BERTHING PROCEDURES FOR VESSELS CALLING AT THE PORT OF POINT LISAS

Similar documents
SANTANDER PORT CONTROL PROCEDURE

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

SHIPPING OPERATIONAL PROCEDURES

Terms, conditions and prices

Navigation and operation 20. port procedures manual 22. communication 22. port security 23. Services

TANJONG PAGAR/KEPPEL/BRANI TERMINALS. DEPTH A/S (m)

Port Tariffs Version #8 Valid from 1 August 2017 until 30 June 2018

Bantry Bay Port Company Limited

Bantry Bay Port Company Limited

Section 4 / Rev Page 1 of 5

Channel and Facility Guidelines

REVISION TO THE PRE-ARRIVAL NOTIFICATION OF SECURITY (PANS)

TRINIDAD OFFSHORE CALLING INSTRUCTIONS

PORT PHILLIP SEA PILOTS PTY LTD PILOTAGE RATES EFFECTIVE 1st JULY 2015

Hellesylt. GEIRANGERFJORD CRUISE PORT

WHARFAGE, HARBOUR DUES AND PORT CHARGES REGULATIONS

b) Cargo ships, including high-speed craft, of 500 GT and above; and c) Mobile offshore units, including mobile offshore drilling units

Notice To Mariner No. 80/2004. SUBJECT : ISPS Code VESSELS CALLING AT PORT OF FUJAIRAH & FUJAIRAH OFFSHORE ANCHORAGE AREA

NOTICE 01/2012 NOTICE TO SHIPOWNERS, SHIPPING AGENTS, MASTERS, PORT PILOTS, BUNKER VESSEL OPERATORS, PORT TERMINAL OPERATORS AND PORT COMMUNITY

7. Services Navigation and Operation

PORT AUTHORITY OF NEW SOUTH WALES. Schedule of Port Charges Sydney

PORT OF PORT HEDLAND - VESSEL MOVEMENT PROTOCOLS

Dalian VTS Guide for Users

Changes in Berth Hire Charges from the previous edition have been highlighted.

T A R I F F OF PORT CHARGES AND OTHER SERVICES

DOCKING AND ROUTING PLAN

Marine Notice No. 19 of 2014 This Marine Notice supersedes Marine Notice No. 12 of 2013.

Port State Control Commencement of the New Inspection Regime on 1 st January 2011

PPA APPLICATION FOR PILOTAGE EXEMPTION/LOCAL KNOWLEDGE PROCEDURE PORT OF PORT HEDLAND

HUMBER PASSAGE PLAN PREPARED BY ASSOCIATED BRITISH PORTS. 2 Version 1.1

AYR and TROON. Information for Visiting Vessels. To the Master, Officers and Crew. Welcome to the Ports of Ayr and Troon. Local time: GMT / GMT +1

MINISTRY OF INFRASTRUCTURES AND TRANSPORT HARBOUR MASTER S OFFICE OF RAVENNA ORDER NO. 95/2015

PORT CHARGES For the use of PORT OF BERGEN's infrastructure and services (SHORT VERSION FOR CRUISE SHIPS, PLEASURE CRAFTS/YACTHS)

TARIFF PORT: RIO HAINA

Port Handbook SANSOUCI PUERTO SANTO DOMINGO

NOTICE N-1. Berthage and Anchorage Fees Tariff

Alexandria Port, Egypt

MONTROSE PORT AUTHORITY

Cruise Liners. Prices and terms Port of Stockholm and Nynäshamn. Version

SHOREHAM PORT TARIFF 2012

Runway Crossings at Brisbane International Airport

State of the Cruise Port industry in the Med 2015 Fact Finding Report

Prices and terms 2019

PROHIBITION AND RESTRICTION ON VESSELS TRANSITING, ANCHORING OR REMAINING IN THE DEMARCATED AREAS OF THE PORT WATERS

PORT OF FLÅM PORT INFORMATION SHEET Prepared November Harbour Master: Mr. John Erik Johnsen, (until May 2018) Aurland Port Authority

WARRENPOINT HARBOUR AUTHORITY PORT OF WARRENPOINT SCHEDULE OF CHARGES

Fjarðabyggð Municipality Harbour Fund

PULAU SEBAROK - VOPAK TERMINAL (OSV) MAX DISPL. (tonnes) MAX LOA(m) 45, ,000 80, ,000 13,000 12, ,000 19,500 19,500

FROM THE GENERAL PERMITTED DEVELOPMENT ORDER PART 18 AVIATION DEVELOPMENT. Class A Development at an airport Permitted development

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

2017 STAKEHOLDER REPORT

Terms, conditions and prices Trondheim Port Authority Valid from 1 January 2018

CAPTAIN NICHOLAS J. LEWIS Marine Expert

MINISTRY OF TRANSPORT OF THE RUSSIAN FEDERATION. ORDER dated Tuesday, August 12, 2014 No. 222 ON APPROVAL OF THE BY-LAWS OF THE SEAPORT OF MURMANSK

Notice of Arrival/Application for Berth/Anchorage (NOA/ABA) Online Submission

Marine Incidents in Victoria

FEES OF THE PORT OF PÄRNU

Finnish Maritime Administration BULLETIN 10/

MINISTRY OF MARITIME AFFAIRS, TRANSPORT AND INFRASTRUCTURE

REPORT OF THE INVESTIGATION INTO THE GROUNDING OF THE M.F.V. "ELSINOR" AT FOILNABOE, IRELAND ON THE 15TH SEPTEMBER, 2001.

ARCHIPELAGO VTS Master s Guide

Annual Summary of Marine Safety Reports

BERTHING POLICY APPPL DAHEJ. ADANI PETRONET (DAHEJ) PORT PVT. LTD. BERTHING POLICY

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

MOORING AND UNMOORING. DECREE N. 407/2018 DATED 31st DECEMBER 2018 BY THE GENOA HARBOUR OFFICE

MV Vemaoil XXIII (IMO ) into the anchored vessel MV Duzgit Integrity (IMO )

PART E SECTION 1 AIRCRAFT DOCKING GUIDANCE SYSTEM

REGULATIONS FOR NY-ÅLESUND HARBOUR SVALBARD. 1. januar december 2017

SALDANHA BAY PORT INFORMATION

ANNEX 2. RESOLUTION MSC.308(88) (adopted on 3 December 2010)

9 June I:\CIRC\MSC\01\1305.doc INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

HUMBER PASSAGE PLAN PREPARED BY ASSOCIATED BRITISH PORTS

Passengers with Reduced Mobility Policy.

the Port of Gothenburg

United Nations Verification and Inspection Mechanism for Yemen (UNVIM) Weekly Situation Report # January 2018

SHOREHAM PORT AUTHORITY TARIFF BOOK. EFFECTIVE 1 st JANUARY 2018

LITTLEHAMPTON HARBOUR BOARD

Harwich Haven Authority

REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE

Welcome aboard! KOS BASE ARRIVAL & PROCEDURE INFORMATION. At (check-in time) p.m At (check-out time) a.m

MARITIME DIRECTORATE OF RAVENNA. DECREE no. 21/2016

PORT INFORMATION HANDBOOK

Low Visibility Operations

NINTH ORDINARY MEETING OF THE OSC 9/8/3 RAC/REMPEITC-Caribe STEERING COMMITTEE 31 May 2018

AUTOMATION OF SHIPS IN PORTS & HARBOURS

UAS are operated, both commercially and recreationally, within five miles of the airport.

MANUAL FREEDOM OF INFORMATION ACTS 1997 TO 2003

Harbourmaster s Office

Administration Policies & Procedures Section Commercial Ground Transportation Regulation

Oil and Gas Capabilities

USS SURFBIRD (ADG 383) Summary of Vietnam Deployments

GUJARAT CHEMICAL PORT TERMINAL COMPANY LIMITED

Summary Report. Contact with Wharf General Villa. 5 March 2006

Allision between the MSC BENEDETTA and pier in Zeebrugge on 16 May 2014

( vs )

HOLIDAY WORK 08:30-16:30 08:30-16:30 08:30-16:30 08:30-16:30 08:30-16:30 IMPOSSIBLE

PORT OF BROWNSVILLE Tariff 6 FMC-T6 SECTION THREE RULES, REGULATIONS AND CHARGES PERTAINING TO VESSELS

PORT CHARGES AND FEES

Guide to Completing the Quarantine Pre-Arrival Report (Pratique) Form for Vessel Clearance

Transcription:

BERTHING PROCEDURES FOR VESSELS CALLING AT THE PORT OF POINT LISAS DATE: 01- OCTOBER - 2015 VERSION: 1.0

1 Contents Page 1.0 Introduction. 1 2.0 Berth Application Process... 2 3.0 Scheduling Summary. 2 4.0 Berthing, Shifting & Un-Berthing at Port Point Lisas... 3 5.0 ArcelorMittal Docks. 4 6.0 The Savonetta Piers.. 5 i

1.0 INTRODUCTION The Port of Point Lisas is located in the Gulf of Paria halfway down the west coast of Trinidad, 32 km south of Port of Spain, in position 10 24.2'N, 61 29.6'W. Trinidad lies about 20 km north of Venezuela. Its location between North and South America allows easy convenient connections to all major shipping routes. PLIPDECO owns and operates the Port of Point Lisas, which houses six (6) berths and approximately ten (10) logistics companies, together with statutory agencies, such as, Customs and Excise Division, Immigration Division, Port Health, and the Trinidad and Tobago Bureau of Standards. PLIPDECO s Harbour and Marine Department coordinates all movement of vessels at the Port of Point Lisas by tracking arrivals at the Port, including those destined for the methanol, ammonia, urea and steel berths owned by the National Energy Corporation of Trinidad and Tobago (NEC). The department also provides mooring and unmooring services for the safe berthing/un-berthing of vessels. This document therefore seeks to formalise the Operating Procedures for the Harbour and Marine Department s business operations and related activities. Page 1 of 5

2.0 BERTH APPLICATION PROCESS Port of Point Lisas 1.1 All vessels calling at the Port of Point Lisas must be represented by a local Agent. 1.2 The Agent shall complete and submit via email, the online Berth Application Form which can be accessed from PLIPDECO s website www.plipdeco.com, to the Harbour & Marine Department at harbourmanagement@plipdeco.com for vessels calling at The Port of Point Lisas (Berths 1, 1A, 2, 3, 4 and 5) For new or non-regular callers 1.3 The Berth Application Form should be submitted one (1) month in advance along with: a) The Vessel s Tonnage Certificate b) The Vessel s Estimated Time of Arrival and Departure (ETA & ETD) 1.4 The Marine Services Coordinator (MSC) shall notify approval of the Berth Application via a return email to the respective Agent and provide an Advance Deposit Notice 3.0 SCHEDULING SUMMARY 1.5 The MSC creates and updates the schedule for vessels using information received from Agents, Savonetta Pier Coordinating Committee (SPCC) weekly plan and ArcelorMittal s coordinator. 1.6 PLIPDECO maintains an online Proposed Daily Schedule (PDS) which provides status of the vessel schedule. This can be accessed via PLIPDEO s website www.plipdeco.com using the path (Services Port Operations PDS Enter User ID and Password). 1.7 The Agent(s) shall provide the MSC with the information of any delays or other changes at regular intervals 72, 48, 24 and 12 hours in advance of ETA. 1.8 The MSC uses the updates provided by Agents and the Vessel Status Schedule to produce the online PDS which displays a comprehensive schedule of all vessel movements at the Port of Point Lisas over the next twenty-four (24) hours. Page 2 of 5

1.9 Through access to the online PDS, the Trinidad and Tobago Pilots Association (TTPA) is advised of times the Pilots are required and NEC s Representatives are informed of the type of tugs needs and the time required. 1.10 The TTPA and NEC utilise and monitor the online PDS for vessel movements (Berthing, Un-Berthing and Shifting): a) If there is an urgent change or update, the MSC would contact the Pilot National Energy Corporation NEC via telephone or VHF radio via channel 16. The Pilots contact the MSC via radio or telephone advising of his arrival either Port Point Lisas or Yara Terminal. 4.0 BERTHING, SHIFTING & UN-BERTHING The Port of Point Lisas 4.1 Berthing of Vessels a) The Vessel s Master shall be advised by the MSC via radio to proceed to the Pilot Boarding Station b) The NEC tugs shall also proceed to the Pilot Boarding Station. NEC s tugs are requested by PLIPDECO in collaboration with the pilot, based on the vessel s length overall (LOA). 4.2 Shifting of Vessels a) In the event that the vessel has to be shifted from one berth to another or un-berth to anchorage, Cargo Handling Operations Personnel (Manager, Cargo Handling, TOS and ATOS) shall advise the MSC at the daily Operations Meeting. 4.3 Un-Berthing of Vessels a) The MSC receives information from Cargo Handling Management Operations representative and the Agents of the vessel status on its readiness. b) The MSC contacts the Master of the Vessel to prepare for the unberthing. Page 3 of 5

5.0 ArcelorMittal Docks (AM-North, Am-Center, AM-South) 5.1 A written request must be submitted by ArcelorMittal s Port Coordinator to the MSC at Harbour & Marine group account harbourmanagement@plipdeco.com. for the berthing of all vessels at their berths. The email must include the following: a) Agent of the Vessel b) Time required c) Orientation of berthing (whether portside or starboard) d) Request for normal movements must be submitted two (2) hours in advance 5.2 The MSC shall advise ArcelorMittal s Port Coordinator via email of any Delays caused by the arrival time of Marine Personnel (Berthing Officer and/or Port Operations Assistants) to conduct the operation at ArcelorMittal s dock. 5.3 The ArcelorMittal s Port Coordinator or appropriate designate must immediately advise the MSC at PLIPDECO via email of vessel delay for the requested operation at ArcelorMittal dock. 5.4 HIGH TIDE MOVEMENT a) ArcelorMittal s Port Coordinator is required to submit all requests via email for High Tide Movements, at least twenty four (24) hours in advance. b) A Letter of Indemnity signed by an authorized person at ArcelorMittal should accompany such requests and this shall be sent via email to harbourmanagement@plipdeco.com to expedite scheduling. The original letter (hard copy) must be delivered one (1) hour prior to the requested scheduling. c) Pilots are required to embark two (2) hours in advance for all high tide movements. d) If a High Tide opportunity is missed, a minimum of twelve (12) hours delay would incur. 5.5 ArcelorMittal s Port Coordinator or authorized personnel must submit an email to the MSC Harbour & Marine at harbourmanagement@plipdeco.com indicating readiness of the vessel for un-berthing/ shifting, i.e. Estimated Time of Completion and/or Shifting Time. Page 4 of 5

6.0 THE SAVONETTA PIERS (SPECIALIZED TERMINALS SP1 NORTH &SOUTH, SP2 NORTH & SOUTH, SP3 AND SP4) 6.1 The Supervisor and the MSC or PLIPDECO s Harbour and Marine Department receive the final vessel schedule for all vessels operations at the Savonetta Piers at 1300 hours every Friday from the Secretary after the weekly SPCC meeting. 6.2 The Agent confirms vessel ETA with the Harbour and Marine Department via email to the Harbour and Marine Group account harbourmanagement@plipdeco.com. The MSC will update the online PDS and also contact the Pilots and NEC, confirming the vessel s ETA. 6.3 Any updates or changes must be approved by the Chairman, SPCC or his designate. For changes at SP1 South, which is operated by PCS Nitrogen, the PCS designate has the authority to determine or change in the schedule of vessels at this pier. Any updates or changes must be sent immediately to the MSC via email to the Harbour and Marine Group account harbourmanagement@plipdeco.com 6.4 Turnaround a) In the event of a request to turnaround a vessel at SP1 South a from Starboard to Portside, a representative of PCS Nitrogen Control Room will submit an e-mail to PLIPDECO s Harbour & Marine group account harbourmanagement@plipdeco.com advising of same. b) In addition, a Letter of Indemnity must be signed by PCS Nitrogen s authorised personnel. c) A copy of the letter can be e-mailed to expedite scheduling; however, the original letter must be delivered to PLIPDECO s Harbour and Marine department no later than one (1) hour before vessel movement. 6.5 The Agent will submit an e-mail to the Harbour and Marine Group account indicating readiness of the vessel for un-berthing. Page 5 of 5