Douala ICAO Workshop Kalibo Study Case

Similar documents
PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Learning Objectives. By the end of this presentation you should understand:

Implementation of PBN in Armenian airspace

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN and airspace concept

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

Performance Based Navigation (PBN) Implementation Plan. The Gambia

(RN R A N V A V & & RN R P N

Performance Based Navigation Implementation of Procedures

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

Status of PBN implementation in France

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Guidance Material Flight Procedure Approval

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Air Navigation Bureau ICAO Headquarters, Montreal

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

APV IMPLEMENTATION PLAN

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

RNAV - RNP. July 2010

ICAO framework for LPV

FLIGHT OPERATIONS PANEL (FLTOPSP)

Implementation challenges for Flight Procedures

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

EUROCONTROL approach to the execution of the PBN IR Mandate

AERONAUTICAL INFORMATION CIRCULAR 18/18

Approach Specifications

Open Questions & Collecting Lessons Learned

REPORT FORM IR(A) INITIAL SKILL TEST. (Use Type or Class Rating forms to revalidate IR(A) or renew expired IR(A)) Type rating: Type rating:

Flight Operations Inspector Manual

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain

Validation & Implementation Considerations Module 14 Activities 11 to 17

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

RNP AR APCH Approvals: An Operator s Perspective

PBN and Procedure Design training

FLIGHT OPERATIONS PANEL

PBN Operational Approval Overview

Analyzing Risk at the FAA Flight Systems Laboratory

Report for instrument rating - IR(A) skill test

Operational Procedures

TWELFTH AIR NAVIGATION CONFERENCE

Continuous Climb Operations (CCO) Manual

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

The pilot and airline operator s perspective on runway excursion hazards and mitigation options. Session 2 Presentation 1

European Aviation Safety Agency

DSNA NAVIGATION STRATEGY

distance and time to descend from a given level or altitude. LO Find the frequency and/or identifiers of radio-navigation aids from charts.

IFR SEPARATION WITHOUT RADAR

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

Technology Transfer and Capability Building in GNSS for Airspace Modernization in Nepal

French DSNA approach to CNS rationalization & evolution

NEW CALEDONIA PBN PLAN

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

Development and validation of procedures

Think the solution, experience the change

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

Título ponencia: Introduction to the PBN concept

DEPARTURE, HOLDING, AND APPROACH PROCEDURES

NEW FPL Transition Phase & Implementation Stages

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information

Challenges in Complex Procedure Design Validation

GENERAL INFO NOTICE 1. BACKGROUND

UK Performance-based Navigation (PBN) Implementation Status

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

34 th Airline/ATS Safety Forum

UK Implementation of PBN

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

THE QUALITY ASSURANCE MANUAL FOR FLIGHT PROCEDURE DESIGN

Figure 3.1. Foreign Airport Assessment Aid

ENAV experience on LPV implementation

Phases of a departure

Flight Operations Officer Recurrent Training Syllabus

Learning Objectives 7.3 Flight Performance and Planning Flight Planning & Flight Monitoring

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

NATA 2018 AGM & CONFERENCE

Instrument Proficiency Check Flight Record

GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD

PBN (EGNOS) Procedures for HEMS Operations: A network for Helipads in the Trento Province

JAA Administrative & Guidance Material Section Five: Licensing, Part Two: Procedures

APAC PBN UPDATE Slide 1 of xx

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

The support of an European ANSP

Guidance for the preparation of EGNOS National Market Analysis

EASA RNP (AR) Workshop The Landscape Working Together

ATM 4 Airspace & Procedure Design

OPERATIONS MANUAL TABLE OF CONTENTS

SDM WORKSHOP ON PBN (19/10/2017)

Contextual note SESAR Solution description form for deployment planning

Safety and Airspace Regulation Group

Transcription:

ICAO WACAF Workshop 1 st 4 th September 2015 Douala ICAO Workshop Kalibo Study Case September 1 st to 4 th 2015, Douala

Objective Objective of the Study Case: To apply the ICAO 9906 steps and Methodology to a concrete case To go deeper in a concrete case, by analyzing & identifying: The existing airport procedures Potential issues and ways of improvement Which PBN Nav Spec may be used to improve the existing procedures

Study Case Kalibo airport Kalibo airport is located in Philippines

Study Case Kalibo airport Airport surrounded by: North: Sea South-West & West: Mountains

Kalibo airport Main features VFR/IFR traffic Non Radar Environment Traffic flow: About 25-30 aircraft per day Mostly Airbus A320 aircraft (80%) and 737-800 (from Russia and Taipei), ATR and Dash Q400 Existing procedures: See AIP

Kalibo airport Study case

Step 1 - Initiation Starting point of the Future Project Why looking at this airport? Authorized material: AIP Weather data

06/11/2014 AIP Page 8

Weather data

Step 1 - Initiation Identification of potential : Operational issues (on both runways) Safety issues AIP and existing procedure: Give your analyse and feedback? Ways of potential : Operational improvement Safety improvement

Step 1 - Initiation Identification of potential : Operational issues : Minima? Traffic separation? Payload? Terrain Awareness triggered? Fuel consumption? Navaids not reliable / Failure? Safety issues : Procedure not coded, higher crew workload Circling: Visual Approach and manual flying Does not facilitate fully stabilized approach

Step 1 - Initiation Who should be involved? Who may provide operational feedback and recommendations?

Step 1 - Initiation Who should be involved? Who may provide operational feedback and recommendations? Outputs GO / NO GO? Pas de décision encore sur la solution mais Go pour lancement. Point focal CAA, formaliser (compte rendu réunion, fiche de présence) Identifier besoins à venir, écheances, contrats nécessaire à mettre en place Stakeholders CAA, ANSP(s) incluant ATC, compagnie(s) aérienne(s), exploitant aéroport, militaires (aérien et autres zones), collectivités locales, aéroclubs, aéroports voisins, espaces aériens voisin,

Step 2 Data Collection Which data?

Step 2 Data Collection Which data? Data collected in the Step 1 Initiation Operational / Safety Feedback Operators ATC In addition, all relevant data for Procedure Design purpose should be gathered: Runway, obstacles Controlled airspace Restricted airspace Airways Existing procedure Entry/Exit points Noise sensitive area Radar/Non Radar Atmospheric conditions / Turbulence area

Step 3 Conceptual Design Using all previous gathered data, a Conceptual Design maybe drafted RW23 RW05

Step 3 Conceptual Design RW23 Using all previous gathered data, a Conceptual Design maybe drafted RW23 Proposed solution? Nav Spec? Proposed Design?

Step 3 Conceptual Design RW23 Reminder of RW23 Existing procedures VOR/DME Reliability of Ground Navaid? NDB coding? RNP procedure No Ground Navaid Coded in NDB (ARINC424) Which Nav Spec? Which Design?

Step 3 Conceptual Design RW23 Non Radar Environment RNP Procedure required (No RNAV)

Step 3 Conceptual Design RW23 Non Radar Environment RNP Procedure required (No RNAV) RNP-APCH approach Basic capability for most aircraft type Basic crew training Fully coded procedure in NDB LNAV & LNAV/VNAV minima

Step 3 Conceptual Design RW05 Using all previous gathered data, a Conceptual Design maybe drafted RW05 Proposed solution? Nav Spec? Proposed Design?

Step 3 Conceptual Design RW05 RW05 High Terrain located West South West of Kalibo

06/11/2014 Step 4: Stakeholders review

06/11/2014 Step 5 to 8 Step 5: Apply criteria Step 6: Documentation Step 7: Safety Assessment Step 8: Validation Step 9: Consult with stakeholders CAA not in charge of these phases (except for specificities) but may be expected to provide inputs See what was presented yesterday

06/11/2014 Step 10: Approval What do you expect to receive as approver? Idée cherchées ensemble Dossier technique Etude de sécurité Rapport / dossier de validation Validation sol, avant vol, simulateur/vol (si nécessaire) Déclaration de conformité (si besoin: Coneptual design = maquette)

06/11/2014 Step 10: Approval What do you expect to receive as approver? Rapport technique Data Critères MSA Design, Etc. Proposition de carte Proposition de codage Rapport de validation Certification du concepteur habilitation du fournisseur des données / des sources utilisées (déjà à travers le document de spécification du projet conceptual design-?) Habilitation du Pilote pour la validation Etude ou dossier de la sécurié

The technical report includes: ICAO AFPP Applicable design criteria; Data sources and set of input data used for the design (airport, terrain, obstacles); All calculations including transformation parameters used; All design parameters used (speeds, bank angles, wind velocity, temperature, descent / climb gradients, height loss, obstacle assessment surface (OAS), etc.); Any deviation from selected criteria including justification and link to validation as required; Full design rationale, construction details; Design assumptions and constraints; Document version and date; Draft elements for publication including chart and coding table as applicable; Any other pertinent points of interest resulting from the FPD process, e.g. software tools used for the design, advantages and drawbacks of the assessed scenarios.