Traffic, delays and forecasts European summer traffic falls outlook for modest long-term growth

NETWORK OPERATIONS REPORT September 2011

Directorate Network Management Monthly Network Operations Report Analysis - June 2012

Directorate Network Management Monthly Network Operations Report Analysis - August 2012

ANNUAL NETWORK OPERATIONS REPORT Main Report Final Edition

Directorate Network Management Monthly Network Operations Report Analysis - May 2012

Monthly Network Operations Report

Monthly Network Operations Report

CODA DIGEST Q All-Causes Delay and Cancellations to Air Transport Europe Q : Use pop-up to enter value. Edition Validity Date

Network Manager nominated by the European Commission EUROCONTROL. Network Operations Report 2013

Directorate Network Management Monthly Network Operations Report Analysis - July 2012

Network Operations Performance

Monthly Network Operations Report

NETWORK OPERATIONS REPORT Main Report - Draft for Consultation Draft for Consultation

CODA DIGEST All-Causes and Cancellations to Air Transport in Europe

Directorate Network Management Monthly Network Operations Report Analysis - April 2012

Monthly Network Operations Report Analysis November 2018

CODA DIGEST All-Causes Delay and Cancellations to Air Transport in Europe Annual 2015

Monthly Network Operations Report

Monthly Network Operations Report

Directorate Network Management Monthly Network Operations Report Analysis - March 2012

Directorate Network Management Monthly Network Operations Report Analysis November 2012

Monthly Network Operations Report Analysis June 2018

Monthly Network Operations Report

CODA DIGEST. All-Causes Delay and Cancellations to Air Transport in Europe 2014

Monthly Network Operations Report

Monthly Network Operations Report

Monthly Network Operations Report

HOLIDAYS SUMMERS ABTO/WES PANEL RESEARCH growth. index %

Monthly Network Operations Report

CODA DIGEST Q All-Causes Delay and Cancellations to Air Transport in Europe Q3 2015

Monthly Network Operations Report

CODA Digest All- Causes Delay and Cancellations to Air Transport in Europe Quarter

Digest Delays to Air Transport in Europe November 2011

Monthly Network Operations Report Analysis September 2018

ANNUAL NETWORK OPERATIONS REPORT Main Report

Monthly Network Operations Report Analysis December 2015

CODA DIGEST Q All-Causes Delay and Cancellations to Air Transport in Europe Q Edition Validity Date

Monthly Network Operations Report

Monthly Network Operations Report Analysis December 2018

Monthly Network Operations Report Analysis January 2019

Monthly Network Operations Report

Directorate Network Management Monthly Network Operations Report Analysis February 2013

Monthly Network Operations Report

Monthly Network Operations Report

Air transport in the EU27 Air passenger transport up by 0.6% in 2008 Declining trend through the year

Monthly Network Operations Report

Monthly Network Operations Report Analysis February 2019

Monthly Network Operations Report Analysis July 2018

Delays decreased in August 2012, with airline delay data for all causes showing an average delay per delayed flight of 25 minutes, this was a

Monthly Network Operations Report

Monthly Network Operations Report

Delays decreased in May 2012, with airline delay data for all-causes showing an average delay per delayed flight of 25 minutes, which is a decrease

Monthly Network Operations Report

Digest Delays to Air Transport in Europe August 2011

Monthly Network Operations Report

CODA DIGEST Q All-Causes Delay and Cancellations to Air Transport in Europe - Q2 2015

Monthly Network Operations Report

Delays decreased slightly in July 2012, with airline delay data for all causes showing an average delay per delayed flight of 27 minutes, this was a

PERFORMANCE REPORT CAPACITY

PERFORMANCE REPORT CAPACITY

Monthly Network Operations Report

Digest Delays to Air Transport in Europe Summer 2011

Delays decreased in September 2012, with airline delay data for all causes showing an average delay per delayed flight of 25 minutes, this was a

EUROCONTROL Low-Cost Carrier Market Update

Intra-European Seat Capacity. January February March April May June July August September October November December. Intra-European Sectors Flown

CODA DIGEST Q All-Causes Delay and Cancellations to Air Transport in Europe Q1 2018

What Happened Winter A Network Perspective. Airports and Airlines Winter Operations. Directorate of Network Management

PERFORMANCE REPORT CAPACITY

CODA DIGEST Q All-Causes Delay and Cancellations to Air Transport in Europe Quarter

Monthly Network Operations Report

CODA Digest All- Causes Delay and Cancellations to Air Transport in Europe Quarter

CODA DIGEST Q All-Causes Delay and Cancellations to Air Transport in Europe - Q3 2017

Digest Delays to Air Transport in Europe June 2011

The SESAR contribution to the near and mid term Safety

Global Seat Capacity May. June. July. Global Sectors Flown May. June. July

Performance Planning Environment. Bernhard Mayr, CM Financial and Performance Committee, 23 May 2014

Monthly Network Operations Report

Global Seat Capacity July. May. June. Global Sectors Flown July. May. June %

GATWICK AIRPORT LGW WINTER 2013/14 (W13) Start of season

Performance Planning Operations: Environment. Bernhard Mayr, CM TF Performance, MoT Germany 20 May 2011

Airport Collaborative Decision Making Michael Hoehenberger, (Munich Airport) on behalf of ACI World

Global Seat Capacity July. May. June. Global Sectors Flown July. May. June %

CODA DIGEST Q All-Causes Delay and Cancellations to Air Transport in Europe Q2 2018

Global September 2014

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. April 2017

INTERNATIONAL VOLCANIC ASH TASK FORCE (IVATF)

Monthly Network Operations Report

Digest Delays to Air Transport in Europe June This page has been deliberately left blank. EUROCONTROL 2 CODA

LONDON CITY AIRPORT LCY Summer 12 START OF SEASON REPORT Change From KEY STATISTICS Summer 2012 Summer 2011 (End)

Airlines and Operations Revenue Data Collection

Current practice of separation delivery at major European airports ATM R&D Seminar, June 2015, Lisbon

Passenger Flows Zurich Airport. July to November 2011

EUROCONTROL. Network Operations Report March Indicators and analysis of the ATM Network Operations Performance

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. January 2018

Airports& NM integration strategic fit with PCP and DP European Organisation for the Safgety of Air Navigation

ATFM Update - EUROCONTROL Day 1-16h45

Transcription:

Edition Number: 1.0 Edition Validity Date: 18/05/2016

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final ii DOCUMENT CHARACTERISTICS Document Title ANNUAL NETWORK OPERATIONS REPORT Document Subtitle (optional) Annex III - Airports - Draft For Consultation Abstract Edition Number Edition Validity Date 1.0 11/05/2016 Author(s) Contact Person(s) Tel/email Unit Status STATUS AND ACCESSIBILITY Accessible via Working Draft Intranet Draft Extranet Proposed Issue Internet (www.eurocontrol.int) Released Issue Intended for TLP STATUS Detail Red Highly sensitive, non-disclosable information Amber Sensitive information with limited disclosure Green Normal business information White Public information 2016 The European Organisation for the Safety of Air Navigation (). This document is published by for information purposes. It may be copied in whole or in part, provided that is mentioned as the source and the extent justified by the non-commercial use (not for sale). The information in this document may not be modified without prior written permission from.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final iii Edition History The following table records the complete history of the successive editions of the present document. Edition No. Edition Validity Date Author Reason 1.0 [free text] [free text]

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final iv Table of Contents DOCUMENT CHARACTERISTICS... II EDITION HISTORY... III TABLE OF CONTENTS... IV NOTICE... V 1 INTRODUCTION & SCOPE... 1 2 AIRPORTS... 2 AUSTRIA - WIEN-SCHWECHAT - VIE/LOWW... 2 BELGIUM - BRUSSELS/BRUSSELS-NATIONAL - BRU/EBBR... 3 CZECH REPUBLIC - PRAHA/RUZYNE - PRG/LKPR... 4 FRANCE - CANNES MANDELIEU - CEQ/LFMD... 5 FRANCE - PARIS-CHARLES DE GAULLE - CDG/LFPG... 6 FRANCE - PARIS-ORLY - ORY/LFPO... 7 GERMANY - FRANKFURT/MAIN - FRA/EDDF... 8 GREECE - DIAGORAS - RHO/LGRP... 9 GREECE - IRAKLION/NIKOS KAZANTZAKIS - HER/LGIR... 10 GREECE - KHANIA SOUDA - CHQ/LGSA... 11 GREECE - KOS - KGS/LGKO... 12 GREECE - MIKONOS - JMK/LGMK... 13 GREECE - SANTORINI - JTR/LGSR... 14 ITALY - PISA SAN GIUSTO - PSA/LIRP... 15 ITALY - ROME FIUMICINO - FCO/LIRF... 16 ITALY - VENICE - VCE/LIPZ... 17 NETHERLANDS - AMSTERDAM/SCHIPHOL - AMS/EHAM... 18 NORWAY - OSLO/GARDERMOEN - OSL/ENGM... 19 PORTUGAL - LISBOA - LIS/LPPT... 20 SPAIN - PALMA DE MALLORCA - PMI/LEPA... 22 SWITZERLAND - GENEVE - GVA/LSGG... 23 SWITZERLAND - ZURICH - ZRH/LSZH... 24 TURKEY - ANTALYA - AYT/LTAI... 25 TURKEY - ISTANBUL/ATATURK - IST/LTBA... 26 TURKEY - ISTANBUL/SABIHA GÖKCEN - SAW/LTFJ... 27 UNITED KINGDOM - ABERDEEN - ABZ/EGPD... 28 UNITED KINGDOM - EDINBURGH - EDI/EGPH... 29 UNITED KINGDOM - GLASGOW - GLA/EGPF... 30 UNITED KINGDOM - LONDON HEATHROW - LHR/EGLL... 31 UNITED KINGDOM - LONDON/CITY - LCY/EGLC... 32 UNITED KINGDOM - LONDON/GATWICK - LGW/EGKK... 33 UNITED KINGDOM - LONDON/LUTON - LTN/EGGW... 34 UNITED KINGDOM - LONDON/STANSTED - STN/EGSS... 35 UNITED KINGDOM - MANCHESTER - MAN/EGCC... 36 DOCUMENT FINAL PAGE... 37

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final v Notice Traffic and Delay Comparisons: All traffic and delay comparisons are between report and previous year, unless otherwise stated. NM Area: All figures presented in this report are for the geographical area that is within Network Manager s responsibility (NM area). Regulation Reason Groupings The table below shows the colour coding used in the report charts. EN-ROUTE CAPACITY (ATC) EN-ROUTE STAFFING (ATC) EN-ROUTE DISRUPTIONS (ATC) EN-ROUTE CAPACITY EN-ROUTE DISRUPTIONS EN-ROUTE EVENTS EN-ROUTE WEATHER 1.0 11/05/2016 [free text] AIRPORT CAPACITY (ATC) AIRPORT STAFFING (ATC) AIRPORT DISRUPTIONS (ATC) AIRPORT CAPACITY AIRPORT DISRUPTIONS AIRPORT EVENTS AIRPORT WEATHER [free text] Reporting Assumptions and Descriptions: For further information on the NM Area and the regulation reason groupings, go to the Reporting Assumptions and Descriptions document available on the website at http://www.eurocontrol.int/articles/network-operations-monitoring-and-reporting.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 1 1 INTRODUCTION & SCOPE This section presents detailed information about 35 individual airports. Each of these airports fit in at least one of the following categories: Top 20 airports for average daily delay in ; Top 20 airports for delay per flight in ; Fully implemented A-CDM airports in ; Implemented Advanced ATC Tower airport in. ICAO Code Airport Name Top 20 ranking for average daily delay in Top 20 ranking for delay per flight in A-CDM implementati on in Advanced ATC Tower implementati on in EGPD Aberdeen x EHAM Amsterdam/Schiphol 3 7 LTAI Antalya 14 16 LEBL Barcelona/El Prat 15 x EBBR Brussels/Zaventem 10 14 LFMD Cannes/Mandelieu 17 LGSA Chania/I. Daskalogiannis 3 EGPH Edinburgh x EDDF Frankfurt/Main 8 LSGG Geneva 7 11 EGPF Glasgow x LGIR Iraklion/N. Kazantzakis 17 6 LTFJ Istanbul/Sabiha Gökcen 1 1 LTBA Istanbul/Ataturk 2 5 LGKO Kos 13 LPPT Lisboa 19 EGLC London/City x EGGW London/Luton x EGSS London/Stansted x EGKK London/Gatwick 11 EGLL London/Heathrow 4 9 EGCC Manchester x LGMK Mikonos 20 2 ENGM Oslo/Gardermoen 18 LEPA Palma De Mallorca 9 12 LFPG Paris/Ch. De Gaulle 16 LFPO Paris/Orly 13 19 LIRP Pisa/San Giusto 18 LKPR Prague x LGRP Rodos/Diagoras 10 LIRF Roma/Fiumicino 6 15 LGSR Santorini 4 LIPZ Venice x LOWW Vienna 12 20 LSZH Zurich 5 8

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 2 2 AIRPORTS AUSTRIA - Wien-Schwechat - VIE/LOWW ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Global Date received: 28-01-2016 ARR RWY 11/16 DEP RWY 16 48 50 68 ARR RWY16 DEP RWY29 48 50 68 ARR RWY34 DEP RWY29 48 50 68 ARR RWY 11 DEP RWY 16 48 50 68 ARR RWY 16 DEP RWY 29/16 48 50 68 ARR RWY 34 DEP RWY 29/34 48 50 68 - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Vienna Schwechat airport traffic decreased, while airport yearly ATFM arrival delays increased compared to 2014. Airport Weather was again the main delay cause. Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): Vienna airport is working towards the implementation of A-CDM - planned for 2017.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 3 BELGIUM - Brussels/Brussels-National - BRU/EBBR ATC Airport Capacity Runway Configuration Maximum Arrivals Maximum Global Peak Operations Departures Date received: 05-02-2016 06:00-06:59 (LT) 45 07:00-22:59 (LT) 48 44 74 23:00-05:59 (LT) Noise Driven - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Brussels National airport traffic and yearly ATFM arrival delays increased compared to 2014. Airport Weather was the main contributor to the increase, Airport Capacity related delays increased compared to 2014 and contributed to total delays, especially some major runway renovation works during the summer. Network Manager Actions in Airport Capacity and Performance (ACAP): Mutual visits have been organized in aiming to promote and establish process for enhanced information exchange between the airport and NM at pre-tactical and tactical level. Airport Collaborative Decision Making (A-CDM): Fully implemented. No major development planned.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 4 CZECH REPUBLIC - Praha/Ruzyne - PRG/LKPR ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Global Date received: 21-01-2016 RWY 06/24 33 ARR / 60 min 33 DEP / 60 min 46 MVT / 60 min RWY 12/30 38 MVT / 60 min - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Prague airport traffic increased significantly compared to 2014. A low number of yearly ATFM delays was recorded. The main causes were Airport Capacity and Weather. Network Manager Actions in Airport Capacity and Performance (ACAP): Airport Capacity assessment study performed in. Continued efforts to promote and establish process for enhanced information exchange between the airport and NM at pre-tactical and tactical level. Airport Collaborative Decision Making (A-CDM): On 2 September Praha Ruzyne became a fully implemented A-CDM airport.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 5 FRANCE - Cannes Mandelieu - CEQ/LFMD Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Cannes Mandelieu airport traffic remained slightly increased compared to previous years. The airport delay per flight increased compared to 2014, mainly due to Airport Capacity issues. Network Manager Actions in Airport Capacity and Performance (ACAP): Continued NM recommendations for closer analysis in cooperation with the French ANSP, the slot coordination office and the airport operator in order to assess the reasons and identifying potential mitigation measures. Airport Collaborative Decision Making (A-CDM): No actions in.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 6 FRANCE - Paris-Charles De Gaulle - CDG/LFPG ATC Airport Capacity Peak Operations Date received: 24-06- Date received: 25-01-2016 Runway Configuration 2 pairs of parallel RWYs:-09R/27L-7L- 09L/27R and -08L/26R-08R/26L 2 pairs of parallel RWYs:-09R/27L-7L- 09L/27R and -08L/26R-08R/26L Maximum Arrivals Maximum Global Departures 62 (scheduled) 69 (scheduled) 118 (scheduled) 64 (scheduled) 70 (scheduled) 120 (scheduled) - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Paris Charles de Gaulle airport was the busiest airport (in terms of movements) in Europe in, despite traffic remaining almost at the same level, while delays increased compared to previous year. Airport Weather was again the main delay cause. Network Manager Actions in Airport Capacity and Performance (ACAP): Continued cooperation with Paris Charles de Gaulle airport on enhanced information exchange between the airport and NM at pre-tactical and tactical level, as well as on RECAT-EU implementation. Deployment of RECAT-EU is planned in 2016. Airport Collaborative Decision Making (A-CDM): A-CDM fully implemented. No major development planned.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 7 FRANCE - Paris-Orly - ORY/LFPO Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Paris Orly airport traffic slightly increased and yearly ATFM arrival delays increased compared to 2014. Airport Weather was again the main delay cause. Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): Paris Orly is an Advanced ATC Tower airport and is working towards the implementation of A-CDM - planned for Q2 2016.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 8 GERMANY - Frankfurt/Main - FRA/EDDF ATC Airport Capacity Peak Operations Date received: 22-01-2016 Runway Configuration independent parallel (northwest, southern rwy) for ARR; center rwy and rwy18 for DEP Maximum Arrivals Maximum Global Departures 55 55 100 - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Frankfurt Main airport traffic remained almost at the same level, but yearly ATFM delays decreased significantly compared to 2014. Airport is not any more on the top 20 airports delay per flight list. Adverse weather conditions generated most of the delays (nearly 80%). Network Manager Actions in Airport Capacity and Performance (ACAP): Successful cooperation in several areas, including enhanced information exchange between the airport operator and NM at pre-tactical and tactical level. Airport Collaborative Decision Making (A-CDM): Fully implemented. No major development planned.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 9 GREECE - Diagoras - RHO/LGRP Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Rhodes Diagoras airport traffic and yearly ATFM arrival delays increased compared to 2014. Airport Capacity remained the main delay cause during summer season, followed by a very low level of Airport Disruptions related delays. Network Manager Actions in Airport Capacity and Performance (ACAP): Continuation of NM Greek Island Action Plan. For more details refer to section Greek Islands - Summer. Airport Collaborative Decision Making (A-CDM): No actions in.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 10 GREECE - Iraklion/Nikos Kazantzakis - HER/LGIR ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Global Date received: 24-11- 09/27 10 12 22 - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Iraklion N. Kazantzakis airport traffic increased compared to 2014. The yearly ATFM arrival delays significantly increased compared to 2014. Airport Capacity remained the main delay cause during summer season. Network Manager Actions in Airport Capacity and Performance (ACAP): Continuation of NM Greek Island Action Plan. For more details refer to section Greek Islands - Summer. Airport Collaborative Decision Making (A-CDM): No actions in.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 11 GREECE - Khania Souda - CHQ/LGSA Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Khania airport traffic has increased and the yearly ATFM arrival delays increased compared to 2014. Airport Capacity remained the main delay cause during summer season. Network Manager Actions in Airport Capacity and Performance (ACAP): Continuation of NM Greek Island Action Plan. For more details refer to section Greek Islands - Summer. Airport Collaborative Decision Making (A-CDM): No actions in.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 12 GREECE - Kos - KGS/LGKO Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Kos airport traffic has increased and the yearly ATFM arrival delays increased compared to 2014. Airport Capacity remained the main delay cause during summer season. Network Manager Actions in Airport Capacity and Performance (ACAP): Continuation of NM Greek Island Action Plan. For more details refer to section Greek Islands - Summer. Airport Collaborative Decision Making (A-CDM): No actions in.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 13 GREECE - Mikonos - JMK/LGMK Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Mikonos airport traffic increased. Yearly ATFM arrival delays significantly increased compared to 2014. Airport Capacity was again the main delay cause during summer season, followed by a very low level of weather related delays. Network Manager Actions in Airport Capacity and Performance (ACAP): Continuation of NM Greek Island Action Plan. For more details refer to section Greek Islands - Summer. New NM measure was applied to delay flights without airport slot exercised based on NM CDM process. Airport Collaborative Decision Making (A-CDM): No actions in.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 14 GREECE - Santorini - JTR/LGSR Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Santorini airport traffic and yearly ATFM arrival delays increased significantly compared to 2014. Airport Capacity remained the main delay cause during summer season. Network Manager Actions in Airport Capacity and Performance (ACAP): Continuation of the NM Greek Island Action Plan. For more details refer to section Greek Islands - Summer. Airport Collaborative Decision Making (A-CDM): No actions in.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 15 ITALY - Pisa San Giusto - PSA/LIRP Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Pisa San Giusto airport traffic decreased and yearly ATFM arrival delay decreased compared to 2014, but it remained in the top 20 airports delay per flight. This was mainly due to Airport Capacity (caused by taxiway maintenance), followed by ATC disruptions impacting airport operations during the year (due to regular radar maintenance). Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): No actions in.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 16 ITALY - Rome Fiumicino - FCO/LIRF ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Global Date received: 28-01-2016 16L16R ARR, 25 DEP 54 60 90 34L34R ARR, 25 DEP 54 60 90 34L DEP/ARR, 34R ARR 54 50 80 25 22 22 40 - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Rome Fiumicino airport traffic remained at the same level, while the yearly ATFM arrival delays increased. The airport disruption were the main cause for delays (fire in Terminal 3 at the beginning of May, which caused capacity reduction), followed by adverse weather conditions. Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): A-CDM fully implemented. No major development planned.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 17 ITALY - Venice - VCE/LIPZ ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Global Date received: 15-01-2016 04R mixed mode 16 14 30 22L mixed mode 12 10 22 04L mixed mode 9 8 16 22R mixed mode 8 6 14 - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Venice airport traffic and yearly ATFM arrival delays increased significantly compared to 2014. Weather was the main cause for delays. Network Manager Actions in Airport Capacity and Performance (ACAP): NM continued supporting Flight Plan suspension process at Venice airport related to noncompliance with airport slot. Airport Collaborative Decision Making (A-CDM): On 20 January Venice airport became a fully implemented A-CDM airport

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 18 NETHERLANDS - Amsterdam/Schiphol - AMS/EHAM ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Global Date received: 01-02-2016 Inbound peak 68 40 108 Outbound peak 38 74 112 Off peak 38 40 78 Night 24 25 49 - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Amsterdam Schiphol airport traffic increased compared to previous years. The yearly ATFM arrival delays significantly increased compared to 2014. Airport Weather (57%) and Airport Capacity (26%) remained the main delay causes. Network Manager Actions in Airport Capacity and Performance (ACAP): Continued cooperation with Amsterdam Schiphol airport on enhanced information exchange between the airport and NM at pre-tactical and tactical level. NM continued collaboration with Amsterdam Schiphol airport and LVNL aiming to assist in reducing recurrent arrival delays. Airport Collaborative Decision Making (A-CDM): Amsterdam Schiphol airport is working towards the implementation of A-CDM - planned for Q4 2016.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 19 NORWAY - Oslo/Gardermoen - OSL/ENGM ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Date received: 02-11- MPO 40 40 SPO 40 40 SRO 20 20 Global - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Oslo Gardermoen airport traffic decreased compared to previous year. The yearly ATFM arrival delays continue decreasing since 2012. Delays were mainly caused by Airport Weather. Network Manager Actions in Airport Capacity and Performance (ACAP): Continued efforts to establish a process on enhanced information exchange between the airport and NM at pre-tactical and tactical level. Airport Collaborative Decision Making (A-CDM): A-CDM fully implemented. No major development planned.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 20 PORTUGAL - Lisboa - LIS/LPPT ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Global Date received: 28-12- 03/21 23 23 38 / 39 / 40* *40 movements/hour between 07h00 and 09h00; 39 movements/hour between 14h00 and 15h00; 40 movements/hour between 19h00 and 21h00. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Lisbon airport traffic increased compared to previous years. The yearly ATFM arrival delays increased compared to 2014. The main reasons were Airport Weather and ATC Capacity related delays. Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): Lisbon airport is working towards the implementation of A-CDM - planned for 2017.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 21 SPAIN - Barcelona - BCN/LEBL ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Global Date received: 16-12- ARR 25R, DEP 25L 38 40 72 DEP 07R, ARR 07L 38 40 72 ARR 02, DEP 07R 24 24 48 - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Barcelona El Prat airport traffic slightly decreased compared to 2014. The yearly ATFM arrival delays were significantly increased compared to the previous years. Environmental issues due to noise abatement were the main reason for the delay (42%), followed by Airport Weather (41%). Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): On 20 October Barcelona El Prat became a fully implemented A-CDM airport.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 22 SPAIN - Palma De Mallorca - PMI/LEPA ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Global Date received: 16-12- ARR 24L - DEP 24R 33 34 65 ARR 06L - DEP 06R 33 34 65 - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Palma de Mallorca airport traffic slightly increased, and yearly ATFM arrival delays increased significantly compared to 2014. Adverse weather conditions were the main cause for delays followed by ATC Capacity and Airport Capacity related delays. Network Manager Actions in Airport Capacity and Performance (ACAP): Airport will be closely monitored as significant traffic increase is forecasted. Airport Collaborative Decision Making (A-CDM): Palma De Mallorca airport is working towards the implementation of A-CDM - planned for 2017.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 23 SWITZERLAND - Geneve - GVA/LSGG ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Global Date received: 25-01-2016 05 25 40 40 23 25 40 40 - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Geneva airport traffic remained almost at the same level, while the yearly ATFM arrival delays increased compared to 2014. Most of the delays were caused by Airport Weather, followed by Airport Capacity. Network Manager Actions in Airport Capacity and Performance (ACAP): Continued cooperation with Geneva airport on enhanced information exchange trial between the airport and NM at pre-tactical and tactical level. Airport Collaborative Decision Making (A-CDM): Geneva airport is working towards the implementation of A-CDM - planned for Q1 2016.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 24 SWITZERLAND - Zurich - ZRH/LSZH ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Global Date received: 25-01-2016 TKOF RWY28/16 LDG RWY14 40 41 66 TKOF RWY10 LDG RWY14 32 30 62 TKOF RWY32/34 LDG RWY28 30 30 60 TKOF RWY32 LDG RWY34 32 30 60 - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Zurich airport traffic remained at the same level, while the yearly ATFM arrival delays slightly increased compared to 2014. Airport Weather and Airport Capacity (limited availability of the optimum runway configuration due to environmental constrains) were again the main delay cause. Network Manager Actions in Airport Capacity and Performance (ACAP): Continued cooperation with Zurich airport on enhanced information exchange between the airport and NM at pre-tactical and tactical level. NM will continue to support cooperative actions to identify and mitigate ATFCM delays. A simulation was organised to find methods of reducing the arrival delay into Zurich airport. As a result of this simulation, operational trial will be conducted, in collaboration with Swiss, Skyguide and Zurich Airport. Airport Collaborative Decision Making (A-CDM): A-CDM fully implemented. No major development planned.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 25 TURKEY - Antalya - AYT/LTAI Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Antalya airport traffic slightly decreased, but the yearly ATFM arrival delays increased significantly compared to 2014. Airport capacity and several disruptions generated most of the delays. Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): No actions foreseen so far.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 26 TURKEY - Istanbul/Ataturk - IST/LTBA ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Global Date received: 01-12- All Configurations 31 31 62 - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Istanbul Ataturk airport continued recording traffic growth (5,6%). Also, the yearly ATFM arrival delays significantly increased compared to 2014 mainly due to Airport Capacity related delays (influenced by traffic increase) and Airport Weather. Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): Istanbul Ataturk airport is working towards the implementation of A-CDM - planned date to be confirmed.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 27 TURKEY - Istanbul/Sabiha Gökcen - SAW/LTFJ Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Istanbul Sabiha Gökcen airport continued recording very high traffic growth (18,7%). The yearly ATFM arrival delays highly increased compared to previous years. This was mainly due to Airport Capacity (influenced by very high traffic increase), followed by Airport Weather related delays. Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): No actions in.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 28 UNITED KINGDOM - Aberdeen - ABZ/EGPD Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Aberdeen airport traffic decreased compared to 2014. Regulations were applied only two times during. Airport Capacity and Weather were causes for delays. Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): On 5 May Aberdeen became an Advanced ATC Tower airport.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 29 UNITED KINGDOM - Edinburgh - EDI/EGPH Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Edinburgh airport traffic has increased compared to 2014. Very small number of ATFM was recorded during one day in. Airport capacity was cause of delays. Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): On 17 July Edinburgh became an Advanced ATC Tower airport.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 30 UNITED KINGDOM - Glasgow - GLA/EGPF Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Glasgow airport traffic has increased significantly compared to 2014. Small number of ATFM delays was recorded during. Main reason for delays was airport Staffing (ATC), followed by Weather related delays. Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): On 17 July Glasgow became an Advanced ATC Tower airport.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 31 UNITED KINGDOM - London Heathrow - LHR/EGLL ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Global Date received: 28-01-2016 27L (dep) / 27R (arr) 45 45 88 27L (arr) / 27R (dep) 45 45 88 09L (arr) / 09R (dep) 45 45 88 - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment London Heathrow airport traffic remained almost at the same level as previous years. The yearly ATFM arrival delays increased compared to 2014, with Airport Weather related delays being the main cause (90% of the total delay). Network Manager Actions in Airport Capacity and Performance (ACAP): Continued cooperation with London Heathrow airport on enhanced information exchange between the airport and NM at pre-tactical and tactical level. Time Based Separation (TBS) implementation at London Heathrow airport went live in March. Airport Collaborative Decision Making (A-CDM): A-CDM fully implemented. No major development planned.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 32 UNITED KINGDOM - London/City - LCY/EGLC Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment London City airport traffic increased significantly, despite yearly ATFM delays decreased compared to 2014. Airport Weather was the main delay cause. Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): On 5 May London City became an Advanced ATC Tower airport.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 33 UNITED KINGDOM - London/Gatwick - LGW/EGKK Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment London Gatwick airport traffic and yearly ATFM arrival delays increased compared to 2014. Airport Weather was again the main delay cause. Network Manager Actions in Airport Capacity and Performance (ACAP): London Gatwick airport is interested in the RECAT-EU concept and a benefit study has been done. Airport Collaborative Decision Making (A-CDM): A-CDM fully implemented. No major development planned.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 34 UNITED KINGDOM - London/Luton - LTN/EGGW Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment London Luton recorded a high traffic growth (12%) and the yearly ATFM arrival delays increased significantly compared to 2014. Weather was main cause for delays, followed by Airport Staffing (ATC). Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): On 17 July London Luton became an Advanced ATC Tower airport.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 35 UNITED KINGDOM - London/Stansted - STN/EGSS Limited information available Airport is not participating in the regular Network Manager reporting process. - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment London Stansted airport traffic and yearly ATFM arrival delays increased significantly compared to 2014. Weather was main cause for delays followed by Airport Capacity (ATC) related delays. Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): On 17 July London Stansted became an Advanced ATC Tower airport.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 36 UNITED KINGDOM - Manchester - MAN/EGCC ATC Airport Capacity Peak Operations Runway Configuration Maximum Arrivals Maximum Departures Global Date received: 24-11- Dual Runway 33 37 61 Single Runway (05L/23R) 28 28 44 - www.eurocontrol.int/coda - www.eurocontrol.int/coda Performance Assessment Manchester airport traffic increased slightly compared to the previous years and the yearly ATFM arrival delays increased significantly compared to 2014, Weather being the main cause for those delays (96%). Network Manager Actions in Airport Capacity and Performance (ACAP): No actions in. Airport Collaborative Decision Making (A-CDM): On 5 May Manchester became an Advanced ATC Tower airport as a first step towards full A-CDM implementation.

Edition Validity Date: 18/05/2016 Edition: 1.0 Status: Final 37 Document Final Page