Revised outlay for 9th Plan (1997-2002) Actual Expenditure for 9th Plan (1997-2002) Cummulative Expenditure during 10th Plan period till March 2008 Sanction FORMAT-C.S.S.-I (PART-I) Proposed Outlay 2008-2009 (State Share) (Rupees in lakhs) 1 2 3 4 5 6 7 9 10 12 Improvement and Upgradation of Menga-Giba Road 35.67 5.00 30.67 30.65 Non-Divertable (8.00 Km) Remarks Page - 4 13 Nyorak to Rime Putok Road 98.97 98.97 29.20 Non-Divertable 14 Construction of Bridge over Siyom on Kaying to Paksing Road (span 122.00 Mtr) 15 Construction of Motorable Suspension Bridge over river Siang at the site of Gandhi Bridge. 16 Construction of Steel Suspension Bridge over Siang River and Approach Road at Kodak near Tuting. 17 Construction of Road from Jengging to Ramsing in Upper Siang District (35.00 Km) 18 Construction of Motorable Bridge over river Lohit to connect Manchal Administrative Circle (span 156.55 Mtr) 76.38 76.38 36.40 Non-Divertable 196.15 15.85 180.30 20.00 Non-Divertable 89.60 18.00 71.60 31.60 Non-Divertable 53.66 53.66 53.65 Non-Divertable 89.68 17.00 72.68 22.70 Non-Divertable Total: 1911.00 0.00 0.00 0.00 199.95 734.90 NOTE : STATE SHARE EARMARKED IS NON-DIVERTABLE

Page No. : 1 upto NAME OF CIRCLE : RUPA CIRCLE NAME OF DIVISION : TAWANG DIVISION SPECIAL ASSISTANCE PACKAGE (SAP) STATE SHARE 1 Construction of Porter Track from Nuranang to Mago DNER/NLP/AP/ 25.90 21.90 4.00 4.00 100% completion Completed 2 Improvement of Porter Track from Tungri to Mago (70.00 Km) DNER/NLP/AP/ 31.06 31.06 31.05 100% completion TOTAL = 56.96 21.90 35.06 35.05

Page No. : 2 upto NAME OF CIRCLE : RUPA CIRCLE NAME OF DIVISION : JANG DIVISION 3 Construction of Link Road from Lhou Nallah to Mukto DNER/NLP/AP/ 180.30 180.30 74.10 Circle HQ via Mirba, Gomkelling and Serjong (15.00 Km) in Tawang District. TOTAL = 180.30 0.00 180.30 74.10

Page No. : 3 upto NAME OF CIRCLE : RUPA CIRCLE NAME OF DIVISION : BOMDILA DIVISION 4 Improvement of Palizi-Thrizino Road (17.00 Km) DNER/NLP/AP/ 74.39 9.60 64.79 29.80 5 Construction of Road from Nafra to Nakhu and Nachiban in West Kameng District (11.00 Km) DNER/NLP/AP/ 75.40 75.40 35.00 TOTAL = 149.79 9.60 140.19 64.80

Page No. : 4 upto NAME OF CIRCLE : RUPA CIRCLE NAME OF DIVISION : BAMENG DIVISION 6 Construction of road from Pakke to Wai (18.00 Km) DNER/NLP/AP/ 112.72 17.30 95.42 20.25 7 Construction of Road from Dipulamgu Bridge point to Pipu (14.00 Km) DNER/NLP/AP/6 2/2004 Dtd.27-12- 2005 8 Construction of Road from Bameng to Lada (40.00 Km) DNER/NLP/AP/6 0/2004 Dtd.27-12- 2005 41.72 4.50 37.22 23.20 89.02 9.75 79.27 59.25 TOTAL = 243.46 31.55 211.91 102.70

Page No. : 5 upto NAME OF CIRCLE : NAHARLAGUN CIRCLE NAME OF DIVISION : SAGALEE DIVISION 9 Improvement/Construction of Road from Sagalee to Sakiang (50.00 Km) 10 Improvement of Doimukh - Toru Road (40.00 Km) (from NH-52A) Nirjuli to Sagalee. DNER/NLP/AP/ 349.38 51.85 297.53 100.00 DNER/NLP/AP/ 204.84 22.10 182.74 95.00 TOTAL = 554.22 73.95 480.27 195.00

Page No. : 6 upto NAME OF CIRCLE : BASAR CIRCLE NAME OF DIVISION : DAPORIJO DIVISION 11 Constuction of Steel Suspension Bridge over Subansiri river near Siyum (span 174.00 Mtr) 12 Improvement and Upgradation of Menga-Giba Road (8.00 Km) DNER/NLP/AP/7 1/2005 Dtd.17-02- 2006 DNER/NLP/AP/6 7/2004 Dtd.27-03- 2006 86.16 7.10 79.06 39.05 35.67 5.00 30.67 30.65 TOTAL = 121.83 12.10 109.73 69.70

Page No. : 7 upto NAME OF CIRCLE : ALONG CIRCLE NAME OF DIVISION : ALONG DIVISION 13 Nyorak to Rime Putok Road DNER/NLP/AP/8 3/2006 Dtd.28-06- 2007 98.97 98.97 29.20 TOTAL = 98.97 0.00 98.97 29.20

Page No. : 8 upto NAME OF CIRCLE : ALONG CIRCLE NAME OF DIVISION : RUMGONG DIVISION 14 Construction of Bridge over Siyom on Kaying to Paksing Road (span 122.00 Mtr) DNER/NLP/AP/7 0/2005 Dtd.06-12- 2006 76.38 76.38 36.40 Approach road B/T-1.50 Km, Cul (4 mtr span)-1 No & Cul (1 mtr span)-3 Nos TOTAL = 76.38 0.00 76.38 36.40

Page No. : 9 upto NAME OF CIRCLE : BOLENG CIRCLE NAME OF DIVISION : YINGKIONG DIVISION 15 Construction of Motorable Suspension Bridge over river Siang at the site of Gandhi Bridge. 16 Construction of Steel Suspension Bridge over Siang River and Approach Roads at Kodak near Tuting. 17 Construction of Road from Jengging to Ramsing in Upper Siang District (35.00 Km) DNER/NLP/AP/6 7/2004 Dtd.27-03- 2006 DNER/NLP/AP/5 9/2004 Dtd.27-12- 2005 DNER/NLP/AP/7 5/2006 Dtd.25-09- 2006 196.15 15.85 180.30 20.00 89.60 18.00 71.60 31.60 53.66 53.66 53.65 TOTAL = 339.41 33.85 305.56 105.25

Page No. : 10 upto NAME OF CIRCLE : TEZU CIRCLE NAME OF DIVISION : HAYULIANG DIVISION 18 Construction of Motorable Bridge over river Lohit to connect Manchal Administrative Circle (span 156.55 Mtr) DNER/NLP/AP/6 3/2004 Dtd.27-12- 2005 89.68 17.00 72.68 22.70 TOTAL = 89.68 17.00 72.68 22.70 GRAND TOTAL = 1911.00 199.95 1711.05 734.90