Indicative Territorial Planning

Similar documents
Meeting of. Rio de. Janeiro, Brazil. the Integration. System (CMS) Continuous. 3, 4 and 5. obstacles and

III.8. MERCOSUR - Chile Hub

Activity Report 2011 IIRSA. Nineteenth Meeting of IIRSA National Coordinators Brasilia, November 29, 2011

VI Meeting of the Executive Steering Committee

ANNEX 18 Integration Sectoral Processes

INITIATIVE FOR THE INTEGRATION OF REGIONAL INFRASTRUCTURE IN SOUTH AMERICA (IIRSA) Ninth Meeting of the Executive Steering Committee

INITIATIVE FOR THE INTEGRATION OF REGIONAL INFRASTRUCTURE IN SOUTH AMERICA. Tenth Meeting of the Executive Steering Committee

Integration Sectoral Processes (PSIs, in Spanish) Progress in 2008

VIII MEETING OF NATIONAL COORDINATORS. Pilot Project Program Border Crossings Summary and Conclusions. Jorge H. Kogan

Initiative for Regional Infrastructure Integration in South America MERCOSUR: Rising Opportunities to Japan Infrastructure Investment Opportunities

THE UNASUR INTEGRATION PRIORITY PROJECT AGENDA (API)

Results of the GTE* of the EID** Paraguay-Paraná Waterway (HPP, in Spanish)

AMOUNT NAME OF PROJECTS INCLUDED GP PROJECT STAGE AMOUNT USD 361,000,213 PUCALLPA PORT

Meeting of the Technical Executive Group on Planning for the Integration and Development of Border Territories

Updated on November 28, 2016

3.3 COST ESTIMATION OF THE MAIN PROJECTS. (1) Main projects. 1) Improvement of export corridor

Infrastructure: Networks to Sustain Development

Activity Report XXI Meeting of IIRSA National Coordinators

for HUB MSMEs IX Meeting of the Executive Steering Committee of IX Meeting of the Executive Steering Committee of IIRSA

CBA Presentation XXIII Comité Mixto Empresario Argentino-Japonés

DIRECT PUBLIC INVESTMENT

MARKET REPORT. Argentina: Low-Cost Airlines - the New Protagonists

WORKSHOP ON AIR INTEGRATION

Endless investment opportunities in public infrastructure and services Carlos Herrera Investors Servicing Director

Infrastructure Report Uruguay 2014

Investment Opportunities in Public infrastructure and Public Service Infrastructure ProInversion Updated to September 2

Investment Opportunities in Public infrastructure and Public Service Infrastructure ProInversion (State Initiatives and Unsolicited proposals

September. ECHO Quito team MONTHLY REPORT

Essential Questions. 1. How have historical figures and events affected South America today?

UNITED NATIONS EDUCATIONAL, SCIENTIFIC AND CULTURAL ORGANIZATION CONVENTION CONCERNING THE PROTECTION OF THE WORLD CULTURAL AND NATURAL HERITAGE

South American Countries. Capital Location Population Terrain Climate

Environmental Impact Assessment of the dredging operations and aids to navigation works in the Argentina s Santa Fe Confluencia waterway.

8.INFRASTRUCTURE #INVESTINGUATEMALA. Industry in Guatemala

TECHNICAL SEMINAR ON TOURISM INVESTMENTS IN THE AMERICAS Asuncion, Paraguay. May 17-18, 2011

Experience from Chile

Brazil and the international electric integration:

The hemispheric program for the eradication of foot and mouth disease challenges and lessons learned

Regional Activities. 25 June Carlos Vogeler Director Executive Secretary for Members Relations and Regional Director for the Americas UNWTO

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

Ibero-American Road Safety Observatory

Public Works Research Institute

Peru: Investment Opportunities Infrastructure and public services

Market Pulse: South America 1st Half of nd Edition

A funny sounding lake. South American Landforms, Climate, and Vegetation

Lessons to be learned by the 5 countries of the River Plate Basin (R.P.B.), from River Management and Collaboration of the River Rhine

Geographic Qualities of South America

Paraguay Parana Wetland System: valuing wetlands and local knowledge for integration

Ecosystem context in the Environmental Impact Assessment of the Dredging Operations in the Argentina s Santa Fe

BRAZIL - Activity Report 2012 ARGENTINA ACTIVITY REPORT 2014

Spanish Countries. & Capitals. Map Labeling & Quiz SpanishMadeEasy.net

ARGENTINA MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES

A Successful Case of University-Government Cooperation Aiming at the Development of the Brazilian-Uruguayan Border

ACS/2013/TRADE Customs Working Group.INFO.001 IMPACT OF THE WELCOME

Name: Hour: Day: The Land and Its Regions (pg ) Define, in your own words, escarpment. Define, in your own words, sertão

COMPETITIVENESS Vs. SECURITY: STRIKING THE RIGHT BALANCE

Agenda Review to the action plans for the implementation of AIDC interconnection in the NAM/CAR/SAM Regions

FILES ACCOUNTING FOR COMPLIANCE WITH THE API PROJECT SELECTION CRITERIA

A global player in the infrastructure sector, with capabilities sourcing and financing, engineering, construction, advanced management

Pantanal Forever Programme

ISA AND ITS BUSINESS UNITS

Month February 2011 South America (except Colombia for HA) Date of submission 09/03/11 MONTHLY REPORT

The Financial Agenda: Investment Climate in South America

Fact Sheet ELANBiz: Country Profile Brazil 1

Property Tax in Latin America: Country Facts

29 December Canada Transportation Act Review Secretariat 350 Albert Street Ottawa ON K1A 0N5

Fieldwork Dates AmericasBarometer

Inter-American Defense College

Latin America. Physical Geography

Operational implementation of new ATM automated systems and integration of the existing ones FOLLOW-UP ON THE IMPLEMENATION OF AUTOMATED SYSTEMS

ICAO regional technical cooperation tools for the implementation of air navigation and safety improvements

XXXIX REPICA, JULY 25-28, 2017, BELIZE CITY, BELIZE

OFFICE OF THE SECRETARY OF ECONOMIC DEVELOPMENT

I m not poor because I live with my five senses and the four spiritual energies

Brazil: Floods. DREF operation n MDRBR005 GLIDE FL BRA 9 April 2010

SMART CITIES FOR THE WORLD / MOBILE WORLD CONGRESS CHILE as a smart country

Organisation de Coopération et de Développement Économiques Organisation for Economic Co-operation and Development

Uruguay: LatAm s Best Kept Secret

Chapter 19 Test on South America

ANALYSIS OF THE INCORPORATION OF THE NORTHEASTERN AND CENTRAL-WESTERN TERRITORIES OF BRAZIL INTO IIRSA INTEGRATION AND DEVELOPMENT HUBS FINAL REPORT

Comprehension Questions:

WWF infrastructure sector work Forest Friendly Roads. Pasto-Mocoa Road. Sofía Rincón Sector Policy Specialist. WWF-Colombia. Michel Roggo / WWF-Canon

ACTION PLAN OF THE SOUTH AMERICAN DEFENSE COUNCIL 2012

LATAM Airlines Group presents technical airport infrastructure requirements for the Northeast hub based on study by the consulting firm Arup

METROPOLITAN REGIONS COMPETITIVENESS AND GOVERNANCE

INDEX. B Birdlife International, 130, 136, 141, 142

Uruguay Additional Information. September 2009

Report for the 40th Session of the World Heritage Committee Istanbul (Turkey), 10 to 20 July 2016

Preliminary Overview of the Economies of Latin America and the Caribbean

Why Colombia Investment Environment & Business Opportunities

Annex Multilateral Conventions 1. SUBJECT Where and When Signed Multilateral Organization Vienna Convention on Vienna, April 24, 1963

ECORREGIONAL ASSESSMENT: EASTERN CORDILLERA REAL ORIENTAL PARAMOS AND MONTANE FORESTS

XIV Meeting of National Coordinators of the Initiative for the Integration of the Regional Infrastructure in South America

MAJOR PROJECTS

EUROPEAN COMMISSION DIRECTORATE-GENERAL HUMANITARIAN AID AND CIVIL PROTECTION - ECHO

Participant Presentations (Topics of Interest to the Meeting)

International Collaboration in Shared Riverbasins

Month June 2011 South America (except Colombia for HA) Date of submission 01/07/11 MONTHLY REPORT

About Romipack 5 ABOUT ROMIPACK

Call Center Industry in Colombia

International Civil Aviation Organization

Transcription:

INITIATIVE INITIATIVE FOR FOR THE THE INTEGRATION INTEGRATION OF OF REGIONAL REGIONAL INFRAESTRUCTURE INFRAESTRUCTURE IN IN SOUTH SOUTH AMERICA AMERICA Indicative Territorial Planning IIRSA PROJECT PORTFOLIO 2004 Addendum: Progress Achieved in 2005 December 2005

0

I. Objective The purpose of this addendum is to summarize the progress made by the countries during 2005 concerning territorial planning and project portfolio for the physical integration of South America. It updates and/or supplements information about regional transportation, energy and telecommunication infrastructure requirements for the short and medium terms, as agreed by the countries ( Indicative Territorial Planning IIRSA Project Portfolio 2004 ), and reflects all changes introduced in the following Integration and Development Hubs: Amazon Hub Paraguay Paraná Waterway Hub MERCOSUR Chile Hub II. Summary of the progress achieved in the field of territorial planning during 2005 During 2005, twelve South American countries and institutions of the Technical Coordination Committee (CCT) focused their actions related to the Integration and Development Hubs on five distinct courses of action: 1. Conduct a follow up of 31 projects under the Implementation Agenda based on Consensus construct a baseline and collect information on critical strategic stages. 2. Develop and give online access to an Information System for the Strategic Monitoring of AIC projects. 3. Enhance the Territorial Planning Process Update Project Portfolio. 4. Further develop IIRSA Geographic Information System. 5. Promote IIRSA s Project Portfolio. In particular, with regard to the territorial planning process for the physical integration of South America, the participating countries held three GTE (Executive Technical Groups) meetings with the purpose of updating regional infrastructure requirements and complete IIRSA s project portfolio. III. Update of Project Portfolio III.1 GTE of the Amazon Hub Brasilia, April 7 8, 2005 The four countries participating in this Hub (Brazil, Colombia, Ecuador and Peru) agreed by consensus the incorporation of a new project group (Group 7: Access to the Morona - Marañon Amazonas Waterway), made up of 10 physical integration projects that account for an estimated investment of US$ 371 million. Such group was incorporated into the Hub by strictly observing the indicative teritorial planning methodology agreed upon by the countries involved, after identifying in relative terms the impact expected from its implementation vis-à-vis the sustainable development of its area of influence as well as analyzing its feasibility. 1

III.1.1 Groups of Projects of the Amazon Hub The Amazon Hub has seven groups of projects: Groups Group 1: Access to the Putumayo Waterway Group 2: Access to the Napo Waterway Group 3: Access to the Huallaga-Marañón Waterway Group 4: Access to the Ucayali Waterway Group 5: Access to the Solimões-Amazonas Waterway Group 6: Amazon Waterway Network Group 7: Access to the Morona-Marañón-Amazonas Waterway Countries involved Colombia-Peru-Brazil Ecuador-Peru-Brazil Peru-Brazil Peru-Brazil Brazil Colombia-Ecuador-Peru-Brazil Ecuador-Peru-Brazil The Map below shows the geographic location and area of influence of each of the groups: Map No. 1 Groups of the Amazon Hub 2

GROUP 7: ACCESS TO THE MORONA-MARAÑÓN-AMAZONAS WATERWAY STRATEGIC FUNCTION Group 7: Access to the Morona-Marañón-Amazonas Waterway To improve the logistics of national integration between the following provinces of Ecuador: Guayas, Cañar, Azuay and Morona-Santiago, as well as El Oro, Loja and Zamora-Chinchipe. To consolidate the opportunity of international integration of the southern half of Ecuador and the North-East of Peru with the Amazonas State of Brazil, through a river towards Manaos. The Map below shows the specific geographic location of the Group s projects: Map No. 2 Amazon Hub - Group 7 3

The following Table shows a detail of related investments: Amazon Hub: Group 7 Estimated Investment (US$) Cargo transshipment port on the Morona river 51,000,000 Improvement of Guayaquil-El Triunfo-La Troncal-Zhud-El Tambo-Cañar-Azoges-Paute-Amaluza-Méndez road and improvement and enlargement of the Méndez-Puerto Morona section 142,400,000 Improvement of Puerto Bolívar-Santa Rosa-Balsas- Chaguarpamba-Loja-Zamora-Yantzaza-El Pangui-Gualaquiza- Gral. Leónidas Plaza-Méndez road 87,000,000 Improvement of Puerto Bolívar-Pasaje-Santa Isabel-Girón- Cuenca-Paute-Amaluza-Méndez-Puerto Morona road 26,800,000 Morona Airport for tourism and international cargo transshipment 40,500,000 22kV electricity network extension from Santiago Hydroelectric Project (400kW) 300,000 Morona Hydroelectric Project (1MW) 2,000,000 Hydroelectric Project on Luis river 15,500,000 K4 Frontera Sur Project (access to telecommunication services) 3,130,000 CEBAFs on the Morona river, Remolinos (Ecuador) and Vargas Guerra (Peru) 2,000,000 TOTAL 370,630,000 4

III.1.2 Project Portfolio of the Amazon Hub The countries have agreed to include fifty-four (54) projects in the Amazon Hub for an estimated investment of US$ 2.38 billion, such as is summarized hereafter: Amazon Hub Name Number of Projects Estimated Investment (in millions of US$) Group 1 Access to the Putumayo Waterway 9 104.20 Group 2 Access to the Napo Waterway 6 271.00 Group 3 Access to the Huallaga Marañón Waterway 10 467.95 Group 4 Access to the Ucayali Waterway 7 715.10 Group 5 Access to the Solimões Amazon Waterway 3 285.00 Group 6 Amazon Waterway Network 9 167.70 Group 7 Access to the Morona-Marañón-Amazonas Waterway 10 370.63 TOTAL 54 2,381.58 III.2 GTE of the Paraguay Paraná Waterway Hub Asunción, August 1, 2005 On the above-mentioned date, Argentina, Bolivia, Brazil, Paraguay and Uruguay, under the CCT s guidance, held the First Meeting of the Executive Technical Group of the Paraguay Paraná Waterway Hub, with the following purposes: To evaluate the study on the Business Vision of the Hub, which describes the current and future economic, social, environmental and infrastructure situation of its area of influence and proposes a preliminary identification of integration projects to submit to the consideration of the countries. To define a preliminary project portfolio related to transportation, energy and telecommunication infrastructure. The GTE validated the diagnosis and defined the following courses of action: a) enlargement of the Hub s area of infuence, by incorporating the areas close to Tieté Paraná - Alto Paraná as well as the Uruguay river sub-basin; and b) summon to a new GTE meeting for the first semester of 2006. 5

III.3 GTE of the Mercosur Chile Hub Asunción, August 2, 2005 Based on the agreed-upon territorial planning methodology, the countries involved updated the Hub s groups as follows: Group N 2 Modify the pattern of the group so that it should link Rio Branco Montevideo Colonia Corridor with Nueva Palmira and interconnect with Buenos Aires. In line with this change, the group was renamed Porto Alegre-Argentina/Uruguay Border-Buenos Aires. Modify the Anchor Project Rio Branco-Montevideo-Colonia-Nueva Palmira Corridor to incorporate road 21. Incorporate the following projects to the group: a) Modernization of Montevideo port ; and b) Alternatives of connection between Argentina and Uruguay. Group N 3 Change the project designation from Building of a Storage Center at Pehuenche to Building of a Border Center for Integrated Control at Pehuenche. Group N 5 Incorporate the Building of Iguazú Hydroelectric Plant project (subject to submittance by the National Coordination of Paraguay of its technical background for approval by the rest of the countries). III.3.1 Groups of Projects of the MERCOSUR-Chile Hub The MERCOSUR-Chile Hub has 5 groups of projects: Groups Group 1: Belo Horizonte- Argentina/Brazil Border-Buenos Aires Group 2: Porto Alegre-Argentina/Uruguay Border-Buenos Aires Group 3: Valparaíso-Buenos Aires Group 4: Mercedes-Santa Fe-Salto-Paysandú Group 5: Energy Countries involved Argentina-Brazil Argentina-Brazil-Uruguay Argentina-Chile Argentina-Uruguay All of them 6

The map below shows the geographic location and area of influence of each group: Map No. 3 Groups of the MERCOSUR-Chile Hub GROUP 2: PORTO ALEGRE-ARGENTINA/URUGUAY BORDER-BUENOS AIRES STRATEGIC FUNCTION Group 2: Porto Alegre-Argentina/Uruguay Border-Buenos Aires To achieve, consolidate and improve the necessary infrastructure and logistics standards for a good performance of the Region on global markets. To make good use of the conditions of scale and demand in the area to attract publicprivate partnerships and disseminate the experience to other Hubs. To accelerate the integration process promoted by the Asunción Treaty. To optimize trade and services flows between economic centers in Argentina, Brazil and Uruguay. To optimize the logistics base so that the industry located in this area can reinforce its competitiveness at the global level. 7

There follows the specific geographic location of the Group s projects: Map No. 4 MERCOSUR-Chile Hub - Group 2 8

The table below provides a detail of related investments: MERCOSUR-Chile Hub: Group 2 Adaptation of the Rio Branco-Montevideo-Colonia-Nueva Palmira Corridor: Roads 1, 11, 8, 17, 18 and 21 Estimated Investment (in millions of US$) 90.37 Adaptation of the Rio Grande-Pelotas leg (BR-392/RS) 99.00 Enlargement of the Rio Grande Port piers /Dredging and deepening of the access canal 129.31 Building of the Jaguarão-Rio Branco International Bridge 12.00 Border Crossing in the Montevideo-Chuy Corridor No info Enlargement of La Paloma Port 30.00 Nueva Palmira Area- Port 10.00 San José combined-cycle thermal plant 170.00 Reconditioning of the Montevideo-Rivera Road 21.84 Road 26: reconditioning of the Rio Branco-Paysandú leg 8.12 Reconditioning of the Montevideo-Fray Bentos Road 1, 3, 11, 23, 12 and 2 Reconditioning of the Railway Line between Montevideo and Rivera 15.54 54.50 Reconditioning of the Railway Line between Salto and Paysandú 9.30 Building of the Buenos Aires-Colonia Bridge (*) 800.00 Modernization of Montevideo Port 85.00 Alternatives of connection between Argentina and Uruguay No info TOTAL 1,534.98 (*) Execution subject to the approval of the International Treaty by both Congresses, under the terms stated therein 9

GROUP 3: VALPARAÍSO-BUENOS AIRES STRATEGIC FUNCTION Group 3: Valparaíso-Buenos Aires To achieve, consolidate and improve the necessary infrastructure and logistics standards for a good performance of the Region on global markets. To make good use of the conditions of scale and demand in the area to attract publicprivate partnerships and disseminate the experience to other Hubs. To optimize trade and services flows between economic centers in Argentina, Brazil and Chile. To optimize the logistics base so that the industry located in this area can reinforce its competitiveness at the global level. To facilitate the fact that Chile serves as a logistics platform for the remaining countries of the Hub to develop markets for their products and services in Asia. There follows the specific geographic location of the Group s projects: Map No. 5 MERCOSUR-Chile Hub Group 3 10

The table below provides a detail of related investments: MERCOSUR-Chile Hub: Group 3 Los Andes (Chile)-Mendoza (Argentina) Railway Project (Ferrocarril Trasandino Central) Estimated Investment (in millions of US$) 224.00 Cargo Center at the Cristo Redentor Border Crossing 7.00 Building of Border Centers for integrated control at Pehuenche 2.00 Building of sheds at the Cristo Redentor border crossing 42.00 Paving of National Road No. 145: Junction National Road No. 40 South-Access to Pehuenche Border Crossing Paving of National Road No. 40 South: from Malargüe to the border with Neuquén 23.00 16.00 Repaving of National Road No. 7 Potrerillos-Border with Chile 14.00 National Road No. 7: building of the Laguna La Picasa road alternative 10.00 National Road No. 7: building of a Laguna La Picasa railway option 30.00 National Road No. 7: building of the option Palmira-Junction National Road No. 40 S National Road No. 7: duplication of the leg Luján-Junction National Road No. 188 (Junín) Caracoles area shed 13.00 90.00 No info International Road 60-CH (Valparaíso-Los Andes Sector) 165.00 Improvements in Valparaíso Port 155.00 Paving of leg Puente Armerillo-Paso Pehuenche. Road CH115 5.40 Land port Los Sauces (Los Andes) 12.50 San Antonio-San Fernando Project ( fruits road ) 64.00 Shed-tunnel Los Libertadores-Argentine border 8.00 Improvements in San Antonio port 34.50 TOTAL 915.40 11

GROUP 5: ENERGY GROUP STRATEGIC FUNCTION Group 5: Energy Group To increase the reliability of the area s electricity and gas systems. To consolidate and increase energy generation, transmission and distribution capacities in a densely populated are with lots of industries. To diversify the energy matrix of MERCOSUR countries. There follows the specific geographic location of the Group s projects: Map No. 6 MERCOSUR-Chile Hub Group 5 12

The table below provides a detail of related investments: Itaipú System (existing) MERCOSUR- Chile Hub: Group 5 Estimated Investment (in millions of US$) No info Yacyretá-Buenos Aires transmission line 150.00 Building of the Corpus Christi Hydroelectricity Plant 2,100.00 Building of the Garabí Hydroelectricity Plant 1,300.00 Yacyretá Hydroelectric Dam. Filled up to height 83 1,074.00 Aldea Brazilera (Argentina)-Uruguaiana-Porto Alegre (Brazil) gas pipeline 510.00 Itaipú-Londrina-Araraquara transmission line 149.14 Yacyretá-Ayolas-Carayao 500-Kw transmission line 130.00 Northeast Argentina Gas Pipeline 1,000.00 Building of the Iguazú Hydroelectricity Plant (*) TOTAL 6,413.14 (*) The countries will analyze the proposal to incorporate this project on the basis of the technical information to be supplied by the National Coordination of Paraguay III.3.2 Project portfolio of the MERCOSUR-Chile Hub The countries agreed to include seventy-one projects in the MERCOSUR-Chile Hub, for an estimated investment of US$ 12.07 million dollars, as summarized hereunder: MERCOSUR-Chile Hub Name Number of Projects Estimated Investment (in millions of US$) Group 1 Belo Horizonte-Buenos Aires 17 3,087.91 Group 2 Porto Alegre-Argentina/Uruguay Boder-Buenos Aires 16 1,534.98 Group 3 Valparaíso-Buenos Aires 19 915.40 Group 4 Mercedes-Santa Fe-Salto-Paysandú 9 210.10 Group 5 Energy Group 10 6,413.14 TOTAL 71 12,161.53 13

IDB Inter-American Development Bank Financial Fund for the Development of the River Plate Basin Secretariat