ADA Compliance Projects Summary Sheet

Similar documents
No 30 x 48 space is provided for a wheelchair under the picnic table.

Skokie Park District 2011 ADA Evaluation & Transition Plan. March 17, 2015 Update

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

Capital Prioritization

35 Bee Tree Park Planning Zone 3

17 Mathilda Welmering Park Planning Zone 3

2014 SPLOST Final Draft County-wide Parks System Rehabilitation

7. Plan Implementation

Trail Etiquette. Hours of Operation. Trail Accessibility

Fun Facts. How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21

CAPITAL PROGRAM SUMMARY

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

PARKS & BEACHES PROJECTS

Frederickson LUAC. Community Plan Update. Parks & Recreation. September 25, 2017

Board of Park Commissioners Project Summary

MORGAN CREEK GREENWAY Final Report APPENDICES

APPENDIX E: SUMMARY OF PUBLIC MEETING QUESTIONNAIRE RESULTS

Appendix G.1: 6-20 year capital improvements program (CIP) - Repair and replacement (R&R)

Chapter eight. Parks and Recreation. Introduction. Crystal Lake Park District

City of Haslett. City of East Lansing. City of East Lansing

Community Park Capital Project. February 6, 2017

DEPARTMENT OF PARKS & RECREATION

BEDFORD TOWNSHIP PARK COMMISSION REPORT TO THE TOWNSHIP BOARD

French Regional Park Creative Play Area

Webber Park Master Plan Charrette Summary

Acquisition in fee simple of approximately one-half acre of property on the shore of Spring Lake to expand the Lakeside Beach Park.

Southwest Quadrant Distinctive Features

City of Galion Park Satisfaction Survey Results

CITY COUNCIL WORK SESSION MEETING AGENDA April 17, :30 6:30pm

20 Grant s Trail. Planning Zone 3. Visit Date: September St. Louis County Parks Master Plan

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Fall 2016 Tender Release

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

City / Village Name. Picked Up So Far = 1245 lbs of Holiday Lights. Arlington Heights / SWANCC. Barrington /

Capital Project Item. Maintenance Item

City of Somersworth. Recreation Division

Langton Lake Park Implementation Planning Session One 6 June Attendees signed in

We would like to clarify a few things related to the enclosed report:

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

2013 Construction Accomplishments

Bowden Park (Ceadar Park) Passive Recreation W. Emerson St., Vinton St. Cabbage Patch

Capital Planning City of Ocean City 1

POLICY & STRATEGIES The Vancouver Park Board approves major changes in Vancouver parks, including the design and development of parks.

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Glenview/ Central/ Fairfield/ Everett/ Old Elm. Quentin 60% 49% 0% 45% 16% 40% 25% 47% 52% 0% 0%


Yuba Creek Natural Area Acquisition. Acme Township. Acme Township. TF Acquisition $1,576, Grand Traverse

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Corktown Parks. Public Meeting. City of Toronto

Handy Superabile ASSOCIAZIONE ONLUS

DISTRICT OF NORTH COWICHAN. Dated: May Municipal Parks. Prepared By Ernie Mansueti, Parks and Recreation Director

Community Input Meeting. Fairgrounds Master Planning Update. January 7, 2016, 7 pm

Capital Five-Year Fiscal Forecast

Town of Queen Creek Park and Facility Rentals Click on each park or facility for additional information

AGENDA REGULAR PARKS COMMISSION MEETING May 26, :15 A.M Monticello Public Works Office

AGENDA MEMORANDUM Community Services Department. CSAB Meeting Date: April 10, 2018

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020

KoenigRubloffLovesTheNorthwestSuburbs COMMUNITY GUIDE

CAPITAL IMPROVEMENT PROGRAM 2018 CAPITAL BUDGET ADOPTED CITY OF ELMIRA, NEW YORK

CAPITAL PROJECTS LIST Pierce County Parks Impact Fee Working Group

APPENDIX C: PARK AND FACILITY SCORECARDS

Schachtner Street. Village Park Somerset, Wisconsin

9/8/2016. Transition Planning. One Agency s Ongoing Experience

Design Considerations For Accessible Parks & Trails

Schoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior.

EXISTING CONDITIONS AND CHARACTER

NORTH OLMSTED PARKS & RECREATION RESERVATIONS

Parks & Facilities. Chapter 4. Assessment

WASHTENAW COUNTY PARKS AND RECREATION COMMISSION

CITY OF WATERLOO ACCESSIBILITY STANDARDS. FINAL ACCESSIBILITY STANDARDS June 20, 2016

Parks, Recreation, Trails and Open Space Master Plan Survey Results. October 2018

November 21, 2012 Barbara Kelleher, (954)

Palm Beach County Traffic Report July 13 through July 20, 2012

ARLINGTON COUNTY, VIRGINIA

TJ Park and Community Center ::: General Information

Parks & Open Space Observations. Park & Recreation Board December 2018

Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

Corabelle Park. Inventory. Future Development

Location: Cariboo, Williams Lake, Cariboo Chilcotin Coast - Recreation : Site (Heritage Discovery Circle Route)

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

WELCOME TO THE NATURAL WORLD CENTRE.

Concert Tent Anderson Building Entry

Dunsmuir Community Park

MERRYMEETING TRAIL A&B. Topsham. Head of Tide Park Trail (Tedford Road to Cathance Road) Length: 1.79 Miles Anticipated Cost: $719,000.

Handy Superabile ASSOCIAZIONE ONLUS

Community Board 12 Parks & Cultural Affairs Commitee Presentation March 7, 2017 MKW + Associates, Parks Capital Design

Riverside County Transportation Department Summary of Bids

NORTH HEMPSTEAD BEACH PARK MASTER PLAN

City of Sierra Madre STUDY AREA PROFILE

Greater Minnesota Regional Parks and Trails Commission Designation Application

HOMER GLEN AREA COMMUNITY PARKS

4. Improvement Plan Elements

WEST CENTRAL SECTION CONTENTS: FARWELL PARK NORTH COMMONS PARK OLIVER TRIANGLE RUSSELL PARK THEODORE WIRTH REGIONAL PARK VALLEY VIEW PARK WILLARD PARK

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Summary of Recreation Sites Development Name:

M E S T I Z O C U R T I S P A R K

COUNTY OF SAN MATEO Parks Department

Fall 2015 Tender Release

Transcription:

District Letter Dated Project % to ADA Amount Granted Buffalo Grove March 10, 2014 Woodland Park - asphalt path 100% $4,500.00 Buffalo Grove March 10, 2014 Wellington Commons Bike path repairs including: repair of slope and cross slope issues and truncated domes installed in areas 4 & 5 62.5% $15,376.00 Buffalo Grove March 10, 2014 Kilmer Park - asphalt path 100% $83,485.00 Olmsteak Park - replace existing walkway from parking lot to exisiting tennis courts, relocate curb cuts and provide two handicap van accessible parking spaces. 100% $11,943.00 Willow Rec Park - remove and replace concrete walks, ramps and walkways at Willow Recreation Center to meet ADA standards. 60% $7,612.00 Willow Rec Park - remove and replace concrete walks, ramps and walkways at Willow Recreation Center to meet ADA standards. 100% $638.00 Seascape Aquatic Park - remove and replace existing concrete curb, re-pave and level asphalt to reduce side slopes greater than 2% in existing handicap stalls. 100% $8,745.00 River Trails May 28, 2014 Mount Prospect June 25, 2014 Palatine Park District September 3, 2014 Poplar Park - remove and replace concrete walks and ramps not in conformance with ADA minimum standards 100% $14,240.00 Cottonwood Park - remove and replace concrete walks and ramps not in conformance with ADA minimum standards and supply tactile surface plate. 100% $5,506.00 Locust Park - remove and replace concrete walks and ramps not in conformance with ADA minimum standards. 100% $1,798.00 Maple Trails Park - curb cut and ADA ramp on north side leading to gate, connecting path on south side and resurfacing court 100% $15,500.00 RecPlex - renovation of eight handicap accessible parking spaces and four concrete squares that are part of the accessible route to the facility. 100% $13,132.30 Parkside Preschool - removal and replacement of the walkway to access each facility. Fred Hall Ampitheater - deck overlooking ampitheater 100% $6,402.00

Mount Prospect September 2, 2014 Mount Prospect Golf Club - excavation and installation of a continuous cart path system and range tees. 100% $226,927.00 Palatine Park District October 10, 2014 Install surfacing to allow patrons with mobility disabilities to access the table. 100% $2,756.26 Elk Grove November 17, 2014 Shenandoah Park - seating and picnic tables were relocated near the playground and a concrete access ramp brings visitors on the engineered wood fiber safety surface 20% $4,882.44 Hoffman Estates March 6, 2015 Triphahn Center - remove and replace existing concrete walks and ramps with existing cracks greater than 1/2" and rise greater than 1/4". Install tactile plats, level asphalt to reduce running and side slopes greater than 2% in handicap parking stalls. 82% $65,000.00 Hoffman Estates March 6, 2015 Joseph Fabbrini Park - rebuild existing pathway network to eliminate running slopes greater than 5% and cross slopes greate than 2%. 99% $250,000.00 Willow Stream Parking Lot - 5' width of the sidewalk work, curb and gutter work and detectable warnings, hadicap parking stalls and signage for those stalls. 100% $34,295.20 Alcott Center Park - 5' width of the 6' wide sidewalk installation. 83% $12,396.70 Willow Stream Park - mulit use trails and sidewalks. 62.50% $76,578.87 Willow Stream Park - trail asphalt and concrete removal 62.50% $16,184.06 Reservoir 7 - fence work, concrete removal, 5' wide sidewalk installation, detectable warnings and turf restoration. 100% $8,644.98 Community Arts Center - ADA ramp (labor & materials), guardrail/handrail. 100% $15,705.22 Salt Creek Janaury 20, 2015 Concrete ramps/curbs and asphalt repair. 100% $56,759.00 Mount Prospect May 19, 2015 Aceessibility improvements to thewalking Path as well as to Friendship Park and Studio parking lots. 100% $46,952.20 Palatine May 15, 2015 Ost Field playground - remove the seating area and entrance walk and replace with concrete. In addition a connecting concrete walk will be installed so the playground will be accessible from the track and the sidewalk. An accessible family picnic table will also be installed. 100% $9,045.00

Palatine June 24, 2015 Palatine Senior Center - removal and replacement of the walkway and install ADA tactile strips to the northwest entrance. 100% $3,000.00 Mount Prospect September 2, 2015 Einstein Park Playground - improvements to accessible routes of travel 100% $4,587.91 Mount Prospect August 28, 2015 Meadows Ballfields - accessible routes of travel to viewing area and athletic fields. 100.00% $8,042.00 Palatine August 19, 2015 Willowwood Park - accessible path installed from the existing park path to the ball field, entry ramps constructed at the depressed curb for each playground space, a depressed curb contructed for the existing swing area and ashphalt pathway to ballfield. 100% $6,328.47 Palatine August 5, 2015 Plum Grove Reservoir - replacement of walkway and parking area. 100% $8,500.00 River Trails May 22, 2015 Maple Trails Park - safety surfacing and asphalt path. 100% $21,598.00 Mount Prospect November 13, 2015 Melas Park - route of travel from Weller Lane across 100% $11,709.31 Elk Grove November 12, 2015 Audubon Park - concrete walks to provice an accessible route to playground and equipment 100% $9,000.00 Elk Grove November 12, 2015 Johnson Park - concrete access ramp and walk 100% $11,660.00 Elk Grove November 12, 2015 Mead Park - replace concrete and provide smooth 100% $7,600.00 Hoffman Estates January 5, 2016 Canterbury Place Park - concrete walks and ramp 100% $23,118.00 Hoffman Estates Janaury 5, 2016 Victoria Playground - replacement ramps and decks 17% $6,568.00 Schaumburg February 26, 2016 Mraz Park - concrete curbing 19% $9,900.00 Buffalo Grove February 29, 2016 Cherbourg Park remove and replace 5 width of the 8 wide sidewalk installation 62.50% $3,210.94 Palatine July 21, 2016 Palatine July 21, 2016 Mount Prospect July 19, 2016 Mount Prospect July 19, 2016 Palatine September 16, 2016 Celtic Park accessible walkway from the southwest sidewalk to the northwest sidewalk 100% $45,567.00 Dutch Schultz Recreation Area installation of accessible walkway from parking lot to tennis courts 100% $32,775.02 Clearwater Park - earth excavaion, hot mix ashphatl pavement removal, Portland cement concrete sidewalk, hot mix asphalt pavement and engineered wood fiber 100% $37,677.00 We-Go Park - earth excavaion, hot mix ashphatl pavement removal, Portland cement concrete sidewalk, hot mix asphalt pavement and engineered wood fiber Tom T. Hamilton Sports Complex - sawcut, misc. 100% $17,555.00 removals and concrete paving 28% $2,914.00

Palatine September 16, 2016 Palatine Park District (north section) - site grading and prep, concrete paving, sloped playground entry and intregal curb to playgroud 30% $16,021.00 Prospect Heights November 3, 2016 Lions Park - woodfiber 100% $2,050.00 Audubon Park - accessible routes to ballfield 24% $1,500.00 Appleseed Park - accessible route to spectator area along first base side 75% $1,500.00 Roosevelt Park - accessible route from ball field and playground to acceible portable toilet 93% $1,500.00 Hattendorf Park - overlay the area when new inclusive playground was installed 100% $1,700.00 Andrews Park - 2 concrete walks to provide an accessible route to playground and equipment 18% $5,915.00 Raven Park - installation of new 5' - 9' wide accessible concrete walks, concrete pads for player's bnesches and bleachers around the southwest baseball field, concrete pad for an accessible portable toilet unit and concrete pads for new site amenities. 91% $93,294.73 Arlington Heights February 24, 2017 Arlington Lakes - accessible 8' asphalt paths throughout the golf course. 50% $205,029.95 Hasbrook Park - baseball field #1 installation of a new 5' wide concrete walk from existing park path fo the baseball field, baseball field #2 installation of a new 9' wide concrete walk and concrete pads for player's benches and bleachers. 57% $22,808.68 Recreation Park - installation of an asphalt overlay for an exisiting driveway/drop off area. 20% $4,589.60 Buffalo Grove March 9, 2017 Willow Stream - path renovation 5' of 8' path 100% $4,320.60 Buffalo Grove March 9, 2017 Winfield Park - removing and relocating a 6' wide asphalt path to make the path ADA compliant with a 5% slope and a cross slope of 2%. 100% $15,733.00 Victoria Park - remove existing asphalt and concrete surfaces and re-grade subgrade so as to conform to less than the maximum running and cross slope requirement. Re=pave surface with asphalt, 5/8 of the 8-foot wide path width. 42% $17,380.00

Mount Prospect March 22, 2017 Mount Prospect March 9, 2017 Mount Prospect March 9, 2017 Salt Creek February 15, 2017 Schaumburg March 8, 2017 Evergreen Park - remove exisiting asphalt surface and regrade subgrade so as to conform to less than the maximum running and cross slope. Re-pave surface with asphalt, 5/8 of the 8-foot wide path width. 42% $38,955.00 Westbury Park - remove existing asphalt surface that has settled and/or heaved over time. Re-grade subgrade so as to conform to less than the maximum running and cross slope. Re-pave surface with asphalt, 5/8 of the 8- foot wide path width. 42% $7,544.00 Friendship Park Conservatory - accessible routes of travle and entry to Conservatory 100% $2,000.00 Einstein Park - asphalt parking lot, asphalt pathways, concrete paving, surfacing and concrete curb and estimate of fees and asbuilt survey. 36% $115,927.02 Lions Memorial Park Bandshell - compliant paths of travel for public assemblies and entertainment events. 26% $19,298.00 South Park - concrete walkway, ramps, playground surface and asphalt parking area. 67% $68,425.00 Spring Valley Nature Center, Bison's Bluff - concrete paving of playground area, playground protective surfacing, boardwalk to main structure, foot bridges (A,B, & C) and concrete paving of parking lot area. 13% $298,170.00