Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Similar documents
Procurement Plan. 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] N/A

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement

INFRASTRUCTURE DEVELOPMENT IN TANZANIA

Key Projects Carmichael Rail Line (CRL)

Procurement Plan National PPFD

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Large Scale Irrigation Modernization Project Procurement Plan

PROCUREMENT PLAN (Textual Part)

PERBADANAN BEKALAN AIR PULAU PINANG (PBAPP) : Twinning Partnership with PDAM Tirta Musi, Kota Palembang A Win Win Experience

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

(Updated version, November 12, 2010)

Korea Eco-Label Program and Green Supply Chain Related Activities

Catchment and Lake Research

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Rangitīkei District Council

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Code Denomination Type. 1.A KB/RRP/C/1/A High visibility vests for schools G. 1.B KB/RRP/C/1/B High visibility vests for Police Service G

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)

UNOPS IN THE CARIBBEAN

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

THE DANUBE WATER PROGRAM PHILIP WELLER, IAWD DANUBE STRATEGY PA 4,, 2015

Current Status of Airport PPP Projects

SPECIAL SESSIONS MONDAY

Tanzania s Transport Hub: What Prospects for Regional Integration and Investment? 22 NOVEMBER 2016, JOHANNESBURG, CHELSEA MARKOWITZ

Ex-Ante Evaluation (for Japanese ODA Loan)

3rd International Forum on sustainable Tourism 20th to 22nd October 2008 Bamako - Mali

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation

WATER MANAGEMENT IN ROMANIA. Elisabeta CSERWID National Institute of Hydrology and Water Management ROMANIA

PCN Annex: GEF Data Sheet

PRINCIPLES FOR DETERMINING THE COSTS OF AERONAUTICAL METEOROLOGICAL SERVICE FOR EN-ROUTE AND TERMINAL AIR NAVIGATION, UNITED REPUBLIC OF TANZANIA

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The United Republic of Tanzania Ministry of Natural Resources and Tourism TOURISM DIVISION The 2013 Tourism Statistical Bulletin

Tenders. Manitoba Infrastructure

Ref: New Tariff for the Water and sewerage Company Inc. (WASCO) Page 1 of 9

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA CIVIL AVIATION AUTHORITY VACANT POSITIONS

WORKSHOP ON THE TRANSPOSAL AND IMPLEMENTATION OF THE EU URBAN WASTE WATER TREATMENT DIRECTIVE (UWWTD 91/271/EEC) IN SERBIA

PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders. February 18 th, Presented To:

Public Disclosure Copy

Order of the Minister of Environment #39, August 22, 2011 Tbilisi

13.1 REGIONAL TOURISM ISSUES AND SUMMARY OF FINDINGS

ASSET MANAGEMENT AND AUTOMATION: ANDRITZ DIGITAL SOLUTIONS AND CASE STUDIES

Embassy of the United Republic of Tanzania

PPP Days 2010 PPPs Lessons from the Last 18 Months

Southern African Power Pool Report to SADC

Hungarian Public Road Nonprofit PLC

Standard Summary Project Fiche centralised programmes Project Fiche: 5

Successful Experiences in Rio Grande/Rio Bravo Watershed Management

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

FROM: Donald J. Polmann, Director of Science and Engineering ( New Water Plan - Quarterly Report - Approve Submittal to SWFWMD

OFFICIAL MEDIA & PRESS KIT Updated November 2014

COUNTY OF MILWAUKEE ADDENDUM NO. 1 DEPARTMENT OF TRANSPORTATION September 9, 2013 AIRPORT DIVISION

The Strategic Commercial and Procurement Manager

KNOWLEDGE NOTE 1-3. Hydro-meteorological Disasters Associated with Tsunamis and Earthquakes. CLUSTER 1: Structural Measures

NRW situa*on of the urban Water U*li*es in Egypt

Manila, November Consultative Group Meeting. Slum Upgrading. Farouk Tebbal, Andrea Merrick

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name

Document No: TCAA/FRM/ANS/AIS-30 Title: AIC Page 1 of 7. The following circular is hereby promulgated for information, guidance and necessary action

Contract (Description)

SES Water WRMP19 Non-household consumption forecast

Policy PL Date Issued February 10, 2014

Compliance Document for New Zealand Building Code for Backcountry Huts

PREFERRED SUPPLIER ARRANGEMENT - BUILDING & OTHER GOOD AND SERVICES SUPPLIES (5 Jan 2018)

Technical Assistance to support implementation of

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

SERENJE NAKONDE ROAD PROJECT PROJECT

DIRECTOR S ORDER #41: Wilderness Preservation and Management

AGENDA ITEM _C2 TAMPA WATER. Completion Date

International Ship and Port Facility Security Code (ISPS) Maritime Transportation Security Act (MTSA)

Technical Assistance to support implementation of

WORKSHOP ON COMPILATION OF INTERNATIONAL MERCHANDISE TRADE STATISTICTS ADDIS ABABA, 8-11 NOVEMBER, 2004 COUNTRY REPORT

BUSINESS OPPORTUNITIES IN TANZANIA

THE SAN JUAN RIVER BASIN PROJECT

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of

INFRASTRUCTURE GAP

The Timok River Basin in Serbia

PPCR/SC.4/5 October 9, Meeting of the PPCR Sub-Committee Washington, D.C. October 28, REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

Figure Huong River Irrigation Scheme. The Study on Nationwide Water Resources. in the Socialist Republic of Vietnam. Development and Management

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

MONTHLY REPORT Issue No. R02-18 February 2018

GCRMN Number of sites regularly monitored

Endless investment opportunities in public infrastructure and services Carlos Herrera Investors Servicing Director

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

CO-OPERATION IN DANUBE RIVER BASIN - THE ROLE OF SHMI SLOVENSKÝ HYDROMETEOROLOGICKÝ ÚSTAV

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Federal Gas Tax Fund-Strategic Priorities Approved and Conditionally Approved Projects 2017 Intake

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

Public-Private Partnerships (P3) for Social Infrastructure. Alberta Schools Alternative Procurement (ASAP Team) Alberta Infrastructure

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Ministry of Natural Resources and Tourism Tourism Division. The 2009 Tourism Statistical Bulletin

NATIONAL REPORT OF TANZANIA ON SEA LEVEL ACTIVITIES AND OBSERVING NETWORK

SAN FRANCISCO INTERNATIONAL AIRPORT

BOARD OF AIRPORT COMMISSIONERS

Transcription:

I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Agency: Ministry of Water and Irrigation Dar es Salaam Water Supply and Sewerage Authority Dar es Salaam Water Supply ans Sewerage Corporation 3. Date of the Plan: April 2017 4. Period Covered by this Plan: First 18 Months II. Thresholds for Review, Approaches and Methods A. Goods, Works and Non-Consulting Services Category Approaches and Methods (US$ millions) Review (US$ millions) Open International Open National Request for Quotation (RfQ) Works 10 15.0 < 15 0.2 Goods, IT, and nonconsulting services B. Consulting Services 2 5 < 5 0.1 Category Review Short List of National s (US$ million) (US$ millions) Consulting Services Engineering and Construction Supervision s (Firms) 1 0.3 0.3 Individual s 0.3 NA. NA. [Overall Project Risk is SUBSTANTIAL] Notes: Terms of Reference: Terms of Reference for all contracts shall be cleared by the Bank, regardless of whether the assignment is for prior or post review. Advertisement: Consultancy Service for Contracts estimated to cost US$ 300,000 equivalent and above per contract shall be advertised in UNDB online in addition to advertising in National News Paper(s) of wide circulation and/or Regional News Paper(s). 1

Page 1 PROCUREMENT PLAN Tanzania : Second Tanzania Water Sector Support Project General Information Country: Tanzania Banks Approval Date of the Original Plan: 2017-04-13 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-09-12 Project ID: P150361 GPN Date: Project Name: Second Tanzania Water Sector Support Project Loan / Credit No:,, IDA / V0310 Executing Agency(ies): Dar Es Salaam Water Supply and Sewarage Authority, Ministry of Water and Irrigation, Dar es Salaam Water and Sewerage Corporation WORKS TZ-DAWASA-6497-CW-RFB / Construction of Mbezi Beach Waste Water Treatment Plant, Pumping Station, and SEWERAGE Network and their Operation (DBO) Component 3: Dar es Salaam Sanitation Improvement Request for Bids Open - International 2018-01-30 2018-02-04 2018-04-05 2018-05-05 2018-06-09 2018-12-06 TZ-MOW-12669-CW-RFB / Drilling Works for Ground Water Monitoring Network in Wami- Ruvu and Internal Drainage Basins Resources Management (IWRM) 2017-09-01 2017-09-06 2017-10-18 2017-11-17 2017-12-22 2018-06-20 TZ-MOW-12670-CW-RFB / Construction of office and water laboratory buildings for Wami- Ruvu Basin Water Board (BWB) Headquarter at Morogoro and Water Users Association (WUA) Offices at Msowero and rehabilitation and extension of office building for Wami-Ruvu BWB in Dodoma. Resources Management (IWRM) 2018-06-04 2018-06-09 2018-07-21 2018-08-20 2018-09-24 2019-03-23 TZ-MOW-12671-CW-RFB / Civil Works Construction and Installation of Water Resources Monitoring Gauges in all the nine Basins in Tanzania Resources Management (IWRM) 2018-07-02 2018-07-07 2018-08-18 2018-09-17 2018-10-22 2019-04-20 TZ-MOW-12673-CW-RFB / Construction of Office Block for the Proposed Water Resources Centre of Excellency (COE) in Dar es Salaam Resources Management (IWRM) 2019-03-04 2019-03-09 2019-04-20 2019-05-20 2019-06-24 2019-12-21 TZ-DAWASCO-10078-CW-RFB / Construction of Public toilets in selected areas 2017-12-15 2017-12-20 2018-01-31 2018-03-02 2018-04-06 2018-10-03 TZ-DAWASCO-10084-CW-RFB / Construction of Decentralized Fecal Sludge Management (FSM) treatment (about 50 units@usd120,000 per unit starting with 10 units first phase) 2017-09-15 2017-09-20 2017-11-01 2017-12-01 2018-01-05 2019-01-05 TZ-DAWASCO-10081-CW-RFB / Construction of transfer stations (about 30 units@usd40,000 per unit) first phase 2017-12-05 2017-12-10 2018-01-21 2018-02-20 2018-03-27 2018-09-23 TZ-DAWASCO-10083-CW-RFB / Construction of off-grid water supply small piped schemes to serve about 100,000 people @ USD 50 per capita (several packages-first phase) 2017-10-16 2017-10-21 2017-12-02 2018-01-01 2018-02-05 2019-07-30 TZ-DAWASCO-10079-CW-RFB / Construction of Condominium sewerage (about 250 houses/scheme 2017-11-10 2017-11-15 2017-12-27 2018-01-26 2018-03-02 2019-03-02 TZ-DAWASA-6487-CW-RFB / Construction of water Supply Distribution Networks Part 1 from University Reservoir to Bagamoyo Request for Bids Open - International 0.00 Canceled 2017-02-28 2017-03-05 2017-05-04 2017-06-18 2017-07-23 2018-01-19 TZ-DAWASCO-10088-CW-RFB / Construction of water supply distribution network Part 1. (from University reservoir to Bagamoyo) Request for Bids Open - International 0.00 Canceled 2017-04-19 2017-04-24 2017-06-05 2017-07-05 2017-08-09 2019-01-31 TZ-DAWASCO-25524-CW-RFB / Construction of Water Supply Distribution Network Part I, from University Reservoir to Bagamoyo Town Request for Bids Open - International 0.00 Under Review 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2019-07-09 TZ-DAWASCO-10087-CW-RFB / of Performance Based Contracts to reduce NRW in selected DMAs (multiple) Request for Bids Open - International 2017-10-25 2017-10-30 2017-12-11 2018-01-10 2018-02-14 2020-02-14 GOODS

Page 2 TZ-MOW-10924-GO-RFB / Supply of Water Users Associations Survival Working Kits Resources Management (IWRM) 2017-05-30 2017-06-04 2017-06-25 2017-07-25 2017-08-29 2017-11-27 TZ-MOW-11480-GO-RFB / Supply of eighteen four-wheel Drive Vehicles for the Basin Water Boards and MoWI's Division of WR. Resources Management (IWRM) 2017-07-03 2017-07-08 2017-08-07 2017-08-28 2017-10-02 2017-12-31 TZ-MOW-12602-GO-RFB / Supply of Motorbikes and Bicycles (100 of each) to support 100 WUAs Resources Management (IWRM) 2017-07-03 2017-07-08 2017-08-07 2017-08-21 2017-09-25 2017-11-24 TZ-MOW-12667-GO-RFB / Supply of office data management tools and equipment including ICT equipment Resources Management (IWRM) 2018-03-01 2018-03-06 2018-04-05 2018-05-05 2018-06-09 2018-09-07 TZ-MOW-12668-GO-RFB / Supply of Communication Strategy Materials Resources Management (IWRM) 2017-10-02 2017-10-07 2017-11-06 2017-12-06 2018-01-10 2018-04-10 TZ-MOW-12610-GO-RFP / Supply of water quality monitoring equipment and tools Resources Management (IWRM) 2017-07-01 2017-07-06 2017-08-05 2017-09-04 2017-10-09 2018-04-07 TZ-MOW-12605-GO-RFB / Supply of surface and groundwater monitoring network gauges monitoring instruments for large dams and sediment monitoring equipment Request for Bids Open - National 2017-07-03 2017-07-08 2017-08-07 2017-09-06 2017-10-11 2018-04-09 TZ-DAWASCO-15274-GO-RFB / Supply of Domestic Water Meters for Utility Modernization and Expansion of Water Supply Distribution System (Packages 2B & 2F) Request for Bids Open - National 0.00 Under 2017-05-24 2017-08-14 2017-05-29 2017-08-18 2017-07-10 2017-08-09 2017-09-13 2018-01-11 TZ-DAWASCO-10124-GO-RFB / Supply of domestic water meters Request for Bids Open - National 0.00 Canceled 2017-04-20 2017-04-25 2017-06-06 2017-07-06 2017-08-10 2017-11-08 TZ-DAWASCO-10122-GO-RFB / Supply and installation of SCADA System, i.e. Bulk meters, pressure meters, central station meters, telemetry for network management and clampon and acoustic equipment for leak detection 2017-09-25 2017-09-30 2017-11-11 2017-12-11 2018-01-15 2018-07-14 TZ-DAWASCO-10095-GO-RFB / Renewal of pipeline (pipes for network rehabilitation) 0.00 Canceled 2017-04-24 2017-04-27 2017-04-29 2017-06-10 2017-07-10 2017-08-14 2017-10-13 TZ-DAWASCO-25523-GO-RFB / Supply of PVC Pipes and Fittings for Network Rehabilitation 2017-09-05 2017-09-10 2017-10-22 2017-11-21 2017-12-26 2018-03-26 TZ-DAWASCO-10121-GO-RFB / Supply of Billing equipment (this is specific to hand held meter reading/billing tools) 0.00 Canceled 2017-04-18 2017-04-27 2017-04-23 2017-06-04 2017-07-04 2017-08-08 2017-10-07 TZ-DAWASCO-25525-GO-RFB / Supply of Data Loggers 2017-09-05 2017-09-10 2017-10-22 2017-11-21 2017-12-26 2018-03-26 NON CONSULTING SERVICES CONSULTING FIRMS Contract Type Combined Evaluation Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Request for Proposals as Proposals / Minutes Proposal Negotiated Contract TZ-DAWASA-6490-CS-QCBS / for review of design and construction supervision of Mbezi Beach waste water treatment plant, pumping station and sewerage network Review 2017-02-14 2017-03-07 2017-04-04 2017-05-02 2017-06-01 2017-07-06 2017-08-10 2018-08-10 TZ-DAWASA-6494-CS-CQS / Preparation of ESIA and RAP for the Mbezi Beach Waste Water Treatment Plant Component 3: Dar es Salaam Sanitation Improvement Post Open - National 0.00 Under 2017-02-28 2017-03-02 2017-03-14 2017-04-11 2017-05-02 2017-06-06 2017-12-03 TZ-MOW-10915-CS-QCBS / Modernizing Hydrological and Meteorological Monitoring Systems 2017-03-30 2017-04-28 2017-06-02 2017-06-30 2017-07-30 2017-08-29 2017-10-03 2019-11-30

Page 3 TZ-MOW-10921-CS-QCBS / Operational Decision Support System through Enhanced Hydro- Meteorological Services 2017-04-11 2017-05-12 2017-06-16 2017-07-14 2017-08-13 2017-09-12 2017-10-17 2018-10-17 TZ-MOW-11533-CS-CQS / Technical Assistance for strengthening Ground water Resources Development and Management in Tanzania Open - National 2017-08-10 2017-08-31 2017-10-14 2017-11-13 2017-12-18 2018-06-16 TZ-MOW-11545-CS-CQS / Technical Assistance on Supporting of IWRMD at National and Basin Levels Open - National 2017-08-30 2017-09-20 2017-11-03 2017-12-03 2018-01-07 2018-07-06 TZ-MOW-11548-CS-CQS / Technical Assistance on Preparation of Water Resources Use Charges Regulations Open - National 2017-08-30 2017-09-20 2017-11-03 2017-12-03 2018-01-07 2018-07-06 TZ-MOW-11553-CS-CQS / Consultancy for Development and of Laboratory Information Management System Open - National 0.00 Under 2017-09-20 2017-05-18 2017-10-11 2017-11-24 2017-12-24 2018-01-28 2018-07-27 TZ-MOW-11558-CS-CQS / Consultancy for Conceptualization and strategic planning for COE Open - National 2017-11-30 2017-12-21 2018-02-03 2018-03-05 2018-04-09 2018-10-06 TZ-MOW-11854-CS-QCBS / Consultancy services for National Hydrological Aquifer Mapping 2017-08-18 2017-09-08 2017-10-22 2017-11-19 2017-12-19 2018-01-23 2018-02-27 2019-02-27 TZ-MOW-11857-CS-QCBS / Operational Decision Support System Through Enhanced Hydro- Meteorological Services Open - International 2017-10-05 2017-11-04 2017-12-18 2018-01-15 2018-02-14 2018-03-21 2018-04-25 2019-04-25 TZ-MOW-11864-CS-QCBS / Modernizing Hydrological and Monitoring Systems Open - International 2017-07-27 2017-08-17 2017-09-30 2017-10-28 2017-11-27 2018-01-01 2018-02-05 2019-02-05 TZ-MOW-11875-CS-CQS / the study of institutional set up for water Resources Centre of Excellence Open - National 2017-05-25 2017-06-15 2017-07-29 2017-08-28 2017-10-02 2018-03-31 TZ-MOW-11878-CS-CQS / Design and Supervision for Centre of Excellence Building Open - National 2017-05-25 2017-06-15 2017-07-29 2017-08-28 2017-10-02 2018-03-31 TZ-MOW-11389-CS-QCBS / design review and supervision of construction of office and laboratory buildings for Wami- Ruvu Basin Water Boards Headquarter Morogoro and Water Users Associations Offices at Msowero and rehabilitation and extension at Dodoma Open - International 2017-09-05 2017-09-26 2017-10-24 2017-11-21 2017-12-21 2018-01-25 2018-03-01 2019-03-01 TZ-MOW-10918-CS-QCBS / Catchment Conservation in Wami- Ruvu Basin Open - International 2017-03-30 2017-04-28 2017-06-02 2017-06-30 2017-07-30 2017-08-29 2017-10-03 2018-10-03 TZ-MOW-12527-CS-QCBS / Institutional development support technical assistance COE Open - International 2017-10-20 2017-11-10 2017-12-24 2018-01-21 2018-02-20 2018-03-27 2018-05-01 2019-05-01 TZ-MOW-12529-CS-CQS / preparation of future investments Open - International 2017-07-03 2017-07-24 2017-08-21 2017-09-04 2017-10-09 2018-04-07 TZ-DAWASA-6480-CS-QCBS / Construction Supervision of Distribution Networks Part 1- from University Reservoir to Bagamoyo Open - International 0.00 Canceled 2017-02-14 2017-03-07 2017-04-04 2017-05-04 2017-06-03 2017-07-08 2017-08-12 2018-08-12 TZ-DAWASCO-10065-CS-QCBS / NRW consultancy: asset management, hydraulic model, DMA installation for NRW management, NRW management Material Handbook, customer metering and billing (multiple) Open - International 2017-10-16 2017-11-06 2017-12-20 2018-01-17 2018-02-16 2018-03-23 2018-04-27 2019-04-27 TZ-DAWASCO-10066-CS-QCBS / Provision of Consultancy Services for Preparation of Detailed Engineering Design, Bidding Documents and Construction Supervision of the Off-Grid Sanitation Works in Dar es Salaam Open - International 2017-09-12 2017-10-03 2017-11-16 2017-12-14 2018-01-13 2018-02-17 2018-03-24 2019-03-24

Page 4 TZ-DAWASCO-10062-CS-QCBS / Provision of Consultancy Services for Preparation of Detailed Engineering Design, Bidding Documents and Construction Supervision of the Off-Grid Water Supply Works in Dar es Salaam Post Open - National 2017-10-18 2017-11-08 2017-12-22 2018-01-19 2018-02-18 2018-03-25 2018-04-29 2019-04-29 TZ-DAWASCO-10055-CS-QCBS / Consultancy for Construction supervision of distribution networks Part 1 - From University Reservoir to Bagamoyo. Open - International 0.00 Canceled 2017-03-27 2017-04-27 2017-04-17 2017-05-04 2017-05-31 2017-09-08 2017-06-28 2017-07-28 2017-09-01 2017-10-06 2020-03-24 TZ-DAWASCO-28217-CS-QCBS / Supervision of Construction of Water Supply Distribution Network Part 1, from University Reservoir to Bagamoyo Town Open - International 2017-09-12 2017-09-12 2017-09-12 2017-10-10 2017-11-09 2017-12-14 2018-01-18 2020-07-06 INDIVIDUAL CONSULTANTS