Newcrest Lihir Gold. Brett Fletcher Executive General Manager PNG & Indonesia

Similar documents
2011 Annual General Meeting. Greg Robinson Managing Director & CEO

Newcrest Mining Limited

Exploration. General Manager Minerals Development

BMO Capital Markets Global Metals & Mining Conference Feb 2012, Florida USA

Quarterly Results. Greg Robinson CEO & Managing g Director

Kalgoorlie, WA - August Colin Moorhead

Mining Address. Ian Smith MD & CEO Newcrest Mining Limited

Lihir Operations PNG Mining and Petroleum Conference 24 November Peter Aitsi Country Manager, PNG

Quarterly Report. Greg Robinson Managing g Director & CEO

Morgan Stanley Asia Pacific Summit November Ian Smith MD & CEO

NEWCREST LOOKING TO THE FUTURE

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE

Annual Mineral Resources and Ore Reserves Statement - 31 December 2016

Market Release Newcrest Mining Limited 10 February 2012

Credit Suisse Asia Investor Conference March 2013, Hong Kong. Greg Robinson Managing Director and Chief Executive Officer

Tax Contribution Report 2017

Annual Mineral Resources and Ore Reserves Statement - 31 December 2017

NEWCREST Newcrest to acquire potential Tier 1 orebody in Canada Sandeep Biswas Managing Director and Chief Executive Officer

For personal use only

ASX Appendix 4D Half-Year Financial Report

Wafi Golpu. Craig Jones Executive General Manager Australian Operations and Projects. 7 October 2014

Bank of America Merrill Lynch Global Metals & Mining Conference May 2015, Barcelona, Spain

Cadia Valley. Peter Smith Executive General Manager Australian Operations

Lihir Operations. 14 th PNG Mining and Petroleum Investment Conference. 5 December 2016

ASX Appendix 4D Half-Year Financial Report

Market Release 11 March 2019

Exploration. Colin Moorehead Executive General Manager Minerals. 7 October 2014

Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2012 (These figures are unaudited)

Half Year Results Newcrest Mining 15 February 2016

Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2013 (These figures are unaudited)

Ramelius Resources Limited ASX:RMS

Quarterly Report Newcrest Mining Limited For the three months ending 30 September 2011 (These figures are unaudited)

Quarterly Report Newcrest Mining Limited For the three months ending 30 June 2007 (These figures are unaudited)

For personal use only

Kinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008

December 2017 Quarterly Report

Cadia East PC2 recorded its highest quarterly ore production, and PC1 recommenced ore production

For personal use only

For personal use only

ASX Appendix 4D Half Year Financial Report 31 December 2014 NEWCREST MINING LIMITED AND CONTROLLED ENTITIES

For personal use only

Gold Mining an Industry in Transition. Melbourne Mining Club 7 June Ian Smith Managing Director and CEO Newcrest Mining Limited NEWCREST 1

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation

For personal use only OZ MINERALS AUSTRALIAN COPPER CONFERENCE. TERRY BURGESS - Managing Director & CEO March

OZ MINERALS CONTINUED INVESTMENT IN SOUTH AUSTRALIA. TERRY BURGESS - Managing Director & CEO SAREIC - 02 May 2011

Market Announcement ASX:NTL, NZX:NTL For Immediate Release

Australian Site Tour Mt Keith Operation. Jaco Harwig General Manager

Lihir record milling throughput rate of 14.5mtpa (annualised) delivering record quarterly gold production

For personal use only

South America Copper Site Visit Non-ferrous overview

ASX Appendix 4D Half-Year Financial Report

For personal use only

Newcrest & the Gold Sector. Brisbane Mining Club 26 April Ian Smith Managing Director and CEO NEWCREST

Newcrest Mining Limited. March 2007 North American Roadshow Ian Smith, MD & CEO

Half Year Results FY18

Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe

OZ MINERALS US ROADSHOW

Ramelius Resources Limited ASX:RMS

OZ MINERALS AUSTRALIA & EUROPE ROADSHOW. May 2011

Gruyere Project Development Update

Australian Securities Exchange Notice

Company Announcements Office

BHP Billiton: A Strategy of Diversification

PROJECTS & TECHNICAL SERVICES

On The Road To Silver Mining In Mexico

For personal use only

2017 Annual General Meeting

For personal use only

Gold production of 548koz, up 5% on the September 2017 quarter, down 14% from the June 2018 quarter

Quarterly Report Newcrest Mining Limited For the three months ended 30 September 2014 (these figures are unaudited)

For personal use only

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION

OZ MINERALS UK ROADSHOW OCTOBER

Quarterly Activities Report Period Ended 31 March 2018

MARCH 2018 QUARTERLY ACTIVITIES REPORT

Group AISC margin of $515/oz, higher by $74/oz compared to the September 2018 quarter

Quarterly Activities Report Period Ended 31 December 2017

Recent Exploration of the Olympic Dam

OZ MINERALS CITI S 4 TH AUSTRALIAN INVESTMENT CONFERENCE OCTOBER

For personal use only

Alberto Calderon Group Executive and Chief Executive Aluminium, Nickel and Corporate Development

Kinross Nevada tour highlights growth potential at Bald Mountain and Round Mountain

Outlook: FY13 EBITDA guidance $28M - $29M. Pursuing contracted 300MW in 2013 growth strategy. FY13 maiden franked dividend payment expected

December 2018 Quarterly Production Report

Contents. Front cover: Amy McKenzie and Andrew Wannan from Cadia Valley Operations conducting water sampling at Rodds Creek.

EL LIMON MINE: EMPLOYEES & CONTRACTORS 133

Candelaria and Ojos del Salado Chile

On The Road To Silver & Gold Mining In Mexico

For personal use only

Kinross acquires mining rights to land adjacent Fort Knox mine, adds more than 2 million ounces to mineral resource estimates

For personal use only

Minara Resources Limitedit Sydney February Peter Johnston

QUARTERLY ACTIVITIES REPORT

For personal use only

Gold production at upper end of revised guidance and only 2% below original guidance

BHP Billiton Limited Annual General Meeting 2016

For personal use only

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp===

FOR THE THREE MONTHS ENDED 31 MARCH 2012

Quarterly Report Newcrest Mining Limited For the three months ended 31 March 2014 (these figures are unaudited)

Transcription:

Newcrest Lihir Gold Brett Fletcher Executive General Manager PNG & Indonesia

Disclaimer Forward Looking Statements These materials include forward looking statements. Forward looking statements inherently involve subjective judgement and analysis and are subject to significant uncertainties, risks and contingencies, many of which are outside of the control of, and may be unknown to, the company. Actual results and developments may vary materially from those expressed in these materials. The types of uncertainties which are relevant to the company may include, but are not limited to, commodity prices, political uncertainty, changes to the regulatory framework which applies to the business of the company and general economic conditions. Given these uncertainties, readers are cautioned not to place undue reliance on such forward looking statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, the company does not in providing this information undertake any obligation to publicly update or revise any of the forward looking statements or any change in events, conditions or circumstances on which any such statement is based. Ore Reserves and Mineral Resources Reporting Requirements As an Australian company with securities listed on the Australian Securities Exchange ( ASX ), Newcrest is subject to Australian disclosure requirements and standards, including the requirements of the Corporations Act and the ASX. Investors should note that it is a requirement of the ASX listing rules that the reporting of Ore Reserves and Mineral Resources in Australia comply with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code ) and that Newcrest s Ore Reserve and Mineral Resource estimates comply with the JORC Code. Competent Persons Statement The information in this presentation that relates to Exploration Results is based on information compiled by Colin Moorhead, EGM Minerals for Newcrest Mining Limited who is a Fellow of The Australasian Institute of Mining and Metallurgy, and a full-time employee of Newcrest Mining Limited. Mr Moorhead has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the JORC Code. Mr Moorhead consents to the inclusion in this presentation of the matters based on this information in the form and context in which they appear. Exploration Target The potential ti quantity and grade related to Exploration Targets in this report is conceptual in nature as there has been insufficient i exploration to define a Mineral Resource. It is uncertain if further exploration will result in the determination of a Mineral Resource. 2

Newcrest 4 th largest global gold producer by market capitalisation Predominately SE Asia/Pacific gold focus 12 th largest ASX listed company (A$27.5 Billion) Largest POMSoX listed company FY11 - Gold production o 2.7Moz and Copper production of 75,600t Proven ability to find, build and operate world class gold and copper mines Strong balance sheet and technical mining capability 3

World Class Asset Portfolio Gosowong Producing g Asset Lihir Wafi Golpu Wafi-Golpu Advanced Project Hidden Valley Namosi Telfer Mali Cracow Mt Rawdon Bukina Fasco CÔTE D IVOIRE Bonikro Cadia Valley Yamoussoukro Abidjan 100 km 4 10 operating mines in 4 countries

Gold Inventory Reserves - 2010 47.3 MILLION OUNCES Reserves - 2011 Post LGL Merger 77.7 MILLION OUNCES Reserves - 2011 80.0 MILLION OUNCES 5% 28% 37% 3% 39% 5% 3% 5% 15% 2% 17% 3% 3% 54% 4% 3% 4% 3% 33% 33% Resources - 2010 83.6 MILLION OUNCES Resources -2011 Post LGL Merger 135.8 MILLION OUNCES Resources - 2011 147.5 MILLION OUNCES 23% 13% 30% 2% 14% 30% 2% 13% 3% 52% 6% 2% 4% 4% 8% 4% 4% 11% 39% 38% CVO Gosowong Telfer Morobe Lihir Namosi Other 5 Reserve estimates are based on Newcrest s production interest. For details refer to the Newcrest Annual Statement of Mineral Resources and Ore Reserves. Reserves based on US$850/oz & Resources based on US$900/oz

Financial Results Summary Sales Revenue Growth + 46% Record Profit A$M 4,500 4,000 4,102 A$M 1200 1000 800 776 1058 908 3,500 3,000 2,802 600 400 557 2,500 2000 2,000 FY10 FY11 200 0 FY10 Underlying Profit FY11 Statutory Profit Cash Flow from Operations + 33% Strong Profit Margins Maintained A$M 1,800 1,729 % 60 1,400 1,303 50 40 52 41 50 38 1,000 30 6 600 FY10 FY11 20 FY10 EBITDA Margin FY11 EBIT Margin

Strong Balance Sheet Low gearing currently 4% at 30 June 2011) gearing of around 15% acceptable (BBB+ profile) Strong unhedged cashflow dividends increased 500% over last 3 years dividends evaluated each six months: cash v capital commitment Access to liquidity as at 30 June 2011 US$500 million facility undrawn 8b banks, equal commitments t Well placed to fund growth opportunities 7

Gold Production: Target of 4 Million Ounces in FY16 ~ 50% increase in Gold production over 5 years FY17+ FY16 FY15 FY14 FY13 FY12 FY11 Large resource, lowcost assets best Target 4.0 Moz growth opportunities 3,650 3,900 koz 5 year growth 3,400 3,600 koz primarily from Cadia and Lihir 2,950 3,100 koz Wafi-Golpu to 2,775 2,925 koz underpin growth beyond 4Moz 2,702 koz 2.7 Moz 4.0 Moz Current Operations Current Projects New Projects 8 Note: Gold production profile includes production from Cracow and Mt Rawdon

Growth Pipeline Hidden Valley Mine Ridgeway Block Cave Gosowong Expansion Lihir MOPU Expansion Cadia East Mine Bonikro Mine Hidden Valley Expansion O Callaghans Wafi - Golpu Namosi Concept & Prefeasibility Feasibility Execution Operation Two major projects, two major studies 9

Newcrest in PNG In just under three years Newcrest has moved from an interested observer to the major mining house in PNG - Largest company on POMSoX - Strong confidence in PNG s ongoing support of the resource sector - Newcrest prepared to make the long-term commitment Newcrest s entry into PNG - Started with our Morobe Mining Joint Venture with Harmony Gold - Expanded to include the acquisition of Lihir Gold - Pre-feasibility of the potentially world class Wafi-Golpu Committed to exploration - in Morobe through the Morobe Mining Joint Venture - at Lihir - Manus Island JV with Triple Plate Junction plc, Golden Success Ltd, Pacrim Energy Ltd & Terenure Ltd Approximately 8,500 employees and contractors in PNG out of a total global workforce of around16,000 of the 8,500 approximately 7,800 are Papua New Guineans New Port Moresby office headed by Peter Aitsi 10

Newcrest PNG Operations 1.2B Kina contributed to the PNG economy in calendar 2010 National Govt. taxes, tax credit scheme & production levy 11% Royalty 5% Employment 4% Lihir Contractors 27% Community Benefits 8% PNG Goods & Services 18% PNG Contractors 27% 11

Portfolio Overview PNG Operations Lihir (Reserves 31Moz & Resources 56Moz gold) MOPU delivers production from 850koz to 1.2-1.3Moz per year Scope for further optimisation and extension of mine life Hidden Valley (Reserves 1.9Moz & Resources 2.7Moz gold) Stabilise production around 300 koz pa Incremental growth 12

13 Lihir Gold

Lihir Fast Facts Located on Niolam Island, New Ireland Province, 900km north of Port Moresby Volcanic sea mountain rising 600m above sea level, 22km long &14.5km wide Ore body discovered in 1982 at Luise Caldera on east coast of island all known deposits located here Exploration conducted 1983 to 1995; construction phase 1995 to 1997 Production commenced May 1997 over 9 Moz of gold produced since then Mine consists of single ore body with 3 linked open pits Lihir processes ~ 6 Mt ore annually Current ore reserves 31 Moz & measured resources 56 Moz 14

Newcrest Lihir Gold - Overview Malle island Lihir island 900 km northeast of Port Moresby 1,700 km northeast of Cairns 3º south of equator 15 New Ireland province

Newcrest Lihir Gold - Overview 16 Lihir Statistics 4800mm avg /year 19-35 celcius 22 km long 14.5 km wide Pop: 18 000

Lost Time Injury Frequency Rate (LTIFR) 2.0 Industry benchmark* = 1.8 1.55 LT IFR (1 mil llion hour rs) 1.5 10 1.0 0.5 053 0.53 12 million hours 2009 14 million hours 2010 0.18 0.26 0.18 0.14 0.0 *Minerals Council of Australia, Australian Minerals Industry 17Safety & Health Quarter 4 2007-08 Survey report, Feb 2009 2005 2006 2007 2008 2009 2010 Calender Years

Pathway to Zero Harm Focus on Behaviour Based Safety 18

Sustainable Development and Community Liaison Build trust by delivering on commitments Proactively working with the community to meet their goals Align interests where possible Lihir Sustainable Development Plan Social Awareness Training 19

Environmental Management Originally permitted in 1996 Re-permitted to PNG Environment Act 2000 Comprehensive Management and Monitoring Plan 4 2 Significant Environmental Incidents ISO 14001 certification 1 1 1 1 1 20 years baseline data 14 years operating performance 199 98 0 0 0 0 0 0 199 99 200 00 200 01 200 02 200 03 200 04 200 05 200 06 200 07 200 08 200 09 201 10 20 No significant incidents >5 years

Newcrest Lihir Gold - Employees 2,146 direct employees 33% Lihirian employees 90% PNG nationals Camp and Residential 65% FIFO camp resident 33% Lihirian local resident 2% Townsite resident Rosters FIFO 15/13 and 21/14 days Residential 5/2 days 21

Our People -Training Lihirian Trainees 270 trainees, 1 in 8 workforce Training Programs Competency based and accredited, RTO s >90 workplace trainers Training Centre PNG National Training Council accredited 96 apprentices, 11 trades 100% Lihirian, 23% Female 22 2007 PNG Apprentice of the Year

People - Training and Development Graduate Development 67 graduates 6 Lihirian Tertiary Sponsorships 47 students 60% Lihirian/NIP Pre-vocation and Resource Centre Capacity Building Public sector and other institutions 23

People - Camp Improvement Program Accommodation 42 Person Blocks Lakenbut (Camp 4) New Mess Officially opened Oct 2010 Amenities Covered walkways Sports field upgrade TV and internet 24

Newcrest Lihir Gold - Mining The main mine consists of distinct production pits with Minifie and Lienetz pit currently in production and the Kapit pit in development. 25

26 The Mining Cycle

Newcrest Lihir Gold Mining Operations Pit mining conditions include high rainfall, low cloud, steam venting, hot water/ground, sulphur gas and PGOA. 27

Newcrest Lihir Gold - Processing Processing plant currently undergoing a million ounce upgrade project. 28

Processing - History and Background Process Plant commissioned 1997 nameplate capacity 2.8 Mt pa Elevated cut off grade strategy High grade ore processed Lower grade ore stockpiled Original plant design allowed for expansion 29

Processing - Background Gold is locked within pyrite Direct cyanidation - only 30% gold recovered Greater than 90% contained pyrite needs to be oxidised Sherritt-Gordon whole ore pressure oxidation technology High temperature, high pressure process with addition of pure oxygen - 205 o C, 2650 kpa Exothermic reaction (generates heat) Pyrite oxidises to ferrous sulphate 30

Processing - Background Flotation circuit i commissioned 2007 Allows processing of lower sulphur grade ore Ability to target t optimum sulphur grades for autoclaves Additional milling capacity Improved operational flexibility 31

Processing - Operational Improvement Focus on two areas Removing Constraints Maximising utilisation of high capital items - Autoclaves & Oxygen Plants Crushing Capacity / Pebble Crushers / CIL/ Elution Optimising Autoclaves Blending strategies Heat recovery Quench capacity 32

Processing Increasing Autoclave Throughput (Tonnes/op h/ hr/autoclave) 146 148 160 169 170 175 176 185 198 205 215 126 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 Calender Years 33

Lihir MOPU Project Overview MOPU Million Ounce Plant Upgrade Brownfields expansion on Lihir Island Increase plant capacity to 12 million tonnes pa. Increase gold output by 200-300k ounces pa. Capital approximately A$1.3B (K3B) Progress 47% complete 3.5 million man hours expended to date on site Schedule completion December 2012 34

Million Ounce Plant Upgrade (MOPU) Grinding 70 10 72 Autoclaves Oxygen (tph) 2 CIL Pre 2007 2 2007 Flotation Expansion 35 2 MOPU

Geothermal - Background 36 2001 - initial iti studies commenced 2003-6 MW pilot plant 2005/7-50 MW commissioned 2007 - Exploration and Options studies 2008 - Geothermal team resources strengthened 2009 -Power department e restructured 2010 - Increased Resource Drilling ( big rig )

37 Geothermal - Power Cycle

Geothermal - Carbon Credits 50 MW geothermal power station PNG s first large scale geothermal power project PNG s first Clean Development Mechanism (CDM) accredited project Certified Emission i Reductions (CER) 10 year crediting period from 2006 to 2015 CO 2 emission reductions up to 250,000 tpa 38

Geothermal - Resource Drilling Inferred Resource 2,00 00 m Measured Resource Probable Resource Deep Upflow Zone Inferred Resource 2,000 0 m Deep Resource 39

40 Exploration

Exploration Activity 41 Drill Rigs in Operation Gosowong 11 Tandai 1 Manus Island 5 W fi G l Wafi-Golpu 5 3 Telfer 4 Mali CÔTE D IVOIRE Bonikro 2 Hidden Valley Namosi 3 Cracow 2 Bukina Fasco Marsden Lihir 4 1 Mt Rawdon Cadia Valley Yamoussoukro Abidjan 100 km 3 41 Drill Rigs in Operation Mining Operation Exploration Advanced Project Emerging Project Mt Kasi

FY11 Exploration Expenditure by Region Total spend A$126M Fiji, 3% Cote d Ivoire, 9% Australia, 33% 38% of total expenditure in PNG = K109.9M 9M Focus on near province opportunities ~50% resource definition ~25% brownfields exploration Greenfield exploration in Cote d Ivoire and the Morobe Province in PNG PNG, 38% =K109.9M Indonesia, 17% 42

PNG, Lihir Resource Growth PLAN VIEW 2011 LIHIR RESOURCE (1) 31 Moz Au 2011 LIHIR RESERVE (2) 56 Moz Au 1000 m Inferred Resource boundary Kapit Kapit NE Pacific Coastal Link Exploration Target Lienetz Borefields Minifie DDHL1924 186m @ 3.9g/t Au DDHL1870 188m @ 3.0g/t Au DDHL1871 212m @ 3.4g/t Au DDHL1875 225m @ 2.4g/t Au DDHL1876 134m @ 4.0g/t Au LIHIR PLANT Mineralisation in drilling extends 500m east of the existing resource and remains open Early indication that further extension at Kapit NE likely l Resource and Reserve update August 2011 43 (1) Newcrest website, market release LGL Resources, 26 August, 2009. (2) Newcrest website, market release LGL Reserves, 29 October, 2009.

44 Luksave long komuniti Aginas

45 Newcrest Lihir Gold Questions?