TANJONG PAGAR/KEPPEL/BRANI TERMINALS. DEPTH A/S (m)

Similar documents
PULAU SEBAROK - VOPAK TERMINAL (OSV) MAX DISPL. (tonnes) MAX LOA(m) 45, ,000 80, ,000 13,000 12, ,000 19,500 19,500

Summary Report. Contact with Wharf General Villa. 5 March 2006

Alexandria Port, Egypt

NOTICE 01/2012 NOTICE TO SHIPOWNERS, SHIPPING AGENTS, MASTERS, PORT PILOTS, BUNKER VESSEL OPERATORS, PORT TERMINAL OPERATORS AND PORT COMMUNITY

BERTHING PROCEDURES FOR VESSELS CALLING AT THE PORT OF POINT LISAS

DOCKING AND ROUTING PLAN

Channel and Facility Guidelines

Navigation and operation 20. port procedures manual 22. communication 22. port security 23. Services

7. Services Navigation and Operation

PROHIBITION AND RESTRICTION ON VESSELS TRANSITING, ANCHORING OR REMAINING IN THE DEMARCATED AREAS OF THE PORT WATERS

Annual Summary of Marine Safety Reports

Port Tariffs Version #8 Valid from 1 August 2017 until 30 June 2018

CPP failure caused heavy contact with lock

Terms, conditions and prices

Harwich Haven Authority

Notice To Mariner No. 147 PORT OF FUJAIRAH & VHFL TERMINAL BERTH CONSTRUCTION & DESIGN CRITERIA

OPERATIONAL SAFETY POLICY GROUND RUNNING OF AIRCRAFT MARCH This document is uncontrolled when printed

Forth Ports Limited. Ruling Depths & Under Keel Clearances

HUMBER PASSAGE PLAN PREPARED BY ASSOCIATED BRITISH PORTS. 2 Version 1.1

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

HOLIDAY WORK 08:30-16:30 08:30-16:30 08:30-16:30 08:30-16:30 08:30-16:30 IMPOSSIBLE

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

Madagascar. Ports description

WARRENPOINT HARBOUR AUTHORITY PORT OF WARRENPOINT SCHEDULE OF CHARGES

Collision between the tug Arafura

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

Marine Exchange of Alaska Port of Juneau Navigation Study

Hellesylt. GEIRANGERFJORD CRUISE PORT

Lennusadam Marina (Seaplane Harbour) Marina Rules

MINISTRY OF INFRASTRUCTURES AND TRANSPORT HARBOUR MASTER S OFFICE OF RAVENNA ORDER NO. 97/2017

PORT INFORMATION AND GUIDE TO PORT ENTRY

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

The Procedures for Entry and Departure into and from, Taipei Harbor

Section 4 / Rev Page 1 of 5

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

SANTANDER PORT CONTROL PROCEDURE

London City Airport. 43 years

Information for Masters and PEC Holders OPS017 v5

CONTROLLING DEPTHS and GUIDELINES

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)

GUIDELINES ON BUNKERING OPERATIONS AND SHIP TO SHIP CARGO TRANSFER OF OILS, SUBJECT TO ANNEX I OF MARPOL 73/78, IN THE BALTIC SEA AREA

SALDANHA BAY PORT INFORMATION

Appendix D Rules of the Air

MINISTRY OF INFRASTRUCTURES AND TRANSPORT HARBOUR MASTER S OFFICE OF RAVENNA ORDER NO. 95/2015

MV Vemaoil XXIII (IMO ) into the anchored vessel MV Duzgit Integrity (IMO )

DEPARTMENT OF TRANSPORT

REPORT OF THE INVESTIGATION INTO THE GROUNDING OF THE M.F.V. "ELSINOR" AT FOILNABOE, IRELAND ON THE 15TH SEPTEMBER, 2001.

Directions Governing Ship Mooring Operations of Taichung Port

NEW ZEALAND TEMPORARY AND PRELIMINARY NOTICES IN FORCE (NZ NTM Edition No. 1 dated 11 January 2019)

HUMBER PASSAGE PLAN PREPARED BY ASSOCIATED BRITISH PORTS

PERSONS AUTHORISED TO SUPPLY WATER TO OCEAN GOING VESSELS AND HARBOUR CRAFT IN PORT

ADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD

Low Visibility Operations

Suez Canal Transit. Characteristics of the current canal lengths

APPENDIX 1 OPERATIONAL/SAFETY CHECK LISTS

AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure)

HMS SCOTT Newsletter

Changes in Berth Hire Charges from the previous edition have been highlighted.

PRACTICES AND PROCEDURES TO BE FOLLOWED BY SHIPS IN THE PORT OF NANAIMO

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.

BERTHING POLICY APPPL DAHEJ. ADANI PETRONET (DAHEJ) PORT PVT. LTD. BERTHING POLICY

VERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE

PORT OF PORT HEDLAND - VESSEL MOVEMENT PROTOCOLS

( vs )

CURRENT PORT CHARGES AND TARIFFS FROM 01/01/2016 TO

Number 162. Underwater bow thruster replacement in harsh conditions Fast underwater hull repairs save time and money for ship owners..

The collision between BLUE BIRD and HAGLAND BONA on 1st December 2008 in Randers Fjord.

Developments in berth layout

Marine Incidents in Victoria

MAST 16 th December 2009

Port dues and charges Free port of Ventspils

PART F SECTION 2 RESPONSIBILITIES AND ACTIONS

TARIFF OF HARBOUR DUES

BOARD OF PILOT COMMISSIONERS PORTS OF GALVESTON COUNTY - STATE OF TEXAS

STANDARDS FOR UNDERTAKING PILOTAGE SERVICE AND TABLE OF STANDARD DRAFT AND TYPES OF VESSELS ENTERING AND/OR DEPARTING KANMON PORT

Dalian VTS Guide for Users

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007

Bye-Laws for the Port of of Gothenburg

RIVER TYNE OFFICIAL TIDE TABLES

SHIPPING OPERATIONAL PROCEDURES

Airports

Port Dues in Hong Kong

SUBPART C Operator certification and supervision

20th - 28th November Schedule of Events The Regatta Organising Authority reserves the right to amend this schedule.

Centerm Expansion Project Marine Transportation Impact Study

LANCASTER & MORECAMBE MODEL AIRCRAFT CLUB FIELD & SAFETY RULES 1) GENERAL REQUIREMENTS

Virtual Royal Air Force

General directions for navigation OPS019 v5

Casualty Incident Report

GAWLER AIRFIELD OPERATIONAL GUIDELINES

Schedule of Charges 2018

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

Port Handbook SANSOUCI PUERTO SANTO DOMINGO

Aerodrome Standards and Requirements Aeroplanes at or below 5700 kg MCTOW Non Air Transport Operations

Port of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010

LOW VISIBILITY OPERATION

MINISTRY OF TRANSPORT OF THE RUSSIAN FEDERATION. ORDER dated 11 th January 2011 No. 10

Corroded pipe causing oil spill

The Huizen Municipality Port Decree

PORT FEES AND CHARGES IN THE PORT OF LIEPAJA

Transcription:

TANJONG PAGAR/KEPPEL/BRANI TERMINALS BERTH DEPTH A/S (m) APPROACH DEPTH (m) T01 13.6 14.0 T02 13.6 14.5 T03 13.6 13.8 T04 11.0 9.7 T05 14.8 15.0 T06 13.6 14.2 REMARKS T07 12.4 12.6 Shallower depths exist North WM 10 T08 8.9 11.5 K9 11.0 11.1 K10 11.0 13.0 K11 14.2 15.0 K12 15.5 15.2 K13 13.8 15.1 K14 12.5 14.2 K15 11.0 12.5 K16 12.1 13.2 K17 10.8 13.2 High spot of 10.5m exists at WM 515 K18 12.0 12.0 K19 11.0 12.0 K20 10.0 10.0 K21 10.0 10.0 K22 10.1 10.0 K23 9.8 9.8 1

BERTH DEPTH A/S (m) APPROACH DEPTH (m) BO1 12.0 11.8 BO2 12.0 11.8 BO3 12.0 12.2 REMARKS BO4 15.0 15.0 See Note 1 & 2 BO5 14.7 14.8 See Note 1 & 2 BO6 14.7 15.0 See Note 1 & 2 BO7 14.6 15.0 See Note 1 & 2 BO8 14.4 15.0 See Note 1 & 2 BO9 12.4 12.0 See Note 3 Note 1: Note 2: Note 3: Note 4: Control depth on the starboard side of the East Keppel Fairway is 15.0m. High spot of 13.4m is located 028 x 450m off Seringat Beacon. BO9 - Tidal berth, program berthing to stem tide. The minimum number of mooring men required for un/berthing of vessels at Container Terminals is as follows: LOA (M) No. of men for berthing No. of men for unberthing <150 8 6 151 200 10 8 > 200 12 10 Note 5: Transit marks (light characteristics: Iso R 4s and Q R) are located at Brani Causeway to indicate the mid-channel leading to B01. BERTH CLEARANCES 2

The following berth clearances are applicable for berthing and unberthing vessels at PSA Container Terminals: a) DISTANCES TO ADJACENT VESSEL AT NON-TIDAL BERTH LOA OF VESSEL (m) DAY/NIGHT CLEARANCE (m) OVERALL CLEARANCE (m) 150 7 14 > 150-220 10 20 > 220-250 15 30 >250 20 40 b) DISTANCES TO DEAD END BERTH (NOT APPLICABLE TO RO-RO VESSEL USING RAMP) LOA OF VESSEL (m) DAY/NIGHT CLEARANCE (m) 150 15 >150-250 20 >250 25 Note: The bridge position indicator should be used, instead of the bow position indicator for all berths. 3

GUIDELINES FOR VESSEL BERTHING/UNBERTHING AT T08 1 Maximum LOA - 130m 2 Vessel > 80 metres - 2 tugs are recommended 3 Vessel can be berthed either port or starboard side to wharf 4 For a vessel with height > 30m but < 37m, and with K09 and T07 both occupied, only quay cranes/ship cranes at K09 will be required to boom up/swing in. Ship s cranes, if any at T07 will be required to swing in. 5 For a vessel with height > 37m and with K09 and T07 both occupied, all quay cranes/ship cranes will be required to boom up/swing in. 6 For a vessel with height < 30m and with K09 and T07 both occupied, only ship cranes will be required to swing in. 7 When only one vessel is berthed at K09 or T07, the quay cranes/ship cranes working over the vessel need not be boomed up. 8 There should only be one bunker barge alongside the vessel at K09 or T07 if both berths are occupied. 9 When there is a vessel berthed at T07 with a clearance of 25m to the corner of T07/T08, then there should be a clearance of at least 1L (the LOA of the vessel berthing at T08) at K09. 4

GUIDELINES FOR VESSEL BERTHING/UNBERTHING AT T07 AND K09 WITH T06 AND K10 BOTH OCCUPIED 1 All vessels berthing at T07 and K09 will have a clearance of 40m from the end corner. 2 For a vessel with a height >37m berthing/unberthing at T07, only quay cranes/ship cranes working over vessel at T06 at wharfmark 400 towards T07 ( a line drawn perpendicular from T06 to the corner of K10/K11 ) will be required to be boomed up/swung in. 3 When a vessel is required to berth with a clearance of 25m from the corner of T07/T08, there should be no vessel alongside T08. 4 When unberthing vessel at T07 with a clearance of 25m from the corner of T07/T08, all quay cranes/ship cranes (if any) at T08 to be boomed up/swung in. 5 For a vessel with height > 30m berthing/unberthing at K09, all quay cranes/ship cranes working over the vessel at K10 are to be boomed up/swung in. 5

BERTHING AND UNBERTHING PROCEDURES S/N PROCEDURES FOR BERTHING ACTION BY 1 s are to check that the vessel s whistle is in working order. 2 Prior to granting berthing clearance, MSCC will inform Shift Duty Manager (SDM) to make the necessary arrangement for berthing. to confirm tug requirements with TDS team 3 After berthing clearance has been granted by POCC, pilots will contact the Wharf Supervisor (WS) on the VHF handset at least 15 minutes prior to the vessel s arrival at the berth. to check bridge bow distances and confirm side to wharf. 4 The WS, in the meantime will ensure : Placement of bridge marker Quay Cranes to be positioned appropriately and boomed up Sufficient mooring men available and other arrangements for the vessel s safe berthing MSCC SDM WS 5 WS to report to pilot that berth is ready for berthing. WS 6 In the event when the pilot receives no response over the VHF handset from the WS, he will contact MSCC for assistance. 7 MSCC will then alert the respective SDM to have the WS to respond to pilot. MSCC SDM 8 After contacting pilot, WS reports to SDM WS PROCEDURES FOR UNBERTHING 1 s are to check that the vessel s whistle is in working order. 2 s will contact WS for the unberthing operation. 3 After a vessel is unberthed, the WS would confirm that they can break off radio contact and leave the wharf for other duties. This is to ensure that the departing vessel is safely cleared from her berth and the adjacent WS S/N POSTIONING OF QUAY CRANES (QC) ACTION BY 1 SDM shall ensure that Quay cranes not working over any vessel must be SDM boomed up during un/berthing operations in the area. 2 QC at the allocated berth where a vessel is to be un/berthed must be boomed up. The positioning of the QC are to be carried out in the following order of priority: i) All QC to be positioned at least 30m away from the bow and stern, i.e. outside the vessel s wharfmarks; or ii) All QC to be position at amidships; or iii) s to be informed if (i) and (ii) above could not be met. If required, pilot may order additional tug to assist in un/berthing. iv) Master/ could request that selective cranes be boomed up due SDM 6

to inclement weather conditions, strong winds, vessels with poor manoeuvring qualities or cranes which detrimentally affect the angle of approach/departure of the vessel. v) SDM to notify MSCC and pilot of any QC which cannot be boomed up or under repair with the boom down. In the event of breakdown the Emergency Procedures would be initiated. The safety distance from the boom down QC would be generally be as follows: i) for vessels having to pass the QC - 100m ii) for vessels which do not have to pass the QC (i.e. QC ahead or astern and away from the direction of the movement of the vessel) - 50 metres. SDM/WS/ vi) During berthing operations, QC should not be lowered until vessels are properly secured to the wharfmarks and in position with 3 lines and a spring at each end. If this practice is not being observed pilots are to inform WS immediately and on returning to the office, inform the Office for follow-up action. Office S/N EMERGENCY PROCEDURES ACTION BY 1 Container Equipment Specialist (CES) should keep a sharp lookout and boom up their respective cranes should they observe that a vessel is closing in towards them and creating a dangerous situation. CES 2 In an emergency, Master/ would sound the vessel s whistle comprising one prolonged blast followed by two short blast ( -.. ) to alert the crane operator to take evasive action accordingly. WS should also be informed that the vessel is experiencing an emergency ( the times of the sounding the signal and informing the Berthing supervisor should be logged in the vessel s log book). WS 7

GENERAL GUIDELINES FOR TOWING OF VESSELS TO AND FROM TANJONG PAGAR, KEPPEL, MARINA AND BRANI TERMINALS. a) These guidelines apply to vessel that has to be towed to/from from Marina wharves Tanjong Pagar, Brani and Keppel Container Terminals. For berthing of vessels: b) For vessels with LOA > 150m, such vessels will only be programmed to berth at the following berth: T02 and T03 T05 and T06 K12 B8 and B7 c) For vessels with LOA 150m, the vessels may be berthed at inner berths (e.g. K13 - K24, B02 - B04 etc.) but these should be done only if the outer berths (i.e. para. B) are not available. d) For all un/berthing movements, the overall clearances should be as follows: VESSEL S LOA (m) 150 40 > 150-200 60 > 200 250 80 >250 100 OVERALL CLEARANCE (m) e) There will be no berthing of such vessels at dead-end berths such as T01, T07, T08, K09, K23, B01 etc. f) Quay cranes at the adjacent berths may be required to be boomed up. g) When conducting the above movements, the number of tugs required would depend on the size of the vessel. h) Towing shall be programmed so that the vessel under tow will transit East Keppel Fairway at tidal strength not exceeding 1.0 knot (Buran Darat prediction). For vessels > 200m, the tidal strength should be 0.5 knot. Revised: 5 Mar 2009 8