Photo list of facilities built under the projects of CJSC "HT Morstroy" Design Institute in

Similar documents
ROSMORPORT perspectives on Clean Shipping in the Baltic Sea

FSUE ROSMORPORT CONSTRUCTION OF THE INTERNATIONAL MARINE TERMINAL WITH YACHT MARINA IN THE CITY OF PIONERSKY, KALININGRAD REGION

Innovation based development of Klaipeda Port technologies

Floating Docks & Special Projects. Reference list

Russian Icebreaking, Ice-Pilotage & Hydro- Meteorological Services on the NSR Dr. Bjørn Gunnarsson, Managing Director

DEPARTMENT OF NAVIGATION AND OCEANOGRAPHY MINISTRY OF DEFENSE OF THE RUSSIAN FEDERATION NATIONAL REPORT OF THE RUSSIAN FEDERATION

Construction of the cruise terminal in Pionersky

Development of Sochi transport node envisaged by items of Program of Olympic venues construction and Sochi development as an alpine resort

Overview of Industrial Holding BLRT Grupp

LNG the future fuel in ferry and cruise ship ports?!

NATIONAL REPORT OF THE RUSSIAN FEDERATION

Alexandria Port, Egypt

Nikita V. VOROSHILOV Head of Marketing Department, Vyborg Shipyard JSC. 1. Brief background of collaboration in the past:

Discover a proven way! PORT of KLAIPEDA. Klaipeda Port Extensive Business Opportunities Artūras Drungilas. Marketing and Corporate Affairs Director

Ohio Freight Conference Great Lakes Commercial Navigation

Policy Research Corporation

Marine Façade. ade ST. PETERSBURG RUSSIA

Port of Tallinn Estonia s Biggest Maritime Gateway

Polish Ports in 2017 February 2018

Walvis Bay and its role as a logistics hub for the SADC region. Christian Faure Executive: Marketing and Strategic Business Development

SHIPBUILDING INDUSTRY

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

Oil and Gas Capabilities

Increasing Maritime Transport, Impacts on Maritime Safety

Project Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825

Baltic Port Market. BPO Conference Riga, RECIENT FACTS & FIGURES. dr Maciej Matczak

Republic of Turkey - Ministry of Economy,

Erhama bin Jaber Al Jalahma Shipyard

Shanghai Green Port Construction. Shanghai Municipal Transportation Commission

Port of Newcastle Schedule of Port Pricing

SOME OBSERVATIONS & SOME CALCULATIONS RELATED TO THE NORTHERN SEA ROUTE

Panama Canal Stakeholder Working Group Meeting

INDEX NAVIGATION SUPPORT RATE (T0) 3 VESSEL RATE (T1) 4 1. ZONE I: SHORT STAY BERTHING 4 2. ZONE I: PROLONGED STAY BERTHING 5

MURMANSK REGION THE REGION WITH RICH TOURISM POTENTIAL

Investment possibilities of municipal formation KINGISEPP MUNICIPAL DISTRICT. This project is funded by the European Union

TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August

Current Activities and Future Developments in Arctic Shipping

NOTICE 01/2012 NOTICE TO SHIPOWNERS, SHIPPING AGENTS, MASTERS, PORT PILOTS, BUNKER VESSEL OPERATORS, PORT TERMINAL OPERATORS AND PORT COMMUNITY

PORT OF MATAMOROS ADMINISTRACIÓN PORTUARIA INTEGRAL DE TAMAULIPAS, S.A. DE C.V. H. MATAMOROS, TAMAULIPAS.

DEVELOPMENT OF TRAFFIC VOLUMES IN BALTIC SEA

Navigation and operation 20. port procedures manual 22. communication 22. port security 23. Services

What s happening in the arctic 2017?

INTSOK 12 th Annual Russian-Norwegian Oil & Gas Conference

Port Tariffs Version #8 Valid from 1 August 2017 until 30 June 2018

Viktor Olersky, the Deputy Minister of transport of the Russian Federation. Yury Melenas Permanent Representative of THE RUSSIAN FEDERATION to IMO

MINISTRY OF TRANSPORT OF THE RUSSIAN FEDERATION. ORDER dated 11 th January 2011 No. 10

Oil and Gas Capabilities

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee

THE ICE CLASS TANKER MARKET

PORT OF HELSINKI ALL OF FINLAND WITHIN YOUR REACH

WE RE HERE FOR THE LONG HAUL.

Manson Construction Co.

SAMOA PORTS AUTHORITY

Tour of Finland s Maritime Community

sailing on the LNG era POSEIDON MED ll

Delivering the Goods: Ports in the South

PORT OF MIIDURANNA PORT RULES

Lessons to be learned by the 5 countries of the River Plate Basin (R.P.B.), from River Management and Collaboration of the River Rhine

F6. Coastal Ferry Terminal Zone

NATIONAL REPORT OF THE RUSSIAN FEDERATION

Report on shipping accidents in the Baltic Sea area during Introduction

Introduction to BPO and Green InfraPort Project. Bogdan Ołdakowski, Secretary General, Baltic Ports Organization

CURRENT PORT CHARGES AND TARIFFS FROM 01/01/2016 TO

SHIPBUILDING INDUSTRY CORPORATION (SBIC) VIETNAM MARITIME INDUSTRY (Presentation at ASEF 9 th Forum)

HUTCHISON PORTS STOCKHOLM

API Marine Reference List TANKERS

Gina Dickerson Senior Project Manager, Point Thomson ExxonMobil

Port Everglades 2014 Master/Vision Plan Update

April 17, Ray Greene Marketing Manager Port of Argentia

Sabine Neches Waterway: Smiths Bluff to Beaumont Turning Basin

Waterways Council November 10, 2017

BUNKERS IN COLOMBIA June 2014 Eugenia Benavides

ADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD

WORLD LARGEST VISITS SINGAPORE

Madagascar. Ports description

CHAPTER 14. MARINE TRANSPORTATION

Half-yearly Report 2013

Oil and Gas Capabilities

Jack-Up Barge THE CLIMBING DUTCHMAN THE INDEPENDENT MAGAZINE FOR PROFESSIONALS IN THE ONSHORE AND OFFSHORE OIL AND GAS INDUSTRY volume 2 ISSUE 4

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

SHIP POWER YOUR SHORTER ROUTE TO BIGGER PROFITS. JAAKKO ESKOLA Group Vice President, Ship Power

Port of Pensacola WHSE 8 83,000 SF WHSE +/-

Willemstad: Maritime Heritage. Dimitri Cloose


Lennusadam Marina (Seaplane Harbour) Marina Rules

Samara Urban Area Samara Region Russian Federation

The History & Management of the Atlantic Intracoastal Waterway in Florida

VERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE

Statistical Data 2010

Russian Maritime Industry - opportunities and potential

Value creation from R&D

partially modernized in 1970's for super-tanker construction. of the Naval overhaul market and is apparently satisfying the Navy.

SEA DUBAI. By Rasiena

Waterway Access and the Atlantic Intracoastal Waterway in Florida

MARITIME DIRECTORATE OF RAVENNA. DECREE no. 21/2016

Corporate Presentation 5 March 2003

DEPARTMENT OF TRANSPORT

GAS PRODUCTION GAS TRANSMISSION SYSTEM DEVELOPMENT

Report on shipping accidents in the Baltic Sea area during 2010

Transcription:

Photo list of facilities built under the projects of CJSC "HT Morstroy" Design Institute in 2000 2016 Construction as of March 31, 2016 2016 General Designer 2015 General Designer 2015 General Designer 2015 General Designer 2015 General Designer 2015 General Designer The temporary roads transshipment complex for Umba storage tanker. RPK-Nord LLC, the Murmansk Region Saint Petersburg port. Berthing complex for holding anchorage of icebreaker fleet of FSUE Rosmorport. ITS 2 at the water body: the Baltic Sea, the Gulf of Finland, water area of the seaport Big port of St. Petersburg, for location of capital structures of federal significance of the MFMTC Bronka, Fenix LLC MFMTC Bronka. Linear ranges Bronka-2 and Bronka-3 of the first stage of the ship channel, CJSC BaltStroy Ship channel and water area of MFMTC Bronka. Reconstruction of St. Petersburg channel, 1 stage of ship channel. CJSC BaltStroy MFMTC Bronka. 1 stage of construction of onshore buildings and structures. JSC Fenix 2/12

2015 general designer; PD subcontractor for preparatory period facilities Sea port in the area of settl. Sabetta at the Yamal peninsula. Preparatory period facilities. Onshore facilities and engineering infrastructure. OJSC Yamal LNG 2015 general designer; PD subcontractor for preparatory period facilities Sea port in the area of settl. Sabetta at the Yamal peninsula. Preparatory period facilities. Cargo berths No.1, 2, 3, 4. OJSC Yamal LNG 2015 General Designer Detailed drawings Floating passage from berth No. 45 of JSC MMRP to the jack up floating drilling rig GSP SATURN, Murmansk, OJSC Gazprom neft 2014 General Designer 2013 General Designer Port protecting structure of southern waterfront water area. Section 1 (1 construction phase). Federal State Unitary Enterprise Rosmorport The liquefied hydrocarbon gases transshipment complex. JSC Sibur-Portenergo 2013 General Designer PD The support fleet base in Phase 1. Hydraulic engineering structures. Federal State Unitary Enterprise Rosmorport 3/12

2013 General Designer MFMTC Bronka, CJSC BaltStroy : Piled foundations of berths No. 5, 6; Territory formation; East bank protection (200 m), water inlet water discharge at berth No.6. 2012 General Designer Water area formation of south and north parts of Ust Luga commercial seaport. Stages 1, 2, 3, 4, 5. FSUE Rosmorport 2012 General Designer Piled foundations of berths No. 1, 2, 3, 4 of Multiple- Function Marine Transhipping Complex Bronka. CJSC BaltStroy 2012 General Designer of the maritime part Berth No.2 and dredging operations at the water area if berth No.2 of the sea oil-loading export terminal Special sea oil port Kozmino. Federal State Unitary Enterprise Rosmorport 2011 Designer of general port facilities and structures PD Bulk cargo complex. OJSC Rosneftebunker 2011 General Designer Container terminal JSC Baltic Stevedoring Company. Structures of 1 stage of 1 phase. BSK LLC 4/12

2011 General Designer The Sakhalin-1 Project. Temporary cofferdam. Exxon Neftegas Limited 2011 General Designer The Sakhalin-3 Project. Kiringskoye GCF arrangement. Temporary cofferdam. OJSC Mezgregiontruboprovodstroy 2011 Designer of hydraulic structures Terminal grain complex Taman. Cargo berths No.3 and No. 4 2011 General Designer P (FS), Container terminal. The first construction stage. CJST ULKT 2011 General Designer PD Water area formation of south and north parts of Ust Luga commercial seaport. Stages 4, 5. Navigational beacons of the west ship channel. Federal State Unitary Enterprise Rosmorport 2010 General Designer Multi-discipline transshipment complex Ug-2. Offshore and onshore structures (2 nd launch complex). OJSC Ust Luga company 5/12

2010 General Designer for the berth in Dalnyaya bay North European Gas Pipeline Russia Germany (Nord stream). Transshipment berths for heavy and construction cargoes of Portovaya CS. OAO "Giprospetsgaz" 2009 General Designer of the maritime part Special sea oil port Kozmino. The first stage of pipeline system East Siberia Pacific ocean. Marine structures of the port. 2009 General Designer DP City of Baltiysk, the Kaliningrad Region. Reconstruction of entrance quay piers. Federal State Unitary Enterprise Rosmorport 2009 General Designer Container terminal. Dredging operations at the operating water area of the first launch complex. Federal State Unitary Enterprise Rosmorport 2009 General Designer 2008 General Designer IS, FS, Automobile and railway ferry complex of the international railway ferry Ust Luga Baltiysk German ports (2 nd launch compex). Federal State Unitary Enterprise Rosmorport The football stadium in the western part of the Krestovskiy island, St. Petersburg (Kirovskiy stadium). Builders berth 6/12

2008 General Designer Multi-discipline transshipment complex Ug-2 (1 st launch complex). OJSC Ust Luga company 2008 General Designer FS, PD Maritime passenger terminal in Vasilyevsky Island in St. Petersburg ( Waterfront ). Dredging operations at navigable passage and water area of the terminal. Federal State Unitary Enterprise Rosmorport 2008 Designer of ship channels New section of the ship channel to the navigation pass S-1. Dredging operations at the section from the entrance buoy to picket PK-352. Federal State Unitary Enterprise Rosmorport 2008 General Designer Maritime passenger terminal in Vasilyevsky Island in St. Petersburg ( Waterfront ). Leading beacons at the hydraulic base of the ship channel. Federal State Unitary Enterprise Rosmorport 2008 General Designer Approach section of Kronshtadt ship channel in the mark of navigation pass S-1. Back leading beacon ZSZ-2 45 m high at the hydraulic base 7/12

2007 General Designer С, First Container Terminal. Extension, upgrade of technology and equipment, reconstruction of coverage and engineer support facilities. OJSC PKT 2007 General Designer Maritime passenger terminal in Vasilyevsky Island in St. Petersburg (Waterfront). Leading beacons at the hydraulic base of the Petrovskii fairway. Federal State Unitary Enterprise Rosmorport 2006 General Designer PD Railway ferry complex in basin No.4 of city of Baltiysk, the Kaliningrad region. Dredging operations at navigable passage and water area of the complex. Federal State Unitary Enterprise Rosmorport 2006 General Designer IS, FS, Automobile and railway ferry complex. Dredging operations at the operating water area. Federal State Unitary Enterprise Rosmorport 2005, 2006 General Designer of the hydraulic part Taganrog Shipyard: Grain terminal. Shiprepairing quay overhaul; Hydraulic engineering installations for oil product transshipment 8/12

2006 General Designer Automobile ferry complex of city of Baltiysk, the Kaliningrad region. Container terminal. 2006 General Designer 2006 General Designer IS, FS, FS (project), International railway ferry Ust Luga Baltiysk German ports. Automobile and railway ferry complex (1 st launch complex). Federal State Unitary Enterprise Rosmorport Railway ferry complex in basin No.4 of city of Baltiysk. Complex of hydraulic engineering installations and onshore structures. Federal State Unitary Enterprise Rosmorport 2005 Chornaya river of the Leningrad Region. Transshipment point for heavy and large equipment of KINEF LLC 2005 General Designer Vysotsk port. Distributional and transshipment oil product complex LUKOIL-II. Dredging operations at navigable passage and water area of the terminal 9/12

2004 Vysotsk port. Distributional and transshipment oil product complex LUKOIL-II. Hydraulic structures 2003 FS (project), Bridge crossing over Neva river at section No.2 of the first stage of St. Petersburg Ring Road. The quay for river passenger vessels and the ice barrier 2003 General Designer Combined terminal of rolling cargoes and containers at berth No.101 2003 General Designer Roadstead complex of oil transshipment at the inner roadstead of the Kola Bay, further south than Mishukov cape. Inshore mooring of the carrier tanker 2003 Grain terminal, city of Azov. Berthing facilities of the grain terminal. 2003 General Designer Murmansk port. The coal terminal at berth No.4. Further equipping of the berth to ensure receipt of Panamax type ships. 10/12

2003 of the terminal Cargo-and-passenger ferry terminal in basin No.3 of city of Baltiysk, the Kaliningrad region. Berths No.1, 2. Onshore facilities 2003 St. Petersburg oil terminal. Hydrotechnical structures of berths No.3, 4 2003 General Designer Roadstead complex of oil transshipment in the area of Belokamenka settlement at the water area of the Kola Bay. Inshore mooring of the storage tanker 2002 General Designer of the hydraulic part FS, Baltiysky bulk carrier terminal. Berth No.107 in the coal port 2002 Yeysk Sea Port. Bank slopes, berth, berth No. 2 overhaul 11/12

2001 Designer of hydrotechnic part and utility networks Lukoil-Kaliningradmorneft LLC Reconstruction of berth No.3 to ensure construction of unitized units of D-6 oil producing platform 2001 General Designer St. Petersburg oil terminal. Further equipping of bunker berth No. 99 2000 Designer of hydrotechnic part St. Petersburg oil terminal. Hydrotechnic structures of berths No.1, 2 2000 Designer of hydrotechnic part St. Petersburg oil terminal. Hydrotechnic structures of berth No.112 a * Legend Design stages: IS С DOI PDP FS (project) PD DP investment substantiation; concept; declaration on intent; pre-design proposals; (project) feasibility study; project documentation; detail project with approved part; detail documentation; designer supervision. 12/12