Flight test organisation

Similar documents
The type rating of test pilots having flown the aircraft for its development and certification needs to be addressed as a special case.

Continuing Airworthiness

IRELAND SAFETY REGULATION DIVISION IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel Fax AFTN EIDWYOYX

EASA PART 21 + AMC/GM. Syllabus

Better regulation for general aviation (update July 2010) July 2010 Better regulation for General Aviation 1

Continuing Airworthiness update

FCL Rulemaking update

COMMISSION REGULATION (EU)

7696/12 GL/mkl 1 DG C I C

Application for Issue, Extension or Recommendation of an Airworthiness Review Certificate and Permit to Fly Privilege

Registry Publication 17

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

Production Organisation Approval for Products, Parts and Appliances

Regulation (EU) 965/2012 on air operations. and related EASA Decisions (AMC&GM and CS-FTL.1)

Instructions for Continued Airworthiness - ICA

Operational Evaluation Board Report

Annex to ED Decision 2015/026/R. AMC/GM to Part-21 Issue 2, Amendment 4

PILATUS AIRCRAFT LTD.

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

Advisory Circular AC19-1. Test Pilot Approvals 03 July Revision 0

Human external cargo draft

Comparison on the Ways of Airworthiness Management of Civil Aircraft Design Organization

Terms of Reference for rulemaking task RMT.0325 (OPS.057(a)) & RMT.0326 (OPS.057(b))

Terms of Reference for a rulemaking task. Implementation of Evidence-Based Training within the European regulatory framework RMT.0696 ISSUE

Air Operations Requirements. Information Session Commercial Balloon Operations Cologne, 17 February 2009

Terms of Reference for a rulemaking task

AIRBUS FLIGHT TEST CREW MEMBERS RESPONSE to NPA and b

COMMISSION IMPLEMENTING REGULATION (EU)

GA ROADMAP: UPDATE MOVING TOWARDS IMPLEMENTATION UPDATE

Explanatory Notes EASA type rating and licence endorsement list flight crew

DESIGNATED PILOT EXAMINER. Skill Test Standards. for

Official Journal L 362. of the European Union. Legislation. Non-legislative acts. Volume December English edition. Contents REGULATIONS

Terms of Reference for a rulemaking task. Review of provisions for examiners and instructors

DRAFT COMMISSION REGULATION (EU) / of XXX. laying down rules and procedures for the operation of unmanned aircraft

Terms of Reference for a rulemaking task

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

Opinion No 10/2013. Part M General Aviation Task Force (Phase I)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

ANNEX II to EASA Opinion No 09/2017. COMMISSION REGULATION (EU) No /.. of XXX

Flight Test Operations Manual Guide

Aviation Regulation Latest Developments and Their Impact for Industry

Regulation EU1149/2011 and Decision 2012/004/R

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /

Part 115. Adventure Aviation, Initial Issue - Certification and Operations. CAA Consolidation. 18 May 2018

AUDIT SUMMARY REPORT OF THE CIVIL AVIATION ADMINISTRATION DENMARK

European Aviation Safety Agency. Opinion No 10/2017

Part 105. Parachuting - Operating Rules. CAA Consolidation. 15 December Published by the Civil Aviation Authority of New Zealand

Aircraft Maintenance Engineer Licensing

EASA COMMITTEE ADOPTION PROCEDURES (VERSION 28/10/2015) (Dates in brackets are tentative) ENTRY INTO FORCE

GUERNSEY ADVISORY CIRCULARS. (GACs) UPSET PREVENTION AND RECOVERY TRAINING GAC 121/135-2

Unmanned Aircraft: Regulatory Framework in the EU EASA team High Level Conference on Drones Warsaw 24 November 2016

EASA The medium term agenda

SURVEY REPORT AND RECOMMENDATION FOR CERTIFICATE OF AIRWORTHINESS. Issue Renewal Export

Certificate of Airworthiness

AIRWORTHINESS ADVISORY CIRCULAR

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

Terms of Reference for a rulemaking task. Requirements for Air Traffic Services (ATS)

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance

Subpart H. 2042/2003

(Part-M) M.1. Occurrence reporting. Continuing airworthiness tasks. Aircraft Maintenance Programme. Airworthiness directives

Terms of reference for a rulemaking task

CAAC Continuing Airworthiness of Domestic Designed Transport Airplanes

How will the entry into force of Part M Section B (Procedure for Competent Authorities) affect your Authority?

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

Operations. Henrik Svensson TO Operations & Flight Safety European Gliding Union. From NCO OPS to Part-SAO

ANNEX I. Annex I (Part-M) to Regulation (EU) No 1321/2014 is amended as follows:

AMC THE OPERATORS MAINTENANCE INSPECTION PROGRAMME (M.I.P.)

GUERNSEY AVIATION REQUIREMENTS. (GARs) CERTIFICATION OF AIRCRAFT PART 21

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

of 26 August 2010 for a Commission Regulation XXX/2010 laying down Implementing Rules for Pilot Licensing

EUROPEAN AVIATION SAFETY AGENCY Joint Aviation Authorities

July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE

GM1DTO.GEN.110 Scope GM1 DTO.GEN.115(a) Declaration GM2 DTO.GEN.115(a) Declaration AMC1DTO.GEN.115(a)(2) Declaration

European Aviation Safety Agency

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

Aircraft Maintenance Personnel Licensing

Terms of Reference for a rulemaking task. Portable Electronic Devices (PEDs)

Airworthiness Procedures Briefing Note

Research on Design Assurance System with the Development of CAAC s Design Organization Management

CIVIL AVIATION PUBLICATION CAP 08 CERTIFICATE OF AIRWORTHINESS

(Non-legislative acts) REGULATIONS

Certification Memorandum. Guidance to Certify an Aircraft as PED tolerant

Aviation Training Catalogue

Advisory Circular. Changes to the Type Design of an Aeronautical Product

EGU Congress Paris. February DTO/Medical

EUROPEAN MILITARY AIRWORTHINESS REQUIREMENTS EMAR 21 SECTION A

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

Certification Memorandum. Large Aeroplane Evacuation Certification Specifications Cabin Crew Members Assumed to be On Board

AIRCRAFT INCIDENT REPORT AND EXECUTIVE SUMMARY

RMT.0464 ATS Requirements

FSD/OPERATIONS SECTION INFORMATION BULLETIN

This advisory circular relates specifically to Civil Aviation Rule Part 21, Subpart I Special Flight Permits.

All-Weather Operations Training Programme

SYLLABUS. EASA 1321/2014 Part-M - ADVANCED (FLY Course code: 005-C-A) Issue of 01/02/2018 FLY EN

ICAO LOC-I SYMPOSIUM STALL & UPRT IMPLEMENTATION. Itash Samani Global Head of FSTD Regulations, Regulatory Affairs June 2015 Nairobi Kenya

POA and Production without POA

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2

NZQA registered unit standard version 2 Page 1 of 7. Demonstrate competence for a Category B flight instructor rating

EUROPEAN MILITARY AIRWORTHINESS DOCUMENT EMAD 1 DEFINITIONS AND ACRONYMS DOCUMENT

BGA GMP Sailplane and Self Sustaining Sailplane Maintenance Programme

Transcription:

Flight test organisation Dominique ROLAND Dirk RICHARD DOATLM/GA Test Pilot DOATL/Former Army helicopter pilot Issue: 1 Revision: 2

Who is this course for? DOATL: DOA Team Leaders You will learn about: How valid test results are achieved Safe operation of the test aircraft Having taken this course, you will be able to properly assess flight test procedures and organisations performing flight tests PCM: Product Certification Managers You will understand Part 21 core issues related to establishment and approval of flight conditions as would be required from the DOA member holding the respective privilege. 04/09/2013 Flight Test Organisation 2

Pre requisite knowledge for this course Assumed knowledge You already have a knowledge of the DOA expectations; i.e. that there is a general requirement for a manual describing the organisation and its procedures You understand how the organisations are expected to demonstrate compliance with DOA requirements 04/09/2013 Flight Test Organisation 3

About this course In this course we will: Look at examples of best practice established for Flight Test Organizations We will identify and detail those aspects of these best practices that are applicable to organizations that only occasionally perform flight tests Through this, you will be able to better understand the reasoning behind the questionnaire provided in WI.DOA.00147 001 The training is divided into 3 parts: Part 1: Part 2: Part 3: Definition of a Flight Test Organisation Associated Deliverables Case studies 04/09/2013 Flight Test Organisation 4

Definition of a flight test What kind of flights could fall under the definition of a flight test, according to Part 21? The GM to 21.A.701 provides useful information for identifying what is a flight test. Development: Testing of new aircraft or modifications Testing of new concepts of airframe, engine, propeller and equipment Testing of new operating techniques Not all the cases listed in this GM should be qualified as a flight test. We are interested in 2 of these cases: Demonstration of compliance with regulations or certification specifications: Certification flight testing for type certification, supplemental type certificates, changes to type certificates or ETSO authorisation 04/09/2013 Flight Test Organisation 5

Regulatory requirements What existing requirements are actually related to the flight test activity? What forthcoming requirements could impact the flight test activity? Part 21 21A.4(a), 21A.20, 21A.33, 21A.35(a), 21A.35(b), 21A.55, 21A.239, 21A.243, 21A.245, 21A.251, 21A.257(a), 21A.257(b), 21A.263(c), 21A.265, 21A.701, 21A.707, 21A.708, 21A.709, 21A.710, 21A.711, 21A.713, 21A.723, 21A.725, 21A.727, 21A.729 and related GMs and AMCs Part FCL FCL.820 (Opt out until 08/05/15) Part 21 and Part SPO Opinion 07/2013 TOR RMT.0348 and RMT.349 (2016?) 04/09/2013 Flight Test Organisation 6

Safety aspects of flight testing What are the safety issues related to flight test activity? Is there a need to closer investigate how flight testing is addressed in DO? safety of the design and operational risks associated to the flight testing Accidents related to Flight Testing: No statistical data available that would indicate a higher than average accident rate on flight test activities but when accidents occur, organizational aspects usually are a contributing factor 04/09/2013 Flight Test Organisation 7

Elements of a flight test organisation What are the key elements to consider during the assessment of a flight test organisation? Aircraft (without an aircraft, no flight test ) Personnel (we need ground and flight crew to perform the test) Facilities Handbook and procedures Deliverables (the purpose of the flight test is to collect information) 04/09/2013 Flight Test Organisation 8

Aircraft in a flight test environment What topics should be addressed before an aircraft used for flight test activity is declared ready for flight? Configuration: Basic configuration established at handover from production should be documented and configuration management process defined Maintenance: Maintenance Scheme must be available and associated responsibilities defined (delegated to production, to Part M or integrated in the DOA) Flight Test Instrumentation: Design and configuration should be controlled, calibration process should be defined Safety equipment 04/09/2013 Flight Test Organisation 9

Elements of a flight test organisation What are the key elements to consider during the assessment of a flight test organisation? Aircraft (without an aircraft, no flight test ) Personnel (we need ground and flight crew to perform the test) Facilities Handbook and procedures Deliverables (the purpose of the flight test is to collect information) 04/09/2013 Flight Test Organisation 10

Personnel in a flight test organisation Who are the people required in a flight test organisation? Test pilots Flight Test Engineers Designers Mechanics Certifying staff Safety officer 04/09/2013 Flight Test Organisation 11

Flight Crew What needs to be defined by the FTO concerning 'test pilots' and 'flight test engineers'? Qualification requirements Licences Ratings Skills Recency (recurrent) training Experience Behaviour Authorizations (eventually time limited?) Validity check of licences, medical etc. Flight time limitation policy CRM 04/09/2013 Flight Test Organisation 12

Elements of a flight test organisation What are the key elements to consider during the assessment of a flight test organisation? Aircraft (without an aircraft, no flight test ) Personnel (we need ground and flight crew to perform the test) Facilities Handbook and procedures Deliverables (the purpose of the flight test is to collect information) 04/09/2013 Flight Test Organisation 13

Facilities What should be considered as part of flight test facilities? Airfield: suitability, location, length of runway, ATC, airspace Hangar: environmental protection, security of the test aircraft.. Rescue and safety equipment: parachutes (serviceability), fire extinguishers, life vest, survival kit, flight suits oxygen Rescue services (with trained people) Ground control, communication, telemetry 04/09/2013 Flight Test Organisation 14

Elements of a flight test organisation What are the key elements to consider during the assessment of a flight test organisation? Aircraft (without an aircraft, no flight test ) Personnel (we need ground and flight crew to perform the test) Facilities Handbook and procedures Deliverables (the purpose of the flight test is to collect information) 04/09/2013 Flight Test Organisation 15

Handbook and procedures Organisations performing flight tests in order to demonstrate regulatory compliance are required to document all activity in a Flight Test Organisation Manual (FTOM) The FTOM should provide general information about principles adopted by the organisation and the management of the flight test activity. 04/09/2013 Flight Test Organisation 16

Handbook and procedures What subjects should the FTOM cover? Organizational structure and position within the DO Competences requirement and nomination process versus Categories of flights Facilities requirements Management and calibration of test equipment Configuration management of the test aircraft Maintenance of test aircraft (arrangements with CAMO and Part 145) Arrangements with suppliers (e.g. pilots, flight test engineers, and suppliers of flight test instrumentation) Flight Test Procedure SOP 04/09/2013 Flight Test Organisation 17

Elements of a flight test organisation What are the key elements to consider during the assessment of a flight test organisation? Aircraft (without an aircraft, no flight test ) Personnel (we need ground and flight crew to perform the test) Facilities Handbook and procedures Deliverables (the purpose of the flight test is to collect information) 04/09/2013 Flight Test Organisation 18

Deliverables What are the deliverables which could be associated to a flight test process? FTOM Flight test Programme Flight test report Flight Test Order Flight Test Card Techlog Briefing/Debriefing minutes Training records Safety analysis Flight conditions Permit to fly 04/09/2013 Flight Test Organisation 19

Flight Test Programme Flight Test Plan Specific to the project, covering development and certification flights, the flight test Programme should document: Sequence and planning of flights (with phases if needed) Reference to the applicable requirements (certification flights) Method of test flight Safety provisions (analysis, emergency devices, airspace ) Design Limitations Ground and flight crew Facilities information Test aircraft configuration versus target configuration Flight test instrumentation Maintenance of the test aircraft 04/09/2013 Flight Test Organisation 20

Flight Test Programme Additional requirements of the Flight Test Programme: A matrix in appendix showing the reference of a flight in compared against the certification requirement could be used as a compliance check list for the certification process. The Certification flight test Programme should be kept up to date. Initial issue and subsequent revisions should be accepted by EASA. 04/09/2013 Flight Test Organisation 21

Documents structure Flight test Programme Specific to the project, shows sequence of flights Flight test order One per flight, show sequence of test points Flight test Card One per test point 04/09/2013 Flight Test Organisation 22

Flight Test Order The flight test order is an order given by someone having the appropriate authority to the test pilot and flight test engineer to perform a predefined sequence of tasks, called test points. Who is able to issue the order should be defined in the Handbook 04/09/2013 Flight Test Organisation 23

Flight Test Order What does a flight test order contain? The crew Communication information The required facilities and airspace The required and actual weather conditions Weight and balance The aircraft configuration (directly or indirectly) The limitations applicable to the flight Emergency procedures Test points, with test method and mean used for the recording (FTI, FTE, Cooper Harper ) that an operational safety analysis has been performed for all test points. Conditions that could lead to interrupt the flight should be clearly identified the flight profile 04/09/2013 Flight Test Organisation 24

Flight test cards What is a flight test card? Why can a flight test card not replace a flight test order? Flight Test cards can be used as input data, to prepare the Flight Test Order, and/or to record data, collected from the Flight Test Instrumentation or the notes recorded by the test pilot or the flight test engineer. Flight Test Cards, when used, are specific to a test point. They are standalone documents and cannot replace the Flight Test Order, which is defining the sequence of test points. A compilation of filled Flight Test Cards can be used to build a flight test report. 04/09/2013 Flight Test Organisation 25

Safety of the design & associated limitations Could you give examples of limitations triggered by the result of a safety assessment of the design? Structure: An aircraft for which the static test has been perform up to limit load only, normally operated up to 3,8g could be limited to 2,7 g Structure: No full ground test performed for the flutter assessment. VD and associated speeds limited System: Landing Gear retraction system actuators not fully qualified, first flight performed with LG extended 04/09/2013 Flight Test Organisation 26

Safety of the design & associated limitations Who are the actors participating to the preparation of the safety analysis document? Who should check this document? Does this document need to be updated? Obviously, experts for each technical domain impacted by the project should participate Part 21 requires an independent check of the safety substantiation (not a CVE role) This document needs to be updated, in order to substantiate new limitations, or lift/amend existing ones 04/09/2013 Flight Test Organisation 27

Safety of the flight test operations At what stage should the safety of the operation be assessed? Who are the actors? What are the elements and the output of this activity? Where should the evidence of this activity be recorded? Safety of the operations should be assessed before each flight The Test Pilot, the Flight Test Engineer and possibly a safety officer should participate to the assessment Each test point should be analysed and associated risk identified and classified. Risk should be mitigated by appropriate limitation (altitude, safety equipment, chase aircraft). No flight should be performed if the risk after mitigation is classified as catastrophic The result of the analysis should be visible in the flight test order 04/09/2013 Flight Test Organisation 28

Technical logbook (Techlog) The technical logbook is an essential deliverable for flight test operations. What should a Techlog be used for? Any change in aircraft configuration, like implementation of changes, installation or removal of flight test instrumentation, installation or change in ballast configuration Maintenance tasks performed on the test aircraft Snags reported by the crew 04/09/2013 Flight Test Organisation 29

Technical logbook (Techlog) Who should sign the Techlog? The maintenance or production certifying staff appointed by the DOA to attest the work performed on the aircraft. The FTE or/and test pilot for acceptance. 04/09/2013 Flight Test Organisation 30

Briefing & debriefing What should be discussed during the briefing? Review of the techlog (aircraft condition) Review of the flight test order (showing limitations) Weather condition Crew condition FAA Test Briefing Guide 04/09/2013 Flight Test Organisation 31

Briefing & debriefing What should be discussed during the debriefing? Snags recorded during the flights Configuration to be prepared before next flight Airbus process overview 04/09/2013 Flight Test Organisation 32

Briefing & debriefing Briefing and debriefing are key activities during flight test operations. It is important to record evidence of these activities. What documents could be used for this purpose? Specific minutes Flight test order (if all participants identified) Techlog 04/09/2013 Flight Test Organisation 33

Flight Test Report Could you identify, among all deliverables identified so far, what are the elements which could be used to compile a flight test report? Flight test Programme Flight test cards Data collected from the FTI 04/09/2013 Flight Test Organisation 34

Flight Test Report How many CVE should sign a flight test report (used as compliance document)? As many as technical domain impacted by the project, e.g. performances, handling qualities, avionic, structure (flutter) They can sign the report but can also sign directly at flight test card level. 04/09/2013 Flight Test Organisation 35

Flight Conditions Would you feel comfortable in approving flight conditions if all what we have presented here was properly implemented by the DOA? Yes Flight conditions can be approved for one flight only (Airbus system), for a series of flights or even a flight test campaign if they are associated with procedures, tools and deliverables ensuring that configuration, maintenance and safety of the aircraft is properly managed. 04/09/2013 Flight Test Organisation 36

Permit to fly Flight conditions have an approver. Permit to fly as well, but on top the approver, what is the important role associated to the PtF? The Permit to fly holder 04/09/2013 Flight Test Organisation 37

Permit to fly Permit to fly has a validity period, but not the flight conditions, why? The aircraft cannot fly only with flight conditions. They must be associated with a Permit to Fly. The Flight conditions are controlled via the permit and the obligation of the holder to check that the aircraft is conform to the configuration defined in the latest approved FC. If not, the permit is automatically invalidated. 04/09/2013 Flight Test Organisation 38

Permit to fly For PtF issued by DO under 21.A.263(c)(7) privilege why should the DOA holder send a copy of the PtF to the competent authority within 72 hours? To be sure that national operational / airspace / flight crew requirements are properly considered. 04/09/2013 Flight Test Organisation 39

Handbook and procedures What subjects should the FTOM cover? Organizational structure and position within the DO Competences requirement and nomination process versus Categories of flights Facilities requirements Management and calibration of test equipment Configuration management of the test aircraft Maintenance of test aircraft (arrangements with CAMO and Part 145) Arrangements with suppliers (e.g. pilots, flight test engineers, and suppliers of flight test instrumentation) Flight Test Procedure SOP Safety analysis process Flight Conditions and Permit to Fly process 04/09/2013 Flight Test Organisation 40

Case study 1: Aerospool Flight Test Operations Manual Could you identify the contents that have been addressed in the first part of our training session? Could you identify the missing elements, if any? Could you assess the quality of the FTOM (Strengths and weaknesses)? Time allocated: 30 minutes 04/09/2013 Flight Test Organisation 41

Case study 2: STC case, flight test plan and FC approved by EASA Could you check the proposed flight conditions and supporting substantiations and report if some elements are missing? Could you assess the definition of the aircraft configuration? Could you assess the quality of the Test Plan and the Test Report? Time allocated: 30 minutes 04/09/2013 Flight Test Organisation 42

Case study 3: TC case, Tecnam P2008 flight test programme Could you review the attached flight test programme and report if some elements are missing? Could you assess the quality of this document? Time allocated: 30 minutes 04/09/2013 Flight Test Organisation 43

Case study 4: Flight Test Orders comparison Could you review and compare the two Flight Test Orders, one used for the A380 by Airbus and one used for the ME 262 by Cassidian? Time allocated: 30 minutes 04/09/2013 Flight Test Organisation 44

More info Books and Documents: Breaking the Mishap Chain Gulfstream G650 Accident Report Airbus A320 Accident Report FAA Order 4040.26B Aircraft Certification Service Flight Test Risk Management Program Websites: Flight Test Safety Committee 04/09/2013 Flight Test Organisation 45

Thank you! http://intranet/your intranet page