WARSZAWA/Modlin RWY 08 OLILA 2C RNAV 1 STANDARD DEPARTURE CHART INSTRUMENT (SID) - ICAO AD 2 EPMO AIP POLSKA AIP POLAND AIRAC effective date

Similar documents
AIP Georgia AD 2.UGTB-RSID-13R 18/09/2014 STANDARD DEPARTURE ROUTES INSTRUMENT (SID) RWY 13R SID ROUTING AND ALTITUDES MIN. CLIMB GRAD. LAMUS 6A LAMUS

AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D

RNAV - RNP. July 2010

PORTUGAL DIRECÇÃO DE SEGURANÇA E DESEMPENHO OPERACIONAL AERONAUTICAL INFORMATION SERVICE APARTADO LISBOA CODEX

REPUBLIC OF CROATIA. Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, POBox 103 Croatia

3) There have some basic terminology of a flight plan and it is the fuel calculations

Icao Charting Manual Doc 8697

WP 09 Language proficiency for GA

PBN Airspace Concept. ATS requirements

LOCALIZER I-SAM CH 28 VOR/DME SAC CH 98. CAUTION : ft Obstacle located R 245/12DME from VOR/DME. D2 (MAPt) GAFOA I-SAM (SDF) I-SAM

Pilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information

GENERAL OPERATING PROCEDURES FINLAND(GOP)

Pi Aero Instrument Rating Syllabus

HOLDING PATTERN USING VOR

AIR LAW AND ATC PROCEDURES

CLASS D CONTROLLED AIRSPACE GUIDE

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

AIRAC AIP SUPPLEMENT 02/16 26 th MAY 2016

REPUBLIC OF CROATIA. LDDU - DUBROVNIK/Čilipi Airport - Temporary suspension of RNAV (GNSS) RWY12 and trial of PBN instrument flight procedures

EKYT - AALBORG AIR BASE

LFPG / Paris-Charles de Gaulle / CDG

Following supplement is issued for information, guidance and necessary action. [EFFECTIVE DATE: 1 JULY 2010] RGI AIRPORT, SHAMSHABAD

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

Using PBN for Terminal and Extended Terminal Operations

UDSG Gyumri. UDSG AD 2.1 Aerodrome location indicator and name. UDSG AD 2.2 Aerodrome geographical and administrative data N E

2016 Flight Crew Recency Requirements Self-Paced Study Program Refer to paragraph (2)(d) of the Canadian Aviation Regulations (CARs) standard.

Effective: GOLD COAST (YBCG) NEW PROCEDURES FOR INTRODUCTION OF ILS ON RWY 14

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Standard Operational Procedures

ALTIMETER SETTING PROCEDURES

SAFETYSENSE LEAFLET 11 -

PILOT BRIEFING GENEVA RFE 2018

AIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES

ENR 1.14 AIR TRAFFIC INCIDENTS

Crosswind dependent separations and update on TBS concept (transitional step)

JeppView for Windows. jep=jeppesen. Airport Information For EPWA Printed on 06 Dec 2017 Page 1. Runway Information. Communication Information

Standard Operational Procedures

DEPARTURE, HOLDING, AND APPROACH PROCEDURES

AREA NAVIGATION RNAV- MANAGEMENT

ADMINISTRATIVE BULLETIN Air Navigation services Perum LPPNPI Kantor Cabang JAKARTA AIR TRAFFIC SERVICE CENTER Gedung 611 Bandar Udara Internasional

Operating Procedures. For the Provision of Air Traffic Control Services. RAF Mount Pleasant EGYP. Falklands Islands. RAF Monte Agradable EGYP

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 1

AIP ENR JORDAN 01 MAY 2014

EVTA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVTA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

CLEARANCE INSTRUCTION READ BACK

Airservices Australia 2016

SAFETYSENSE LEAFLET 11 INTERCEPTION PROCEDURES

Implementation of PBN in Armenian airspace

LIRF ROME FIUMICINO Pilot Briefing

INTERCEPTION PROCEDURES A I R L AW

Terminal- Area Opera.ons Prof. Hamsa Balakrishnan

AIXM Coding guidelines for the ICAO data sets

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 2

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Lisboa RFE. Respect the ATC and the other pilots at all times and be understanding.

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Letter of Agreement (LOA)

SPECIAL PROCEDURES FOR IN-FLIGHT CONTINGENCIES IN OCEANIC AIRSPACE OF SEYCHELLES FIR

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51)

POLFRA Polish Free Route Airspace

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Terminal- Area Opera.ons Prof. Hamsa Balakrishnan

ENR 1.7 ALTIMETER SETTING PROCEDURES

NON-RNAV STANDARD INSTRUMENT DEPARTURE PROCEUDRE COCHIN INTERNATIONAL AIRPORT

Airworthiness considerations for UAVs

AD 2. AERODROMES FYWE AD 2.1 AERODROME LOCATION INDICATOR AND NAME. FYWE - Windhoek (Eros) Airport

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain

JeppView for Windows. General Information. Runway Information. Communication Information. jep=jeppesen

PROCEDURES SPECIAL OPERATIONS

NETHERLANDS ANTILLES ATC PHRASEOLOGY GUIDE ATC OPERATIONS BY: MATHIEU LAFLAMME

EVVA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVVA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

CAT E Subject to NOTAM: No

MID Region AIM SG/2. AIS-AIM Study Group 31 August Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG

The Aircraft Cost Evaluator for Windows. Challenger 300

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

The Aircraft Cost Evaluator for Windows. Gulfstream V

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

airservices AERODROME CHART - Page 1 MELBOURNE/ESSENDON, VIC (YMEN) AD ELEV 282 S E Airservices Australia 2018 ATIS AWIS SMC PAL (AH)

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

Advisory Circular. File No.: Z U Issue No.: 01

AD 2-OERY-1 7 JAN 16 OERY AD 2.1 AERODROME LOCATION INDICATOR AND NAME. OERY - RIYADH/ King Salman Air Base

1- Wher can you find the difference between ICAO standards and Iran regulation and procedure? a) GEN 2.5 b) ENR 3 c) GEN 1.

NDS Subject to NOTAM: No

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

Annecy Airport IFR briefing For indication only

Los Angeles Noise Mitigation. Captain Dan L. Delane FedEx Express Fleet Check Airman 13 November 2013

Cross the Pond Westbound 2013 London Gatwick (EGKK) Pilot Briefing

The aim of any instrument approach is to allow the aircraft to safely descend to a low altitude in order to become visual.

PART 71. Designation Of Class A And C Airspace; Air Traffic Service Routes; Designation Of Airways; And Reporting Points

LATVIJAS CIVILĀS AVIĀCIJAS AĂENTŪRA EKSAMINĒŠANA AIR LAW PPL(A) Variants: 107 WEB. Jautājumu skaits - 20 Eksāmena ilgums 60 minūtes

AD 2 AERODROMES EVLA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVLA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

COSCAP CAAM COOPERATION

AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) IMPLEMENTATION IN INDONESIA

LETTER OF AGREEMENT. between. and

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11

Transcription:

AIP POSKA AIP POAND AIAC effective date AD 2 EPMO 4-2-1-1 NAV 1 STANDAD DEPATUE CHAT INSTUMENT (SID) - ICAO WASZAWA/Modlin WY 08 OIA 2C DESIGNATO OUTE EMAKS OIA 2C Climb on D 076 MO to - - DOMOB - WA663 [F80+] - OIA [F100+]. Climb and maintain 4000 ft unless otherwise cleared by ATC. DOMOB WA663 OIA COODINATES 52 34 02.2 N 020 44 47.0 E 52 36 27.7 N 020 37 26.2 E 52 42 1 N 020 19 42.0 E ATITUDE ESTICTIONS F80 F100 TEMINATO FY - OVE TUN TACK CIMB GADIENT CF 8.2 317.9 313 298.5 294 298.4 293 2.7 5.1 12.3 7.5 7.5 7.5 Turn at : MAX IAS 220 KT bank angle 25. POSKA AGENCJA ŻEGUGI POWIETZNEJ POISH AI NAVIGATION SEVICES AGENCY AIAC AMDT 196

AD 2 EPMO 4-2-1-2 AIAC effective date AIP POSKA AIP POAND NAV 1 STANDAD DEPATUE CHAT INSTUMENT (SID) - ICAO WASZAWA/Modlin WY 08 OSI 2C DESIGNATO OUTE EMAKS OSI 2C Climb on D 076 MO to - - [A6000+] - [F80+] - [F130+] - - MO861 [F160+] - GIA - WA664 - OSI. Climb and maintain 4000 ft unless otherwise cleared by ATC. MO861 GIA WA664 OSI COODINATES 021 01 2 E 52 09 48.5 N 020 49 39.6 E 52 01 36.5 N 020 32 52.4 E 52 04 4 N 020 18 58.0 E 52 10 38.9 N 019 52 17.0 E ATITUDE ESTICTIONS TEMINATO FY - OVE TUN TACK CIMB GADIENT CF 8.2 6000 ft F80 F130 F160 231.5 290.1 285 290.0 285 13.2 9.1 17.5 Turn at : MAX IAS AIAC AMDT 196 POSKA AGENCJA ŻEGUGI POWIETZNEJ POISH AI NAVIGATION SEVICES AGENCY

AIP POSKA AIP POAND AIAC effective date AD 2 EPMO 4-2-1-3 NAV 1 STANDAD DEPATUE CHAT INSTUMENT (SID) - ICAO WASZAWA/Modlin WY 08 SOXE 2C DESIGNATO OUTE EMAKS SOXE 2C Climb on D 076 MO to - - [A6000+] - [F80+] - [F130+] - - MO861 [F160+] - GIA - WA666 - SOXE. Climb and maintain 4000 ft unless otherwise cleared by ATC. MO861 GIA WA666 SOXE COODINATES 021 01 2 E 52 09 48.5 N 020 49 39.6 E 52 01 36.5 N 020 32 52.4 E 52 02 01.7 N 020 18 33.6 E 52 02 37.8 N 019 56 05.9 E ATITUDE ESTICTIONS TEMINATO FY - OVE TUN TACK CIMB GADIENT CF 8.2 6000 ft F80 F130 F160 231.5 272.8 268 272.6 268 13.2 8.8 13.9 Turn at : MAX IAS POSKA AGENCJA ŻEGUGI POWIETZNEJ POISH AI NAVIGATION SEVICES AGENCY AIAC AMDT 196

AD 2 EPMO 4-2-1-4 AIAC effective date AIP POSKA AIP POAND NAV 1 STANDAD DEPATUE CHAT INSTUMENT (SID) - ICAO WASZAWA/Modlin WY 08 EVINA 2C DESIGNATO OUTE EMAKS EVINA 2C Climb on D 076 MO to - - [A6000+] - [F80+] - [F130+] - - MO861 [F160+] - NITKI - XIBO - NIPUS [F180+] - EVINA. Climb and maintain 4000 ft unless otherwise cleared by ATC. MO861 NITKI XIBO NIPUS EVINA COODINATES 021 01 2 E 52 09 48.5 N 020 49 39.6 E 51 56 56.1 N 020 34 20.3 E 51 48 21.7 N 020 29 19.6 E 51 39 10.8 N 020 23 59.8 E 51 23 1 N 020 21 3 E ATITUDE ESTICTIONS TEMINATO FY - OVE TUN TACK CIMB GADIENT CF 8.2 6000 ft F80 F130 F160 F180 231.5 216.4 211 199.9 195 199.9 195 185.4 180 1 9.1 9.8 1 Turn at : MAX IAS AIAC AMDT 196 POSKA AGENCJA ŻEGUGI POWIETZNEJ POISH AI NAVIGATION SEVICES AGENCY

AIP POSKA AIP POAND AIAC effective date AD 2 EPMO 4-2-1-5 NAV 1 STANDAD DEPATUE CHAT INSTUMENT (SID) - ICAO WASZAWA/Modlin WY 08 XIMBA 2C DESIGNATO OUTE EMAKS XIMBA 2C Climb on D 076 MO to - - [A6000+] - [F80+] - [F130+] - - WA656 - XIMBA. Climb and maintain 4000 ft unless otherwise cleared by ATC. WA656 XIMBA COODINATES 021 01 2 E 52 01 13.2 N 021 04 47.7 E 51 39 21.0 N 021 25 40.0 E ATITUDE ESTICTIONS TEMINATO FY - OVE TUN TACK CIMB GADIENT CF 8.2 6000 ft F80 F130 171.8 167 149.4 144 14.5 25.4 Turn at : MAX IAS POSKA AGENCJA ŻEGUGI POWIETZNEJ POISH AI NAVIGATION SEVICES AGENCY AIAC AMDT 196

AD 2 EPMO 4-2-1-6 AIAC effective date AIP POSKA AIP POAND NAV 1 STANDAD DEPATUE CHAT INSTUMENT (SID) - ICAO WASZAWA/Modlin WY 08 BAMSO 2C DESIGNATO OUTE EMAKS BAMSO 2C Climb on D 076 MO to - - [A6000+] - [F80+] - [F130+] - DIMU - WA698 - BAMSO. Climb and maintain 4000 ft unless otherwise cleared by ATC. DIMU WA698 BAMSO COODINATES 52 19 49.0 N 021 20 41.8 E 52 15 12.9 N 021 41 42.6 E 52 20 09.1 N 021 54 34.5 E ATITUDE ESTICTIONS TEMINATO FY - OVE TUN TACK CIMB GADIENT CF 8.2 6000 ft F80 F130 142.0 109.5 105 057.9 053 4.0 Turns at : MAX IAS AIAC AMDT 196 POSKA AGENCJA ŻEGUGI POWIETZNEJ POISH AI NAVIGATION SEVICES AGENCY