The State of Transport in Macquarie Park

Similar documents
5 Rail demand in Western Sydney

3 The growth of Western Sydney

4 Transport projects underway in Western Sydney


Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Figure 3: Global Sydney. Draft Metropolitan Strategy for Sydney. North Sydney CBD. Second Harbour Crossing. Walsh Bay Arts Precinct.

Major Scheme Business Case Summary Report for Programme Entry

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

PCAL Case Study Retail Areas: Rouse Hill Town Centre

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

Northern Beaches Transport Action Plan

7.0 Bus and light rail in Sydney

Industry briefing NOVEMBER 2017

TERMINAL DEVELOPMENT PLAN

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

Investor Report. Connecting the best of both worlds

UNLOCKING THE BRIGHTON MAINLINE

Sydney CBD - Partnering with the coach industry for solutions

Part four. In this part you will find: The next steps to deliver the master plan

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

SEARs strategic context and project need

OUTLOOK EAST LEPPINGTON

Why the. Building for growth. West Metro. is vital

TRANSPORT, TRAFFIC AND PARKING ASSESSMENT REPORT

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan

Public Transport for Perth in 2031

CBD Rail Link Business Case

OBJECTION TO AMENDMENT TO PLANNING SCHEME AND GRANTING OF PLANNING PERMIT

South East Traffic Solution

Concord Road Interchange. Standard hours of work

5.1 Traffic and Transportation

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

$960 $1,175 $91 OVERVIEW National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY

MARKET OUTLOOK. 01 Walkability & Accessibility 02 Infrastructure & Employment 03 Demographics 04 Residential Analysis 06 Rental Analysis

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway

South of England north-south connectivity

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

Board meeting

ASCOT SUBURB PROFILE

NORTH WEST GROWTH CENTRE

CUMULATIVE IMPACTS CHAPTER TWENTY-SIX

Connecting Sydney Olympic Park and GPOP with Greater Sydney. Final Summary Report 29 May 2017

London Borough of Barnet Traffic & Development Design Team

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

Draft City Centre Transport Proposals

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

ABOVE + BEYOND PINNACLE OFFICE PARK 4 DRAKE AVENUE, MACQUARIE PARK, NSW

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Review of Government Secondary School Requirements within the Sunbury South Precinct Structure Plan

Sustainable Urban Development. Presentation to WVCC 1 December 2010

RE: Victoria Road upgrade (RTA December 2007). Thank you for the briefing from your department and the invitation to comment on the above.

Map showing location of public transport projects in vicinity of railway station

BARANGAROO. Integrated Transport Plan

The Coalition s Policy

Sky Temporary Car Park Transport Statement

PO Box 257 PO Box 257 PARRAMATTA NSW 2124 PARRAMATTA NSW 2124

TfL Planning. 1. Question 1

Lake Erie Commerce Center Traffic Analysis

7.0 GROUND TRANSPORT DEVELOPMENT PLAN OVERVIEW. Sydney Airport Master Plan

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

Memorandum of Understanding with ACT Government

POSITIVE + OUTLOOK MICROSOFT CAMPUS 1 EPPING ROAD, NORTH RYDE, NSW

Table 1 overleaf summarises the changes in planned growth between the 2016 and 2017 iterations of the plan.

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

SYDNEY S SECOND AIRPORT

EAST WEST RAIL EASTERN SECTION. prospectus for growth

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT

GUNGAHLIN TOWN CENTRE

Toga has appointed Urbis to assist in developing a Toga response to the draft District Plans. Urbis has

University of Wollongong Innovation Campus Masterplan

[REGIONAL LAND TRANSPORT PROGRAM AND REGIONAL FUEL TAX SUBMISSION ]

Strategies and Land Release

IMPACT HOMES Introducing The Meadows Estate 3

Pedestrian Safety Review Spadina Avenue

NSW GOVERNMENT RESPONSE TO THE VISITOR ECONOMY TASKFORCE REPORT

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Newcastle Transport Program Newcastle Light Rail Determination Report

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Transport Delivery Committee

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

BUSINESS PARK. 8 Parkview Drive, Sydney Olympic Park FOR LEASE

Airport Planning Area

Technical Paper 1 Traffic report

Chapter 4 Route Window NE3 Manor Park station. Transport for London

New Runway Project. Connecting people and places. Supporting business. Engaging with community

NEWCASTLE. Australia / PRIME PORTSIDE OPPORTUNITY / / 43 & 45 GREENLEAF ROAD, KOORAGANG NSW

New free City connector bus service

POSITIVE + OUTLOOK PRECINCT CORPORATE CENTRE 1 RICHARDSON PLACE, NORTH RYDE, NSW

Capital & Counties. October 2007

Transcription:

The State of Transport in Macquarie Park 31st August 2015

Overview Macquarie Park is a major economic centre that contributes over $9billion to Australia s economy each year. Providing access to and from Macquarie Park is a major task that requires significant resources and co-ordination. This report outlines the state of transport in Macquarie Park through a discussion of the challenges facing Macquarie Park, and recommendations for further action to address these challenges. Some of the key challenges facing Macquarie Park are: High levels of development are planned for the near future, which will lead to significant growth in employment, students and population. The existing road-based transport is congested leading to slow travel times and poor reliability for drivers and public transport users alike. There are barriers to walking and cycling access, including limited crossing opportunities, delays at intersections and incomplete footpaths. Public transport access will be enhanced in the future with the Sydney Metro, priority bus corridors and a potential light rail link, but many areas served by bus will not receive priority infrastructure. In the coming years, leading up to and including the temporary closure of the Epping to Chatswood Railway, travel will be constrained, with longer travel times and lower reliability for public transport users. Without proper co-ordination of transport and development during this period, there will be an even greater impact on people s access to Macquarie Park during these times. Based on these challenges that face Macquarie Park, further action is recommended according to four key themes: Gather information to fill knowledge gaps Co-ordinate development activity and rail station closures Fast-track infrastructure for walking and cycling Develop long-term transport strategy Page 20 of this document provides a more detailed list of recommendations for further research and action. 2

Location and importance Macquarie Park is located approximately 12 kilometres north-west of the Sydney Central Business District and one of Australia s largest employment precincts. In 2014 the Property Council of NSW released office market reports citing Macquarie Park as the second largest business precinct in NSW, ahead of both North Sydney and Parramatta, with over 850,000 square metres of commercial space1. Modelling released by PriceWaterhouseCoopers found Macquarie Park s output was $9.1 billion and ranked the precinct as the tenth biggest location for economic output in Australia2. N 0 0.5 1.0 1.5 2.0 2.5 kilometres Figure 1: Macquarie Park in its regional context. 1. Australia Uncovered Report- PriceWaterhouseCoopers, 2014 2. Australia Uncovered Report- PriceWaterhouseCoopers, 2014 3

Location and importance People working, studying and living in Macquarie Park Macquarie Park and the adjacent Riverside Corporate Park in North Ryde are first and foremost places where people work in a range of offices, technology and laboratory buildings, warehousing and logistics spaces. Macquarie Park is also home to a major university Macquarie University, a teaching hospital, a major shopping centre and several housing precincts. Currently, in Macquarie Park there are approximately: 53,800 workers; 37,900 students; and 3,300 residents. Figure 2 shows the distribution of employees throughout Macquarie Park. Figure 3 shows the distribution of residents. This mix of land uses in Macquarie Park means that it is first and foremost a destination location for travel with large amounts of travel to the area in the morning, and away from the area in the late afternoon and evening. Figure 2: Macquarie Park employment in 2011. 3. Bureau of Transport Statistics, 2011 employment 4. Macquarie University Masterplan, 2013 students 5. Bureau of Transport Statistics, 2011 population 4

Transport in Macquarie Park - An Overview Figure 3: Macquarie Park population in 2011. 5

Overview of transport networks Road network Macquarie Park is served by Sydney s road and rail-based transport networks. It is located adjacent to the M2 Motorway, which provides a direct connection to the Sydney Central Business District, Sydney Airport and northwestern suburbs for people travelling in cars and buses. There are also major arterial road connections around and through Macquarie Park that provide regional connections to north and central-western Sydney, the North Shore and Northern Beaches areas for people travelling by car and bus. Public transport network The public transport network serving Macquarie Park is comprised of both train services and bus services. Train services operate along the T1 Northern Line to and from train stations at Macquarie University, Macquarie Park and North Ryde. These stations are served by direct services connecting the Sydney Central Business District, Chatswood, Hornsby and Epping every 15 minutes throughout the day, with a high degree of reliability. Having opened just six years ago, train stations serving Macquarie Park handle a combined 31,000 daily passenger trips to and from Macquarie Park each day. Between 2013 and 2014, the number of people travelling on trains to and from stations in Macquarie Park increased by 14 per cent, amongst the highest growth in Sydney 6. Buses serve a range of stops throughout Macquarie Park, with many commencing or terminating at a large bus interchange at Macquarie Shopping Centre, adjacent to Macquarie University Station. Buses provide direct connections between Macquarie Park and the Sydney Central Business District, North-West and Hills District, North Shore and Northern Beaches, as well as to a variety of nearby locations in the Ryde area. Individual services generally serve the park every 10-15 minutes throughout the day, with higher frequencies during peak hours. Key bus corridors on Waterloo Road, Lane Cove Road and Epping Road carry many bus routes, with buses serving stops every 2 minutes or more frequent during busy morning and evening travel times 7. Although Macquarie Park is served by a variety of bus services, the network is highly complex, with bus routes serving the same location departing from a range of different locations. The complex bus network in Macquarie Park is a confusing to customers, and potentially negatively impacts the experience of public transport travel to and from Macquarie Park. Figure 5 shows the road and public transport network serving Macquarie Park. 6. Sydney Trains Barrier Counts, 2009-2014 - Bureau of Transport Statistics 7. Analysis of Transport for NSW operational timetable, 2015 6

Overview of transport networks Figure 5: Transport network serving Macquarie Park. 7

Challenge: Macquarie Park is growing rapidly Macquarie Park is set to experience some of the highest levels of growth in New South Wales, with the number of people working, studying and living in Macquarie Park expected to increase significantly in the near future. By 2021, Macquarie Park is expected to have almost 61,000 workers 7,000 more than it did in 2011 8. This is amongst the highest employment growth forecast throughout Sydney over this time. The additional jobs expected in Macquarie Park will add to the number of people travelling to and from Macquarie Park each day. If each of these people were to drive to Macquarie Park, that would mean an additional 5,800 cars on the road. If they caught public transport, it would be enough to fill 140 buses, or six trains each morning and evening. Macquarie University s growth in the past years has largely exceeded predictions. University forecasts anticipate that the number of people studying at the University could grow from 27,000 to 50,000 fulltime equivalent students by 2023 under a high-growth scenario 9. This would see almost twice as many student accessing the university each day, placing an additional strain on roads and public transport services. Major residential Priority Precincts are planned at Herring Rd and North Ryde. At Herring Rd, up for 2,400 additional homes (6,800 people) are planned to be built by 2021 10. At North Ryde, an additional 3,000 homes (8,500 people) are planned to be built by 2031. This residential development is expected to drive a 75% increase in people living in Macquarie Park since 2011. The increase in people living in Macquarie Park will lead to a greater number of people travelling within Macquarie Park to access jobs, shopping and recreational facilities and regional public transport services. This likely means there will be a greater number of people travelling to and from Macquarie Park at different times of the day, as Macquarie Park s role as an origin location increases. In addition to these increases within Macquarie Park, the surrounding region is expected to be home to an increasing number of people in the future. By 2021, an additional 150,000 people are expected to live within ten kilometres of Macquarie Park 11. In October 2014, Macquarie Centre finished the first stage of major redevelopments, making it the largest shopping centre in New South Wales with 250 retail stores, a cinema complex and an ice rink 12. Travel between the shopping centre and growing residential areas will result in further increases in trips to and from Macquarie Park each day. Figures 6 and 7 show the expected population, employment and student growth in Macquarie Park from 2011 to 2021. Differences in population and employment forecasts: There are a variety of figures used to describe future population, employment and students in promotional, planning and strategy documents relating to Macquarie Park. These are generally from similar datasets, but can relate to different areas or geographical definitions of Macquarie Park and the adjacent North Ryde area. This report generally uses figures drawn from the September 2014 release of the Bureau of Transport Statistics population and employment forecasts, and have been summarised according to the 477 hectare geographical area shown in the maps within this document. A comparison of some key population and employment data relating to Macquarie Park and North Ryde is provided in the appendix of this report. 8. Bureau of Transport Statistics, Population Forecasts (2011-2021), September 2014 release 9. Macquarie University Masterplan, 2013 10. Department of Planning & Environment 11. AMP Capital - Macquarie Centre Synopsis 12. Bureau of Transport Statistics, Population Forecasts (2011-2021), September 2014 release 8

Figure 6: Population and employment growth in Macquarie Park. Figure 7: Forecast population and employment growth in Macquarie Park (2011-2021) Bureau of Transport Statistics, 2014 and Department of Planning and Environment, 2015 9

Challenge: Existing road-based transport is congested Major roads serving Macquarie Park carry large amounts of traffic. Each day, these roads can carry over 40,000 vehicles in each direction, with many of these vehicles travelling during the busiest times in the morning and early evening as people travel to and from work. Table 1 shows the average daily traffic volumes on some of the key roads approaching Macquarie Park. Table 1: Average daily traffic volumes on key roads approaching Macquarie Park. Location Westbound Eastbound Combined Epping Road (between Balaclava and Vimera Roads) 20,000 18,500 38,500 Epping Road (North Ryde - West of Hills Motorway, M2 terminal) 29,600 26,900 56,500 Lane Cove Road (300m south of Bridge Road) 30,500 29,700 60,200 Lane Cove Road (North Ryde - At De Burghs Bridge) 41,300 40,200 81,500 Source: Average Annual Daily Traffic Counts (Weekdays in 2012) 13 The large numbers of vehicles travelling on roads in Macquarie Park lead to traffic congestion that directly impacts the speed and reliability of travel. Due to congestion, people travelling on roads to and from Macquarie Park experience some of the slowest travel speeds in Sydney, as well as a high level of variation in this travel time from day to day. Currently, key road intersections within Macquarie Park are measured as failing or approaching failure 14. This means that they are struggling to handle the traffic demand using them, creating delays as people must wait multiple traffic light cycles before they can pass through an intersection. In the future, this is expected to worsen with increased traffic demand leading to longer travel times to and from Macquarie Park. For cars, travel speeds through and approaching Macquarie Park on Epping Road and Lane Cove Road are regularly below 20km/h during peak hours 15. Lane Cove Road between Ryde and Macquarie Park is one of the ten slowest sections of road in Sydney during the evening peak period, averaging 19.5km/ h 16. Traffic congestion in Macquarie Park is caused by large numbers of people trying to access parking in Macquarie Park, as well as large numbers of people travelling through the area to access other destinations. Traffic also impacts many of the buses travelling to and from Macquarie Park. Whilst some buses travel in protected priority bus lanes, other services operate in mixed traffic conditions and experience the full impact of traffic congestion. Travel speeds for buses approaching Macquarie Park in the morning peak are slow; as low as 12 km/h on parts of Lane Cove Road that do not have bus lanes 17. 13 Roads and Maritime Services, 2012. 14 Temporary Transport Plan for Macquarie Park, 2014 15 Roads and Maritime Services Roads Report, 2015 16 Roads and Maritime Services Roads Report, 2015 17 Analysis of data from the Public Transport Information and Priority System 10

These are amongst the slowest bus travel speeds in Sydney, with bus speeds generally ranging between 10 and 50km/h. Buses travelling on roads in Macquarie Park are also subject to variable travel times, meaning that the amount of time it takes to get from A to B can change significantly from day to day. The congestion on the road network has been reported to cause frustration amongst drivers and bus passengers alike. In many instances, illegal driver behaviour such as queuing across intersections and running red lights is exacerbated by these conditions. Figure 8: Level of Service levels of different intersections during the PM peak. The LOS levels range from A to F, where level F includes excessive queueing and delays. Epping to Chatswood - Temporary Transport Plan, Parsons Brinckerhoff (2014) 125 km /h 10 Speed 100 km /h 75 km /h 50 km /h 25 km /h 8 6 4 2 Throughput (hourly '000 vehicle.km) 0 km /h 0 00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00 Time of Day Average Speed Speed Range Average Throughput Figure 9: Average vehicle travel speeds on Lane Cove Road, between Ryde and Macquarie Park, March to May, 2015. Roads and Maritime Services (2015) 11

Challenge: Walking and cycling access continues to be hindered Walking and cycling access continues to be hindered A greater number of people walking and cycling could benefit Macquarie Park by reducing the strain on roads and public transport services. The increased number of people that will be living in Macquarie Park in the future presents a significant opportunity to the area, as nowadays the large amounts of people driving to Macquarie Park leads to traffic congestion each weekday. Unfortunately, walking and cycling access to, from and within Macquarie Park continues to be hindered by barriers caused by major roads, incomplete infrastructure, and a street structure that is not conducive to walking. Providing strong, connected networks to, from and within Macquarie Park is critical to increasing the share of people using walking and cycling and public transport for travel. Barriers for pedestrians Large and busy roads in Macquarie Park create barriers that hinder the movement of people walking to, from and within the precinct. This is primarily due to the limited opportunities to cross roads. Despite strong desire lines across key roads in Macquarie Park, pedestrians often have to walk up to five minutes out of their way to find a legal and safe crossing opportunity. An example is the strong desire for people to cross Lane Cove Road at lunch time. In this case, the few crossing opportunities result in instances of jaywalking (shown in Figures 11 and 12). Walking in Macquarie Park is hindered by the internal street structure, which is made up of large blocks that require people to make relatively circuitous journeys when walking throughout the area. Walking between locations in Macquarie Park takes longer than it would over equivalent distances in other major commercial centres in Sydney such as Parramatta, North Sydney and Chatswood. Figure 10: Opportunities for improving pedestrian facilities. 12

Ryde Council has introduced development policy that aims to create smaller blocks within Macquarie Park by encouraging developers to add new roads and pedestrian links when land is redeveloped18. Whilst this mechanism may lead to the reduction of block sizes over the long-term, there has been little change to the street pattern in Macquarie Park since the introduction of the policy, and it is unlikely that any major changes will occur prior to major increases in the number or residents, workers and students expected over the next decade. Improvements that would enhance the walking network in the Macquarie Park were identified in a Pedestrian Access and Mobility Plan (PAMP) released by Ryde Council in 201319, some of which are shown in Figure 10. Many of these improvements are not currently funded, with others having an unclear timeframe for delivery. An example is the construction of traffic signals at the corner of Waterloo Road and Khartoum Road, which would create an opportunity to cross the road that where there is currently a one kilometre stretch without any formal crossing opportunity. In-line with the construction of footpath surface improvements, an interim solution has resulted in the further reduction of connectivity, with pedestrian fencing requiring people to walk even further to cross the road at this location. Although funded, Ryde Council has identified the construction of signals may not be complete until 2017/18, and has not released a detailed timeline for delivery20. There are further opportunities to improve the environment for cyclists by growing the cycling network that serves travel to and from Macquarie Park. Cycling access has improved in recent years with the introduction of a network of shared paths along key routes such as Waterloo Road, however connectivity between routes remains hindered by major roads with fast travel speeds that are not conducive to encouraging cycling. Furthermore, routes connecting to Macquarie Park remain incomplete. Figure 11, Figure 12: Pedestrians crossing Lane Cove Rd. 18 Macquarie Park DCP, 2008 and Space Syntax Report, 2009. 19 Macquarie Park Pedestrian Access and Mobility Plan, 2013 20 City of Ryde Works and Community Committee May 2015 13

Challenge: Public transport access is earmarked for improvement however details are unclear Rail improvements Sydney Metro Northwest is currently under construction and will introduce a high frequency metro train service to stations in Macquarie Park from 2019. Sydney Metro Northwest will increase the frequency of trains to 15 per hour in each direction approximately one train every four minutes throughout the day. This is four times as many trains than currently serve these stations today. The project will also provide a direct train service between Macquarie Park and the northwestern suburbs, reducing the travel time between Macquarie Park and key locations such as Castle Hill to one third of what is experienced today. Bus and light rail improvements There are planned improvements to the bus infrastructure and services serving Macquarie Park however the timeframes for the delivery of these improvements are not clear. The NSW Government s Sydney s Bus Future strategy identifies two Rapid Bus Routes serving Macquarie Park and North Ryde. Planned increases in the number of buses operating on these corridors will providing capacity for up to 1,500 extra passengers each day, as well as providing increased reliability through additional bus priority measures on Waterloo Road, Lane Cove Road and Epping Road. Transport for NSW is currently developing a plan to roll-out improvements to increase the speed and reliability of buses on these key corridors. Details of these improvements are not available to the public at this stage. Once improvements are made, there will be an opportunity to operate a simpler and more reliable bus network on key priority corridors. One of these rapid routes between Macquarie Park and Parramatta is under investigation by the NSW Government as part of a light rail network serving Parramatta. The light rail line could potentially move up to 10,000 people per hour, however is not currently a committed project for the NSW Government 21. Transport for NSW is currently working with Macquarie University and AMP Capital to investigate options for improving the Herring Road bus interchange. The specific benefits and timeframes of these improvements are also not yet determined and subject to further investigation. The unclear timeframes and specific details of planned transport improvements make it difficult to integrate developments with transport. Locations without planned improvements There are currently no planned infrastructure or major service improvements to increase the speed and reliability of buses serving Macquarie Park from the North Shore and Northern Beaches, Eastwood and Gladesville which are each key areas where people who work in Macquarie Park travel from each day. Without these improvements, there is unlikely to be any significant improvement in slow and unreliable bus travel from these locations. 21 Parramatta Light Rail Strategic Plan 14

Figure 13: Network improvements in Macquarie Park. 15

Challenge: Rail shut-down and development in 2018-19 The next five years will be a challenging time for access to, from and within Macquarie Park. As part of the construction of the Sydney Metro Northwest, the train stations in Macquarie Park will be closed, meaning that over 30,000 people that currently catch the train to and from Macquarie Park each day will need to travel by other means. The length of the closure will be at least seven months, however documentation prepared by Transport for NSW suggests the closure could extend up to 13 months 22. To facilitate the closure of the Macquarie Park stations each day, an additional five bus routes leading to 64 additional buses during the morning peak period and 75 additional buses during the evening peak period will be introduced. Buses will connect passengers to train stations at Chatswood, Epping, St Leonards, Eastwood and Gordon 23. Replacement bus services will result in people requiring up to 45 minutes extra a day to travel between Macquarie Park and stations of the Sydney Trains network due to the slower travel speeds of buses, and the way they will be impacted by traffic congestion. Furthermore, the large number of additional buses will further add to the congestion already experienced on the road network. Continued growth in workers, students, residents and shoppers will result in a growing number of people travelling each day and large amounts of planned construction activity will potentially create disruptions to travel, and additional freight and heavy vehicle traffic. There is a lack of clarity around the timeframes for major transport and development projects. In particular the development timeframes of the Priority Precincts, bus priority infrastructure and road upgrades require further clarity due to their potential accumulative impact. Major projects proposed without definitive construction schedules could overlap leading to cumulative impacts during times when the transport network is most constrained. This is likely to lead to further increases in the time it takes to travel to and from Macquarie Park, as well as lower levels of reliability. Property development and road upgrades that are planned to occur during the temporary closure of train stations at Macquarie Park are likely to further exacerbate traffic congestion that will impact drivers, bus passengers, and train passengers using replacement buses. The lack of clarity and co-ordination around development as well as the potential shut-down of rail services for over one year will be a major risk to the desirability and viability of Macquarie Park as a place to do business. Figure 13 details planned and potential development activity within Macquarie Park and North Ryde over the next five years. 22 Epping to Chatswood Railway - Temporary Transport Plan (2014) 23 Epping to Chatswood Railway - Temporary Transport Plan (2014) 16

Timeline Interim rail service EC Rail Shutdown Herring Rd. Priority Precinct Macquarie Center Bus Interchange Upgrade Signals Herring/Waterloo Intersection Upgrade Signals Khartoum/Waterloo Intersection North Ryde Priority Precinct Construction Masters Hardware Store Upgrade Signals Wicks/Epping Rd. Intersection Upgrade Signals Wicks/Waterloo Rd. Intersection Construction Ryde Garden (residential) Construction Lachlan s Line (residential) Improvements Pittwater/Lucknow Rd. Novartis To be provided before 31 Dec. 2020 To be provided before 31 Dec. 2016 Other developments 10 Byfield St. (hotel) 110 Herring Rd. (Stamford) 269 Lane Cove Rd. (Mirvac) 67 Epping Rd. (hotel) Ivanhoe Estate redevelopment Macq. Centre, 2nd stage redevelopment Astrazeneca Park (between Talavera Rd. and Waterloo Rd.) 22 Giffnock Avenue (7 storey commercial) 8 Khartoum Rd. (7 storey commercial) Macquarie Central (5 building residential highrise) 4 Eden Park Dr. (5 storey data centre) 111 Wicks Rd. 84 Talavera Rd. (Mixed use) 63 Waterloo Rd. (17 storey mixed use) 136 Herring Rd. (4 storey student housing) 2015 2016 2017 2018 2019 2020 Legend Land use development Infrastructure development Figure 15: Timeline of all identified projects within Macquarie Park. Sources include the City of Ryde and the City of Ryde DA Tracker. 17

What needs to be done Gather information to fill knowledge gaps A strong knowledge-base of information is important to ensure robust planning to move people into, out of and within Macquarie Park. This knowledge base needs to provide insight into the demand and travel characteristics related to land-use as well as the performance of transport networks. Whilst extensive study into the park has developed a rich information base for Macquarie Park, there are still information gaps that need to be filled in order to effectively plan for the future. The following knowledge gaps have been identified: Specific characteristics and sensitivities that influence mode choice in Macquarie Park are not well understood. Specific timing of many land and property development projects are unclear. The length and specific impacts of the rail line closure are unclear. Methods of rapidly achieving fine-grain walking networks within budgetary constraints are not clear. There is not a specific understanding of the impact and magnitude of traffic congestion in terms of personhours. In order to fill knowledge gaps, the following programme of data collection is recommended: Connect Macquarie Park should undertake research to understand the specific characteristics and sensitivities that influence mode choice for people working and studying at Macquarie Park. Connect Macquarie Park should work with TfNSW to understand the magnitude of road network congestion in terms of passengers impacted and the length of time they are delayed through a detailed analysis of road congestion and utilisation data. NSW Government and City of Ryde should clarify major project timeframes for major land use and transport initiatives occurring in Macquarie Park over the next five years. City of Ryde should undertake research to understand potential financial mechanisms to rapidly develop a fine-grain network for walking in Macquarie Park. Co-ordinate development activity and rail station closures The impact of planned and potential development, transport projects, and the temporary closure of the train line has not been considered holistically. During the most constrained period, in 2019, there is no indication that additional priority will be provided for public transport users accessing Macquarie Park on the road network, despite significantly higher numbers of passengers using buses. Poor travel time and reliability on public transport will risk further people choosing to drive their cars on already congested road networks, exacerbating problems further. The comprehensive co-ordination of transport services in line with potential development and transport network impacts will be essential to maintaining access to Macquarie Park and minimising the significant impacts on people travelling to workplaces, educational and shopping facilities. This coordination process must consider activity under the jurisdiction of different levels of government and may not be achievable through conventional development and construction impact assessment and tracking processes. In order to achieve co-ordination, the following actions are recommended: 18

What needs to be done NSW Government should work with City of Ryde to establish a co-ordination body to understand and manage major projects and the travel task to Macquarie Park during the shutdown of the train line in 2018-19. NSW Government should immediately review public transport priority infrastructure on key roads with the aim to ameliorate the expected travel time impacts resulting from the Epping to Chatswood Rail Line closure in 2018-19 NSW Government should develop an information and public relations campaign to provide Macquarie Park workers and residents with information about travel options now, during the train line closure in 2019 and once the Sydney Metro opens. It will be essential for this information to be communicated effectively prior to major changes. Connect Macquarie Park should work with businesses and NSW government (TfNSW) to identify demand management schemes that can mitigate the impacts of rail shutdown on workers. Fast-track infrastructure for walking A suite of improvements to create safer and easier pedestrian access and movement throughout Macquarie Park have been identified in studies such as the Pedestrian Access and Mobility Plan (2013) and the Macquarie Park Baseline Movement Economy Report (2009). This infrastructure should be fast-tracked to ensure that pedestrian movement is fully-supported as rapid growth occurs in the park. In order to achieve this, the following actions are recommended: City of Ryde should prioritise, fund and implement recommendations for action from the Pedestrian Access and Mobility Plan City of Ryde should work with NSW Government to plan, prioritise and fund opportunities for pedestrians to cross busy road corridors, in particular, adjacent to major bus stops and train stations. Lane Cove Road should be addressed as a priority. City of Ryde should work with NSW Government (Roads and Maritime Services) to fast-track the implementation of key signalised road crossings in Macquarie Park. City of Ryde should investigate alternate systems and financing options to rapidly construct additional local streets and pedestrian links identified in the Macquarie Park Baseline Movement Economy Report (2009) as necessary to achieve a fine-grain local walking network in Macquarie Park. Develop long-term transport strategy Long-term strategic transport and land use planning for Macquarie Park would guide and prioritise the future development of transport infrastructure and services in Macquarie Park. This process is an essential requirement given the very high levels of growth expected over the next 20 years, and the significant accessibility challenges faced across multiple transport modes. To build a long-term strategic platform for Macquarie Park, the following actions are recommended: NSW Government (Transport for NSW) should work with City of Ryde to undertake an integrated transport planning process that develops clear access principles, and appropriately prioritises different forms of transport in different spaces in collaboration with key stakeholders in Macquarie Park. NSW Government (Transport for NSW) should work with City of Ryde to develop an integrated access strategy report for Macquarie Park that communicates clear directions and initiatives for the development of an integrated transport network for Macquarie Park. 19

Summary of recommended actions Theme Actions Lead organisation Gather information to fill knowledge gaps Undertake research to understand the specific characteristics and sensitivities that influence mode choice for people working and studying at Macquarie Park. Understand the magnitude of road network congestion in terms of passengers impacted and the length of time they are delayed through a detailed analysis of road congestion and utilisation data. Clarify major project timeframes for major land use and transport initiatives occurring in Macquarie Park over the next five years. Understand potential financial mechanisms to rapidly develop a finegrain network for walking in Macquarie Park. Connect Macquarie Park, City of Ryde, NSW Government Co-ordinate development activity and rail station closures Establish a co-ordination body to understand and manage major projects and the travel task to Macquarie Park during the shutdown of the train line in 2018-19. Immediately review public transport priority infrastructure on key roads with the aim to ameliorate the expected travel time impacts resulting from the Epping to Chatswood Rail Line closure in 2019 Develop an information and public relations campaign to provide Macquarie Park workers and residents with information about travel options now, during the train line closure in 2019 and once the Sydney Metro opens. It will be essential for this information to be communicated effectively prior to major changes. Connect Macquarie Park should work with businesses and NSW government (TfNSW) to identify demand management schemes that can mitigate the impacts of rail shutdown on workers. NSW Government working with City of Ryde, Connect Macquarie Park Fast-track infrastructure for walking Prioritise, fund and implement recommendations for action from the Pedestrian Access and Mobility Plan. Plan, prioritise and fund opportunities for pedestrians to cross busy road corridors, in particular, adjacent to major bus stops and train stations. Lane Cove Road should be addressed as a priority. Fast-track the implementation of key signalised road crossings in Macquarie Park. Investigate alternate systems and financing options to rapidly construct additional local streets and pedestrian links necessary to build a finegrain local walking network in Macquarie Park. City of Ryde, working with NSW Government (Roads and Maritime Services) 20

Appendix: Comparison of population, employment and student forecasts Source Population Employment Students Bureau of Transport Statistics Employment Forecasts 2011-41 (September 2014)(a) NA - 53,777 in 2011-60,797 in 2021-68,829 in 2031 within a 477 ha area that includes Riverside Corporate Park but excludes Fontenoy Road precinct NA Bureau of Transport Statistics Population Forecasts 2011-41 (September 2014) (a) - 3,269 in 2011-11,623 in 2021-25,044 in 2031 within a 477 ha area that includes Riverside Corporate Park but excludes Fontenoy Road precinct NA NA Census Usual Residents (Used by ABS, ID) 6,149 (2011) for 676 ha area that excludes Riverside Corporate Park but includes Fontenoy Road precinct. NA NA Western Sydney Light Rail (uses Bureau of Transport Statistics) - 1,029 (dwellings) in 2011-48,366 (dwellings) in 2031, within an unstated area that is likely a catchment/ portion of Macquarie Park. (b) - 14,000 jobs in 2011-2, 520 jobs in 2031 within an unstated area that is likely a catchment/portion of Macquarie Park. NA Herring Road Urban Activation Precinct Planning Report 6,149 persons (2012 estimate) The Macquarie Park precinct is directly accessible by rail and predicted to provide about 55,000 jobs by 2021 The Metropolitan Strategy plans for the Macquarie Park Specialised Precinct to provide at least 16,000 additional jobs by 2031. Macquarie University is a major education and research facility, with approximately 38,000 students. Average occupancy rate of 2.0 persons per household in Macquarie Park Planning Proposal for Macquarie Park Ryde Local Environmental Plan 2013 Draft (Amendment 1) Macquarie Park Corridor NA The Macquarie Park Corridor is a 7.5 km 2 employment centre located equidistant from Sydney City and Parramatta City Centre. Employment within the Corridor exceeds 39,000. More than 30,000 students attend Macquarie University.

Appendix B: Comparison of population, employment and student forecasts Source Population Employment Students Department of Planning Metropolitan Plan 2036 (superseded) Macquarie Park is identified under the Metropolitan Plan 2036 as having a base of 39,000 jobs in 2009 and anticipated to grow to 58,000 by 2036. Macquarie Park is identified under the Metropolitan Plan 2036 as having a base of 39,000 jobs in 2009 and anticipated to grow to 58,000 by 2036. NA Macquarie University Masterplan NA NA In 2013 there were a total of 37,921 enrolled students. These are made up of: - 25,603 full-time students - 12,318 part-time students (a) There are earlier releases of these forecasts, the most widely-used is from 2012. (b) The occupancy rates of dwellings in Macquarie Park is approximately 2. This would equate to approximately 2,100 people in 2011 and 96,700 people in 2031. This latter number appears to be erroneous.