Arkansas State Highway and Transportation Department. Bella Vista Rotary Club

Similar documents
Arkansas State Highway and Transportation Department. Fayetteville Commerce District

Dick Trammel. Senior Democrats of Northwest Arkansas. Chad Adams. Chairman, Arkansas Highway Commission. District 4 Engineer

Arkansas State Highway and Transportation Department. Hot Springs National Park Rotary Club

Arkansas State Highway and Transportation Department. Riverside Rotary Club North Little Rock

Arkansas State Highway and Transportation Department

Arkansas State Highway and Transportation Department. Rotary Club of West Pine Bluff Pine Bluff Country Club

Arkansas State Highway and Transportation Department. Rotary Club of Little Rock Little Rock

Scott E. Bennett, P.E. Director of Highways and Transportation ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT. Fifty for the Future

NWARPC Congestion Management Process - January 16, 2014

Arkansas State Highway and Transportation Department

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

Current Corridor Characteristics

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Northwest Arkansas Heritage Trail Plan

Hearts of Hope Red Hatters FOR YOUR SAFETY

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONTRACTS AWARDED FROM THE LETTING OF FEBRUARY 18, 1998

Providing public transportation since 1999 between Washington and Milwaukee Counties

Northwest Arkansas Heritage Trail Plan

Independence: overview

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE

Scott E. Bennett, P.E. Director of Highways and Transportation. FHWA DFS South Leadership Meeting

ARKANSAS 2003 TRAFFIC CRASH STATISTICS

FAYETTEVILLE, ARKANSAS

Arkansas Department of Transportation JOB HWY. 49B - HWY. 242S (HELENA - WEST HELENA) (S) FEDERAL AID PROJECT STPC-9200(7)

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

Project Location. Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll facility. Jacksonville

PACIFIC FISHERY MANAGEMENT COUNCIL CHAIR S RECEPTION. Saturday, March 5, :00 p.m. Second Floor Foyer Hilton Hotel Vancouver, Washington

Major Projects Overview

2016 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON ORLANDO, GRANDE LAKES August 4-7, 2016

2017 Excellence in Construction Awards Winners

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

I-94 East Corridor Performance

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 29 Solutions Projects

Experience the environment

THE RICHMOND REGION Transportation Priority Projects

Arkansas Department of Transportation JOB DITCH AT L.M STR. & APPRS. (S) FEDERAL AID PROJECT NHPP-0074(34)

Susan Jones Moses Susan Jones Moses and Associates Glen Weisbrod Economic Development Research Group

AIRPORTS DIVISION. The Hawaii Airports System Is Self-Supporting

Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

State of Hawaii Dept. of Transportation Airports Division Capital Improvement Program Update

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

Most people notice when ODOT builds something

City of Grand Island Tuesday, December 12, 2017 Council Session

BRISBANE INDUSTRIAL MARKET OVERVIEW API State of the Market Brisbane Industrial 22 nd of March 2018

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

Airport Planning Area

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits

1. Hotel Trends Occupancy Rate

Arkansas Tourism Ticker

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

Arkansas State Highway and Transportation Department JOB DITCH NO. 43-WEST (S)

29 June Eastern Region 15/16 Program Presentation

1.2 Corridor History and Current Characteristics

Basic Project Information

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

KDOT announces approved November bids

INVESTMENT SUMMARY. RESIDENTIAL COMMERCIAL ** *

2014 STATEWIDE COMPREHENSIVE OUTDOOR RECREATION PLAN

Road Construction Ahead January-April 2015 NORTHWEST REGION

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

APPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY

COMMERCIAL MIXED-USE OFFICE. Bullsboro Road. E Broad Street KEY DEVELOPMENT HIGHLIGHTS

Park System Development Charge Update Investment Plan

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

Passenger Facility Charge (PFC) Program: Eligibility of Ground Access Projects Meeting

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT TABULATION FOR BID NO

25 th Avenue Grade Separation. December 13, 2017

Mission Statement. Spur 601 Project Highlights

Vancouver Island Rail

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Leeds Grenville Economic Development Summit Thousand Islands International Bridge Outlook

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities

VDOT Culpeper District John Lynch, P.E. District Administrator December 12, 2013

Leesburg Streets and Highways. Tom Brandon Manager, Office of Capital Projects Potomac Section

Presented By: Deputy Executive Director February 17, 2011

Feb 6 th, 2007 Japan Airlines Corporation

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

South of Fraser Transportation Priorities March 2017 Engagement

RPO AMERICA PEER SYMPOSIUM: SHARING INNOVATIONS IN REGIONAL TRANSPORTATION PLANNING Presented by David Cole, Former Commissioner, Maine DOT

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND. PNWER November 2018

TABLE OF CONTENTS. 1 P age

Two townships received top

PennDOT MAJOR ROAD PROJECTS

Transportation TRANSPORTATION PROJECTS

APPENDIX D TIERED FREIGHT PROJECTS

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

America the Beautiful (AtB) Pass Distribution\Purchase Locations SWL Project Recreation Area\Sites Military\ Season USACE AtB Senior

El Dorado County / Tahoe Roadwork Schedule

Media Release For Immediate Release Tuesday, April 17, 2018

Transcription:

Arkansas State Highway and Transportation Department Bella Vista Rotary Club Wednesday, August 12, 2015

Arkansas Highway & Transportation AHTD Quick Facts 3rd Largest State Agency (3,634 employees) Maintain 16,416 miles of highway and 7,335 bridges Central Offices in Little Rock; 10 Districts Statewide Mission: Provide a safe, efficient, aesthetically pleasing and environmentally sound intermodal transportation system for the user.

Arkansas Highway & Transportation Highway Districts District Headquarters

Arkansas Highway & Transportation Other Programs/Activities State Aid Programs for Cities and Counties Game & Fish Roads State Park Roads Institutional Roads Airport Access Roads Welcome Centers & Rest Areas Arkansas Recreational Trails Transportation Alternatives Program

Arkansas Highway & Transportation Other Programs/Activities Arkansas Commercial Truck Safety and Education Program Historic Bridge Program Adopt-A-Highway Program Litter Hotline Public Transportation Programs Wildflower Program Research Grants to State Universities Scholarships for Engineering Students

2011 2012

Interstate Rehabilitation Program 51 Scheduled 10 Under Const. 21 Complete

Connecting Arkansas Program 31 Scheduled 4 Under Construction 0 Complete

Benton & Washington County Construction Projects Number Cost Complete 295 $413 million Under Construction 50 $278 million Scheduled 173 $657 million Total 518 $1.3 billion 9

Hwy. 72 S.- Hwy. 72 N. Bella Vista Bypass Complete: April 2014 Co. Rd. 34-Missouri Bella Vista Bypass Scheduled: TBD Hwy. 72 North-Co. Rd. 34 Bella Vista Bypass Complete: June, 2015 Hwy. 71B Hwy. 72 S. Bella Vista Bypass Complete: Mid 2016 Hwy.62/102 Hwy. 72 Widening/Interchange Impvts Scheduled: Mid 2016 Hwy. 71 Interchange Bella Vista Bypass Scheduled: TBD Projects Northwest Arkansas New Hope Rd. Hwy. 62/102 Widening (Rogers) Complete: Nov 2015 Hwy.62/102 Interchange Impvts. 8 th St. Widening (Bentonville) Scheduled: Mid 2016 Hwy. 71B Interchange Impvts. Scheduled: Mid 2016 Scheduled Under Construction Complete

Hwy. 72 S- Hwy 72 N. 3.03 Miles $19.9 Million Complete: April 2014 Co. Rd. 34-Missouri State Line 2.42 Miles $10 Million Scheduled: TBD Hwy. 72 North-Co. Rd. 34 2.38 Miles $13.6 Million Complete: June, 2015 Hwy. 71B Hwy. 72 S. 4.73 Miles $52.6 Million Complete: Mid 2016 Hwy. 71 Interchange Approx. 1.5 Miles $42 Million Scheduled: TBD Projects Northwest Arkansas Scheduled Under Construction Complete

Totals: 14.3 Miles $86.1 Million Under Contract or Com $52 Million Estimated Amount for Las $138 Million Total

Bella Vista Bypass Projects Northwest Arkansas

Bella Vista Bypass Projects Northwest Arkansas

Bella Vista Bypass Projects Northwest Arkansas

Bella Vista Bypass Projects Northwest Arkansas

Bella Vista Bypass Roundabout Projects Northwest Arkansas

Bella Vista Bypass Roundabout Projects Northwest Arkansas

Bella Vista Bypass SPUI Projects Northwest Arkansas

Bella Vista Bypass SPUI & RA Projects Northwest Arkansas

SW Regional Airport Blvd Hwy. 12 Widening Hwy. 71B Shell Rd. Est. Complete: Late 2016 Projects Northwest Arkansas Scheduled Under Construction Complete

Hwy. 62 Widening (5 Lanes) Avoca-Garfield Est. Complete: Late 2015 Projects Northwest Arkansas Scheduled Under Construction Complete

Hwy. 264 New Hope Rd. Widening (6 Lanes) Scheduled: Mid 2016 Springdale Bypass Hwy. 112 - I-49 Complete: Mid 2019 Wagon Wheel Rd. Hwy. 264 Widening Complete: Oct 2014 Wagon Wheel Rd. Interchange Impvts. Complete: Feb 2015 Hwy. 71B Interchange Impvts. Scheduled: Mid 2016 Hwy. 264 Interchange Impvts. Complete: Mid 2016 Elm Springs Rd. Interchange Impvts. Scheduled: Late 2015 Projects Northwest Arkansas Hwy. 412 Wagon Wheel Rd. Widening (6 Lanes) Scheduled: Sept 2015 Elm Springs Rd. Interchange Temp Signal I-49 (Springdale) Complete: Mid 2015 Scheduled Under Construction Complete

Construction Springdale Bypass Hwy. 112 - I-49 $100 million Complete: Mid 2019 Projects Northwest Arkansas

Hwy. 71B Hwy. 412 Widening Scheduled: Mid 2015 Porter Rd. Hwy. 112/71B Widening & Intchng Impvts Scheduled: Mid 2016 Hwy. 16-Porter Road Widening Complete: Mid 2015 Hwy. 62/180 Hwy. 16 Widening Fayetteville Interim Improvements Complete: December 2012 I-540/Don Tyson Pkwy. Interchange (Springdale) Complete: July 2014 Johnson Mill Boulevard Interchange Improvements Complete: October 2014 Hwy. 16/112 Spur Interchange Improvements Scheduled: 2016 I-540/Hwy. 62/180 Interchange Interim Improvements (Fayetteville) Complete: October 2012 Projects Northwest Arkansas Hwy. 62 Interchange Improvements Scheduled: 2016 Scheduled Under Construction Complete

Proposed 3-Lane Proposed 3-Lane Proposed 4 & 5 Lane (Partial New Location Eastern N-S Corridor Construction Fayetteville-E. Joyce Blvd. Complete Under Construction Scheduled Programmed New Location Existing 4 & 5 Lanes 4 Lanes Under Construction Existing 4 & 5 Lanes

Winter Weather Improvements Belly Plows Added to Fleet Snow & Ice Removal Guide

Costs Revenue

Arkansas Travel Trends 2007-2014 Gas & diesel Consumption Gas & diesel Revenue Miles Traveled 2007 2014 Difference 2.095 billion $454 million 32.4 billion 1.980 billion $392 million 33.8 billion 115 million $62 million 1.4 billion

Arkansas Highway & Transportation State General Revenue vs. AHTD Net Highway Revenue Net Highway Revenue

Arkansas Highway & Transportation Challenges $100,000,000 Widening Program $10,000,000 Overlay Program 37 200 15 54 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 69 $25,000,000 Bridge Program 26 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14

1993 Hwy. Funding Breakdown Fed 36% State 64%

2014 Hwy. Funding Breakdown Fed 56% State 44%

HIGHWAY TRUST FUND

2015 Projects Removed

Ramifications Projects pulled Highway system deterioration Lost economic development Lost jobs Compromised safety Higher operating costs

The Bottom Line Highway funding system is flawed Spending inconsistent with expectations Infrastructure must be a higher priority

@AHTD Litter Hotline 866-811-1222