Infrastructure Services

Similar documents
Infrastructure Services TYPE OF REVENUE/USER UNIT/DESCR 2012 RATE RATES (NO

Building Permit Fees (B) Electrical Permit Fees (C) Mechanical Permit Fees (D)

Table of Contents TABLE OF CONTENTS. HOW THIS BY-LAW WORKS... i PART 1 - ADMINISTRATION, INTERPRETATION, ENFORCEMENT, AND DEFINITIONS

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

City of Cambridge Building Division

CITY OF OCEAN SHORES, WASHINGTON ORDINANCE NO. 940

Construction Permits Detail Report

BUILDING GUIDELINES FOR RIVER RIDGE ASSOCIATION EFFECTIVE NOVEMBER 16, 2009

City of Rolling Hills INCORPORATED JANUARY 24, 1957

CA CA CA CA CA CA CA CA CA CA Educational facilities - public elementary and high schools and private schools with a curriculum similar to public

PART I GENERAL INFORMATION OF KENT COUNTY WATER AUTHORITY

STONEMOR INDIANA LLC 1414 S GREEN RIVER RD 699, Exempt, Other STRIP AVERAGE 027 1/6

CLASS B OWNER CHECKLIST

HIGHWAY TRAFFIC BOARD DECISION. File Number: Alsask Bus Services Ltd. of Alsask, Saskatchewan

Osceola County Department of Fire Rescue and Emergency Medical Services

INSTRUCTIONS FOR ADMINISTRATIVE APPROVAL OF PROJECTS (OVER-THE COUNTER APPROVAL)

RECREATIONAL VEHICLE RESORT DISTRICT R-RVR. Lacombe County Land Use Bylaw No: 1237/17 Date Adopted: July 6, Page 111

DESIGN CONTROL GUIDELINES NORTHLAKE HOME LOTS

TABLE WATERFRONT RESIDENTIAL ZONES, PERMITTED MAIN USES

Heathrow Airport Property Rents 2016/17 Consultation Document

County of Ventura - Division of Building and Safety Report of Permits Issued for the Week Ending 12/4/2017

AN URGENCY ORDINANCE OF THE COUNTY OF BUTTE CAMP FIRE DISASTER RECOVERY TEMPORARY HOUSING ORDINANCE: 4/5 VOTE REQUIRED

County of Ventura - Division of Building and Safety Report of Permits Issued for the Week Ending 5/16/2014

Temporary Structure Permit Guide

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2

WAIPU COVE RESERVE BOARD POLICY DOCUMENT ANNUAL SITE DEVELOPMENT REGULATIONS

CONSTRUCTION COMMITTEE MEETING AGENDA

Permit Application Requirements For Temporary Tents, and Membrane Structures

REGULATIONS (10) FOREIGN AIR OPERATORS

BAXTER LAKE RECREATION AREA ASSOCIATION

General Information on the proposed new Irish Register of Ships.

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA

COMMUTING MASS TRANSPORT CALCULATOR GUIDE Version 1.0

Building Permit Application

Program Manual. January 1, EarthCraft House Single Family Program. Viridiant 1431 West Main Street Richmond, VA

CHAPTER 61 SHEBOYGAN COUNTY MEMORIAL AIRPORT

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

Terms of Hire TERMS AND CONDITIONS OF AGREEMENT FOR HIRE OF CAMPER TRAILER FROM BEATS WORKING CAMPER HIRE 1. INTRODUCTION 2. RENTAL OF CAMPER TRAILER

LIVE. WORK. PLAY. STATUS OF DEVELOPMENT SPRING Produced for information by the City of Markham

BUSHFIRE ATTACK LEVEL ASSESSMENT REPORT

CAMS Capitol Accessibility, Maintenance and Safety

ARTICLE 7 MOBILE HOME AND RECREATIONAL VEHICLE PARKS AND CAMPGROUNDS

The Corporation of the Township of Wollaston By-law Being a by-law to licence recreational vehicles and tents in the Township of Wollaston

Heathrow Airport Property Rents Consultation Document

If you re a returning camper, Welcome Back! If you are new to Brushy Creek Campground, we look forwarding to sharing our facility with you.

COMMITTEE OF ADJUSTMENT FOR MINOR VARIANCE MINUTES Monday, October 3, :30 p.m Town Council Chambers Page 1

SAN DIEGO CONVENTION CENTER

Seasonal Camping Agreement Beavermead Family Campground 2018

RV LOT PROCEDURE. RV1.4 Special circumstances (e.g., hardship, military service) will be addressed on an individual basis.

November Attention: Airport Operators. Dear Sir/Madame: Re: Final Rates and Fees Adjustments January 1, 2013

REPORT. Bed and Breakfast Review - Land Use Policies and Regulations

Temporary Structure/Use Checklist

Commencement 2. This Regulation commences on 1 September 1995.

1 Introduction 2 2 Acknowledgements 2 3 Differences between Green Star SA rating tools 2 4 About the Calculator 2 5 How to Use the Calculator 2

b. Minimum Site Area. Recreational vehicle parks shall be located on a parcel of land not less than 3 acres in area.

Mason County Planning & Zoning Department 102 E. FIFTH STREET SCOTTVILLE, MICHIGAN (231) FAX (231)

Is designed to provide seasonal or temporary living quarters for camping and which may be connected to utilities.

We have attached a summary and the final revised changes and a new rates and fees schedule as posted to our website (

San Bernardino International Airport Authority Hangar Policies and Procedures

USE OF TENTS Guide. Frederick County Fire and Rescue Services Division. Office of the Fire Marshal

City of Redding Airports

Terms and Conditions of the Carrier

Grade Crossing Regulations

To propose the demolition of the former St. Ann School Education Resource Centre building located at 2123 Hixon Street, Oakville.

Powerade Centre Overview. Budget Committee October 2015

Article 10 Hotels and Motels

CIVIL AVIATION REQUIREMENT SECTION 3 AIR TRANSPORT SERIES C PART I ISSUE IV, 24 th March 2017 EFFECTIVE: FORTHWITH

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS.

These fee changes have been established in order to establish base fee recoveries for expanding infrastructure and ongoing annual maintenance.

LOGAN BECK FARM. Broughton-in-Furness, Cumbria, LA20 6EU

communication tower means a tower or structure built to support equipment used to transmit communication signals;

To obtain Board approval to demolish the former St. Ann School Education Resource Centre building located at 2123 Hixon Street, Oakville.

(a) it has been licensed for the purpose, and save in accordance with the conditions prescribed in such licence; or

DEVILS LAKE MUNICIPAL AIRPORT AERIAL APPLICATOR OPERATING PERMIT

COMMERCIAL LAND/BUILDING

TOWN OF OSOYOOS DIVIDEND RIDGE AND SPARTAN DRIVE/FUJI COURT STREET LIGHT INSTALLATION

ORDINANCE NO. JACKSON TOWNSHIP, CAMBRIA COUNTY

County of Ventura - Division of Building and Safety Report of Permits Issued for the Week Ending 11/24/2018

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

Capital Five-Year Fiscal Forecast

SKP Park of the Sierras, Inc. Park Rules

ST. PAUL'S RESIDENCE ADDITION WATERLOO, ONTARIO

Schedule of New Construction Fees (Plan Check & Inspection Combined) (All Construction Types)

Terminal Reconstruction and Addition at the M.R. Štefánik Airport in Bratislava

The following criteria shall be applied within the boundaries of the AO District:

PROVINCE OF BRITISH COLUMBIA ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL. Pres

2.2 For these reasons the provision of tourist signing will only be considered:

ORDINANCE NO. 418 BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE CITY OF MACKAY, CUSTER COUNTY, IDAHO:

EL AL Agent Debit Memo (ADM) Policy for Russian Travel Agents

AIRWORTHINESS ADVISORY CIRCULAR

9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF

SUBMITTAL DOCUMENT PARKING ANALYSIS WORKSHEET

Region of Waterloo International Airport 2019 Fees and Charges

Aviation Tax Report. June 30, 2016

VIRGIN ISLANDS PORT AUTHORITY (VIPA) 2016 PUBLIC HEARING ON PROPOSED TARIFF INCREASE. ! July

77th OREGON LEGISLATIVE ASSEMBLY Regular Session. House Bill 2064

City of Moses Lake 2018 Fee Schedule Effective January 1, 2018 Ordinance No Revised February 27, 2018 DEPART FEE TYPE FEE DESCRIPTION 2018 Fee

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

Ponderosa Volunteer Fire Association, Inc. CAMPER 63 & Generator Usage Final August 2017 Purpose & Scope:

AERODROME LICENCE APPLICATION PROCESS

Transcription:

Other Fees (NO RATES (NO Compliance Letter - Single Residential Unit Each $134.18 $138.21 $138.00 3.0% E Compliance Letter Other Properties (Flat Fee) Each $267.86 $275.89 $276.00 3.0% E Written response for inquiries Each $115.94 $119.41 $119.00 3.0% E Other Permits (NO RATES (NO Pool Enclosure Permit Flat Rate $224.99 $231.74 $232.00 3.0% E Two Unit Hoe Registration Flat Rate $1,007.39 $1,038.00 $1,038.00 3.0% E PART A CLASS OF BUILDING PERMITS (NO RATES (NO Change of Use Permit Each $563.36 $580.26 $580.00 3.0% E Conditional Building Permit Flat Rate $1,553.30 $1,599.90 $1,600.00 3.0% E Demolition Permit Flat Rate $208.16 $214.40 $214.00 3.0% E Demolition Permit with Additional or General Flat Rate $317.01 $326.52 $327.00 3.0% E Review Demolition Permit with Environmental Review Flat Rate $404.83 $416.97 $417.00 3.0% E Minimum Building Permit Fee - Non-Residential Flat Rate $267.85 $275.89 $276.00 3.0% E Minimum Building Permit Fee - Residential Flat Rate $207.75 $213.99 $214.00 3.0% E PART B GENERAL FEES (NO RATES (NO Additional Plans Examination or Inspection Fee $/hour + $96.89 $99.79 $99.79 3.0% E (Post Issuance Review) disbursements & 15% administration charge Authorizing Partial Occupancy (Non-residential) Flat Rate $371.45 $382.60 $383.00 3.0% E Building Permit Fee for Construction Commenced without a permit 1.5 times the required fee as stated in Part C. 3.0% Flat Rate $451.09 $464.63 $465.00 3.0% E Building Permit specific agreements (i.e. Limiting Distance) Building Permit Transfer Fee Flat Rate $107.28 $110.49 $110.00 3.0% E Continuo or Special Inspection Mon. to Fri. (Per $96.88 $99.79 $99.79 3.0% E hr) Continuo or Special Inspection Sat. & Sun $124.06 $127.78 $127.78 3.0% E (minimum 4 hours) Document Review Fee Per hour $95.72 $98.59 $98.59 3.0% E Document Search Fee Flat Rate $41.66 $42.91 $42.91 3.0% E Early review of Hoe Model Drawings Per Model $1,126.68 $1,160.48 $1,160.00 3.0% E For phased projects, in addition to the permit fee for the complete building, an additional fee for each phase Flat Rate $207.83 $214.07 $214.00 3.0% E

PART B GENERAL FEES (NO RATES (NO Halton Original Model Express Service Flat Rate $1,126.68 $1,160.48 $1,160.00 3.0% E (H.O.M.E.S.)-Plans review only (Flat fee/model) Lot Grading Resubmission Each Resubmission $213.45 $219.85 $219.85 3.0% E Permit Extensions (no additional review Flat Rate $106.98 $110.19 $110.00 3.0% E required) - Small Residential Permit Extensions (no additional review required) Flat Rate $213.87 $220.28 $220.00 3.0% E - All Other Occupancies Plans review of Alternative Solutions Flat Rate $623.88 $642.60 $643.00 3.0% E Re-examination Fee - (applicable for "Supplemental/01" permits and for review after "Deficiency Letter" has been issued) ($99.80/hour + disbursements & 15% administration charge) - Minimum $214.00 for residential & $276.00 for nonresidential $96.89 $99.80 $99.80 3.0% E Re-examination Fee (administration fee Flate Rate $207.64 $213.87 $214.00 3.0% E associated with "Undertakings") Part 3 Re-examination Fee (administration fee Flat Rate $101.63 $104.68 $105.00 3.0% E associated with "Undertakings") Part 9 Residential Resiting Flat Rate $208.58 $214.83 $215.00 3.0% E Security for Conditional Permit Agreement $12.77/m2 $12.40 $12.77 $12.77 3.0% E (minimum determined by CBO) Written requests for information concerning a Per Hour $96.89 $99.80 $99.80 3.0% E building compliance with the current building code Written requests for information to support Provincial license applications where there is a current perrmit or application Flate Rate $107.10 $110.31 $110.00 3.0% E Group A [Assembly Occupancies] - $/m² unless otherwise indicated (NO RATES (NO Alterations/Renovations Per/m2 $9.69 $9.98 $9.98 3.0% E Group A [Assembly Occupancies] - $/m² unless otherwise indicated (NO RATES (NO Places of Worship Per/m2 $19.42 $20.00 $20.00 3.0% E Portable Classroom Flat Rate $437.46 $450.59 $451.00 3.0% E Recreation Per/m2 $20.59 $21.21 $21.21 3.0% E Restaurants Per/m2 $21.10 $21.73 $21.73 3.0% E School/Library Per/m2 $19.42 $20.00 $20.00 3.0% E Theatre Per/m2 $20.59 $21.21 $21.21 3.0% E Other Per/m2 $21.11 $21.74 $21.74 3.0% E

Group B [Institutional Occupancies] (NO RATES (NO Alterations/Renovations Per/m2 $12.13 $12.50 $12.50 3.0% E Hospital Per/m2 $24.27 $25.00 $25.00 3.0% E Institutional Building Per/m2 $24.27 $25.00 $25.00 3.0% E Interior Alterations/Partitioning/Renovations for Per/m2 $9.72 $10.01 $10.01 3.0% E Nursing Homes and Dental, Medical, etc. clinics Nursing Home Per/m2 $19.43 $20.01 $20.01 3.0% E Other Per/m2 $24.27 $25.00 $25.00 3.0% E Group C [Residential Occupancies] (NO RATES (NO Basement finish Per/m2 $7.75 $7.98 $7.98 3.0% E Carport Per/m2 $5.17 $5.33 $5.33 3.0% E Deck Flat Rate $224.46 $231.19 $231.00 3.0% E Garage Per/m2 $7.41 $7.64 $7.64 3.0% E Hotel/Motel Per/m2 $21.27 $21.90 $21.90 3.0% E Porch (Uncovered) Flat Rate $224.46 $231.19 $231.00 3.0% E Relocating or moving of a hoe Per/m2 $11.33 $11.67 $11.67 3.0% E Residential Additions (Hoes) Per/m2 $15.86 $16.33 $16.33 3.0% E Residential Alterations and repairs (Hoes) Per/m2 $8.11 $8.36 $8.36 3.0% E Roof over Deck (Hoes) Flat Rate $224.46 $231.19 $231.00 3.0% E Single/semi dwelling, townhoe, <325 m2 Per/m2 $16.26 $16.75 $16.75 3.0% E (<3500ft2) Single/semi dwelling, townhoe, Per/m2 $20.79 $21.41 $21.41 3.0% E >475m2 (> 5000ft2) Single/semi dwelling, townhoe, 325-475m2 Per/m2 $19.03 $19.60 $19.60 3.0% E (3500ft2-5000ft2) Structures accessory to small residential. Per/m2 $7.41 $7.64 $7.64 3.0% E Occupancies Walkouts, Exterior Stairs and Ramps Flat Rate $224.46 $231.19 $231.00 3.0% E All other multiple unit residential buildings Per/m2 $15.42 $15.89 $15.89 3.0% E Group D [Biness and Personal Service Occupancies] (NO RATES (NO Building Finished Per/m2 $17.97 $18.51 $18.51 3.0% E Building Finishing only (with shell building permit) Per/m2 $4.34 $4.47 $4.47 3.0% E Building Shell Per/m2 $11.00 $11.33 $11.33 3.0% E Alteration/Renovations to existing finished areas Per/m2 $9.03 $9.30 $9.30 3.0% E Group E [Mercantile Occupancies] (NO RATES (NO Building Finished Per/m2 $14.82 $15.26 $15.26 3.0% E

Group E [Mercantile Occupancies] (NO RATES (NO Building Finishing Only (with shell building permit) Per/m2 $3.71 $3.83 $3.83 3.0% E Building Shell Per/m2 $11.32 $11.66 $11.66 3.0% E Alteration/Renovations to existing finished areas Per/m2 $7.41 $7.63 $7.63 3.0% E Group F [Indtrial Occupancies] (NO RATES (NO Alterations/Renovations Per/m2 $5.43 $5.60 $5.60 3.0% E Building Finished (<5000 m2) Per/m2 $10.87 $11.19 $11.19 3.0% E Building Finished (>15000 m2) Per/m2 $7.99 $8.23 $8.23 3.0% E Building Finished (5000-15000 m2) Per/m2 $9.44 $9.72 $9.72 3.0% E Building Shell (<5000 m2) Per/m2 $8.71 $8.97 $8.97 3.0% E Building Shell (>15000 m2) Per/m2 $5.79 $5.97 $5.97 3.0% E Building Shell (5000-15000 m2) Per/m2 $7.26 $7.48 $7.48 3.0% E Canopy over pump island Per/m2 $5.07 $5.22 $5.22 3.0% E Car wash, gas station, repair garage Per/m2 $12.27 $12.64 $12.64 3.0% E Interior Finishing (with shell building permit) Per/m2 $3.89 $4.01 $4.01 3.0% E Mezzanines (open storage) Per/m2 $7.07 $7.28 $7.28 3.0% E Mezzanines (other than storage) Per/m2 $10.44 $10.75 $10.75 3.0% E Parking Garage Per/m2 $6.44 $6.63 $6.63 3.0% E Parking Garage - Repairs Per/m2 $3.22 $3.32 $3.32 3.0% E Miscellaneo (NO RATES (NO Agricultural - Farm Building Per/m2 $3.64 $3.75 $3.75 3.0% E Agricultural - Pole Barn Per/m2 $1.80 $1.86 $1.86 3.0% E Communication Tower Per Structure $508.69 $523.95 $524.00 3.0% E Crane Runway Per System $694.08 $714.91 $715.00 3.0% E Demising Walls, Fire Separations, Fire Walls Flat Rate $404.43 $416.57 $417.00 3.0% E (Flat Fee) Exterior Tank and Support Per Structure $508.69 $523.95 $524.00 3.0% E Fire Protection - Fire Alarm System Flat Rate $404.46 $416.60 $417.00 3.0% E Fire Protection - Sprinklers Fire Protection - Standpipe systems Minimum fee $530.00 for other than small residential Minimum fee $530.00 $0.51 $0.52 $0.52 3.0% E $0.51 $0.52 $0.52 3.0% E Fireplaces, Wood Stoves, Chimneys Flat Rate $300.55 $309.57 $310.00 3.0% E HVAC - Non-Residential (not proposed with the Flat Rate $612.85 $631.23 $631.00 3.0% E Original Building Permit) HVAC - Residential (not proposed with the Flat Rate/unit $300.71 $309.73 $310.00 3.0% E Original Building Permit) Pedestrian Bridge Per Structure $716.94 $738.45 $738.00 3.0% E

Miscellaneo (NO RATES (NO Plumbing - Backflow preventer Flat Rate $300.72 $309.74 $310.00 3.0% E Plumbing - Backflow preventer (up to 3 units or Per Flat Rate $612.84 $631.23 $631.00 3.0% E complex design) Plumbing - Non-Residential -Inside Flat Rate $612.84 $631.22 $631.00 3.0% E Plumbing - Residential - Inside Flat Rate $300.56 $309.58 $310.00 3.0% E Plumbing - Residential - Outside Flat Rate $300.56 $309.58 $310.00 3.0% E Plumbing - Residential serving more than one Per Unit $202.63 $208.71 $209.00 3.0% E Dwelling - Outside Plumbing Back flow preventer ( to be added if Per Unit $147.61 $152.04 $152.00 3.0% E applicable to cost of permit) Retaining Wall Per/structure $442.99 $456.28 $456.00 3.0% E Sewage System Flat Rate $710.34 $731.65 $732.00 3.0% E Sewage System - Repair (including Septic Tank Flat Rate $404.88 $417.03 $417.00 3.0% E Replacement) Sewage System (Other Than Class 4) Flat Rate $404.83 $416.97 $417.00 3.0% E Sewage System assessment Flat Rate $202.63 $208.71 $209.00 3.0% E Shoring and Underpinning $/m1 $11.84 $12.19 $12.19 3.0% E Sign - Fascia Flat Rate $213.54 $219.94 $220.00 3.0% E Signs - Self standing Flat Rate $322.31 $331.98 $332.00 3.0% E Solar Collector, Wind Turbine (Other than Small Flat Rate NEW $630.00 $630.00 Residential Projects) - New Solar Collector, Wind Turbine, (Small residential Flat Rate $306.71 $315.91 $316.00 3.0% E projects) Special Systems: Commercial Kitchen Exhat Flat Rate $613.13 $631.52 $632.00 3.0% E System, Spray Booths, Dt Collectors, Water Supply for Fire Fighting Stage Flat Rate $213.54 $219.95 $220.00 3.0% E Temporary Sales office/pavilion and any other Temporary Prefabricated Building (Other than portable classrooms) Per/m2 $11.90 $12.25 $12.25 3.0% E Tent (<225sqm) Flat Rate $224.44 $231.18 $231.00 3.0% E Tent (>225sqm) Flat Rate $371.81 $382.96 $383.00 3.0% E The Fees for all other building types, structures and work not provided for in items A to F & Misc. above, will be based on $16.20 for each $1,000.00 of Construction Value or part thereof, with a minimum fee of $214.00 for Residential and $276.00 for Non-Residential $/$1,000.00 $15.73 $16.20 $16.20 3.0% E REFUNDS - UPON WRITTEN REQUEST (NO RATES (NO Calculated amounts under $100.00 No Refunds Where permit issued & any construction or demolition commenced. Where permit issued but no inspection done Where permit not issued, & administrative functions carried out. No Refund 25% of Fee Refunded 75% of Fee Refunded

REFUNDS - UPON WRITTEN REQUEST TYPE OF REVENUE/USER UNIT/DESCR 2013 RATE 2014 (NO RATES (NO Where permit not issued, & technical plans 50% of Fee review carried out. Refunded NOTES: 2014 13% HST 2014 RATE INCL HST 2014 % HST INCR Stat "Construction Value", means the value of the proposed construction as determined by the Chief Building Official, whose determination of the value shall be final. Where there is no prescribed construction value the CBO will determine building permit fee based on required time. Application for a Conditional Permit shall be only accepted in conjunction with a complete full permit submission. All relevant fess, securities and signed Conditional Permit Agreement shall be also provided. Each Indtrial Occupancy rate includes incidental finished office space to a maximum of 10% of the total floor area. Fees for Interior Alterations/Renovations for any building classification not provided for in Part C of this fee schedule will be equal to.5 of the fee value proposed for the new construction. Floor area shall be measured to the outer face of exterior walls and to the centerline of party walls or demising walls. Except for interconnected floor spaces, no deductions shall be made for openings within the floor area (e.g. stairs and stair openings, ducts, elevators, escalators). Floor areas shall include all habitable areas, including mezzanines, lofts, finished attics, mechanical penthoes or floors and enclosed or covered balconies. For "All other multiple unit residential buildings" the fee does not include charges for common rooms and parking garages, which will be calculated based on the corresponding fees. For detached, semi-detached and townhoe dwellings unfinished basements shall not be included in the area calculations. Corresponding fees for porches, decks and roofs over porches and decks shall be added accordingly. In addition to the fees calculated in accordance with Parts A, B, or C, each application for consideration of an Alternative Solution shall be accompanied by a nonrefundable fee of $500. This fee includes 5 hours of review time. For each additional hour of review time, a $100 fee shall be paid. In the case of interior alterations or renovations, the area of proposed work is the actual space receiving the work (i.e. tenant space). Minimum Building Permit fee includes plans review and 3 inspections. Any additional (required) inspections will be added to the minimum Building Permit fee. The applicable "shell" rate shall be applied to the floor areas of a speculative structure, where the only finished floor areas are to be the common areas (e.g. lobby, corridors, washrooms). The applicable rates for new buildings do not include the "Special Systems" such as sprinkler or standpipe systems, kitchen exhat systems, fire alarm systems, water supply for fire fighting & site servicing for other than small residential buildings. (Corresponding fee shall be added accordingly). The applicable rates for Solar Collectors and Wind Turbines (Other than Small Residential Projects) do not include the fees associated with alterations to the supporting buildings. Corresponding fees for such alterations will be added accordingly. The occupancy categories in this Section correspond with the major occupancy classification in the Building Code. For mixed occupancy floor area, the Service Index for each of the applicable occupancy categories may be ed, except where an occupancy category is less than 10% of the floor area. Upon request, the Chief Building Official may authorize a fast track, after hours service at a rate of 1.5 times the permit fee prescribed herein. Where an inspector determines that work for which an inspection has been requested is not sufficiently complete to allow proper inspection, or an infraction which was previoly identified has not been remedied, an additional fee will have to be paid prior to subsequent inspection being scheduled. ENGINEERING (NO RATES (NO Benchmark Manual (survey tech) Each $20.80 $21.43 $2.79 $24.00 3.0% T Benchmark Tablet Each $48.24 $49.69 $6.46 $56.00 3.0% T Central Biness Districts Parking Study (1990) Each $54.68 $56.32 $7.32 $64.00 3.0% T Entrance Permit - non residential Adm. Fee $208.87 $215.14 $215.00 3.0% E Entrance Permit - residential Adm. Fee $104.44 $107.57 $108.00 3.0% E Lot Servicing Inquiry Each $104.64 $107.78 $108.00 3.0% E Municipal Consent Application Review Fee Adm. Fee $150.00 $154.50 $155.00 3.0% E Road Cut Permit Adm. Fee $314.47 $323.91 $324.00 3.0% E Road Needs Study Each $91.12 $93.85 $12.20 $106.00 3.0% T Stormwater Management Study Each $55.74 $57.41 $7.46 $65.00 3.0% T Subdivision Manual Each $47.15 $48.56 $6.31 $55.00 3.0% T Traffic Accident Data Per Location $52.27 $53.84 $54.00 3.0% E Traffic Count Data Per Location $51.76 $53.31 $53.00 3.0% E Traffic Data or Analysis Request Per Hour $103.58 $106.68 $107.00 3.0% E

ENGINEERING Damage Deposits (NO RATES (NO Frontage for each Indtrial Institutional or Per metre up to $36.03 $37.11 $37.00 3.0% E Commercial max.of $1,000 Frontage for each multiple residential lot Per metre up to $36.03 $37.11 $37.00 3.0% E max.of $4,000 Single family or semi-detached undeveloped lot Each $562.70 $579.58 $580.00 3.0% E Site Alteration Permit Fees (NO RATES (NO Alteration of a Site Add $50/hectare $1,279.26 $1,317.64 $1,318.00 3.0% E Alteration of a site that require/relies on a Add $125/hectare $3,167.25 $3,262.26 $3,262.00 3.0% E Subwatershed Impact Study (SIS) or Agreement Construction of an additional Commercial, $704.52 $725.66 $726.00 3.0% E Indtrial or Institutional Building Major landscaping relative to a Residential $128.75 $132.62 $133.00 3.0% E Dwelling & Including backfill and/or decommissioning of inground pools Residential Dwelling Construction on an infill lot $560.32 $577.13 $577.00 3.0% E NOTES: A refundable deposit is required with each permit. PUBLIC WORKS (NO RATES (NO ActiVan fares - After Regular Hours Per trip $3.00 $3.00 $3.00 ActiVan fares - Non-Subscription Service Per trip $2.00 $2.00 $2.00 Construction markers/cones - rental Each per day $3.54 $4.25 $0.55 $5.00 20.0% T Construction signs/barricades - rental Each per day $3.54 $3.54 $0.46 $4.00 0.0% T Load Exemption Permit Adm. Fee $88.50 $91.16 $11.85 $103.00 3.0% T Oversize/Overweight Permit Adm. Fee $276.99 $285.30 $37.09 $322.00 3.0% T Parking Lots Full Time Permits Space $88.50 $88.50 $11.50 $100.00 0.0% T Parking Lots Overnight Permits Space $22.12 $22.12 $2.88 $25.00 0.0% T Spillage or Tracking Cleanup Work for Others Per Hr./per Veh. $174.83 $180.07 $23.41 $203.00 3.0% T Tree Seedling Sales on Earth Day Tree Seedling (ea.) $5.00 $5.00 $5.00 NOTES: Activan Fares - Support persons of a person with a disability is no charge. Equipment Rates charged are calculated according to Report Eng.-98-02, based on cost recovery of maintenance and replacement expenditures ing 5 year averages and current replacement values respectively.